WisDOT contract 20250408027 bid tabulation
Mequon Road, City of Mequon; Washington Co Line to Buntrock Ave (STH 167, Ozaukee County Mequon Road). Let by Wisconsin DOT on April 8, 2025, Ozaukee. 6 bids received; low bid $3,487,164 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 210
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $3,487,164 | Low |
| 2 | Stark Pavement Corporation | $3,530,000 | +1.0% |
| 3 | Lalonde Contractors Incorporated | $3,674,527 | +5.0% |
| 4 | Zignego Company, Inc. | $3,701,130 | +6.0% |
| 5 | Zenith Tech., Inc. - Waukesha | $3,822,084 | +10% |
| 6 | Michels Road & Stone, Inc. | $3,898,649 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Stark Pavement Corporation | 3. Lalonde Contractors Incorporated | 4. Zignego Company, Inc. | 5. Zenith Tech., Inc. - Waukesha | 6. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 8 | $349.00 | $527.50 | $349.00 | $1.00 | $250.00 | $250.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $1,285.00 | $500.00 | $500.00 | $1,500.00 | $1,120.00 | $1,120.00 |
| 3 | Debris containment over waterway (structure) 01. C-45-31 (203.0335) | EACH | 1 | $4,144.00 | $4,144.00 | $4,144.00 | $4,144.00 | $4,144.00 | $4,144.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 793 | $9.88 | $9.80 | $18.26 | $20.00 | $17.90 | $17.90 |
| 5 | Removing asphaltic surface (204.0110) | SY | 218 | $12.10 | $7.50 | $16.28 | $20.00 | $17.90 | $17.90 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 110 | $3.20 | $3.20 | $3.20 | $3.20 | $11.35 | $3.20 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 64,600 | $1.86 | $1.96 | $1.96 | $1.96 | $2.25 | $1.96 |
| 8 | Removing curb & gutter (204.0150) | LF | 1,011 | $10.00 | $9.50 | $12.74 | $10.00 | $6.00 | $6.00 |
| 9 | Removing concrete sidewalk (204.0155) | SY | 243 | $18.00 | $8.25 | $12.04 | $20.00 | $4.05 | $4.05 |
| 10 | Removing concrete bases (204.0195) | EACH | 24 | $307.40 | $250.00 | $250.00 | $500.00 | $350.00 | $307.40 |
| 11 | Removing inlets (204.0220) | EACH | 1 | $342.50 | $500.00 | $500.00 | $1,200.00 | $500.00 | $500.00 |
| 12 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 17 | $29.26 | $30.00 | $30.00 | $20.00 | $47.80 | $47.80 |
| 13 | Removing (item description) 01. retaining wall R-45-42 (204.9060.S) | EACH | 1 | $4,500.00 | $3,109.90 | $6,848.00 | $5,000.00 | $1,270.00 | $1,270.00 |
| 14 | Removing (item description) 02. (traffic signals STH 167 & granville RD.) (204.9060.S) | EACH | 1 | $4,304.67 | $5,000.00 | $5,000.00 | $5,000.00 | $6,500.00 | $4,304.67 |
| 15 | Removing (item description) 03. (traffic signals STH 167 & wasaukee RD.) (204.9060.S) | EACH | 1 | $4,304.67 | $5,000.00 | $5,000.00 | $5,000.00 | $6,500.00 | $4,304.67 |
| 16 | Removing (item description) 04. (loop detector wire & lead-in cable STH 167 & granville RD.) (204.9060.S) | EACH | 1 | $1,434.89 | $500.00 | $500.00 | $500.00 | $1,500.00 | $1,434.89 |
| 17 | Removing (item description) 05. (loop detector wire & lead-in cable STH 167 & granville RD.) (204.9060.S) | EACH | 1 | $1,434.89 | $500.00 | $500.00 | $500.00 | $1,500.00 | $1,434.89 |
| 18 | Excavation common (205.0100) | CY | 1,237 | $48.10 | $30.55 | $55.40 | $25.00 | $25.00 | $25.00 |
| 19 | Backfill granular grade 1 (209.1100) | CY | 100 | $59.92 | $40.00 | $40.00 | $49.00 | $48.80 | $48.80 |
| 20 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 79 | $115.00 | $115.00 | $115.00 | $115.00 | $200.00 | $115.00 |
