3831-07-71. Let by Wisconsin DOT on March 11, 2025, Kenosha. 4 bids received; low bid $3,138,914 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
11 MAR 2025
Pay items
219
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$3,138,914Low
2Stark Pavement Corporation$3,275,000+4.0%
3Zignego Company, Inc.$3,408,361+9.0%
4A.W. Oakes & Son, Inc.$3,445,210+10%
WisDOT contract 20250311020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. Stark Pavement Corporation3. Zignego Company, Inc.4. A.W. Oakes & Son, Inc.
1Removing concrete pavement (204.0100)SY10,683$7.71$7.50$7.50$7.85
2Removing curb (204.0130)LF115$8.33$15.00$15.00$15.00
3Removing curb & gutter (204.0150)LF370$7.24$15.00$15.00$15.00
4Removing concrete sidewalk (204.0155)SY1,480$10.55$7.50$7.50$10.00
5Removing fence (204.0170)LF238$2.50$2.50$2.50$3.00
6Removing concrete bases (204.0195)EACH19$346.82$400.00$400.00$450.00
7Removing manholes (204.0210)EACH4$1,573.00$1,573.00$1,573.00$1,500.00
8Removing inlets (204.0220)EACH9$894.00$894.00$894.00$370.00
9Removing storm sewer (size) 01. removing storm sewer 12-inch (204.0245)LF307$21.00$21.00$21.00$13.00
10Removing storm sewer (size) 02. removing storm sewer 15-inch (204.0245)LF57$21.00$21.00$21.00$16.00
11Removing storm sewer (size) 03. removing storm sewer 21-inch (204.0245)LF155$21.00$21.00$21.00$25.00
12Removing storm sewer (size) 04. removing storm sewer 60-inch (204.0245)LF8$21.00$21.00$21.00$70.00
13Removing storm sewer (size) 05. removing storm sewer 72-inch (204.0245)LF392$21.00$21.00$21.00$50.00
14Removing (item description) 01. remove traffic signals. washington RD (38TH ST) & 30TH ave (204.9060.S)EACH1$3,742.06$3,742.06$3,742.06$3,800.00
15Removing (item description) 02. removing lighting system (204.9060.S)EACH2$6,236.76$6,236.76$6,236.76$6,500.00
16Excavation common (205.0100)CY3,486$14.29$33.50$33.50$26.00
17Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON467$65.42$65.00$65.00$87.00
18Finishing roadway (project) 01. ID 3831-07-71 (213.0100)EACH1$2,956.00$7,500.00$1,000.00$3,500.00
19Base aggregate dense 1 1/4-inch (305.0120)TON4,968$29.06$24.00$24.00$21.00
20Base aggregate open-graded (310.0110)TON29$27.00$27.00$27.00$52.00
21Concrete pavement 8-inch (415.0080)SY7,820$65.99$63.00$72.00$73.00
22Concrete pavement hes 8-inch (415.1080)SY2,870$73.54$68.00$80.50$78.00
23Concrete pavement joint filling (415.4100)SY11,674$1.87$2.40$1.00$2.60
24Drilled tie bars (416.0610)EACH78$15.15$20.00$15.00$15.00
25Drilled dowel bars (416.0620)EACH190$18.84$30.00$15.00$20.00
26Tack coat (455.0605)GAL117$4.00$4.00$4.00$5.00
27Asphaltic surface driveways and field entrances (465.0120)TON87$145.00$145.00$145.00$155.00
28Asphaltic surface temporary (465.0125)TON501$92.00$92.00$92.00$105.00
29Concrete collars for pipe (520.8000)EACH4$956.00$956.00$956.00$1,500.00
30Concrete curb type A (601.0105)LF30$48.56$45.00$63.77$40.00
31Concrete curb type D (601.0110)LF120$47.81$45.00$50.91$24.00
32Concrete curb & gutter 18-inch type A (601.0405)LF1,981$30.78$22.65$13.80$24.00
