WisDOT contract 20250311014 bid tabulation
C Glendale, Silver Spring Dr; N 27th St to Milwaukee River (LOC STR, Milwaukee County C Glendale, Silver Spring Dr; N 27th St to Milwaukee River). Let by Wisconsin DOT on March 11, 2025, Milwaukee. 2 bids received; low bid $8,559,374 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 257
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $8,559,374 | Low |
| 2 | Zignego Company, Inc. | $8,828,450 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Zignego Company, Inc. |
|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 1,510 | $7.50 | $9.25 |
| 2 | Removing concrete pavement (204.0100) | SY | 21,050 | $6.22 | $9.20 |
| 3 | Removing asphaltic surface (204.0110) | SY | 3,045 | $5.01 | $9.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 29,465 | $3.25 | $3.25 |
| 5 | Removing curb & gutter (204.0150) | LF | 14,830 | $4.77 | $0.01 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 3,665 | $10.07 | $8.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 54 | $185.00 | $500.00 |
| 8 | Removing inlets (204.0220) | EACH | 22 | $900.00 | $350.00 |
| 9 | Removing storm sewer (size) 01. 12-inches (204.0245) | LF | 90 | $15.00 | $25.00 |
| 10 | Removing storm sewer (size) 02. 15-inches (204.0245) | LF | 64 | $18.00 | $30.00 |
| 11 | Sealing pipes (204.0280) | EACH | 10 | $550.00 | $400.00 |
| 12 | Removing (item description) 01. removing lighting units crestwood BLVD system (204.9060.S) | EACH | 57 | $350.00 | $350.00 |
| 13 | Removing (item description) 02. removing lighting units pick-N- save system (204.9060.S) | EACH | 77 | $350.00 | $350.00 |
| 14 | Removing (item description) 03. removing traffic signals bethmaur lane (204.9060.S) | EACH | 1 | $5,000.00 | $5,000.00 |
| 15 | Removing (item description) 04. removing traffic signals crestwood BLVD (204.9060.S) | EACH | 1 | $5,000.00 | $5,000.00 |
| 16 | Removing (item description) 05. removing traffic signals pick N save (204.9060.S) | EACH | 1 | $5,000.00 | $5,000.00 |
| 17 | Removing (item description) 06. removing traffic signals bridgewood lane (204.9060.S) | EACH | 1 | $5,000.00 | $5,000.00 |
| 18 | Removing (item description) 07. removing traffic signals milwaukee river pkwy (204.9060.S) | EACH | 1 | $5,000.00 | $5,000.00 |
| 19 | Excavation common (205.0100) | CY | 14,195 | $20.70 | $19.28 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 16,650 | $18.58 | $22.11 |
| 21 | Breaker run (311.0110) | TON | 2,145 | $18.99 | $23.00 |
| 22 | Concrete base 10-inch (320.0165) | SY | 4,605 | $74.98 | $95.00 |
| 23 | Coloring concrete wisdot red (405.0100) | CY | 14 | $140.09 | $300.00 |
| 24 | Concrete pavement 6-inch (415.0060) | SY | 4,630 | $45.83 | $69.00 |
| 25 | Concrete pavement 10-inch (415.0100) | SY | 8,150 | $83.57 | $95.00 |
| 26 | Drilled tie bars (416.0610) | EACH | 7,500 | $10.20 | $10.00 |
| 27 | Drilled dowel bars (416.0620) | EACH | 900 | $13.82 | $15.00 |
| 28 | Tack coat (455.0605) | GAL | 2,710 | $4.00 | $4.00 |
| 29 | Incentive density HMA pavement (460.2000) | DOL | 4,960 | $1.00 | $1.00 |
