WisDOT contract 20250114045 bid tabulation

C New Berlin Moorland Road; CTH Es to CTH D (CTH O, Waukesha County C New Berlin, Mooreland Rd). Let by Wisconsin DOT on January 14, 2025, Waukesha. 8 bids received; low bid $8,340,785 by Hoffman Construction Company.

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
224
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hoffman Construction Company$8,340,785Low
2Zignego Company, Inc.$8,444,961+1.0%
3Musson Bros., Inc.$8,513,335+2.0%
4Stark Pavement Corporation$8,537,649+2.0%
5Lalonde Contractors Incorporated$8,746,241+5.0%
6Vinton Construction Company$8,796,378+5.0%
7Michels Road & Stone, Inc.$9,129,591+9.0%
8James Peterson Sons, Inc.$9,265,290+11%
WisDOT contract 20250114045: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hoffman Construction Company2. Zignego Company, Inc.3. Musson Bros., Inc.4. Stark Pavement Corporation5. Lalonde Contractors Incorporated6. Vinton Construction Company
1Clearing (201.0105)STA9$850.00$800.00$850.00$858.50$400.00$850.00
2Clearing (201.0120)ID246$50.00$25.00$50.00$50.50$33.00$50.00
3Grubbing (201.0205)STA9$200.00$400.00$200.00$202.00$140.00$200.00
4Grubbing (201.0220)ID246$10.00$20.00$10.00$10.10$4.00$10.00
5Removing concrete pavement (204.0100)SY54,322$5.00$5.00$2.20$2.20$4.45$1.00
6Removing curb & gutter (204.0150)LF1,290$5.00$5.00$3.30$3.30$5.58$6.50
7Removing concrete sidewalk (204.0155)SY488$10.00$10.00$3.10$3.10$7.72$9.00
8Removing concrete bases (204.0195)EACH14$304.68$200.00$166.00$304.68$304.68$304.68
9Removing manholes (204.0210)EACH13$500.00$500.00$1,161.00$505.00$575.00$515.00
10Removing inlets (204.0220)EACH56$500.00$500.00$916.00$404.00$375.00$335.00
11Removing storm sewer (size) 01. 12-inch (204.0245)LF1,483$12.00$12.00$23.00$10.10$19.00$10.70
12Removing storm sewer (size) 02. 15-inch (204.0245)LF448$12.00$12.00$22.00$12.12$19.00$10.70
13Removing storm sewer (size) 03. 18-inch (204.0245)LF253$12.00$12.00$22.00$14.14$20.00$12.60
14Removing storm sewer (size) 05. 24-inch (204.0245)LF99$16.00$16.00$22.00$20.20$22.00$16.00
15Removing storm sewer (size) 06. 27-inch (204.0245)LF442$16.00$16.00$22.00$23.23$25.00$16.25
16Removing storm sewer (size) 07. 30-inch (204.0245)LF283$16.00$16.00$22.00$25.25$30.00$16.75
17Removing (item description) 01.traffic signals ( CTH O (S moorland RD) & W ryerson RD) (204.9060.S)EACH1$5,559.84$5,559.84$5,559.84$5,559.84$5,559.84$5,559.84
18Removing (item description) 02.traffic signals ( CTH O (S moorland RD) & W coffee RD) (204.9060.S)EACH1$3,790.80$3,790.80$3,790.80$3,790.80$3,790.80$3,790.80
19Removing (item description) 01. landscaping bricks (204.9090.S)LF20$20.00$50.00$25.50$50.00$9.00$9.00
20Excavation common (205.0100)CY43,086$0.01$0.01$13.00$13.00$14.84$22.03
21Backfill structure type B (210.2100)CY48$50.00$50.00$47.50$47.50$38.00$60.00
22Finishing roadway (project) 01. 2722-08-71 (213.0100)EACH1$100.00$1,000.00$500.00$30,000$3,000.00$6,000.00
23Base aggregate dense 1 1/4-inch (305.0120)TON23,235$0.01$0.01$11.50$11.50$20.73$13.11
24Base aggregate open-graded (310.0110)TON82$25.00$25.00$14.50$59.59$24.00$42.35