33Concrete curb & gutter 18-inch type D (601.0407)LF110$30.30$22.65$56.67$34.00
34Concrete curb & gutter 30-inch type A (601.0409)LF366$36.07$36.00$21.25$27.00
35Concrete curb & gutter integral 30- inch type D (601.0452)LF2,332$21.37$21.25$35.00$27.00
36Concrete sidewalk 4-inch (602.0405)SF13,248$6.96$8.75$4.73$7.50
37Curb ramp detectable warning field yellow (602.0505)SF10$45.60$50.00$48.72$55.00
38Curb ramp detectable warning field radial yellow (602.0605)SF84$59.79$55.00$75.91$75.00
39Concrete driveway 8-inch (602.0820)SY347$89.84$80.00$77.06$68.00
40Concrete driveway hes 8-inch (602.0870)SY230$93.59$86.00$81.94$72.00
41Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF492$82.00$82.00$82.00$90.00
42Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF58$108.00$108.00$108.00$113.00
43Storm sewer pipe reinforced concrete class III 21-inch (608.0321)LF156$194.00$194.00$194.00$130.00
44Storm sewer pipe reinforced concrete class III 60-inch (608.0360)LF8$848.00$848.00$848.00$645.00
45Storm sewer pipe reinforced concrete class III 72-inch (608.0372)LF334$555.00$555.00$555.00$770.00
46Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 58X91-inch (608.2358)LF53$771.00$771.00$771.00$990.00
47Manhole covers type J (611.0530)EACH8$1,106.00$1,106.00$1,106.00$615.00
48Inlet covers type H (611.0624)EACH4$789.00$789.00$789.00$860.00
49Inlet covers type H-S (611.0639)EACH8$1,108.00$1,108.00$1,108.00$860.00
50Inlet covers type Z (611.0666)EACH12$1,120.00$1,120.00$1,120.00$870.00
51Manholes 4-FT diameter (611.2004)EACH2$4,971.00$4,971.00$4,971.00$3,500.00
52Manholes 8-FT diameter (611.2008)EACH1$20,300$20,300$20,300$15,000
53Manholes 10-FT diameter (611.2010)EACH1$27,971$27,971$27,971$26,500
54Manholes variable tee 4-FT diameter (611.2504)EACH2$9,836.00$9,836.00$9,836.00$15,500
55Inlets 3-FT diameter (611.3003)EACH10$2,032.00$2,032.00$2,032.00$2,500.00
56Inlets 4-FT diameter (611.3004)EACH3$3,054.00$3,054.00$3,054.00$3,400.00
57Inlets 2X3-FT (611.3230)EACH11$1,859.00$1,859.00$1,859.00$2,650.00
58Adjusting manhole covers (611.8110)EACH3$958.00$958.00$958.00$530.00
59Cover plates temporary (611.8120.S)EACH15$536.00$536.00$536.00$140.00
60Pipe underdrain 6-inch (612.0106)LF400$36.00$36.00$36.00$13.00
61Pipe underdrain unperforated 6- inch (612.0206)LF23$128.00$128.00$30.00$30.00
62Pipe underdrain wrapped 6-inch (612.0406)LF108$12.00$12.00$12.00$12.00
63Maintenance and repair of haul roads (project) 01. ID 3831-07-71 (618.0100)EACH1$1.00$2,000.00$1.00$2,500.00
64Mobilization (619.1000)EACH1$115,120$245,452$307,000$260,000
65Concrete median sloped nose (620.0300)SF116$15.61$18.00$12.42$16.00
66Water (624.0100)MGAL50$54.90$55.00$55.00$45.00
67Topsoil (625.0100)SY2,104$6.90$6.90$6.90$7.50
68Erosion bales (628.1104)EACH40$0.01$0.01$0.01$0.01
69Silt fence (628.1504)LF530$2.20$2.20$2.20$2.50
70Silt fence maintenance (628.1520)LF530$0.01$0.01$0.01$0.01
71Mobilizations erosion control (628.1905)EACH2$50.00$50.00$50.00$50.00
72Mobilizations emergency erosion control (628.1910)EACH4$50.00$50.00$50.00$50.00