| 30 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 7,740 | $74.95 | $74.95 |
| 31 | Asphaltic surface temporary (465.0125) | TON | 510 | $125.00 | $125.00 |
| 32 | Concrete collars for pipe (520.8000) | EACH | 28 | $650.00 | $725.00 |
| 33 | Concrete sidewalk 5-inch (602.0410) | SF | 27,445 | $7.74 | $5.53 |
| 34 | Curb ramp detectable warning field natural patina (602.0515) | SF | 1,050 | $39.82 | $49.92 |
| 35 | Concrete driveway 6-inch (602.0810) | SY | 135 | $79.48 | $58.10 |
| 36 | Concrete driveway hes 6-inch (602.0860) | SY | 10 | $81.56 | $69.05 |
| 37 | Concrete driveway hes 8-inch (602.0870) | SY | 405 | $93.34 | $77.80 |
| 38 | Concrete surface drains (602.3010) | CY | 1 | $936.75 | $738.13 |
| 39 | Storm sewer pipe reinforced concrete class V 12-inch (608.0512) | LF | 1,530 | $117.00 | $112.34 |
| 40 | Storm sewer pipe reinforced concrete class V 15-inch (608.0515) | LF | 59 | $126.00 | $106.17 |
| 41 | Storm sewer pipe reinforced concrete class V 18-inch (608.0518) | LF | 141 | $134.00 | $128.64 |
| 42 | Storm sewer pipe reinforced concrete class V 21-inch (608.0521) | LF | 20 | $217.00 | $136.04 |
| 43 | Reconstructing manholes (611.0420) | EACH | 13 | $2,602.00 | $1,250.00 |
| 44 | Reconstructing inlets (611.0430) | EACH | 23 | $2,602.00 | $1,150.00 |
| 45 | Manhole covers type J-special (611.0535) | EACH | 34 | $687.00 | $736.00 |
| 46 | Inlet covers type C (611.0612) | EACH | 7 | $687.00 | $745.00 |
| 47 | Inlet covers type H (611.0624) | EACH | 42 | $895.00 | $950.00 |
| 48 | Inlet covers type MS-A (611.0645) | EACH | 2 | $700.00 | $750.00 |
| 49 | Inlet covers type S (611.0651) | EACH | 54 | $891.00 | $1,010.00 |
| 50 | Inlet covers type Z (611.0666) | EACH | 29 | $907.00 | $960.00 |
| 51 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $5,107.00 | $4,206.58 |
| 52 | Inlets 3-FT diameter (611.3003) | EACH | 6 | $3,502.00 | $3,908.70 |
| 53 | Inlets 4-FT diameter (611.3004) | EACH | 20 | $4,261.00 | $4,286.52 |
| 54 | Inlets 2X3-FT (611.3230) | EACH | 40 | $3,446.00 | $3,850.90 |
| 55 | Inlets median 1 grate (611.3901) | EACH | 2 | $3,643.00 | $4,500.00 |
| 56 | Adjusting manhole covers (611.8110) | EACH | 37 | $650.00 | $625.00 |
| 57 | Adjusting inlet covers (611.8115) | EACH | 56 | $650.00 | $525.00 |
| 58 | Mobilization (619.1000) | EACH | 1 | $225,037 | $450,000 |
| 59 | Concrete median sloped nose (620.0300) | SF | 975 | $14.91 | $10.46 |
| 60 | Water (624.0100) | MGAL | 30 | $38.17 | $100.00 |
| 61 | Topsoil (625.0100) | SY | 18,570 | $4.80 | $4.80 |
| 62 | Silt fence (628.1504) | LF | 990 | $1.95 | $1.95 |
| 63 | Silt fence maintenance (628.1520) | LF | 990 | $0.01 | $0.01 |
| 64 | Mobilizations erosion control (628.1905) | EACH | 5 | $100.00 | $100.00 |
| 65 | Erosion mat class I type A (628.2002) | SY | 1,950 | $1.05 | $1.05 |
| 66 | Inlet protection type B (628.7010) | EACH | 170 | $45.00 | $45.00 |
| 67 | Fertilizer type B (629.0210) | CWT | 15 | $80.00 | $80.00 |
| 68 | Seeding mixture no. 40 (630.0140) | LB | 5 | $11.95 | $11.95 |
| 69 | Seed water (630.0500) | MGAL | 45 | $10.00 | $10.00 |
| 70 | Sod water (631.0300) | MGAL | 370 | $38.00 | $38.00 |
| 71 | Sod lawn (631.1000) | SY | 16,625 | $6.75 | $6.75 |
| 72 | Trees (species, root, size) 01. honeylocust (fruitless/thornless), B&B, 2.5" cal (632.0101) | EACH | 7 | $634.00 | $634.00 |
| 73 | Trees (species, root, size) 02. kentucky coffee tree (fruitless), B&B, 2.5" cal (632.0101) | EACH | 7 | $592.00 | $592.00 |
| 74 | Trees (species, root, size) 03. ginkgo (not columnar variety), B&B, 2.5" cal (632.0101) | EACH | 6 | $830.00 | $830.00 |
| 75 | Trees (species, root, size) 04. new horizon elm, B&B, 2.5" cal (632.0101) | EACH | 6 | $536.00 | $536.00 |
| 76 | Trees (species, root, size) 05. london plane tree, B&B, 2.5" cal (632.0101) | EACH | 6 | $564.00 | $564.00 |
| 77 | Trees (species, root, size) 06. spaeth’S alder, B&B, 2.5" cal (632.0101) | EACH | 6 | $578.00 | $578.00 |
| 78 | Trees (species, root, size) 07. shawnee brave baldcypress, B&B, 2.5" cal (632.0101) | EACH | 6 | $676.00 | $676.00 |
| 79 | Trees (species, root, size) 08. eastern red bud, B&B , 2.5" cal (632.0101) | EACH | 7 | $592.00 | $592.00 |
| 80 | Trees (species, root, size) 09. hawthorn (single stem, thorned), B&B, 2.5" cal (632.0101) | EACH | 7 | $536.00 | $536.00 |
| 81 | Trees (species, root, size) 10. amur maackia, B&B, 2.5" cal (632.0101) | EACH | 6 | $613.00 | $613.00 |
| 82 | Landscape planting surveillance and care cycles (632.9101) | EACH | 21 | $1,000.00 | $1,000.00 |
| 83 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 2 | $175.00 | $175.00 |
| 84 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 140 | $180.00 | $180.00 |
| 85 | Signs type II reflective H (637.2210) | SF | 915 | $20.00 | $20.00 |
| 86 | Signs type II reflective H folding (637.2215) | SF | 98 | $24.00 | $24.00 |
| 87 | Signs type II reflective F (637.2230) | SF | 190 | $22.00 | $22.00 |
| 88 | Moving signs type II (638.2102) | EACH | 8 | $90.00 | $90.00 |
| 89 | Removing signs type II (638.2602) | EACH | 180 | $25.00 | $25.00 |
| 90 | Removing small sign supports (638.3000) | EACH | 80 | $25.00 | $25.00 |
| 91 | Traffic control drums (643.0300) | DAY | 324,870 | $0.15 | $0.08 |
| 92 | Traffic control barricades type II (643.0410) | DAY | 12,701 | $0.25 | $0.35 |
| 93 | Traffic control barricades type III (643.0420) | DAY | 33,605 | $0.25 | $0.40 |
| 94 | Traffic control warning lights type A (643.0705) | DAY | 31,400 | $0.05 | $0.05 |
| 95 | Traffic control warning lights type C (643.0715) | DAY | 96,285 | $0.05 | $0.05 |
| 96 | Traffic control arrow boards (643.0800) | DAY | 1,588 | $5.00 | $6.00 |
| 97 | Traffic control signs (643.0900) | DAY | 82,467 | $0.10 | $0.35 |
| 98 | Traffic control covering signs type II (643.0920) | EACH | 82 | $50.00 | $15.00 |
| 99 | Traffic control signs fixed message (643.1000) | SF | 462 | $14.00 | $10.00 |
| 100 | Traffic control signs PCMS (643.1050) | DAY | 3,117 | $10.00 | $20.00 |
| 101 | Traffic control cones 42-inch (643.1070) | DAY | 2,940 | $1.00 | $0.10 |
| 102 | Temporary marking line paint 4- inch (643.3105) | LF | 79 | $1.30 | $1.00 |
| 103 | Temporary marking line removable tape 4-inch (643.3150) | LF | 6,573 | $1.30 | $0.75 |
| 104 | Temporary marking line paint 6- inch (643.3165) | LF | 23,415 | $0.80 | $0.52 |
| 105 | Temporary marking line removable tape 6-inch (643.3180) | LF | 3,780 | $1.65 | $1.15 |
| 106 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 2,730 | $2.00 | $1.25 |
| 107 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 263 | $6.00 | $3.50 |
| 108 | Traffic control (643.5000) | EACH | 1 | $48,780 | $45,259 |
| 109 | Temporary pedestrian curb ramp (644.1601) | DAY | 11 | $50.00 | $50.00 |
| 110 | Temporary pedestrian detectable warning field (644.1605) | SF | 210 | $12.00 | $50.00 |
| 111 | Temporary pedestrian barricade (644.1810) | LF | 252 | $6.00 | $6.00 |
| 112 | Marking line epoxy 4-inch (646.1020) | LF | 2,523 | $1.70 | $1.70 |
| 113 | Marking line epoxy 8-inch (646.3020) | LF | 2,654 | $3.50 | $3.50 |
| 114 | Marking arrow epoxy (646.5020) | EACH | 76 | $250.00 | $250.00 |
| 115 | Marking word epoxy (646.5120) | EACH | 2 | $355.00 | $355.00 |
| 116 | Marking symbol epoxy (646.5220) | EACH | 49 | $185.00 | $185.00 |
| 117 | Marking stop line epoxy 18-inch (646.6120) | LF | 964 | $17.00 | $17.00 |
| 118 | Marking yield line epoxy 18-inch (646.6220) | EACH | 42 | $175.00 | $175.00 |
| 119 | Marking diagonal epoxy 12-inch (646.7120) | LF | 432 | $14.00 | $14.00 |
| 120 | Marking chevron epoxy 24-inch (646.7220) | LF | 149 | $19.00 | $19.00 |
| 121 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,649 | $16.00 | $16.00 |
| 122 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 151 | $22.00 | $22.00 |
| 123 | Marking curb epoxy (646.8120) | LF | 1,064 | $7.50 | $7.50 |
| 124 | Marking island nose epoxy (646.8220) | EACH | 19 | $300.00 | $300.00 |
| 125 | Marking parking stall epoxy (646.8320) | LF | 352 | $12.00 | $12.00 |
| 126 | Construction staking storm sewer (650.4000) | EACH | 85 | $115.00 | $115.00 |
| 127 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 33,631 | $1.25 | $1.25 |
| 128 | Construction staking concrete pavement (650.7000) | LF | 1,000 | $2.00 | $2.00 |
| 129 | Construction staking electrical installations (project) 01. 2090-07- 71 (650.8501) | EACH | 1 | $3,500.00 | $3,500.00 |
| 130 | Construction staking curb ramps (650.9000) | EACH | 82 | $125.00 | $125.00 |
| 131 | Construction staking sidewalk (project) 01. 2090-07-71 (650.9500) | EACH | 1 | $2,000.00 | $2,000.00 |
| 132 | Construction staking supplemental control (project) 01. 2090-07-71 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 |
| 133 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 7,100 | $5.40 | $5.40 |
| 134 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 12,148 | $7.85 | $7.85 |
| 135 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 5,164 | $9.25 | $9.25 |
| 136 | Conduit loop detector (652.0800) | LF | 2,635 | $7.00 | $7.00 |
| 137 | Pull boxes steel 24X42-inch (653.0140) | EACH | 81 | $1,180.00 | $1,180.00 |
| 138 | Removing pull boxes (653.0905) | EACH | 101 | $80.00 | $80.00 |
| 139 | Concrete bases type 1 (654.0101) | EACH | 19 | $900.00 | $900.00 |
| 140 | Concrete bases type 2 (654.0102) | EACH | 29 | $1,280.00 | $1,280.00 |
| 141 | Concrete bases type 5 (654.0105) | EACH | 39 | $1,100.00 | $1,100.00 |
| 142 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 5 | $2,100.00 | $2,100.00 |
| 143 | Concrete control cabinet bases type L30 (654.0230) | EACH | 2 | $1,900.00 | $1,900.00 |
| 144 | Cable traffic signal 3-14 AWG (655.0210) | LF | 1,587 | $1.30 | $1.30 |
| 145 | Cable traffic signal 7-14 AWG (655.0240) | LF | 3,537 | $2.00 | $2.00 |
| 146 | Cable traffic signal 9-14 AWG (655.0250) | LF | 1,920 | $2.50 | $2.50 |
| 147 | Cable traffic signal 12-14 AWG (655.0260) | LF | 501 | $3.00 | $3.00 |
| 148 | Cable traffic signal 15-14 AWG (655.0270) | LF | 460 | $3.50 | $3.50 |
| 149 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 3,034 | $2.20 | $2.20 |
| 150 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 8,705 | $1.10 | $1.10 |
| 151 | Electrical wire lighting 12 AWG (655.0610) | LF | 3,393 | $0.75 | $0.75 |
| 152 | Electrical wire lighting 10 AWG (655.0615) | LF | 15,500 | $1.10 | $1.10 |
| 153 | Electrical wire lighting 8 AWG (655.0620) | LF | 14,200 | $1.40 | $1.40 |
| 154 | Electrical wire lighting 6 AWG (655.0625) | LF | 8,700 | $1.80 | $1.80 |
| 155 | Loop detector lead in cable (655.0700) | LF | 7,790 | $1.50 | $1.50 |
| 156 | Loop detector wire (655.0800) | LF | 2,395 | $1.30 | $1.30 |
| 157 | Electrical service meter breaker pedestal (location) 01. lighting cabinet at crestwood BLVD (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 |
| 158 | Electrical service meter breaker pedestal (location) 02. lighting cabinet at pick N save (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 |
| 159 | Electrical service meter breaker pedestal (location) 03. signal cabinet at bethmaur lane (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 |
| 160 | Electrical service meter breaker pedestal (location) 04. signal cabinet at crestwood BLVD (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 |
| 161 | Electrical service meter breaker pedestal (location) 05. signal cabinet at pick N save (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 |
| 162 | Electrical service meter breaker pedestal (location) 06. signal cabinet at bridgewood lane (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 |
| 163 | Electrical service meter breaker pedestal (location) 07. signal cabinet at milwaukee river pkwy (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 |
| 164 | Pedestal bases (657.0100) | EACH | 19 | $250.00 | $250.00 |
| 165 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 61 | $585.00 | $585.00 |
| 166 | Poles type 2 (657.0305) | EACH | 6 | $2,300.00 | $2,300.00 |
| 167 | Poles type 3 (657.0310) | EACH | 12 | $3,200.00 | $3,200.00 |
| 168 | Poles type 4 (657.0315) | EACH | 11 | $2,100.00 | $2,100.00 |
| 169 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 12 | $730.00 | $730.00 |
| 170 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 1 | $750.00 | $750.00 |
| 171 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 6 | $620.00 | $620.00 |
| 172 | Trombone arms 15-FT (657.0585) | EACH | 2 | $1,600.00 | $1,600.00 |
| 173 | Trombone arms 25-FT (657.0595) | EACH | 16 | $2,260.00 | $2,260.00 |
| 174 | Traffic signal face 3S 12-inch (658.0173) | EACH | 65 | $740.00 | $740.00 |
| 175 | Traffic signal face 4S 12-inch (658.0174) | EACH | 4 | $900.00 | $900.00 |
| 176 | Pedestrian signal face 16-inch (658.0416) | EACH | 50 | $560.00 | $560.00 |
| 177 | Pedestrian push buttons (658.0500) | EACH | 43 | $320.00 | $320.00 |
| 178 | Signal mounting hardware (location) 01. signal cabinet at bethmaur lane (658.5070) | EACH | 1 | $4,800.00 | $4,800.00 |
| 179 | Signal mounting hardware (location) 02. signal cabinet at crestwood BLVD (658.5070) | EACH | 1 | $4,400.00 | $4,400.00 |
| 180 | Signal mounting hardware (location) 03. signal cabinet at pick N save (658.5070) | EACH | 1 | $4,700.00 | $4,700.00 |
| 181 | Signal mounting hardware (location) 04. signal cabinet at bridgewood lane (658.5070) | EACH | 1 | $5,200.00 | $5,200.00 |
| 182 | Signal mounting hardware (location) 05. signal cabinet at milwaukee river pkwy (658.5070) | EACH | 1 | $5,100.00 | $5,100.00 |
| 183 | Lighting control cabinets 240/480 30-inch (659.2230) | EACH | 2 | $11,600 | $11,600 |
| 184 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 134 | $2.00 | $2.00 |
| 185 | Temporary traffic signals for intersections (location) 01. signal at bethmaur lane (661.0201) | EACH | 1 | $46,000 | $46,000 |
| 186 | Temporary traffic signals for intersections (location) 02. signal at crestwood BLVD (661.0201) | EACH | 1 | $46,000 | $46,000 |
| 187 | Temporary traffic signals for intersections (location) 03. signal at pick N save (661.0201) | EACH | 1 | $46,000 | $46,000 |
| 188 | Temporary traffic signals for intersections (location) 04. signal at bridgewood lane (661.0201) | EACH | 1 | $46,000 | $46,000 |
| 189 | Temporary traffic signals for intersections (location) 05. signal at milwaukee river pkwy (661.0201) | EACH | 1 | $46,000 | $46,000 |
| 190 | Conduit HDPE directional bore 2- duct 2-inch (671.0222) | LF | 1,800 | $29.00 | $29.00 |
| 191 | Communication vault type 1 (673.0105) | EACH | 23 | $3,200.00 | $3,200.00 |
| 192 | Sawing asphalt (690.0150) | LF | 1,160 | $1.54 | $1.54 |
| 193 | Sawing concrete (690.0250) | LF | 24,015 | $1.93 | $1.93 |
| 194 | Incentive compressive strength concrete pavement (715.0720) | DOL | 3,840 | $1.00 | $1.00 |
| 195 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 196 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,000 | $5.00 | $5.00 |
| 197 | Special 01. sanitary manhole internal/external seal and adjustment (SPV.0060) | EACH | 35 | $2,425.00 | $800.00 |
| 198 | Special 02. adjusting valve boxes (SPV.0060) | EACH | 40 | $384.00 | $650.00 |
| 199 | Special 03. adjusting water boxes (SPV.0060) | EACH | 25 | $179.50 | $500.00 |
| 200 | Special 04. pipe connection to existing structure (SPV.0060) | EACH | 32 | $709.00 | $800.00 |
| 201 | Special 05. inlet covers special (SPV.0060) | EACH | 10 | $833.00 | $880.00 |
| 202 | Special 06. inlets 4-FT diameter, special (SPV.0060) | EACH | 7 | $5,708.00 | $4,376.59 |
| 203 | Special 07. manholes 4-FT diameter, special (SPV.0060) | EACH | 3 | $5,722.00 | $4,491.14 |
| 204 | Special 08. manholes 5-FT diameter, special (SPV.0060) | EACH | 2 | $7,154.00 | $5,062.99 |
| 205 | Special 09. inlets 2-FT diameter (SPV.0060) | EACH | 5 | $3,937.00 | $3,442.30 |
| 206 | Special 10. marking speed hump epoxy 12-inch (white) (SPV.0060) | EACH | 49 | $185.00 | $185.00 |
| 207 | Special 11. municipal light pole and LED luminaire single (SPV.0060) | EACH | 4 | $3,400.00 | $3,400.00 |
| 208 | Special 12. municipal light pole and LED luminaire double (SPV.0060) | EACH | 32 | $4,500.00 | $4,500.00 |
| 209 | Special 13. municipal LED luminaire (SPV.0060) | EACH | 30 | $1,100.00 | $1,100.00 |
| 210 | Special 14. lighting system survey (SPV.0060) | EACH | 1 | $3,500.00 | $3,500.00 |
| 211 | Special 15. backplates with reflective border 3 section 12-inch (SPV.0060) | EACH | 65 | $110.00 | $110.00 |
| 212 | Special 16. backplates with reflective border 4 section 12-inch (SPV.0060) | EACH | 4 | $136.00 | $136.00 |
| 213 | Special 17. traffic signal control cabinet (bethmaur lane) (SPV.0060) | EACH | 1 | $26,800 | $26,800 |
| 214 | Special 18. traffic signal control cabinet (crestwood BLVD) (SPV.0060) | EACH | 1 | $26,800 | $26,800 |
| 215 | Special 19. traffic signal control cabinet (pick N save) (SPV.0060) | EACH | 1 | $26,800 | $26,800 |
| 216 | Special 20. traffic signal control cabinet (bridgewood lane) (SPV.0060) | EACH | 1 | $26,800 | $26,800 |
| 217 | Special 21. traffic signal control cabinet (milwaukee river parkway) (SPV.0060) | EACH | 1 | $26,800 | $26,800 |
| 218 | Special 22. temporary evp system (bethmaur lane) (SPV.0060) | EACH | 1 | $7,400.00 | $7,400.00 |
| 219 | Special 23. temporary evp system (crestwood BLVD) (SPV.0060) | EACH | 1 | $7,400.00 | $7,400.00 |
| 220 | Special 24. temporary evp system (pick N save) (SPV.0060) | EACH | 1 | $7,400.00 | $7,400.00 |
| 221 | Special 25. temporary evp system (bridgewood lane) (SPV.0060) | EACH | 1 | $7,400.00 | $7,400.00 |
| 222 | Special 26. temporary evp system (milwaukee river pkwy) (SPV.0060) | EACH | 1 | $7,400.00 | $7,400.00 |
| 223 | Special 27. emergency vehicle detection system (bethmaur) (SPV.0060) | EACH | 1 | $7,600.00 | $7,600.00 |
| 224 | Special 28. emergency vehicle detection system (crestwood) (SPV.0060) | EACH | 1 | $7,600.00 | $7,600.00 |
| 225 | Special 29. emergency vehicle detection system (pick N save) (SPV.0060) | EACH | 1 | $7,600.00 | $7,600.00 |
| 226 | Special 30. emergency vehicle detection system (bridgewood) (SPV.0060) | EACH | 1 | $7,600.00 | $7,600.00 |
| 227 | Special 31. emergency vehicle detection system (milw. river pkwy) (SPV.0060) | EACH | 1 | $7,600.00 | $7,600.00 |
| 228 | Special 32. fire hydrant relocation (SPV.0060) | EACH | 4 | $15,113 | $17,172 |
| 229 | Special 33. remove, salvage & replace light pole (SPV.0060) | EACH | 3 | $1,900.00 | $1,900.00 |
| 230 | Special 34. rectangular rapid flashing beacon (long island DR) (SPV.0060) | EACH | 1 | $16,500 | $16,500 |
| 231 | Special 35. rectangular rapid flashing beacon (sunny point) (SPV.0060) | EACH | 1 | $16,500 | $16,500 |
| 232 | Special 36. rectangular rapid flashing beacon (sta 386+10) (SPV.0060) | EACH | 1 | $16,500 | $16,500 |
| 233 | Special 37. rectangular rapid flashing beacon removal & salvage (green bay ave on-ramp) (SPV.0060) | EACH | 1 | $16,500 | $16,500 |
| 234 | Special 38. rectangular rapid flashing beacon removal & salvage (sunny point RD) (SPV.0060) | EACH | 1 | $16,500 | $16,500 |
| 235 | Special 39. manhole covers type MS 58A (SPV.0060) | EACH | 28 | $958.00 | $1,005.41 |
| 236 | Special 40. manhole covers type MS 58A (SPV.0060) | EACH | 7 | $958.00 | $747.74 |
| 237 | Special 41. furnish & install fiber optic splice enclosure (SPV.0060) | EACH | 5 | $1,794.00 | $1,794.00 |
| 238 | Special 42. fiber optic splice (SPV.0060) | EACH | 30 | $175.00 | $175.00 |
| 239 | Special 43. furnish & install fiber optic termination (SPV.0060) | EACH | 5 | $1,160.00 | $1,160.00 |
| 240 | Special 44. communication system testing (SPV.0060) | EACH | 5 | $1,220.00 | $1,220.00 |
| 241 | Special 45. furnish & install ethernet switches (SPV.0060) | EACH | 5 | $2,250.00 | $2,250.00 |
| 242 | Special 46. furnish & install 6-CT fiber optic 100-FT (SPV.0060) | EACH | 5 | $1,320.00 | $1,320.00 |
| 243 | Special 47. furnish & install small form-factor pluggable (SPF) (SPV.0060) | EACH | 10 | $340.00 | $340.00 |
| 244 | Special 01. concrete curb & gutter 30-inch type A (SPV.0090) | LF | 3,540 | $35.38 | $29.55 |
| 245 | Special 02. concrete curb & gutter 24-inch type A (SPV.0090) | LF | 12,155 | $27.51 | $24.69 |
| 246 | Special 03. concrete curb & gutter 36-inch type A (SPV.0090) | LF | 7,355 | $37.10 | $32.57 |
| 247 | Special 04. concrete curb & gutter 18-inch type A (SPV.0090) | LF | 10,585 | $21.86 | $13.15 |
| 248 | Special 05. marking speed hump epoxy 12-inch (white) (SPV.0090) | LF | 864 | $13.00 | $13.00 |
| 249 | Special 06. marking bike epoxy transverse (green) (SPV.0090) | LF | 432 | $30.00 | $30.00 |
| 250 | Special 07. conduit HDPE directional bore 2-duct 3-inch (SPV.0090) | LF | 2,200 | $33.00 | $33.00 |
| 251 | Special 08. storm sewer pipe PVC SDR 26, 6-inch (SPV.0090) | LF | 37 | $104.00 | $76.30 |
| 252 | Special 09. trench drain R-4995, 11 1/2-inch (SPV.0090) | LF | 8 | $941.00 | $500.00 |
| 253 | Special 10. furnish & install fiber optic cable outdoor plant 36-CT (SPV.0090) | LF | 7,450 | $2.20 | $2.20 |
| 254 | Special 01. marking bike lanes (green boxes at intersections) (SPV.0165) | SF | 7,141 | $8.50 | $8.50 |
| 255 | Special 02. cast iron tactile directional indicator (SPV.0165) | SF | 36 | $54.33 | $50.00 |
| 256 | Special 01. concrete pavement hes 6-inches (SPV.0180) | SY | 400 | $51.13 | $70.00 |
| 257 | Special 01. management of solid waste (SPV.0195) | TON | 190 | $89.75 | $94.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.