| 21 | Finishing roadway (project) 01. 1380-02-70 (213.0100) | EACH | 1 | $2,000.00 | $4,000.00 | $3,056.00 | $1,000.00 | $1,883.90 | $5,000.00 |
| 22 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,000 | $30.00 | $23.20 | $30.71 | $0.01 | $30.45 | $30.45 |
| 23 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 3,140 | $0.01 | $24.25 | $29.66 | $0.01 | $30.45 | $30.45 |
| 24 | Shaping shoulders (305.0500) | STA | 147 | $50.00 | $63.15 | $56.69 | $100.00 | $20.00 | $20.00 |
| 25 | Base patching concrete shes (390.0405) | CY | 4 | $1,000.00 | $1,100.00 | $987.00 | $1,000.00 | $550.99 | $1,000.00 |
| 26 | Drilled tie bars (416.0610) | EACH | 1,905 | $7.65 | $9.00 | $10.79 | $15.00 | $5.49 | $11.85 |
| 27 | Drilled dowel bars (416.0620) | EACH | 7,587 | $13.75 | $12.00 | $13.54 | $15.00 | $11.65 | $18.70 |
| 28 | Concrete pavement repair (416.1710) | SY | 3,009 | $83.82 | $82.00 | $92.37 | $108.00 | $102.37 | $102.84 |
| 29 | Concrete pavement repair shes (416.1715) | SY | 100 | $185.00 | $110.00 | $197.82 | $250.00 | $139.19 | $118.68 |
| 30 | Concrete pavement replacement (416.1720) | SY | 2,461 | $87.82 | $85.00 | $88.84 | $108.00 | $110.97 | $88.66 |
| 31 | Continuous diamond grinding concrete pavement (420.1000) | SY | 24,022 | $6.70 | $6.63 | $5.27 | $5.27 | $7.50 | $5.27 |
| 32 | Tack coat (455.0605) | GAL | 4,510 | $3.00 | $3.00 | $3.00 | $3.00 | $2.25 | $3.00 |
| 33 | Incentive density HMA pavement (460.2000) | DOL | 3,029 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 34 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 223 | $136.00 | $136.00 | $136.00 | $136.00 | $122.00 | $136.00 |
| 35 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 7,049 | $69.90 | $69.90 | $69.90 | $69.90 | $68.25 | $69.90 |
| 36 | Asphaltic surface patching (465.0110) | TON | 163 | $147.00 | $147.00 | $147.00 | $147.00 | $167.85 | $147.00 |
| 37 | Asphaltic surface driveways and field entrances (465.0120) | TON | 44 | $147.00 | $147.00 | $147.00 | $147.00 | $105.00 | $147.00 |
| 38 | Concrete surface repair (509.1500) | SF | 19 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 39 | Concrete collars for pipe (520.8000) | EACH | 1 | $850.00 | $700.00 | $700.00 | $750.00 | $1,000.00 | $1,000.00 |
| 40 | Culvert pipe reinforced concrete class III 54-inch (522.0154) | LF | 72 | $476.04 | $430.00 | $430.00 | $451.00 | $624.00 | $624.00 |
| 41 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,081.27 | $900.00 | $900.00 | $1,647.00 | $823.00 | $823.00 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,582.56 | $1,300.00 | $1,300.00 | $2,152.00 | $1,466.00 | $1,466.00 |
| 43 | Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054) | EACH | 2 | $3,915.06 | $4,500.00 | $4,500.00 | $6,349.00 | $3,384.00 | $3,384.00 |
| 44 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 752 | $45.00 | $47.00 | $51.63 | $51.12 | $54.34 | $51.87 |
| 45 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 639 | $48.00 | $47.00 | $51.63 | $47.41 | $50.46 | $49.38 |
| 46 | Concrete sidewalk 5-inch (602.0410) | SF | 25,552 | $5.95 | $7.00 | $5.71 | $4.53 | $4.90 | $5.48 |
| 47 | Curb ramp detectable warning field yellow (602.0505) | SF | 120 | $35.00 | $50.00 | $43.87 | $32.96 | $34.49 | $55.86 |
| 48 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 202 | $50.00 | $55.00 | $63.26 | $48.26 | $50.51 | $61.38 |
| 49 | Concrete driveway 7-inch (602.0815) | SY | 196 | $75.00 | $72.00 | $83.64 | $71.57 | $75.95 | $93.65 |
| 50 | Riprap medium (606.0200) | CY | 1 | $100.00 | $1,950.00 | $841.00 | $1,000.00 | $500.00 | $200.00 |
| 51 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 37 | $110.13 | $75.00 | $75.00 | $103.00 | $79.50 | $79.50 |
| 52 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 130 | $142.96 | $90.00 | $90.00 | $115.00 | $89.70 | $89.70 |
| 53 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 12 | $148.94 | $95.00 | $95.00 | $116.00 | $91.50 | $91.50 |
| 54 | Reconstructing manholes (611.0420) | EACH | 3 | $1,575.33 | $1,800.00 | $1,800.00 | $3,187.00 | $2,500.00 | $2,500.00 |
| 55 | Reconstructing inlets (611.0430) | EACH | 22 | $972.73 | $2,000.00 | $2,000.00 | $2,550.00 | $2,500.00 | $2,500.00 |
| 56 | Manhole covers type J (611.0530) | EACH | 1 | $467.78 | $900.00 | $900.00 | $1,205.00 | $1,210.00 | $1,210.00 |
| 57 | Inlet covers type H (611.0624) | EACH | 1 | $691.44 | $1,250.00 | $1,250.00 | $1,205.00 | $1,442.00 | $1,442.00 |
| 58 | Inlet covers type MS (611.0642) | EACH | 1 | $477.28 | $725.00 | $725.00 | $1,205.00 | $955.00 | $955.00 |
| 59 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,406.99 | $4,700.00 | $4,700.00 | $3,721.00 | $3,000.00 | $3,000.00 |
| 60 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $4,375.34 | $4,500.00 | $4,500.00 | $3,497.00 | $3,000.00 | $3,000.00 |
| 61 | Inlets median 1 grate (611.3901) | EACH | 1 | $3,048.44 | $3,600.00 | $3,600.00 | $2,902.00 | $2,500.00 | $2,500.00 |
| 62 | Adjusting manhole covers (611.8110) | EACH | 4 | $510.00 | $900.00 | $900.00 | $1,182.00 | $1,620.00 | $1,620.00 |
| 63 | Adjusting inlet covers (611.8115) | EACH | 15 | $476.00 | $950.00 | $950.00 | $1,182.00 | $1,620.00 | $1,620.00 |
| 64 | Cover plates temporary (611.8120.S) | EACH | 7 | $346.71 | $400.00 | $400.00 | $900.00 | $350.00 | $350.00 |
| 65 | Barrier system grading shaping finishing (614.0010) | EACH | 1 | $7,000.00 | $4,100.00 | $1,500.00 | $11,500 | $2,500.00 | $6,600.00 |
| 66 | Adjusting steel plate beam guard (614.0400) | LF | 100 | $10.00 | $12.90 | $12.00 | $12.00 | $16.00 | $12.90 |
| 67 | Replacing guardrail posts and blocks (614.0950) | EACH | 7 | $100.00 | $115.00 | $125.00 | $125.00 | $100.00 | $115.00 |
| 68 | Replacing guardrail rail and hardware (614.0951) | LF | 100 | $25.00 | $25.00 | $25.00 | $25.00 | $12.00 | $25.00 |
| 69 | Fence safety (616.0700.S) | LF | 500 | $1.00 | $4.00 | $3.35 | $3.35 | $3.50 | $4.00 |
| 70 | Maintenance and repair of haul roads (project) 01. 1380-02-70 (618.0100) | EACH | 1 | $0.01 | $1,500.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 71 | Mobilization (619.1000) | EACH | 1 | $147,000 | $89,913 | $107,814 | $189,000 | $146,172 | $329,196 |
| 72 | Concrete median sloped nose (620.0300) | SF | 107 | $15.00 | $25.00 | $16.90 | $14.85 | $15.87 | $18.13 |
| 73 | Water (624.0100) | MGAL | 30 | $30.00 | $85.00 | $54.00 | $50.00 | $75.00 | $75.00 |
| 74 | Topsoil (625.0100) | SY | 6,688 | $6.37 | $7.00 | $4.80 | $4.80 | $8.00 | $8.00 |
| 75 | Mulching (627.0200) | SY | 6,688 | $0.01 | $0.31 | $0.38 | $0.38 | $0.25 | $0.31 |
| 76 | Erosion bales (628.1104) | EACH | 100 | $0.01 | $11.25 | $10.00 | $10.00 | $16.00 | $11.25 |
| 77 | Silt fence (628.1504) | LF | 1,579 | $2.10 | $1.64 | $1.95 | $1.95 | $2.50 | $1.64 |
| 78 | Silt fence maintenance (628.1520) | LF | 1,579 | $0.01 | $0.05 | $0.01 | $0.01 | $0.10 | $0.05 |
| 79 | Mobilizations erosion control (628.1905) | EACH | 4 | $50.00 | $150.00 | $150.00 | $150.00 | $250.00 | $150.00 |
| 80 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $0.01 | $90.00 | $150.00 | $150.00 | $300.00 | $90.00 |
| 81 | Erosion mat urban class I type A (628.2006) | SY | 5,830 | $2.00 | $1.69 | $1.70 | $1.70 | $1.80 | $1.69 |
| 82 | Erosion mat urban class I type B (628.2008) | SY | 858 | $2.00 | $1.71 | $1.75 | $1.75 | $1.85 | $1.71 |
| 83 | Inlet protection type A (628.7005) | EACH | 13 | $50.00 | $89.10 | $95.00 | $95.00 | $125.00 | $89.10 |
| 84 | Inlet protection type B (628.7010) | EACH | 5 | $50.00 | $38.50 | $50.00 | $50.00 | $50.00 | $38.50 |
| 85 | Inlet protection type D (628.7020) | EACH | 210 | $110.00 | $65.00 | $70.00 | $70.00 | $125.00 | $65.00 |
| 86 | Culvert pipe checks (628.7555) | EACH | 13 | $20.00 | $38.10 | $16.00 | $16.00 | $20.00 | $38.10 |
| 87 | Rock bags (628.7570) | EACH | 100 | $1.00 | $8.00 | $10.00 | $10.00 | $20.00 | $8.00 |
| 88 | Fertilizer type B (629.0210) | CWT | 9 | $80.00 | $79.50 | $80.00 | $80.00 | $80.00 | $79.50 |
| 89 | Seeding mixture no. 30 (630.0130) | LB | 304 | $9.00 | $8.50 | $7.95 | $7.95 | $8.50 | $8.50 |
| 90 | Seeding temporary (630.0200) | LB | 182 | $3.00 | $3.25 | $2.95 | $2.95 | $5.00 | $3.25 |
| 91 | Seed water (630.0500) | MGAL | 150 | $10.00 | $10.00 | $12.00 | $12.00 | $25.00 | $10.00 |
| 92 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 38 | $140.00 | $88.50 | $105.00 | $105.00 | $125.00 | $88.50 |
| 93 | Signs type II reflective H (637.2210) | SF | 379.68 | $22.00 | $19.50 | $20.00 | $20.00 | $28.00 | $19.50 |
| 94 | Signs type II reflective H folding (637.2215) | SF | 104.52 | $30.00 | $23.90 | $28.00 | $28.00 | $32.00 | $23.90 |
| 95 | Signs type II reflective F (637.2230) | SF | 220 | $24.00 | $18.45 | $22.00 | $22.00 | $28.00 | $18.45 |
| 96 | Moving signs type II (638.2102) | EACH | 49 | $90.00 | $75.00 | $90.00 | $90.00 | $75.00 | $75.00 |
| 97 | Removing small sign supports (638.3000) | EACH | 18 | $20.00 | $18.50 | $28.00 | $28.00 | $35.00 | $18.50 |
| 98 | Field office type B (642.5001) | EACH | 1 | $10,000 | $9,000.00 | $26,210 | $20,000 | $14,012 | $26,000 |
| 99 | Traffic control drums (643.0300) | DAY | 29,703 | $0.18 | $0.18 | $0.18 | $0.10 | $0.18 | $0.18 |
| 100 | Traffic control barricades type III (643.0420) | DAY | 10,019 | $0.40 | $0.40 | $0.40 | $0.25 | $0.40 | $0.40 |
| 101 | Traffic control warning lights type A (643.0705) | DAY | 20,038 | $0.10 | $0.10 | $0.10 | $0.05 | $0.10 | $0.10 |
| 102 | Traffic control warning lights type C (643.0715) | DAY | 1,033 | $0.46 | $0.46 | $0.46 | $0.10 | $0.46 | $0.46 |
| 103 | Traffic control arrow boards (643.0800) | DAY | 28 | $25.00 | $25.00 | $25.00 | $8.00 | $25.00 | $25.00 |
| 104 | Traffic control signs (643.0900) | DAY | 42,547 | $0.21 | $0.21 | $0.21 | $0.20 | $0.21 | $0.21 |
| 105 | Traffic control covering signs type II (643.0920) | EACH | 10 | $46.33 | $46.33 | $46.33 | $50.00 | $46.33 | $46.33 |
| 106 | Traffic control signs fixed message (643.1000) | SF | 105 | $22.00 | $22.00 | $22.00 | $15.00 | $22.00 | $22.00 |
| 107 | Traffic control signs PCMS (643.1050) | DAY | 128 | $45.00 | $45.00 | $45.00 | $25.00 | $45.00 | $45.00 |
| 108 | Traffic control cones 42-inch (643.1070) | DAY | 298 | $2.67 | $2.67 | $2.67 | $1.00 | $2.67 | $2.67 |
| 109 | Temporary marking line removable tape 6-inch (643.3180) | LF | 7,495 | $2.26 | $2.26 | $2.26 | $1.60 | $2.26 | $2.26 |
| 110 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 809 | $3.11 | $3.11 | $3.11 | $1.95 | $3.11 | $3.11 |
| 111 | Traffic control (643.5000) | EACH | 1 | $17,000 | $17,000 | $17,000 | $22,232 | $17,000 | $17,000 |
| 112 | Temporary pedestrian surface asphalt (644.1410) | SF | 2,752 | $0.01 | $6.75 | $8.67 | $5.00 | $8.00 | $6.75 |
| 113 | Temporary pedestrian curb ramp (644.1601) | DAY | 665 | $3.75 | $3.75 | $3.75 | $5.00 | $3.75 | $3.75 |
| 114 | Temporary pedestrian detectable warning field (644.1605) | SF | 360 | $5.70 | $5.70 | $5.70 | $50.00 | $5.70 | $5.70 |
| 115 | Temporary pedestrian barricade (644.1810) | LF | 3,584 | $2.00 | $2.00 | $2.00 | $3.50 | $2.00 | $2.00 |
| 116 | Geotextile type HR (645.0120) | SY | 52 | $10.00 | $10.00 | $8.16 | $10.00 | $20.00 | $10.00 |
| 117 | Marking line epoxy 4-inch (646.1020) | LF | 3,016 | $0.34 | $0.70 | $0.80 | $0.34 | $0.34 | $0.34 |
| 118 | Marking line epoxy 6-inch (646.2020) | LF | 466 | $0.44 | $0.90 | $0.90 | $0.44 | $0.44 | $0.44 |
| 119 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 4,549 | $1.95 | $1.00 | $1.40 | $1.95 | $1.95 | $1.95 |
| 120 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 82,878 | $1.20 | $1.27 | $1.60 | $1.20 | $1.20 | $1.20 |
| 121 | Marking line epoxy 8-inch (646.3020) | LF | 1,058 | $0.87 | $1.50 | $1.20 | $0.87 | $0.87 | $0.87 |
| 122 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 8,362 | $2.47 | $2.75 | $3.20 | $2.47 | $2.47 | $2.47 |
| 123 | Marking arrow epoxy (646.5020) | EACH | 61 | $288.23 | $220.00 | $320.00 | $288.23 | $288.23 | $288.23 |
| 124 | Marking word epoxy (646.5120) | EACH | 16 | $331.26 | $240.00 | $350.00 | $331.26 | $331.26 | $331.26 |
| 125 | Marking stop line epoxy 18-inch (646.6120) | LF | 758 | $12.27 | $13.00 | $16.50 | $12.27 | $12.27 | $12.27 |
| 126 | Marking yield line epoxy 18-inch (646.6220) | EACH | 57 | $28.83 | $65.00 | $95.00 | $28.83 | $28.83 | $28.83 |
| 127 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,866 | $11.77 | $10.00 | $8.00 | $11.77 | $11.77 | $11.77 |
| 128 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,865 | $11.39 | $10.00 | $13.00 | $11.39 | $11.39 | $11.39 |
| 129 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 114 | $19.88 | $17.50 | $22.00 | $19.88 | $19.88 | $19.88 |
| 130 | Marking corrugated median epoxy (646.8020) | SF | 2,304 | $7.05 | $7.50 | $5.00 | $7.05 | $7.05 | $7.05 |
| 131 | Marking curb epoxy (646.8120) | LF | 310 | $5.79 | $8.25 | $6.00 | $5.79 | $5.79 | $5.79 |
| 132 | Marking island nose epoxy (646.8220) | EACH | 26 | $227.32 | $275.00 | $275.00 | $227.32 | $227.32 | $227.32 |
| 133 | Construction staking storm sewer (650.4000) | EACH | 3 | $55.55 | $125.00 | $55.55 | $55.55 | $55.55 | $55.55 |
| 134 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 619 | $0.67 | $1.50 | $0.67 | $0.67 | $0.67 | $0.67 |
| 135 | Construction staking pipe culverts (650.6000) | EACH | 1 | $150.00 | $200.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 136 | Construction staking resurfacing reference (650.8000) | LF | 20,186 | $0.11 | $0.29 | $0.11 | $0.11 | $0.11 | $0.11 |
| 137 | Construction staking electrical installations (project) 01. 1380-02- 70 (650.8501) | EACH | 1 | $5,495.94 | $3,200.00 | $5,495.94 | $5,495.94 | $5,495.94 | $5,495.94 |
| 138 | Construction staking curb ramps (650.9000) | EACH | 23 | $175.00 | $200.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 139 | Construction staking sidewalk (project) 01. 1380-02-70 (650.9500) | EACH | 1 | $3,423.97 | $4,000.00 | $3,423.97 | $3,423.97 | $3,423.97 | $3,423.97 |
| 140 | Construction staking supplemental control (project) 01. 1380-02-70 (650.9911) | EACH | 1 | $533.96 | $1,850.00 | $533.96 | $533.96 | $533.96 | $533.96 |
| 141 | Construction staking slope stakes (650.9920) | LF | 4,789 | $0.87 | $1.00 | $0.87 | $0.87 | $0.87 | $0.87 |
| 142 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,506 | $7.51 | $8.00 | $8.00 | $8.00 | $7.80 | $7.51 |
| 143 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,283 | $9.81 | $10.00 | $10.00 | $10.00 | $15.00 | $9.81 |
| 144 | Conduit special 2-inch (652.0605) | LF | 1,380 | $18.22 | $25.00 | $25.00 | $25.00 | $25.00 | $18.22 |
| 145 | Conduit special 3-inch (652.0615) | LF | 1,557 | $27.09 | $26.00 | $26.00 | $26.00 | $45.00 | $27.09 |
| 146 | Conduit loop detector (652.0800) | LF | 3,440 | $6.43 | $7.00 | $7.00 | $7.00 | $8.00 | $6.43 |
| 147 | Pull boxes steel 24X36-inch (653.0135) | EACH | 10 | $1,333.45 | $900.00 | $900.00 | $900.00 | $1,200.00 | $1,333.45 |
| 148 | Pull boxes steel 24X42-inch (653.0140) | EACH | 31 | $1,249.64 | $1,100.00 | $1,100.00 | $1,100.00 | $1,300.00 | $1,249.64 |
| 149 | Removing pull boxes (653.0905) | EACH | 33 | $128.04 | $200.00 | $200.00 | $200.00 | $200.00 | $128.04 |
| 150 | Concrete bases type 1 (654.0101) | EACH | 8 | $966.11 | $750.00 | $750.00 | $750.00 | $1,200.00 | $966.11 |
| 151 | Concrete bases type 2 (654.0102) | EACH | 4 | $1,535.88 | $1,300.00 | $1,300.00 | $1,300.00 | $1,380.00 | $1,535.88 |
| 152 | Concrete bases type 10 (654.0110) | EACH | 2 | $6,810.75 | $8,600.00 | $8,600.00 | $8,600.00 | $8,500.00 | $6,810.75 |
| 153 | Concrete bases type 10-special (654.0120) | EACH | 6 | $8,870.66 | $12,000 | $12,000 | $12,000 | $10,000 | $8,870.66 |
| 154 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 2 | $2,756.11 | $2,200.00 | $2,200.00 | $2,200.00 | $2,200.00 | $2,756.11 |
| 155 | Cable traffic signal 5-14 AWG (655.0230) | LF | 905 | $1.62 | $1.50 | $1.50 | $1.50 | $1.50 | $1.62 |
| 156 | Cable traffic signal 7-14 AWG (655.0240) | LF | 632 | $2.09 | $2.25 | $2.25 | $2.25 | $1.81 | $2.09 |
| 157 | Cable traffic signal 12-14 AWG (655.0260) | LF | 4,747 | $3.16 | $3.25 | $3.25 | $3.25 | $2.80 | $3.16 |
| 158 | Cable traffic signal 15-14 AWG (655.0270) | LF | 317 | $3.69 | $5.50 | $5.50 | $5.50 | $3.60 | $3.69 |
| 159 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 1,658 | $1.99 | $2.10 | $2.10 | $2.10 | $2.00 | $1.99 |
| 160 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,805 | $1.20 | $1.30 | $1.30 | $1.30 | $1.05 | $1.20 |
| 161 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,728 | $1.03 | $1.00 | $1.00 | $1.00 | $0.95 | $1.03 |
| 162 | Loop detector lead in cable (655.0700) | LF | 11,660 | $1.71 | $1.90 | $1.90 | $1.90 | $1.35 | $1.71 |
| 163 | Loop detector wire (655.0800) | LF | 8,166 | $1.29 | $1.40 | $1.40 | $1.40 | $0.95 | $1.29 |
| 164 | Traffic signal evp detector cable (655.0900) | LF | 1,928 | $2.14 | $2.00 | $2.00 | $2.00 | $2.00 | $2.14 |
| 165 | Electrical service meter breaker pedestal (location) 01. STH 167 & granville RD. (656.0201) | EACH | 1 | $1,631.11 | $1,500.00 | $1,500.00 | $1,500.00 | $1,800.00 | $1,631.11 |
| 166 | Electrical service meter breaker pedestal (location) 02. STH 167 & wasaukee RD. (656.0201) | EACH | 1 | $1,631.11 | $1,500.00 | $1,500.00 | $1,500.00 | $1,800.00 | $1,631.11 |
| 167 | Pedestal bases (657.0100) | EACH | 8 | $336.49 | $275.00 | $275.00 | $275.00 | $260.00 | $336.49 |
| 168 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 4 | $785.95 | $650.00 | $650.00 | $650.00 | $610.00 | $785.95 |
| 169 | Poles type 3 (657.0310) | EACH | 4 | $4,239.33 | $3,800.00 | $3,800.00 | $3,800.00 | $4,000.00 | $4,239.33 |
| 170 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $982.11 | $900.00 | $900.00 | $900.00 | $656.00 | $982.11 |
| 171 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 8 | $1,029.77 | $750.00 | $750.00 | $750.00 | $750.00 | $1,029.77 |
| 172 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 8 | $422.36 | $600.00 | $600.00 | $600.00 | $310.00 | $422.36 |
| 173 | Traffic signal face 3S 12-inch (658.0173) | EACH | 24 | $935.15 | $800.00 | $800.00 | $800.00 | $720.00 | $935.15 |
| 174 | Traffic signal face 4S 12-inch (658.0174) | EACH | 16 | $1,207.93 | $1,100.00 | $1,100.00 | $1,100.00 | $1,050.00 | $1,207.93 |
| 175 | Signal mounting hardware (location) 01. (STH 167 & granville RD.) (658.5070) | EACH | 1 | $6,761.55 | $6,310.00 | $6,310.00 | $6,310.00 | $3,000.00 | $6,761.55 |
| 176 | Signal mounting hardware (location) 02. (STH 167 & wasaukee RD.) (658.5070) | EACH | 1 | $5,488.36 | $5,385.00 | $5,385.00 | $5,385.00 | $3,800.00 | $5,488.36 |
| 177 | Luminaires utility LED C (659.1125) | EACH | 12 | $903.06 | $400.00 | $400.00 | $400.00 | $255.00 | $903.06 |
| 178 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 54 | $28.70 | $125.00 | $125.00 | $125.00 | $75.00 | $28.70 |
| 179 | Temporary traffic signals for intersections (location) 01. (STH 167 & granville RD.) (661.0201) | EACH | 1 | $56,757 | $49,000 | $49,000 | $49,000 | $45,000 | $56,757 |
| 180 | Temporary traffic signals for intersections (location) 02. (STH 167 & wausakee RD.) (661.0201) | EACH | 1 | $56,757 | $48,000 | $49,000 | $49,000 | $45,000 | $56,757 |
| 181 | Generators (661.0300) | DAY | 2 | $935.50 | $300.00 | $300.00 | $300.00 | $500.00 | $935.50 |
| 182 | Install camera assembly (677.0200) | EACH | 2 | $8,636.57 | $8,000.00 | $8,000.00 | $8,000.00 | $7,500.00 | $8,636.57 |
| 183 | Sawing asphalt (690.0150) | LF | 2,376 | $1.39 | $1.39 | $1.10 | $1.10 | $1.39 | $1.39 |
| 184 | Sawing concrete (690.0250) | LF | 15,590 | $1.85 | $1.85 | $2.00 | $2.00 | $1.85 | $1.85 |
| 185 | Incentive iri ride (740.0440) | DOL | 15,293 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 186 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 187 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,320 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 188 | Special 01. transp & install state furnished traf sig cabinet at STH 167 & granville RD (SPV.0060) | EACH | 1 | $3,587.22 | $8,500.00 | $8,500.00 | $8,500.00 | $2,000.00 | $3,587.22 |
| 189 | Special 02. transp & install state furnished traf sig cabinet at STH 167 & wasaukee RD (SPV.0060) | EACH | 1 | $3,587.22 | $8,500.00 | $8,500.00 | $8,500.00 | $2,000.00 | $3,587.22 |
| 190 | Special 03. remove & install wireless communication equipment at STH 167 & granville RD (SPV.0060) | EACH | 1 | $9,467.20 | $2,000.00 | $2,000.00 | $2,000.00 | $6,000.00 | $9,467.20 |
| 191 | Special 04. remove & install wireless communication equipment at STH 167 & wasaukee RD (SPV.0060) | EACH | 1 | $9,467.20 | $2,000.00 | $2,000.00 | $2,000.00 | $6,000.00 | $9,467.20 |
| 192 | Special 06. cleaning manhole (SPV.0060) | EACH | 12 | $250.00 | $500.00 | $500.00 | $500.00 | $175.00 | $175.00 |
| 193 | Special 07. cleaning inlet (SPV.0060) | EACH | 59 | $169.49 | $300.00 | $300.00 | $500.00 | $175.00 | $175.00 |
| 194 | Special 08. adjusting city of mequon sanitary sewer manhole covers (SPV.0060) | EACH | 2 | $1,150.00 | $1,800.00 | $1,675.76 | $3,191.00 | $2,000.00 | $2,000.00 |
| 195 | Special 09. adjusting mequon water utility water boxes (SPV.0060) | EACH | 2 | $355.50 | $900.00 | $279.50 | $1,200.00 | $300.00 | $300.00 |
| 196 | Special 10. strapping (C-45-31) (SPV.0060) | EACH | 1 | $3,700.00 | $3,700.00 | $3,700.00 | $3,700.00 | $3,700.00 | $3,700.00 |
| 197 | Special 11. temporary water diversion little menomonee creek (SPV.0060) | EACH | 1 | $9,750.00 | $9,750.00 | $9,750.00 | $9,750.00 | $9,750.00 | $9,750.00 |
| 198 | Special 13. utility line opening (SPV.0060) | EACH | 5 | $800.00 | $850.00 | $1,650.00 | $1,000.00 | $700.00 | $700.00 |
| 199 | Special 15. TRN & inst state furn evp det heads W/conf beacons at STH 167 & granville RD (SPV.0060) | EACH | 1 | $2,624.67 | $1,800.00 | $1,800.00 | $1,800.00 | $4,500.00 | $2,624.67 |
| 200 | Special 16. TRN & inst state furn evp det heads W/conf beacons at STH 167 & wasaukee RD (SPV.0060) | EACH | 1 | $2,624.67 | $1,800.00 | $1,800.00 | $1,800.00 | $4,500.00 | $2,624.67 |
| 201 | Special 17. transport & install state furnished luminaire arms steel 15- FT (SPV.0060) | EACH | 4 | $697.87 | $500.00 | $500.00 | $500.00 | $450.00 | $697.87 |
| 202 | Special 18. transport & install state furnished poles type 9 special (SPV.0060) | EACH | 4 | $1,493.17 | $2,000.00 | $2,000.00 | $2,000.00 | $2,200.00 | $1,493.17 |
| 203 | Special 19. transport & install state furnished poles type 10 (SPV.0060) | EACH | 2 | $1,493.17 | $2,400.00 | $2,400.00 | $2,400.00 | $2,200.00 | $1,493.17 |
| 204 | Special 20. transport & install state furnished poles type 10 special (SPV.0060) | EACH | 2 | $1,493.17 | $2,500.00 | $2,500.00 | $2,500.00 | $3,500.00 | $1,493.17 |
| 205 | Special 21. transport & install state furnished monotube arms 30-FT (SPV.0060) | EACH | 2 | $1,659.57 | $1,800.00 | $1,800.00 | $1,800.00 | $3,500.00 | $1,659.57 |
| 206 | Special 22. transport & install state furnished monotube arms 40-FT special (SPV.0060) | EACH | 1 | $1,659.57 | $2,000.00 | $2,000.00 | $2,000.00 | $4,500.00 | $1,659.57 |
| 207 | Special 23. transport & install state furnished monotube arms 45-FT special (SPV.0060) | EACH | 5 | $1,957.44 | $2,000.00 | $2,200.00 | $2,200.00 | $4,500.00 | $1,957.44 |
| 208 | Special 01. minor retaining wall cap replacement (SPV.0090) | LF | 107 | $4.00 | $25.90 | $48.00 | $48.00 | $22.50 | $25.90 |
| 209 | Special 01. coarse aggregate mix for stream bed (SPV.0195) | TON | 14 | $194.78 | $60.00 | $60.00 | $500.00 | $168.00 | $100.00 |
| 210 | Special 02. asphaltic repair (SPV.0195) | TON | 1,476 | $91.10 | $91.10 | $91.10 | $91.10 | $115.00 | $91.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.