73Inlet protection type A (628.7005)EACH50$50.00$50.00$50.00$60.00
74Inlet protection type B (628.7010)EACH6$50.00$50.00$50.00$60.00
75Inlet protection type C (628.7015)EACH16$70.00$70.00$70.00$75.00
76Inlet protection type D (628.7020)EACH28$125.00$125.00$125.00$150.00
77Tracking pads (628.7560)EACH1$0.01$3,000.00$3,000.00$2,000.00
78Fertilizer type B (629.0210)CWT2$80.00$80.00$80.00$100.00
79Seeding temporary (630.0200)LB57$1.00$1.00$1.00$1.00
80Seed water (630.0500)MGAL47$1.00$1.00$1.00$1.00
81Sod water (631.0300)MGAL23$10.00$10.00$10.00$15.00
82Sod lawn (631.1000)SY2,104$6.31$6.31$6.31$7.00
83Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH9$200.00$200.00$200.00$220.00
84Posts tubular steel 2X2-inch X 16- FT (634.0816)EACH1$200.00$200.00$200.00$220.00
85Signs type II reflective H (637.2210)SF138$21.90$21.90$21.90$25.00
86Signs type II reflective F (637.2230)SF9$23.90$23.90$23.90$26.00
87Removing signs type II (638.2602)EACH13$18.00$18.00$18.00$20.00
88Removing small sign supports (638.3000)EACH3$18.00$18.00$18.00$20.00
89Field office type B (642.5001)EACH1$15,368$9,000.00$20,000$25,000
90Traffic control drums (643.0300)DAY58,925$0.20$0.20$0.20$0.25
91Traffic control barricades type II (643.0410)DAY92$0.48$0.48$0.48$0.50
92Traffic control barricades type III (643.0420)DAY3,584$0.49$0.49$0.49$0.50
93Traffic control flexible tubular marker posts (643.0500)EACH345$8.70$8.70$8.70$9.00
94Traffic control flexible tubular marker bases (643.0600)EACH345$29.57$29.57$29.57$30.00
95Traffic control warning lights type A (643.0705)DAY11,727$0.11$0.11$0.11$0.15
96Traffic control warning lights type C (643.0715)DAY9,451$0.11$0.11$0.11$0.15
97Traffic control arrow boards (643.0800)DAY262$11.00$11.00$11.00$15.00
98Traffic control signs (643.0900)DAY12,008$0.32$0.32$0.32$0.40
99Traffic control covering signs type II (643.0920)EACH40$34.38$34.38$34.38$35.00
100Traffic control signs PCMS (643.1050)DAY28$36.14$36.14$36.14$38.00
101Temporary marking line paint 4- inch (643.3105)LF2,113$0.65$0.65$0.65$0.70
102Temporary marking line removable tape 4-inch (643.3150)LF14,949$1.33$1.33$1.33$1.40
103Temporary marking line paint 8- inch (643.3205)LF335$0.75$0.75$0.75$0.80
104Temporary marking line removable tape 8-inch (643.3250)LF2,094$7.82$7.82$7.82$8.00
105Temporary marking crosswalk removable tape 6-inch (643.3350)LF1,093$1.86$1.86$1.86$2.00
106Temporary marking stop line paint 18-inch (643.3805)LF73$3.00$3.00$3.00$3.00
107Temporary marking stop line removable tape 18-inch (643.3850)LF193$7.01$7.01$7.01$8.00
108Traffic control (643.5000)EACH1$29,000$29,000$29,000$33,000
109Temporary pedestrian surface asphalt (644.1410)SF675$6.83$5.00$24.00$13.00
110Temporary pedestrian surface matting (644.1440)SF85$12.00$12.00$10.00$13.00
111Temporary pedestrian curb ramp (644.1601)DAY192$16.00$16.00$10.00$18.00
112Temporary pedestrian detectable warning field (644.1605)SF100$15.00$15.00$50.00$15.00
113Temporary pedestrian barricade (644.1810)LF6,224$2.22$2.22$2.22$2.40
114Geotextile type DF schedule A (645.0111)SY111$6.00$6.00$3.00$5.00
115Geotextile type HR (645.0120)SY87$6.00$6.00$6.00$4.00
116Marking line epoxy 4-inch (646.1020)LF3,296$1.80$1.80$0.80$2.00
117Marking line epoxy 8-inch (646.3020)LF1,226$2.25$2.25$1.15$2.40
118Marking arrow epoxy (646.5020)EACH12$200.00$200.00$310.00$225.00
119Marking word epoxy (646.5120)EACH3$225.00$225.00$350.00$250.00
120Marking stop line epoxy 18-inch (646.6120)LF175$12.50$12.50$17.75$13.00
121Marking diagonal epoxy 12-inch (646.7120)LF164$10.00$10.00$16.25$11.00
122Marking crosswalk epoxy transverse line 6-inch (646.7420)LF659$10.00$10.00$10.50$11.00
123Marking crosswalk epoxy block style 24-inch (646.7520)LF474$15.50$15.50$19.10$16.00
124Marking curb epoxy (646.8120)LF180$8.00$8.00$12.50$9.00
125Marking island nose epoxy (646.8220)EACH6$275.00$275.00$245.00$300.00
126Marking removal line 4-inch (646.9000)LF497$0.65$0.65$0.65$0.80
127Construction staking storm sewer (650.4000)EACH32$115.00$115.00$92.00$150.00
128Construction staking subgrade (650.4500)LF1,702$0.01$2.00$0.01$0.01
129Construction staking concrete pavement (650.7000)LF1,702$2.15$2.15$2.25$1.00
130Construction staking electrical installations (project) 01. ID 3831- 07-71 (650.8501)EACH1$1,700.00$1,700.00$1,975.00$2,500.00
131Construction staking curb ramps (650.9000)EACH4$125.00$125.00$180.00$150.00
132Construction staking sidewalk (project) 01. ID 3831-07-71 (650.9500)EACH1$2,000.00$2,000.00$2,200.00$2,000.00
133Construction staking supplemental control (project) 01. ID 3831-07-71 (650.9911)EACH1$1,500.00$1,500.00$1,800.00$2,000.00
134Construction staking slope stakes (650.9920)LF1,702$0.70$0.70$1.10$1.00
135Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,704$7.46$7.46$7.46$8.00
136Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,514$10.31$10.31$10.31$11.00
137Pull boxes steel 24X36-inch (653.0135)EACH5$1,239.55$1,239.55$1,239.55$1,300.00
138Pull boxes steel 24X42-inch (653.0140)EACH14$1,128.11$1,128.11$1,128.11$1,200.00
139Removing pull boxes (653.0905)EACH8$112.57$112.57$112.57$120.00
140Concrete bases type 1 (654.0101)EACH5$899.60$899.60$899.60$900.00
141Concrete bases type 2 (654.0102)EACH4$1,521.32$1,521.32$1,521.32$1,600.00
142Concrete bases type 5 (654.0105)EACH8$1,204.61$1,204.61$1,204.61$1,210.00
143Concrete bases type 13 (654.0113)EACH1$16,675$16,675$16,675$17,000
144Concrete bases type 10-special (654.0120)EACH3$11,439$11,439$11,439$11,500
145Concrete control cabinet bases type 9 special (654.0217)EACH1$2,605.53$2,605.53$2,605.53$2,800.00
146Cable traffic signal 5-14 AWG (655.0230)LF570$1.51$1.51$1.51$1.60
147Cable traffic signal 7-14 AWG (655.0240)LF1,690$1.95$1.95$1.95$2.00
148Cable traffic signal 12-14 AWG (655.0260)LF804$2.94$2.94$2.94$3.00
149Cable traffic signal 15-14 AWG (655.0270)LF1,236$3.43$3.43$3.43$3.50
150Cable traffic signal 19-14 AWG (655.0280)LF381$3.38$3.38$3.38$3.50
151Cable type UF 2-10 AWG grounded (655.0320)LF1,277$1.86$1.86$1.86$2.00
152Electrical wire traffic signals 10 AWG (655.0515)LF2,262$1.12$1.12$1.12$1.20
153Electrical wire lighting 12 AWG (655.0610)LF1,308$0.96$0.96$0.96$1.00
154Electrical wire lighting 6 AWG (655.0625)LF5,700$2.18$2.18$2.18$2.20
155Electrical service meter breaker pedestal (location) 01. washington RD (38TH ST) & 30TH ave (656.0201)EACH1$1,483.32$1,483.32$1,483.32$1,500.00
156Pedestal bases (657.0100)EACH5$326.01$326.01$326.01$350.00
157Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH6$750.86$750.86$750.86$800.00
158Poles type 3 (657.0310)EACH4$3,858.73$3,858.73$3,858.73$4,000.00
159Poles type 5-aluminum (657.0322)EACH2$2,238.44$2,238.44$2,238.44$2,300.00
160Poles type 10-special (657.0352)EACH3$14,107$14,107$14,107$15,000
161Poles type 13 (657.0360)EACH1$17,280$17,280$17,280$17,500
162Traffic signal standards aluminum 3.5-FT (657.0405)EACH3$426.26$426.26$426.26$450.00
163Traffic signal standards aluminum 10-FT (657.0430)EACH2$698.03$698.03$698.03$700.00
164Monotube arms 40-FT-special (657.0541)EACH1$5,576.92$5,576.92$5,576.92$5,800.00
165Monotube arms 45-FT-special (657.0546)EACH2$5,964.59$5,964.59$5,964.59$6,500.00
166Monotube arms 50-FT (657.0550)EACH1$13,538$13,538$13,538$14,000
167Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH2$409.77$409.77$409.77$410.00
168Luminaire arms truss type 4-inch clamp 12-FT (657.0709)EACH4$783.82$783.82$783.82$800.00
169Luminaire arms steel 12-FT (657.0812)EACH4$1,259.46$1,259.46$1,259.46$1,300.00
170Traffic signal face 3S 12-inch (658.0173)EACH13$984.88$984.88$984.88$1,000.00
171Traffic signal face 4S 12-inch (658.0174)EACH8$1,274.39$1,274.39$1,274.39$1,300.00
172Pedestrian signal face 16-inch (658.0416)EACH8$570.54$570.54$570.54$600.00
173Pedestrian push buttons (658.0500)EACH11$402.67$402.67$402.67$425.00
174Signal mounting hardware (location) 01. washington RD (38TH ST) & 30TH ave (658.5070)EACH1$8,654.48$8,654.48$8,654.48$9,000.00
175Luminaires utility LED B (659.1120)EACH10$519.07$519.07$519.07$550.00
176Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH26$43.76$43.76$43.76$50.00
177Temporary traffic signals for intersections (location) 01. washington RD (38TH ST) & 30TH ave (661.0201)EACH1$41,573$41,573$41,573$43,000
178Sawing asphalt (690.0150)LF934$1.15$1.15$2.85$3.00
179Sawing concrete (690.0250)LF675$2.20$2.20$2.85$4.00
180Incentive compressive strength concrete pavement (715.0720)DOL3,020$1.00$1.00$1.00$1.00
181On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,000$5.00$5.00$5.00$5.00
182On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,400$5.00$5.00$5.00$5.00
183Special 01. utility line opening (ulo) (SPV.0060)EACH20$1,764.00$1,300.00$1,764.00$600.00
184Special 02. temporary pipe connection 12-inch (SPV.0060)EACH5$1,812.00$1,812.00$1,812.00$240.00
185Special 03. temporary pipe connection 18-inch (SPV.0060)EACH1$2,304.00$2,304.00$2,304.00$240.00
186Special 04. temporary pipe connection 21-inch (SPV.0060)EACH1$2,998.00$2,998.00$2,998.00$240.00
187Special 05. temporary pipe connection 72-inch (SPV.0060)EACH1$4,721.00$4,721.00$4,721.00$2,400.00
188Special 06. radar sensor system, washington RD (38TH ST) & 30TH ave (SPV.0060)EACH1$46,146$46,146$46,146$50,000
189Special 07. traffic signal cabinet and controller, washington RD (38TH ST) & 30TH ave (SPV.0060)EACH1$33,074$33,074$33,074$35,000
190Special 08. salvage and reinstall GPS evp detector system, washington RD (38TH ST) & 30T (SPV.0060)EACH1$3,602.83$3,602.83$3,602.83$4,000.00
191Special 09. section corner monuments (SPV.0060)EACH1$1,500.00$1,500.00$1,000.00$1,000.00
192Special 10. manholes 10X3-FT (SPV.0060)EACH1$28,990$28,990$28,990$27,000
193Special 11. manholes 10X4-FT (SPV.0060)EACH1$26,030$26,030$26,030$29,000
194Special 12. adjusting sanitary sewer manholes (SPV.0060)EACH4$1,412.00$1,412.00$1,412.00$875.00
195Special 13. adjusting water valves (SPV.0060)EACH11$408.00$408.00$408.00$175.00
196Special 14. 4-inch gate valve & box - MJ (SPV.0060)EACH1$1,819.00$1,819.00$1,819.00$2,150.00
197Special 15. 6-inch gate valve & box - MJ (SPV.0060)EACH1$2,188.00$2,188.00$2,188.00$2,550.00
198Special 16. 8-inch gate valve & box - MJ (SPV.0060)EACH1$2,986.00$2,986.00$2,986.00$3,400.00
199Special 17. 12-inch B.F. valve & box - MJ (SPV.0060)EACH2$4,165.00$4,165.00$4,165.00$4,700.00
200Special 18. 12-inch 45-degree bend - MJ (SPV.0060)EACH5$1,115.00$1,115.00$1,115.00$1,300.00
201Special 19. 6-inch 45-degree bend - MJ (SPV.0060)EACH2$489.00$489.00$489.00$625.00
202Special 20. 4-inch 45-degree bend - MJ (SPV.0060)EACH2$369.00$369.00$369.00$495.00
203Special 21. 12-inch solid sleeve - MJ (SPV.0060)EACH4$950.00$950.00$950.00$1,200.00
204Special 22. 8-inch solid sleeve - MJ (SPV.0060)EACH1$545.00$545.00$545.00$750.00
205Special 23. 6-inch solid sleeve - MJ (SPV.0060)EACH2$443.00$443.00$443.00$640.00
206Special 24. 4-inch solid sleeve - MJ (SPV.0060)EACH1$323.00$323.00$323.00$510.00
207Special 25. 12-inch cap - MJ (SPV.0060)EACH3$535.00$535.00$535.00$615.00
208Special 26. 6-inch cap - MJ (SPV.0060)EACH1$292.00$292.00$292.00$350.00
209Special 27. 4-inch cap - MJ (SPV.0060)EACH1$220.00$220.00$220.00$270.00
210Special 28. 12-inch X8-inch tee - MJ (SPV.0060)EACH1$1,404.00$1,404.00$1,404.00$1,550.00
211Special 29. 12-inch X 6-inch tee - MJ (SPV.0060)EACH1$1,268.00$1,268.00$1,268.00$1,400.00
212Special 30. 12-inch X 4-inch tee - MJ (SPV.0060)EACH1$1,249.00$1,249.00$1,249.00$1,400.00
213Special 31. relocate curbstop (complete) (SPV.0060)EACH1$3,813.00$3,813.00$3,813.00$3,500.00
214Special 32. encase EX. W.M. in insulating concrete (complete) (SPV.0060)EACH1$956.00$956.00$956.00$2,100.00
215Special 01. 4-inch PVC (C-900) pipe (SPV.0090)LF20$353.00$353.00$353.00$215.00
216Special 02. 6-inch PVC (C-900) pipe (SPV.0090)LF30$808.00$808.00$808.00$230.00
217Special 03. 8-inch PVC (C-900) pipe (SPV.0090)LF10$918.00$918.00$918.00$185.00
218Special 04. 12-inch PVC (C-900) pipe (SPV.0090)LF400$216.00$216.00$216.00$202.00
219Special 01. wall modular block gravity landscape (sta 10+00 to sta 11+07.66) (SPV.0165)SF300$78.00$78.00$78.00$85.00
WisDOT contract 20250311020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy