WisDOT contract 20250408031 bid tabulation

C Milwaukee W Morgan Avenue; Ints W/ 20th, 16th, 13th & 6th St (LOC STR, Milwaukee County C Milwaukee, W Morgan Avenue). Let by Wisconsin DOT on April 8, 2025, Milwaukee. 3 bids received; low bid $2,427,145 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
08 APR 2025
Pay items
156
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$2,427,145Low
2Zenith Tech., Inc. - Waukesha$2,555,228+5.0%
3Zignego Company, Inc.$2,654,423+9.0%
WisDOT contract 20250408031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. Zenith Tech., Inc. - Waukesha3. Zignego Company, Inc.
1Removing concrete pavement (204.0100)SY770$27.88$25.00$20.00
2Removing curb & gutter (204.0150)LF180$17.69$24.00$20.00
3Removing concrete sidewalk (204.0155)SY707$18.05$17.00$20.00
4Removing concrete bases (204.0195)EACH24$250.00$525.81$500.00
5Removing (item description) 301. lighting units (204.9060.S)EACH41$920.00$706.35$706.35
6Excavation common (205.0100)CY169.40$71.81$60.00$50.00
7Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON30.50$193.14$130.00$200.00
8Finishing roadway (project) 001. 2984-21-73 (213.0100)EACH1$3,808.00$3,269.03$1,000.00
9Base aggregate dense 1 1/4-inch (305.0120)TON225$51.05$55.00$50.00
10Concrete base 8-inch (320.0145)SY206$85.06$86.87$150.00
11Concrete pavement 8-inch (415.0080)SY41$130.01$113.68$150.00
12Drilled tie bars (416.0610)EACH461$24.23$11.39$30.00
13Drilled dowel bars (416.0620)EACH181$28.86$25.71$30.00
14Asphaltic surface (465.0105)TON27$394.00$388.89$394.00
15Concrete curb & gutter 31-inch (601.0331)LF861$66.12$67.42$75.00
16Concrete curb pedestrian (601.0600)LF196$67.15$26.30$75.00
17Concrete sidewalk 5-inch (602.0410)SF5,670$9.58$14.06$17.00
18Curb ramp detectable warning field natural patina (602.0515)SF274$52.07$30.84$50.00
19Curb ramp detectable warning field radial natural patina (602.0615)SF158$72.73$45.52$100.00
20Adjusting inlet covers (611.8115)EACH1$811.00$1,500.00$2,000.00
21Mobilization (619.1000)EACH1$109,084$147,752$227,000
22Concrete median sloped nose (620.0300)SF401$18.46$21.65$20.00
23Topsoil (625.0100)SY221$5.95$10.00$5.95
24Mobilizations erosion control (628.1905)EACH2$200.00$100.00$200.00
25Mobilizations emergency erosion control (628.1910)EACH2$200.00$10.00$200.00
26Inlet protection type A (628.7005)EACH3$105.00$50.00$105.00
27Inlet protection type D (628.7020)EACH41$95.00$125.00$95.00
28Sod lawn (631.1000)SY221$9.95$25.00$9.95
29Field office type C (642.5201)EACH1$16,468$13,609$20,000
30Traffic control drums (643.0300)DAY33,300$0.10$0.18$0.10
31Traffic control barricades type II (643.0410)DAY2,700$0.25$0.15$0.25
32Traffic control barricades type III (643.0420)DAY1,980$0.25$0.55$0.25
33Traffic control warning lights type A (643.0705)DAY3,960$0.08$0.12$0.08
34Traffic control warning lights type C (643.0715)DAY1,560$0.10$0.12$0.10
35Traffic control arrow boards (643.0800)DAY240$5.00$12.50$5.00
36Traffic control signs (643.0900)DAY11,220$0.25$0.16$0.25
37Traffic control covering signs type II (643.0920)EACH5$50.00$95.00$50.00
38Traffic control signs PCMS (643.1050)DAY56$35.00$22.50$35.00
39Temporary marking line removable tape 4-inch (643.3150)LF16,144$1.30$1.40$1.30
40Temporary marking crosswalk removable tape 6-inch (643.3350)LF1,013$1.95$2.15$1.95
41Traffic control (643.5000)EACH1$21,000$21,000$21,000
42Temporary pedestrian surface asphalt (644.1410)SF98$36.48$1.00$10.00
43Temporary pedestrian curb ramp (644.1601)DAY540$8.00$7.00$20.00
44Temporary pedestrian detectable warning field (644.1605)SF170$12.00$6.50$50.00
45Temporary pedestrian barricade (644.1810)LF1,132$4.00$5.25$4.00
46Marking line epoxy 4-inch (646.1020)LF7,557$1.45$0.40$1.45
47Marking line epoxy 6-inch (646.2020)LF4,100$2.25$0.50$2.25
48Marking line epoxy 8-inch (646.3020)LF1,256$2.95$1.05$2.95
49Marking arrow epoxy (646.5020)EACH36$95.00$340.25$95.00
50Marking word epoxy (646.5120)EACH12$125.00$391.00$125.00
51Marking symbol epoxy (646.5220)EACH17$105.00$328.80$105.00
52Marking stop line epoxy 12-inch (646.6020)LF1,786$4.45$13.90$4.45
53Marking yield line epoxy 18-inch (646.6220)EACH59$6.65$34.05$6.65
54Marking removal line water blasting 4-inch (646.9010)LF4,734$0.40$0.40$0.40
55Marking removal line water blasting 6-inch (646.9012)LF37$5.00$1.00$5.00
56Marking removal line water blasting 8-inch (646.9110)LF1,085$0.90$1.10$0.90
57Marking removal line water blasting wide (646.9210)LF2,744$2.00$2.50$2.00
58Marking removal special marking water blasting (646.9310)EACH22$95.00$175.00$95.00
59Construction staking curb gutter and curb & gutter (650.5500)LF861$1.50$1.16$4.45
60Construction staking electrical installations (project) 001. 2984-21- 73 (650.8501)EACH1$5,000.00$1,650.00$5,700.00
61Construction staking curb ramps (650.9000)EACH36$165.00$325.00$145.00
62Construction staking sidewalk (project) 001. 2984-21-73 (650.9500)EACH1$5,000.00$2,500.00$2,160.00
63Construction staking supplemental control (project) 001. 2984-21-73 (650.9911)EACH1$5,000.00$1,500.00$2,100.00
64Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF285$12.35$14.48$14.48
65Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,545$17.55$15.82$15.82
66Conduit special 3-inch (652.0615)LF2,895$28.90$31.38$31.38
67Removing pull boxes (653.0905)EACH6$300.00$109.43$109.43
68Concrete bases type 1 (654.0101)EACH22$1,140.00$1,093.62$1,093.62
69Concrete bases type 5 (654.0105)EACH9$1,350.00$1,203.94$1,203.94
70Concrete bases type 10 (654.0110)EACH9$7,500.00$6,597.11$6,597.11
71Concrete bases type 10-special (654.0120)EACH6$9,500.00$8,206.81$8,206.81
72Cable traffic signal 5-14 AWG (655.0230)LF3,720$2.85$1.84$1.84
73Cable traffic signal 7-14 AWG (655.0240)LF90$3.20$3.33$3.33
74Cable traffic signal 9-14 AWG (655.0250)LF595$3.60$4.18$4.18
75Cable traffic signal 12-14 AWG (655.0260)LF185$4.20$4.18$4.18
76Cable traffic signal 15-14 AWG (655.0270)LF2,065$5.00$4.81$4.81
77Cable traffic signal 19-14 AWG (655.0280)LF1,850$5.70$5.92$5.92
78Cable type UF 2-12 AWG grounded (655.0305)LF5,630$2.30$1.00$1.00
79Electrical wire traffic signals 10 AWG (655.0515)LF2,430$1.15$2.60$2.60
80Traffic signal evp detector cable (655.0900)LF2,725$1.05$1.70$1.70
81Pedestal bases (657.0100)EACH22$665.00$386.24$386.24
82Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH9$980.00$706.86$706.86
83Poles type 9 (657.0345)EACH1$9,956.00$8,762.45$8,762.45
84Poles type 10 (657.0350)EACH9$10,890$10,730$10,730
85Poles type 10-special (657.0352)EACH6$12,995$13,188$13,188
86Traffic signal standards aluminum 3.5-FT (657.0405)EACH3$565.00$483.53$483.53
87Traffic signal standards aluminum 13-FT (657.0420)EACH15$975.00$909.21$909.21
88Traffic signal standards aluminum 10-FT (657.0430)EACH4$900.00$854.28$854.28
89Monotube arms 15-FT (657.0515)EACH2$4,890.00$4,020.36$4,020.36
90Monotube arms 25-FT (657.0525)EACH2$5,195.00$4,552.67$4,552.67
91Monotube arms 30-FT (657.0530)EACH6$5,990.00$5,752.80$5,752.80
92Monotube arms 35-FT-special (657.0536)EACH2$6,810.00$7,177.40$7,177.40
93Monotube arms 40-FT-special (657.0541)EACH2$6,900.00$7,302.44$7,302.44
94Monotube arms 45-FT-special (657.0546)EACH2$6,990.00$7,414.63$7,414.63
95Traffic signal face 3S 12-inch (658.0173)EACH74$995.00$1,002.69$1,002.69
96Traffic signal face 4S 12-inch (658.0174)EACH2$1,675.00$1,306.52$1,306.52
97Pedestrian signal face 12-inch (658.0412)EACH32$995.00$539.32$539.32
98Signal mounting hardware (location) 001. S. 20TH street (658.5070)EACH1$6,155.00$4,270.65$4,270.65
99Signal mounting hardware (location) 002. S. 16TH street (658.5070)EACH1$6,820.00$5,047.75$5,047.75
100Signal mounting hardware (location) 003. S. 13TH street (658.5070)EACH1$6,820.00$5,047.75$5,047.75
101Signal mounting hardware (location) 004. S. 6TH. street (658.5070)EACH1$6,750.00$4,965.95$4,965.95
102Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH41$25.00$29.19$29.19
103Temporary traffic signals for intersections (location) 001. S.20TH street (661.0201)EACH1$17,500$51,105$51,105
104Temporary traffic signals for intersections (location) 002. S. 16TH street (661.0201)EACH1$18,000$52,862$52,862
105Temporary traffic signals for intersections (location) 003. S.13TH. street (661.0201)EACH1$21,500$55,495$55,495
106Temporary traffic signals for intersections (location) 004. S.6TH. street (661.0201)EACH1$24,000$65,829$65,829
107Remove cable (674.0300)LF4,830$2.00$2.54$2.54
108Sawing asphalt (690.0150)LF56$1.20$1.20$3.52
109Sawing concrete (690.0250)LF1,770$2.20$2.20$2.17
110On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS800$5.00$5.00$5.00
111On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,000$5.00$5.00$5.00
112Special 001. adjusting water valve boxes (SPV.0060)EACH2$534.00$1,200.00$2,000.00
113Special 002. adjusting water manhole (SPV.0060)EACH2$1,507.00$1,800.00$2,500.00
114Special 003. utility line opening (ulo) (SPV.0060)EACH20$1,778.79$1,600.00$1.00
115Special 004. section corner monuments (SPV.0060)EACH2$1,801.00$2,483.92$1,000.00
116Special 201. install city precast controller base (SPV.0060)EACH4$1,250.00$1,246.21$1,246.21
117Special 203. concrete bases type 10 spread footing (SPV.0060)EACH1$11,500$9,220.72$9,220.72
118Special 205. atc controller and cabinet installed (SPV.0060)EACH4$37,500$36,460$36,460
119Special 215. electrical service pedestal (SPV.0060)EACH3$3,350.00$1,779.90$1,779.90
120Special 218. EVP1 direction detector (SPV.0060)EACH16$1,570.00$1,461.39$1,461.39
121Special 221. evp phase selector card 4 channel (SPV.0060)EACH4$4,995.00$4,835.02$4,835.02
122Special 223. evp confirmation light (SPV.0060)EACH16$189.00$539.63$539.63
123Special 225. vehicular video detection system 2 cameras (SPV.0060)EACH1$34,700$33,241$33,241
124Special 243. remove traffic signals (20TH street) (SPV.0060)EACH1$6,500.00$5,176.01$5,176.01
125Special 244. remove traffic signals (16TH street) (SPV.0060)EACH1$7,000.00$5,176.01$5,176.01
126Special 245 remove traffic signals (13TH street) (SPV.0060)EACH1$8,000.00$5,176.01$5,176.01
127Special 246 remove traffic signals (6TH street) (SPV.0060)EACH1$8,500.00$6,538.17$6,538.17
128Special 267. pedestrian countdown signal face 12-inch (SPV.0060)EACH32$1,370.00$539.32$539.32
129Special 268. voice instruction audible push button (SPV.0060)EACH32$1,315.00$1,199.02$1,199.02
130Special 269. voice instruction audible control unit (SPV.0060)EACH4$3,820.00$3,879.73$3,879.73
131Special 302. fiberglass/polymer concrete pull box 13"X24"X24" (SPV.0060)EACH35$1,260.00$1,281.67$1,281.67
132Special 303. fiberglass/polymer concrete pull box 17"X30"X24" (SPV.0060)EACH38$1,475.00$1,375.89$1,375.89
133Special 310. remove poles (SPV.0060)EACH19$900.00$644.11$644.11
134Special 312. poles type A-26 (gray concrete, direct bury) (SPV.0060)EACH3$3,990.00$3,794.40$3,794.40
135Special 325. pole 30-FT aluminum bolt down (SPV.0060)EACH9$2,620.00$1,889.08$1,889.08
136Special 334. 40' wood poles (SPV.0060)EACH29$1,216.00$2,836.89$2,836.89
137Special 338. primary or secondary riser (SPV.0060)EACH23$890.00$784.34$784.34
138Special 343. submersible multitap 4-port pre-insulated connector (SPV.0060)EACH69$120.00$204.37$204.37
139Special 345. luminaire arm single member 6-foot (SPV.0060)EACH23$450.00$322.83$322.83
140Special 346. luminaire arm single member 6-foot wood pole mount (SPV.0060)EACH21$225.00$322.83$322.83
141Special 347. luminaire arm single member 8-foot (special) (SPV.0060)EACH6$1,274.00$792.17$792.17
142Special 353. equipment grounding electrode (SPV.0060)EACH17$680.00$229.65$229.65
143Special 355. A21-26 city furnished mounting clamp (single bracket) (SPV.0060)EACH3$500.00$583.78$583.78
144Special 375. luminaire utility 2LED (SPV.0060)EACH13$445.00$668.62$668.62
145Special 376. luminaire utility 3LED (SPV.0060)EACH49$445.00$668.62$668.62
146Special 881. inline 5A fast acting fuse with holder (SPV.0060)EACH25$105.00$311.45$311.45
147Special 002. marking line 24-inch epoxy stop line (SPV.0090)LF454$8.95$14.80$8.95
148Special 300. cable type 1#8 AWG 5KV concentric city furnished (SPV.0090)LF1,580$4.89$6.01$6.01
149Special 301. electrical cable 1#6 primary linewire 5KV (SPV.0090)LF1,900$6.40$7.08$7.08
150Special 302. electrical cable 3#6AL triplex (SPV.0090)LF1,620$6.03$3.01$3.01
151Special 304. electrical cable 2#2/1#4 AL triplex (SPV.0090)LF3,260$6.30$3.39$3.39
152Special 319. liquidtight flexible nonmetallic conduit 1 1/2INCH (SPV.0090)LF900$14.75$7.69$7.69
153Special 323. electrical cable type 3#4/1#8 xlpe use-2 (SPV.0090)LF290$17.50$10.36$10.36
154Special 324. electrical cable type 4#2/1#8 xlpe use-2 (SPV.0090)LF3,110$16.10$9.03$9.03
155Special 325. conduit 3-inch HDPE schedule 40 (SPV.0090)LF3,210$24.60$32.74$32.74
156Special 001. excavation, hauling and disposal of cvoc contaminated soil (SPV.0195)TON5.50$487.92$350.00$200.00
WisDOT contract 20250408031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy