WisDOT contract 20250610006 bid tabulation
Delavan - Lake Geneva; Lake Lawn to STH 67 (STH 050, Walworth County Lake Lawn Dr to STH 67). Let by Wisconsin DOT on June 10, 2025, Walworth. 2 bids received; low bid $2,841,664 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 JUN 2025
- Pay items
- 215
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $2,841,664 | Low |
| 2 | Rock Road Companies, Inc. | $2,884,992 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. |
|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $3,282.83 | $0.01 |
| 2 | Grubbing (201.0205) | STA | 16 | $397.98 | $100.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 3 | $122.91 | $240.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 108 | $4.70 | $15.00 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 804 | $0.01 | $9.96 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 98,347 | $1.50 | $1.00 |
| 7 | Removing curb & gutter (204.0150) | LF | 869 | $10.00 | $11.25 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 83 | $40.00 | $15.00 |
| 9 | Removing guardrail (204.0165) | LF | 230 | $7.00 | $7.00 |
| 10 | Removing fence (204.0170) | LF | 2,100 | $2.00 | $2.00 |
| 11 | Removing concrete bases (204.0195) | EACH | 15 | $285.00 | $298.19 |
| 12 | Removing inlets (204.0220) | EACH | 3 | $245.84 | $600.00 |
| 13 | Removing storm sewer (size) 01. (8-inch) (204.0245) | LF | 50 | $14.75 | $15.00 |
| 14 | Removing storm sewer (size) 02. (12-inch) (204.0245) | LF | 10 | $14.75 | $30.00 |
| 15 | Removing storm sewer (size) 03. (24-inch) (204.0245) | LF | 125 | $16.66 | $1.00 |
| 16 | Abandoning sewer (204.0291.S) | CY | 70 | $166.56 | $130.00 |
| 17 | Removing (item description) 01. traffic signal (STH 50/CTH F & town hall RD/southshore DR) (204.9060.S) | EACH | 1 | $4,174.27 | $4,174.27 |
| 18 | Removing (item description) 02. traffic signal (STH 50 & STH 67) (204.9060.S) | EACH | 1 | $4,174.27 | $4,174.27 |
| 19 | Removing (item description) 03. removing loop detector wire & lea(STH 50/CTH F & town hall RD/southshore DR) (204.9060.S) | EACH | 1 | $1,391.42 | $1,391.42 |
| 20 | Removing (item description) 04. removing loop detector wire & lead-in cable (STH 50 & STH 67) (204.9060.S) | EACH | 1 | $834.85 | $834.85 |
| 21 | Excavation common (205.0100) | CY | 1,101 | $36.50 | $10.00 |
| 22 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 19 | $140.00 | $145.00 |
| 23 | Finishing roadway (project) 01. 3170-11-70 (213.0100) | EACH | 1 | $2,023.01 | $5,380.68 |
| 24 | Base aggregate dense 3/4-inch (305.0110) | TON | 767 | $34.25 | $20.00 |
| 25 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 194 | $51.50 | $18.00 |
| 26 | Drilled tie bars (416.0610) | EACH | 100 | $10.00 | $10.00 |
| 27 | Drilled dowel bars (416.0620) | EACH | 27 | $15.00 | $15.00 |
| 28 | Concrete pavement repair (416.1710) | SY | 12 | $120.00 | $120.00 |
| 29 | Concrete pavement repair shes (416.1715) | SY | 13 | $120.00 | $120.00 |
| 30 | Concrete pavement replacement shes (416.1725) | SY | 115 | $120.00 | $120.00 |
| 31 | Tack coat (455.0605) | GAL | 10,936 | $2.22 | $2.65 |
| 32 | Incentive density HMA pavement (460.2000) | DOL | 11,460 | $1.00 | $1.00 |
| 33 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 7,434 | $70.00 | $70.00 |
| 34 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 10,531 | $78.00 | $80.70 |
| 35 | Asphaltic surface patching (465.0110) | TON | 50 | $72.00 | $139.40 |
| 36 | Asphaltic surface driveways and field entrances (465.0120) | TON | 135 | $93.00 | $226.66 |
| 37 | Asphaltic surface temporary (465.0125) | TON | 54 | $150.00 | $118.41 |
| 38 | Asphaltic flumes (465.0315) | SY | 9 | $94.00 | $58.87 |
| 39 | Apron endwalls for culvert pipe 15- inch (520.1015) | EACH | 2 | $143.16 | $225.00 |
| 40 | Cleaning culvert pipes (520.8700) | EACH | 9 | $638.00 | $1,250.00 |
| 41 | Culvert pipe corrugated steel 15- inch (521.3115) | LF | 26 | $95.62 | $55.00 |