25Select crushed material (312.0110)TON20,682$0.01$0.01$18.50$18.50$16.29$20.05
26Coloring concrete custom (405.0200)CY40$144.62$223.36$144.62$250.00$116.66$130.00
27Stamping colored concrete (405.1000)CY40$703.49$269.56$703.49$430.00$281.96$300.00
28Concrete pavement 10 1/2-inch (415.0105)SY46,987$59.27$63.84$59.27$61.40$63.03$61.69
29Concrete pavement hes 10 1/2- inch (415.1105)SY4,423$87.90$76.00$87.90$69.75$80.41$65.69
30Drilled tie bars (416.0610)EACH90$9.69$30.00$9.69$13.50$12.70$10.00
31Drilled dowel bars (416.0620)EACH120$13.29$30.00$13.29$17.00$16.55$18.00
32Tack coat (455.0605)GAL80$2.50$4.00$4.00$10.00$4.00$4.00
33HMA pavement 4 LT 58-28 S (460.5224)TON81$445.00$216.00$216.00$400.00$216.00$216.00
34HMA pavement 3 MT 58-28 S (460.6223)TON96$255.00$186.00$186.00$385.00$186.00$186.00
35HMA pavement 4 MT 58-28 S (460.6224)TON60$255.00$259.00$259.00$410.00$259.00$259.00
36Asphaltic surface driveways and field entrances (465.0120)TON96$445.00$245.00$245.00$375.00$245.00$245.00
37Asphaltic surface temporary (465.0125)TON513$109.00$126.00$126.00$115.00$126.00$126.00
38Cold patch (495.1000.S)TON50$0.01$100.00$37.50$450.00$273.30$300.00
39Sheet membrane waterproofing for buried structures (516.0610.S)SY310$45.00$80.00$80.00$123.00$73.00$80.00
40Concrete collars for pipe (520.8000)EACH15$1,000.00$1,000.00$958.00$353.50$838.00$950.00
41Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$1,500.00$1,500.00$1,435.00$1,666.50$1,064.00$965.00
42Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH2$1,600.00$1,600.00$1,470.00$1,709.93$1,491.00$1,085.00
43Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH2$1,700.00$1,700.00$1,494.00$1,826.08$1,550.00$1,290.00
44Concrete curb & gutter 18-inch type A (601.0405)LF44$112.70$33.96$112.70$55.00$40.17$65.00
45Concrete curb & gutter 30-inch type A (601.0409)LF22,209$15.23$20.71$15.23$21.00$22.56$25.00
46Concrete curb & gutter 30-inch type D (601.0411)LF33$16.32$68.45$16.32$55.00$42.89$65.00
47Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF88$17.04$59.96$17.04$55.00$43.77$65.00
48Concrete curb & gutter integral 30- inch type D (601.0452)LF1,126$19.54$22.00$19.54$30.00$16.75$25.00
49Concrete curb pedestrian (601.0600)LF88$101.53$64.48$101.53$42.00$48.32$44.00
50Concrete sidewalk 5-inch (602.0410)SF10,035$7.48$8.38$7.48$6.50$7.50$10.50
51Curb ramp detectable warning field yellow (602.0505)SF140$52.87$31.09$52.87$50.00$41.15$45.00
52Concrete driveway 7-inch (602.0815)SY368$69.26$95.08$69.26$70.00$70.16$55.00
53Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF1,409$68.00$68.00$119.00$83.83$87.00$98.75
54Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF544$70.00$70.00$103.00$101.00$92.00$112.35
55Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF684$72.00$72.00$98.00$102.01$117.00$115.00
56Storm sewer pipe reinforced concrete class III 21-inch (608.0321)LF380$84.00$84.00$125.00$136.35$142.00$148.00
57Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF49$90.00$90.00$144.00$146.45$163.00$194.80
58Storm sewer pipe reinforced concrete class III 27-inch (608.0327)LF442$120.00$120.00$158.00$163.62$173.00$172.90
59Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF283$130.00$133.00$157.00$184.83$225.00$185.30
60Manhole covers type J (611.0530)EACH2$800.00$800.00$793.00$777.70$550.00$516.00
61Inlet covers type H-S (611.0639)EACH59$1,000.00$1,000.00$919.00$1,004.95$800.00$695.00
62Inlet covers type MS-A (611.0645)EACH8$800.00$800.00$839.00$808.00$585.00$550.00
63Catch basins 4-FT diameter (611.1004)EACH5$3,000.00$3,000.00$3,862.00$3,761.24$5,700.00$5,135.00
64Catch basins 5-FT diameter (611.1005)EACH6$6,200.00$6,200.00$5,812.00$6,128.68$8,150.00$6,885.00
65Catch basins 6-FT diameter (611.1006)EACH1$10,000$10,000$11,527$9,015.26$12,600$9,895.00
66Manholes 4-FT diameter (611.2004)EACH2$2,500.00$2,500.00$4,997.00$3,665.29$5,690.00$4,575.00
67Inlets 2X3-FT (611.3230)EACH55$2,000.00$2,000.00$2,237.00$2,788.61$2,112.00$2,950.00
68Adjusting manhole covers (611.8110)EACH10$400.00$400.00$728.00$809.01$895.00$550.00
69Adjusting inlet covers (611.8115)EACH21$400.00$400.00$728.00$809.01$895.00$500.00
70Cover plates temporary (611.8120.S)EACH7$400.00$400.00$454.00$353.50$250.00$520.00
71Salvaged manhole covers (611.9705)EACH7$500.00$500.00$366.00$454.50$250.00$565.00
72Salvaged inlet covers (611.9710)EACH21$500.00$500.00$261.00$454.50$250.00$565.00
73Pipe underdrain 6-inch (612.0106)LF830$25.00$25.00$29.00$33.33$35.00$22.10
74Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY76$75.00$75.00$10.00$21.21$14.00$28.00
75Maintenance and repair of haul roads (project) 01. 2722-08-71 (618.0100)EACH1$1.00$1.00$100.00$5,000.00$1.00$0.01
76Mobilization (619.1000)EACH1$1,775,157$1,609,000$735,000$520,428$278,915$409,000
77Concrete median sloped nose (620.0300)SF723$12.59$34.54$12.59$15.50$15.21$15.00
78Water (624.0100)MGAL320.10$0.01$0.01$0.01$0.01$54.40$0.01
79Topsoil (625.0100)SY26,383$5.00$5.00$2.60$2.60$6.42$3.42
80Mulching (627.0200)SY1,510$0.30$0.30$0.30$0.30$0.30$0.30
81Silt fence (628.1504)LF1,573$1.76$1.76$1.76$1.76$2.13$2.13
82Silt fence maintenance (628.1520)LF1,573$0.10$0.10$0.10$0.10$0.01$0.01
83Silt fence heavy duty (628.1530.S)LF244$13.00$13.00$13.00$13.00$13.00$13.00
84Silt fence heavy duty maintenance (628.1535.S)LF244$1.00$1.00$1.00$1.00$0.01$0.01
85Mobilizations erosion control (628.1905)EACH16$50.00$50.00$50.00$50.00$50.00$50.00
86Mobilizations emergency erosion control (628.1910)EACH9$50.00$50.00$50.00$50.00$25.00$25.00
87Inlet protection type A (628.7005)EACH94$60.00$60.00$60.00$60.00$50.00$50.00
88Inlet protection type B (628.7010)EACH3$95.00$95.00$95.00$95.00$50.00$50.00
89Inlet protection type C (628.7015)EACH4$95.00$95.00$95.00$95.00$50.00$50.00
90Inlet protection type D (628.7020)EACH123$95.00$95.00$95.00$95.00$120.00$120.00
91Temporary ditch checks (628.7504)LF20$15.00$15.00$15.00$15.00$8.00$8.00
92Culvert pipe checks (628.7555)EACH15$30.00$30.00$30.00$30.00$25.00$25.00
93Fertilizer type B (629.0210)CWT18$80.00$80.00$80.00$80.00$80.00$80.00
94Seeding mixture no. 40 (630.0140)LB30$15.00$15.00$15.00$15.00$13.00$13.00
95Seeding temporary (630.0200)LB40$10.00$10.00$10.00$10.00$3.00$3.00
96Seed water (630.0500)MGAL500$11.50$11.50$11.50$11.50$10.00$10.00
97Sod water (631.0300)MGAL647$40.00$40.00$40.00$40.00$10.00$10.00
98Sod lawn (631.1000)SY14,172$6.85$6.85$6.85$6.85$6.50$6.50
99Signs type II reflective H (637.2210)SF899.46$19.10$19.10$19.10$19.10$21.10$21.10
100Signs type II reflective H folding (637.2215)SF96.98$28.00$28.00$28.00$28.00$30.00$30.00
101Signs type II reflective F (637.2230)SF85$19.10$19.10$19.10$19.10$23.10$23.10
102Removing signs type II (638.2602)EACH120$30.00$30.00$30.00$30.00$13.00$13.00
103Removing small sign supports (638.3000)EACH63$30.00$30.00$30.00$30.00$13.00$13.00
104Field office type D (642.5401)EACH1$25,000$20,000$19,800$16,000$19,390$15,000
105Traffic control drums (643.0300)DAY85,043$0.07$0.12$0.12$0.12$0.12$0.12
106Traffic control barricades type III (643.0420)DAY9,796$0.20$0.68$0.68$0.68$0.68$0.68
107Traffic control flexible tubular marker posts (643.0500)EACH119$25.00$30.00$30.00$30.00$30.00$30.00
108Traffic control flexible tubular marker bases (643.0600)EACH119$5.00$4.00$4.00$4.00$4.00$4.00
109Traffic control warning lights type A (643.0705)DAY4,626$0.10$0.10$0.10$0.10$0.10$0.10
110Traffic control warning lights type C (643.0715)DAY8,585$0.10$0.10$0.10$0.10$0.10$0.10
111Traffic control arrow boards (643.0800)DAY642$5.00$8.00$8.00$8.00$8.00$8.00
112Traffic control signs (643.0900)DAY17,245$0.15$0.40$0.40$0.40$0.40$0.40
113Traffic control signs PCMS (643.1050)DAY70$30.00$25.00$25.00$25.00$25.00$25.00
114Temporary marking line paint 4- inch (643.3105)LF14,950$0.28$0.48$0.48$0.48$0.48$0.48
115Temporary marking line removable tape 4-inch (643.3150)LF15,451$1.35$0.78$0.78$0.78$0.78$0.78
116Temporary marking line paint 8- inch (643.3205)LF1,474$0.55$1.00$1.00$1.00$1.00$1.00
117Temporary marking line removable tape 8-inch (643.3250)LF1,035$2.70$1.65$1.65$1.65$1.65$1.65
118Traffic control (643.5000)EACH1$40,000$38,187$38,187$38,187$38,187$38,187
119Temporary pedestrian surface matting (644.1440)SF857$8.00$5.00$5.00$5.00$5.00$5.00
120Temporary pedestrian curb ramp (644.1601)DAY987$10.00$4.00$4.00$4.00$4.00$4.00
121Temporary pedestrian detectable warning field (644.1605)SF120$20.00$4.00$4.00$4.00$4.00$4.00
122Temporary pedestrian barricade (644.1810)LF528$7.50$3.50$3.50$3.50$3.50$3.50
123Geotextile type DF schedule A (645.0111)SY387$3.00$3.00$1.00$16.16$2.50$4.15
124Geogrid type SR (645.0220)SY8,334$2.00$2.00$2.20$2.20$1.78$2.75
125Marking line epoxy 4-inch (646.1020)LF25,138$0.80$0.80$0.80$0.40$0.80$0.80
126Marking line epoxy 6-inch (646.2020)LF75$1.00$1.00$1.00$0.50$1.00$1.00
127Marking line epoxy 8-inch (646.3020)LF4,293$1.35$1.35$1.35$0.93$1.35$1.35
128Marking arrow epoxy (646.5020)EACH39$225.00$225.00$225.00$306.64$225.00$225.00
129Marking word epoxy (646.5120)EACH6$250.00$250.00$250.00$352.38$250.00$250.00
130Marking symbol epoxy (646.5220)EACH1$350.00$350.00$350.00$297.00$350.00$350.00
131Marking stop line epoxy 18-inch (646.6120)LF488$12.00$12.00$12.00$13.05$12.00$12.00
132Marking diagonal epoxy 12-inch (646.7120)LF2,433$8.00$8.00$8.00$12.55$8.00$8.00
133Marking crosswalk epoxy transverse line 6-inch (646.7420)LF690$11.00$11.00$11.00$12.11$11.00$11.00
134Marking curb epoxy (646.8120)LF366$8.50$8.50$8.50$6.20$8.50$8.50
135Marking island nose epoxy (646.8220)EACH13$300.00$300.00$300.00$242.00$300.00$300.00
136Marking removal line 4-inch (646.9000)LF1,100$0.75$1.00$1.00$1.00$1.00$1.00
137Marking removal line 8-inch (646.9100)LF780$1.45$1.00$1.00$1.00$1.00$1.00
138Marking removal special marking (646.9300)EACH3$125.00$155.00$155.00$155.00$155.00$155.00
139Construction staking storm sewer (650.4000)EACH162$110.00$115.00$115.00$115.00$115.00$110.00
140Construction staking concrete pavement (650.7000)LF5,970$3.00$2.50$2.50$2.50$2.50$3.00
141Construction staking electrical installations (project) 01. 2722-08- 71 (650.8501)EACH1$5,000.00$4,000.00$4,000.00$4,000.00$4,000.00$5,000.00
142Construction staking curb ramps (650.9000)EACH14$130.00$135.00$135.00$135.00$135.00$130.00
143Construction staking sidewalk (project) 01. 2722-08-71 (650.9500)EACH1$800.00$2,000.00$2,000.00$2,000.00$2,000.00$800.00
144Construction staking supplemental control (project) 01. 2722-08-71 (650.9911)EACH1$4,000.00$3,000.00$3,000.00$3,000.00$3,000.00$4,000.00
145Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,898$8.90$8.90$8.90$8.90$8.90$8.90
146Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF7,898$10.35$10.35$10.35$10.35$10.35$10.35
147Conduit special 3-inch (652.0615)LF122$46.52$46.52$46.52$46.52$46.52$46.52
148Install conduit into existing item (652.0700.S)EACH6$408.29$408.29$408.29$408.29$408.29$408.29
149Pull boxes steel 24X42-inch (653.0140)EACH24$1,444.34$1,444.34$1,444.34$1,444.34$1,444.34$1,444.34
150Removing pull boxes (653.0905)EACH14$112.27$112.27$112.27$112.27$112.27$112.27
151Concrete bases type 1 (654.0101)EACH6$992.79$992.79$992.79$992.79$992.79$992.79
152Concrete bases type 2 (654.0102)EACH2$1,327.82$1,327.82$1,327.82$1,327.82$1,327.82$1,327.82
153Concrete bases type 5 (654.0105)EACH2$1,191.55$1,191.55$1,191.55$1,191.55$1,191.55$1,191.55
154Concrete bases type 10 (654.0110)EACH3$6,243.30$6,243.30$6,243.30$6,243.30$6,243.30$6,243.30
155Concrete bases type 10-special (654.0120)EACH2$7,959.15$7,959.15$7,959.15$7,959.15$7,959.15$7,959.15
156Concrete control cabinet bases type 9 special (654.0217)EACH1$2,511.95$2,511.95$2,511.95$2,511.95$2,511.95$2,511.95
157Cable traffic signal 3-14 AWG (655.0210)LF2,232$1.35$1.35$1.35$1.35$1.35$1.35
158Cable traffic signal 5-14 AWG (655.0230)LF1,052$1.62$1.62$1.62$1.62$1.62$1.62
159Cable traffic signal 7-14 AWG (655.0240)LF1,464$2.23$2.23$2.23$2.23$2.23$2.23
160Cable traffic signal 12-14 AWG (655.0260)LF4,432$3.31$3.31$3.31$3.31$3.31$3.31
161Cable traffic signal 19-12 AWG (655.0275)LF281$4.86$4.86$4.86$4.86$4.86$4.86
162Cable type UF 2-12 AWG grounded (655.0305)LF744$1.70$1.70$1.70$1.70$1.70$1.70
163Cable type UF 2-10 AWG grounded (655.0320)LF1,180$2.12$2.12$2.12$2.12$2.12$2.12
164Electrical wire traffic signals 10 AWG (655.0515)LF10,188$1.04$1.04$1.04$1.04$1.04$1.04
165Electrical wire lighting 12 AWG (655.0610)LF2,622$0.95$0.95$0.95$0.95$0.95$0.95
166Electrical wire lighting 6 AWG (655.0625)LF12,201$1.55$1.55$1.55$1.55$1.55$1.55
167Traffic signal evp detector cable (655.0900)LF2,232$1.20$1.20$1.20$1.20$1.20$1.20
168Electrical service meter breaker pedestal (location) 01. CTH O (S moorland RD) & W ryerson RD (656.0201)EACH1$1,316.17$1,316.17$1,316.17$1,316.17$1,316.17$1,316.17
169Pedestal bases (657.0100)EACH3$369.72$369.72$369.72$369.72$369.72$369.72
170Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH4$724.96$724.96$724.96$724.96$724.96$724.96
171Poles type 3 (657.0310)EACH2$3,336.41$3,336.41$3,336.41$3,336.41$3,336.41$3,336.41
172Poles type 5-aluminum (657.0322)EACH2$2,067.33$2,067.33$2,067.33$2,067.33$2,067.33$2,067.33
173Poles type 9 (657.0345)EACH1$8,176.02$8,176.02$8,176.02$8,176.02$8,176.02$8,176.02
174Poles type 9-special (657.0347)EACH2$10,597$10,597$10,597$10,597$10,597$10,597
175Poles type 10 (657.0350)EACH2$9,941.83$9,941.83$9,941.83$9,941.83$9,941.83$9,941.83
176Traffic signal standards aluminum 13-FT (657.0420)EACH2$886.24$886.24$886.24$886.24$886.24$886.24
177Traffic signal standards aluminum 15-FT (657.0425)EACH7$1,015.59$1,015.59$1,015.59$1,015.59$1,015.59$1,015.59
178Monotube arms 20-FT (657.0520)EACH2$4,189.73$4,189.73$4,189.73$4,189.73$4,189.73$4,189.73
179Monotube arms 25-FT (657.0525)EACH1$4,693.39$4,693.39$4,693.39$4,693.39$4,693.39$4,693.39
180Monotube arms 45-FT-special (657.0546)EACH2$7,040.79$7,040.79$7,040.79$7,040.79$7,040.79$7,040.79
181Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH2$335.03$335.03$335.03$335.03$335.03$335.03
182Luminaire arms steel type 10 pole clamp 15-FT (657.0820)EACH8$1,217.34$1,217.34$1,217.34$1,217.34$1,217.34$1,217.34
183Traffic signal face 3S 12-inch (658.0173)EACH12$920.57$920.57$920.57$920.57$920.57$920.57
184Traffic signal face 4S 12-inch (658.0174)EACH17$1,130.91$1,130.91$1,130.91$1,130.91$1,130.91$1,130.91
185Signal mounting hardware (location) 01. CTH O (S moorland RD) & W ryerson RD (658.5070)EACH1$3,370.36$3,370.36$3,370.36$3,370.36$3,370.36$3,370.36
186Signal mounting hardware (location) 02.CTH O (S moorland RD) & W coffee RD (658.5070)EACH1$4,416.23$4,416.23$4,416.23$4,416.23$4,416.23$4,416.23
187Luminaires utility LED C (659.1125)EACH10$563.34$563.34$563.34$563.34$563.34$563.34
188Temporary traffic signals for intersections (location) 01. CTH O (S moorland RD) & W ryerson RD (661.0201)EACH1$36,424$36,424$36,424$36,424$36,424$36,424
189Temporary traffic signals for intersections (location) 02.CTH O (S moorland RD) & W coffee RD (661.0201)EACH1$33,573$33,573$33,573$33,573$33,573$33,573
190Communication vault type 1 (673.0105)EACH4$2,912.03$2,912.03$2,912.03$2,912.03$2,912.03$2,912.03
191Sawing asphalt (690.0150)LF947$1.15$1.39$1.15$1.15$1.15$1.75
192Sawing concrete (690.0250)LF1,669$2.25$2.00$2.25$2.25$2.25$2.35
193Incentive flexural strength concrete pavement (715.0715)DOL15,293$1.00$1.00$1.00$1.00$1.00$1.00
194Incentive iri ride (740.0440)DOL14,000$1.00$1.00$1.00$1.00$1.00$1.00
195On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS3,500$5.00$5.00$5.00$5.00$5.00$5.00
196On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS12,000$5.00$5.00$5.00$5.00$5.00$5.00
197Special 01. 15-foot decorative light pole (SPV.0060)EACH13$7,536.63$7,536.63$7,536.63$7,536.63$7,536.63$7,536.63
198Special 02. decorative luminaire arm (SPV.0060)EACH13$700.43$700.43$700.43$700.43$700.43$700.43
199Special 03. decorative LED luminaire (SPV.0060)EACH13$4,106.47$4,106.47$4,106.47$4,106.47$4,106.47$4,106.47
200Special 04. decorative pole mounted banner arm (SPV.0060)EACH13$1,584.23$1,584.23$1,584.23$1,584.23$1,584.23$1,584.23
201Special 05. concrete bases type 5 modified (SPV.0060)EACH13$1,196.61$1,196.61$1,196.61$1,196.61$1,196.61$1,196.61
202Special 06. furnish and install dead-front gfci (SPV.0060)EACH13$293.76$293.76$293.76$293.76$293.76$293.76
203Special 07. connect to existing storm sewer (SPV.0060)EACH11$1,000.00$1,000.00$1,000.00$1,404.91$405.00$950.00
204Special 08. remove, salvage, and reinstall signs (SPV.0060)EACH7$125.00$125.00$125.00$125.00$90.00$90.00
205Special 09. adjusting sanitary manhole covers (SPV.0060)EACH19$1,000.00$1,000.00$1,356.00$1,984.65$1,737.00$880.00
206Special 10. adjusting water valve boxes (SPV.0060)EACH32$400.00$400.00$407.00$555.50$441.00$300.00
207Special 11. adjusting water manhole covers (SPV.0060)EACH3$1,000.00$1,000.00$728.00$1,051.41$597.00$600.00
208Special 12. evp equipment installation CTH O (S moorland RD) & W ryerson RD (SPV.0060)EACH1$2,959.70$2,959.70$2,959.70$2,959.70$2,959.70$2,959.70
209Special 13. reinstall temporary evp equipment CTH O (S moorland RD) & W ryerson RD (SPV.0060)EACH1$5,733.71$5,733.71$5,733.71$5,733.71$5,733.71$5,733.71
210Special 14. temporary video detection for intersections CTH O (S moorland RD) &W ryerson (SPV.0060)EACH1$14,536$14,536$14,536$14,536$14,536$14,536
211Special 15. traffic signal controller and cabinet (SPV.0060)EACH1$29,317$29,317$29,317$29,317$29,317$29,317
212Special 16. video vehicle detection system CTH O (S moorland RD) & W ryerson RD (SPV.0060)EACH1$39,038$39,038$39,038$39,038$39,038$39,038
213Special 17. accessible pedestrian system CTH O (S moorland RD) & W coffee RD (SPV.0060)EACH1$12,092$12,092$12,092$12,092$12,092$12,092
214Special 18. relocating hydrant (SPV.0060)EACH4$5,000.00$5,000.00$8,555.00$8,445.62$5,570.00$5,845.00
215Special 19. reconstructing sanitary manholes (SPV.0060)EACH2$2,000.00$2,000.00$1,536.00$4,559.14$4,250.00$2,835.00
216Special 22. posts tubular steel 1.75X1.75-inch X 13-FT (SPV.0060)EACH40$165.00$165.00$165.00$165.00$200.00$200.00
217Special 23. posts tubular steel 1.75X1.75-inch X 14-FT (SPV.0060)EACH72$165.00$165.00$165.00$165.00$200.00$200.00
218Special 24. sand bags (SPV.0060)EACH50$50.00$25.00$25.00$25.00$19.00$19.00
219Special 25. drain tile sump connection (SPV.0060)EACH25$1,000.00$1,000.00$980.00$876.68$497.00$550.00
220Special 26. section corner monuments (SPV.0060)EACH1$1,500.00$1,000.00$1,500.00$0.01$1,522.00$1,000.00
221Special 27. reconnect evp system CTH O (S moorland RD) &W coffee RD (SPV.0060)EACH1$1,540.38$1,540.38$1,540.38$1,540.38$1,540.38$1,540.38
222Special 28. spot repair existing storm sewer (SPV.0060)EACH1$5,000.00$5,000.00$7,773.00$10,957$3,268.00$6,165.00
223Special 01. clean existing storm sewer (SPV.0090)LF1,759$3.45$3.45$10.50$10.20$3.45$8.55
224Special 02. video detector cable (SPV.0090)LF1,150$4.77$4.77$4.77$4.77$4.77$4.77
WisDOT contract 20250114045: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way