WisDOT contract 20250114006 bid tabulation
3700-10-64. Let by Wisconsin DOT on January 14, 2025, La Crosse. 2 bids received; low bid $10,670,188 by Chippewa Concrete Services, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 206
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chippewa Concrete Services, Inc. | $10,670,188 | Low |
| 2 | Zignego Company, Inc. | $12,940,797 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chippewa Concrete Services, Inc. | 2. Zignego Company, Inc. |
|---|---|---|---|---|---|
| 1 | Debris containment (structure) 01. B-32-111 (203.0330) | EACH | 1 | $50,000 | $50,000 |
| 2 | Debris containment (structure) 02. B-32-115 (203.0330) | EACH | 1 | $50,000 | $50,000 |
| 3 | Debris containment over waterway (structure) 01. B-32-111 (203.0335) | EACH | 1 | $1.00 | $1.00 |
| 4 | Debris containment over waterway (structure) 02. B-32-115 (203.0335) | EACH | 1 | $1.00 | $1.00 |
| 5 | Removing concrete pavement (204.0100) | SY | 450 | $13.56 | $13.56 |
| 6 | Removing concrete pavement butt joints (204.0105) | SY | 101 | $15.88 | $15.88 |
| 7 | Removing concrete surface partial depth (204.0109.S) | SF | 45,242 | $0.66 | $0.66 |
| 8 | Removing asphaltic surface (204.0110) | SY | 140 | $8.58 | $8.58 |
| 9 | Removing asphaltic surface butt joints (204.0115) | SY | 428 | $10.87 | $10.87 |
| 10 | Removing asphaltic surface milling (204.0120) | SY | 105,597 | $4.63 | $4.63 |
| 11 | Removing curb & gutter (204.0150) | LF | 9,364 | $2.77 | $2.77 |
| 12 | Removing concrete sidewalk (204.0155) | SY | 788 | $7.19 | $7.19 |
| 13 | Removing guardrail (204.0165) | LF | 151 | $5.00 | $5.00 |
| 14 | Removing concrete bases (204.0195) | EACH | 20 | $315.15 | $315.15 |
| 15 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 156 | $13.79 | $13.79 |
| 16 | Removing storm sewer (size) 02. 18-inch (204.0245) | LF | 40 | $17.93 | $17.93 |
| 17 | Excavation common (205.0100) | CY | 1,626 | $15.81 | $15.81 |
| 18 | Finishing roadway (project) 01. 3700-10-64 (213.0100) | EACH | 1 | $2,500.00 | $1.00 |
| 19 | Finishing roadway (project) 02. 7575-01-76 (213.0100) | EACH | 1 | $7,500.00 | $1.00 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,276 | $21.53 | $21.53 |
| 21 | Removing pavement for base patching (390.0100) | CY | 3,265 | $205.39 | $90.00 |
| 22 | Base patching concrete hes (390.0305) | CY | 868 | $324.11 | $312.00 |
| 23 | Base patching concrete shes (390.0405) | CY | 2,397 | $324.11 | $402.00 |
| 24 | Concrete pavement 9-inch (415.0090) | SY | 63 | $82.57 | $100.00 |
| 25 | Concrete pavement hes 9-inch (415.1090) | SY | 357 | $84.02 | $110.00 |
| 26 | Drilled tie bars (416.0610) | EACH | 4,536 | $15.48 | $5.00 |
| 27 | Drilled dowel bars (416.0620) | EACH | 5,180 | $18.19 | $30.00 |
| 28 | Tack coat (455.0605) | GAL | 7,628 | $4.80 | $4.80 |
| 29 | Incentive density HMA pavement (460.2000) | DOL | 6,840 | $1.00 | $1.00 |
| 30 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 10,678 | $114.80 | $114.80 |
| 31 | Asphaltic surface (465.0105) | TON | 28 | $273.33 | $273.33 |
| 32 | Asphaltic surface temporary (465.0125) | TON | 312 | $119.20 | $119.20 |
| 33 | Expansion device (502.3101) | LF | 520 | $230.61 | $230.61 |
| 34 | Pigmented surface sealer reseal (502.3205) | SY | 1,352 | $20.00 | $20.00 |
| 35 | Adhesive anchors no. 5 bar (502.4205) | EACH | 128 | $30.00 | $30.00 |
| 36 | Bar steel reinforcement HS coated structures (505.0600) | LB | 22,130 | $2.33 | $2.33 |
| 37 | Structural steel carbon (506.0105) | LB | 1,250 | $60.00 | $60.00 |
| 38 | Bearing assemblies fixed (structure) 02. B-32-115 (506.5000) | EACH | 7 | $25,000 | $25,000 |
| 39 | Bearing assemblies expansion (structure) 01. B-32-111 (506.6000) | EACH | 7 | $3,500.00 | $3,500.00 |
| 40 | Bearing assemblies expansion (structure) 02. B-32-115 (506.6000) | EACH | 5 | $25,000 | $25,000 |
| 41 | Removing bearings (structure) 01. B-32-111 (506.7050.S) | EACH | 7 | $2,250.00 | $2,250.00 |
| 42 | Removing bearings (structure) 02. B-32-115 (506.7050.S) | EACH | 12 | $6,000.00 | $6,000.00 |
| 43 | Preparation decks type 1 (509.0301) | SY | 125 | $310.00 | $310.00 |
| 44 | Preparation decks type 2 (509.0302) | SY | 65 | $425.00 | $425.00 |
| 45 | Sawing pavement deck preparation areas (509.0310.S) | LF | 1,050 | $5.00 | $5.00 |
| 46 | Cleaning decks (509.0500) | SY | 5,780 | $12.12 | $12.12 |
| 47 | Joint repair (509.1000) | SY | 150 | $2,000.00 | $2,000.00 |
| 48 | Concrete surface repair (509.1500) | SF | 145 | $275.00 | $275.00 |
| 49 | Full-depth deck repair (509.2000) | SY | 50 | $1,150.00 | $1,150.00 |
| 50 | Concrete masonry deck repair (509.2100.S) | CY | 252 | $1.00 | $1.00 |
| 51 | HMA overlay polymer-modified (509.3500.S) | TON | 790 | $580.43 | $580.43 |
| 52 | Structure repainting recycled abrasive (structure) 01. B-32-111 (517.1801.S) | EACH | 1 | $450,000 | $450,000 |
| 53 | Structure repainting recycled abrasive (structure) 02. B-32-115 (517.1801.S) | EACH | 1 | $550,000 | $550,000 |
| 54 | Negative pressure containment and collection of waste materials (structure) 01. B-32-111 (517.4501.S) | EACH | 1 | $120,000 | $120,000 |
| 55 | Negative pressure containment and collection of waste materials (structure) 02. B-32-115 (517.4501.S) | EACH | 1 | $150,000 | $150,000 |
| 56 | Portable decontamination facility (517.6001.S) | EACH | 2 | $1,000.00 | $1,000.00 |
| 57 | Concrete collars for pipe (520.8000) | EACH | 40 | $828.84 | $828.84 |
| 58 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 107 | $69.56 | $55.00 |
| 59 | Concrete curb & gutter 30-inch type K (601.0417) | LF | 4,270 | $69.56 | $55.00 |
| 60 | Concrete sidewalk 5-inch (602.0410) | SF | 1,441 | $19.33 | $17.00 |
| 61 | Curb ramp detectable warning field natural patina (602.0515) | SF | 170 | $60.38 | $50.00 |
| 62 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 393 | $68.90 | $75.00 |
| 63 | Riprap light (606.0100) | CY | 17 | $122.60 | $122.60 |
| 64 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 156 | $181.29 | $181.29 |
| 65 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 40 | $155.08 | $155.08 |
| 66 | Reconstructing inlets (611.0430) | EACH | 128 | $1,034.53 | $1,034.53 |
| 67 | Inlet covers type B (611.0606) | EACH | 16 | $1,191.71 | $1,217.12 |
| 68 | Inlet covers type H (611.0624) | EACH | 21 | $1,074.07 | $1,096.01 |
| 69 | Inlets 4-FT diameter (611.3004) | EACH | 2 | $3,822.83 | $3,822.83 |
| 70 | Inlets 2X2-FT (611.3220) | EACH | 11 | $2,540.13 | $2,540.13 |
| 71 | Inlets 2X3-FT (611.3230) | EACH | 14 | $2,622.52 | $2,622.52 |
| 72 | Adjusting manhole covers (611.8110) | EACH | 1 | $523.78 | $523.78 |
| 73 | Cover plates temporary (611.8120.S) | EACH | 2 | $546.90 | $546.90 |
| 74 | Salvaged manhole covers (611.9705) | EACH | 2 | $699.66 | $699.66 |
| 75 | Salvaged inlet covers (611.9710) | EACH | 3 | $805.06 | $805.06 |
| 76 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 1 | $3,533.00 | $3,533.00 |
| 77 | MGS guardrail temporary thrie beam transition (614.1100) | LF | 39.40 | $95.00 | $95.00 |
| 78 | MGS guardrail temporary terminal eat (614.1200) | EACH | 1 | $3,533.00 | $3,533.00 |
| 79 | MGS guardrail 3 (614.2300) | LF | 25 | $35.00 | $35.00 |
| 80 | MGS thrie beam transition (614.2500) | LF | 39.40 | $95.00 | $95.00 |
| 81 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $3,533.00 | $3,533.00 |
| 82 | Mobilization (619.1000) | EACH | 1 | $765,339 | $3,191,000 |
| 83 | Water (624.0100) | MGAL | 21 | $38.36 | $38.36 |
| 84 | Topsoil (625.0100) | SY | 1,919 | $12.39 | $12.39 |
| 85 | Salvaged topsoil (625.0500) | SY | 4,577 | $6.61 | $6.61 |
| 86 | Mobilizations erosion control (628.1905) | EACH | 5 | $213.00 | $213.00 |
| 87 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $253.00 | $253.00 |
| 88 | Erosion mat urban class I type A (628.2006) | SY | 14 | $5.00 | $5.00 |
| 89 | Erosion mat urban class I type B (628.2008) | SY | 6,496 | $2.75 | $2.75 |
| 90 | Inlet protection type C (628.7015) | EACH | 260 | $30.00 | $30.00 |
| 91 | Fertilizer type B (629.0210) | CWT | 5.80 | $100.00 | $100.00 |
| 92 | Seeding mixture no. 40 (630.0140) | LB | 122 | $12.00 | $12.00 |
| 93 | Seeding temporary (630.0200) | LB | 179 | $6.00 | $6.00 |
| 94 | Seed water (630.0500) | MGAL | 148 | $5.00 | $5.00 |
| 95 | Signs type II reflective H (637.2210) | SF | 15 | $30.00 | $30.00 |
| 96 | Moving signs type II (638.2102) | EACH | 10 | $150.00 | $150.00 |
| 97 | Removing signs type II (638.2602) | EACH | 5 | $50.00 | $50.00 |
| 98 | Traffic control drums (643.0300) | DAY | 30,757 | $0.19 | $0.19 |
| 99 | Traffic control barricades type III (643.0420) | DAY | 5,697 | $0.59 | $0.59 |
| 100 | Traffic control channelizing curb system (643.0650) | LF | 263 | $6.87 | $6.87 |
| 101 | Traffic control warning lights type A (643.0705) | DAY | 8,498 | $0.19 | $0.19 |
| 102 | Traffic control warning lights type C (643.0715) | DAY | 8,579 | $0.19 | $0.19 |
| 103 | Traffic control arrow boards (643.0800) | DAY | 303 | $8.67 | $8.67 |
| 104 | Traffic control signs (643.0900) | DAY | 30,533 | $0.27 | $0.27 |
| 105 | Traffic control covering signs type II (643.0920) | EACH | 69 | $35.35 | $35.35 |
| 106 | Traffic control signs PCMS (643.1050) | DAY | 662 | $27.00 | $27.00 |
| 107 | Traffic control cones 42-inch (643.1070) | DAY | 3,922 | $0.18 | $0.18 |
| 108 | Temporary marking line paint 6- inch (643.3165) | LF | 15,752 | $0.22 | $0.22 |
| 109 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,330 | $1.56 | $1.56 |
| 110 | Temporary marking line paint 10- inch (643.3265) | LF | 1,807 | $0.37 | $0.37 |
| 111 | Temporary marking arrow removable tape (643.3550) | EACH | 8 | $236.84 | $236.84 |
| 112 | Temporary marking word removable tape (643.3650) | EACH | 2 | $433.74 | $433.74 |
| 113 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 286 | $1.96 | $1.96 |
| 114 | Temporary marking removable mask out tape 10-inch (643.3970) | LF | 844 | $4.96 | $4.96 |
| 115 | Traffic control interim lane closure (643.4100) | EACH | 128 | $266.03 | $266.03 |
| 116 | Traffic control (643.5000) | EACH | 1 | $90,449 | $90,449 |
| 117 | Temporary pedestrian surface plate (644.1430) | SF | 3,054 | $6.18 | $10.00 |
| 118 | Temporary pedestrian curb ramp (644.1601) | DAY | 100 | $17.09 | $10.00 |
| 119 | Temporary pedestrian detectable warning field (644.1605) | SF | 50 | $28.24 | $100.00 |
| 120 | Temporary pedestrian barricade (644.1810) | LF | 2,765 | $5.64 | $5.64 |
| 121 | Marking line epoxy 4-inch (646.1020) | LF | 560 | $0.41 | $0.95 |
| 122 | Marking line epoxy 6-inch (646.2020) | LF | 6,449 | $0.53 | $1.20 |
| 123 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 81,611 | $1.44 | $1.60 |
| 124 | Marking line epoxy 8-inch (646.3020) | LF | 554 | $1.04 | $1.85 |
| 125 | Marking line epoxy 10-inch (646.4020) | LF | 476 | $1.14 | $2.20 |
| 126 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 4,625 | $2.97 | $2.85 |
| 127 | Marking arrow epoxy (646.5020) | EACH | 86 | $346.68 | $300.00 |
| 128 | Marking word epoxy (646.5120) | EACH | 16 | $398.32 | $340.00 |
| 129 | Marking stop line epoxy 12-inch (646.6020) | LF | 17 | $14.16 | $10.50 |
| 130 | Marking stop line epoxy 18-inch (646.6120) | LF | 775 | $14.75 | $15.00 |
| 131 | Marking chevron epoxy 24-inch (646.7220) | LF | 24 | $23.91 | $16.00 |
| 132 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,873 | $13.70 | $13.50 |
| 133 | Marking curb epoxy (646.8120) | LF | 808 | $6.96 | $7.00 |
| 134 | Marking island nose epoxy (646.8220) | EACH | 26 | $273.32 | $260.00 |
| 135 | Construction staking resurfacing reference (650.8000) | LF | 32,349 | $0.08 | $0.08 |
| 136 | Construction staking electrical installations (project) 01. 3700-10- 64 (650.8501) | EACH | 1 | $2,000.00 | $2,000.00 |
| 137 | Construction staking curb ramps (650.9000) | EACH | 26 | $10.00 | $10.00 |
| 138 | Construction staking sidewalk (project) 01. 3700-10-64 (650.9500) | EACH | 1 | $1,000.00 | $1,000.00 |
| 139 | Construction staking supplemental control (project) 01. 3700-10-64 (650.9911) | EACH | 1 | $2,200.00 | $2,200.00 |
| 140 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 75 | $10.30 | $10.30 |
| 141 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 408 | $12.70 | $12.70 |
| 142 | Conduit special 2-inch (652.0605) | LF | 317 | $16.88 | $16.88 |
| 143 | Conduit special 3-inch (652.0615) | LF | 1,018 | $19.70 | $19.70 |
| 144 | Conduit loop detector (652.0800) | LF | 196 | $9.51 | $9.51 |
| 145 | Pull boxes steel 24X42-inch (653.0140) | EACH | 16 | $1,162.75 | $1,162.75 |
| 146 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 1 | $1,943.34 | $1,943.34 |
| 147 | Removing pull boxes (653.0905) | EACH | 14 | $176.12 | $176.12 |
| 148 | Concrete bases type 1 (654.0101) | EACH | 9 | $847.32 | $847.32 |
| 149 | Concrete bases type 10 (654.0110) | EACH | 2 | $10,488 | $10,488 |
| 150 | Concrete bases type 10-special (654.0120) | EACH | 2 | $14,457 | $14,457 |
| 151 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $1,294.88 | $1,294.88 |
| 152 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,802 | $1.63 | $1.63 |
| 153 | Cable traffic signal 7-14 AWG (655.0240) | LF | 718 | $2.14 | $2.14 |
| 154 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,605 | $3.39 | $3.39 |
| 155 | Cable traffic signal 15-14 AWG (655.0270) | LF | 51 | $4.21 | $4.21 |
| 156 | Cable traffic signal 21-14 AWG (655.0290) | LF | 653 | $5.11 | $5.11 |
| 157 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 782 | $1.88 | $1.88 |
| 158 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,174 | $1.06 | $1.06 |
| 159 | Electrical wire lighting 10 AWG (655.0615) | LF | 576 | $1.14 | $1.14 |
| 160 | Loop detector lead in cable (655.0700) | LF | 587 | $1.21 | $1.21 |
| 161 | Loop detector wire (655.0800) | LF | 608 | $1.10 | $1.10 |
| 162 | Traffic signal evp detector cable (655.0900) | LF | 389 | $1.47 | $1.47 |
| 163 | Electrical service meter breaker pedestal (location) 01. STH 16, LA crosse ST, & losey boulevard (656.0201) | EACH | 1 | $2,252.11 | $2,252.11 |
| 164 | Pedestal bases (657.0100) | EACH | 7 | $429.85 | $429.85 |
| 165 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $1,278.49 | $1,278.49 |
| 166 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 5 | $1,374.61 | $1,374.61 |
| 167 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $914.93 | $914.93 |
| 168 | Traffic signal face 4S 12-inch (658.0174) | EACH | 4 | $1,153.49 | $1,153.49 |
| 169 | Traffic signal face 5S 12-inch (658.0175) | EACH | 4 | $1,399.08 | $1,399.08 |
| 170 | Pedestrian signal face 16-inch (658.0416) | EACH | 12 | $614.46 | $614.46 |
| 171 | Signal mounting hardware (location) 01. STH 16, LA crosse ST, & losey boulevard (658.5070) | EACH | 1 | $6,953.20 | $6,953.20 |
| 172 | Luminaires utility LED C (659.1125) | EACH | 4 | $511.70 | $511.70 |
| 173 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 36 | $24.61 | $24.61 |
| 174 | Temporary traffic signals for intersections (location) 01. LA crosse ST (661.0201) | EACH | 1 | $85,395 | $85,395 |
| 175 | Temporary traffic signals for intersections (location) 02. STH 16 & conoco RD/CTH B (661.0201) | EACH | 1 | $21,469 | $21,469 |
| 176 | Generators (661.0300) | DAY | 2 | $1,556.50 | $1,556.50 |
| 177 | Sawing asphalt (690.0150) | LF | 1,635 | $1.75 | $1.75 |
| 178 | Sawing concrete (690.0250) | LF | 57,668 | $2.25 | $2.25 |
| 179 | Incentive iri ride (740.0440) | DOL | 24,888 | $1.00 | $1.00 |
| 180 | Railroad flagging reimbursement (801.0117) | DOL | 12,600 | $1.00 | $1.00 |
| 181 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 182 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 183 | Special 01. storm sewer mortar work (SPV.0060) | EACH | 70 | $1,260.77 | $1,260.77 |
| 184 | Special 02. inlet covers flat temporary (SPV.0060) | EACH | 3 | $1,206.40 | $1,231.81 |
| 185 | Special 03. remove and reinstall traffic signal standard (SPV.0060) | EACH | 1 | $911.66 | $911.66 |
| 186 | Special 20. posts steel U-channel 14-FT (SPV.0060) | EACH | 3 | $400.00 | $400.00 |
| 187 | Special 21. install V-loc post anchors (SPV.0060) | EACH | 3 | $400.00 | $400.00 |
| 188 | Special 23. remove and salvage traffic signals (SPV.0060) | EACH | 1 | $7,009.67 | $7,009.67 |
| 189 | Special 24. transport and install poles type 10 (SPV.0060) | EACH | 2 | $2,255.50 | $2,255.50 |
| 190 | Special 25. transport and install poles type 10 special (SPV.0060) | EACH | 2 | $2,255.50 | $2,255.50 |
| 191 | Special 26. transport and install monotube arms 25-FT (SPV.0060) | EACH | 1 | $1,432.91 | $1,432.91 |
| 192 | Special 27. transport and install monotube arms 30-FT (SPV.0060) | EACH | 1 | $1,606.67 | $1,606.67 |
| 193 | Special 28. transport and install monotube arms 35-FT special (SPV.0060) | EACH | 2 | $1,780.42 | $1,780.42 |
| 194 | Special 29. transport and install luminaire arms steel 15-FT (SPV.0060) | EACH | 4 | $143.41 | $143.41 |
| 195 | Special 30. transport and install traffic signal cabinet (SPV.0060) | EACH | 1 | $1,480.61 | $1,480.61 |
| 196 | Special 31. remove, salvage, and reinstall video detection system (SPV.0060) | EACH | 1 | $1,133.10 | $1,133.10 |
| 197 | Special 32. remove, salvage and reinstall evp equipment (SPV.0060) | EACH | 1 | $2,175.61 | $2,175.61 |
| 198 | Special 33. disconnect, salvage & reinstall traffic signal interconnect (SPV.0060) | EACH | 1 | $923.58 | $923.58 |
| 199 | Special 34. transport & install audible pedestrian push button system (SPV.0060) | EACH | 1 | $1,468.68 | $1,468.68 |
| 200 | Special 01. concrete gutter 24-inch shes (SPV.0090) | LF | 2,214 | $71.02 | $72.00 |
| 201 | Special 02. concrete curb & gutter 30-inch type K shes (SPV.0090) | LF | 4,799 | $72.46 | $72.00 |
| 202 | Special 03.concrete curb pedestrian shes (SPV.0090) | LF | 188 | $35.29 | $72.00 |
| 203 | Special 04. concrete joint and crack cleaning (SPV.0090) | LF | 38,138 | $8.15 | $8.15 |
| 204 | Special 05. concrete longitudinal joint repair (SPV.0090) | LF | 4,082 | $39.52 | $55.00 |
| 205 | Special 20. marking crosswalk epoxy transverse line 12-inch (SPV.0090) | LF | 139 | $14.16 | $14.75 |
| 206 | Special 01. concrete sidewalk 5- inch shes (SPV.0165) | SF | 6,306 | $20.01 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.