| 42 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 596 | $25.99 | $25.99 |
| 43 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 34 | $55.00 | $55.00 |
| 44 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 27 | $45.00 | $45.00 |
| 45 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 373 | $38.80 | $38.80 |
| 46 | Concrete curb pedestrian (601.0600) | LF | 13 | $50.00 | $50.00 |
| 47 | Concrete sidewalk 5-inch (602.0410) | SF | 1,903 | $8.15 | $8.15 |
| 48 | Curb ramp detectable warning field yellow (602.0505) | SF | 60 | $40.00 | $40.00 |
| 49 | Riprap medium (606.0200) | CY | 11 | $140.00 | $75.00 |
| 50 | Reconstructing inlets (611.0430) | EACH | 3 | $1,567.53 | $1,698.22 |
| 51 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 93 | $50.00 | $50.00 |
| 52 | Adjusting steel plate beam guard (614.0400) | LF | 201 | $16.00 | $16.00 |
| 53 | Replacing guardrail posts and blocks (614.0950) | EACH | 9 | $110.00 | $110.00 |
| 54 | Replacing guardrail rail and hardware (614.0951) | LF | 25 | $20.00 | $20.00 |
| 55 | Replacing guardrail reflectors (614.0952) | EACH | 10 | $10.00 | $10.00 |
| 56 | MGS guardrail 3 (614.2300) | LF | 150 | $30.00 | $30.00 |
| 57 | MGS thrie beam transition (614.2500) | LF | 34 | $88.00 | $88.00 |
| 58 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $4,500.00 | $4,500.00 |
| 59 | Maintenance and repair of haul roads (project) 01. 3170-11-70 (618.0100) | EACH | 1 | $0.01 | $0.01 |
| 60 | Mobilization (619.1000) | EACH | 1 | $23,245 | $62,000 |
| 61 | Water (624.0100) | MGAL | 19 | $75.00 | $0.01 |
| 62 | Topsoil (625.0100) | SY | 1,926 | $9.00 | $0.01 |
| 63 | Salvaged topsoil (625.0500) | SY | 2,163 | $3.15 | $3.50 |
| 64 | Mulching (627.0200) | SY | 773 | $1.00 | $1.00 |
| 65 | Silt fence (628.1504) | LF | 2,999 | $2.25 | $2.25 |
| 66 | Silt fence maintenance (628.1520) | LF | 2,999 | $0.01 | $0.01 |
| 67 | Mobilizations erosion control (628.1905) | EACH | 5 | $100.00 | $100.00 |
| 68 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $100.00 | $100.00 |
| 69 | Erosion mat urban class I type B (628.2008) | SY | 3,006 | $2.10 | $2.10 |
| 70 | Erosion mat class III type D (628.2039) | SY | 323 | $17.00 | $17.00 |
| 71 | Inlet protection type A (628.7005) | EACH | 1 | $150.00 | $150.00 |
| 72 | Inlet protection type B (628.7010) | EACH | 11 | $60.00 | $60.00 |
| 73 | Inlet protection type C (628.7015) | EACH | 52 | $65.00 | $65.00 |
| 74 | Inlet protection type D (628.7020) | EACH | 5 | $120.00 | $120.00 |
| 75 | Temporary ditch checks (628.7504) | LF | 8 | $15.00 | $15.00 |
| 76 | Culvert pipe checks (628.7555) | EACH | 9 | $18.00 | $18.00 |
| 77 | Rock bags (628.7570) | EACH | 158 | $18.00 | $18.00 |
| 78 | Fertilizer type B (629.0210) | CWT | 2.39 | $85.00 | $85.00 |
| 79 | Seeding mixture no. 30 (630.0130) | LB | 118 | $8.50 | $8.50 |
| 80 | Seeding mixture no. 40 (630.0140) | LB | 68 | $14.00 | $14.00 |
| 81 | Seeding temporary (630.0200) | LB | 113 | $3.75 | $3.75 |
| 82 | Seed water (630.0500) | MGAL | 95 | $10.00 | $10.00 |
| 83 | Markers culvert end (633.5200) | EACH | 21 | $60.00 | $60.00 |
| 84 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 38 | $95.00 | $95.00 |
| 85 | Signs type II reflective H (637.2210) | SF | 155.56 | $21.00 | $21.00 |
| 86 | Signs type II reflective H folding (637.2215) | SF | 43.10 | $26.00 | $26.00 |
| 87 | Signs type II reflective F (637.2230) | SF | 143.75 | $22.00 | $22.00 |
| 88 | Moving signs type II (638.2102) | EACH | 13 | $200.00 | $200.00 |
| 89 | Removing signs type II (638.2602) | EACH | 34 | $30.00 | $30.00 |
| 90 | Removing small sign supports (638.3000) | EACH | 23 | $30.00 | $30.00 |
| 91 | Moving small sign supports (638.4000) | EACH | 1 | $150.00 | $150.00 |
| 92 | Field office type D (642.5401) | EACH | 1 | $7,850.00 | $10,000 |
| 93 | Traffic control drums (643.0300) | DAY | 9,262 | $0.20 | $0.20 |
| 94 | Traffic control barricades type II (643.0410) | EACH | 36 | $1.00 | $1.00 |
| 95 | Traffic control barricades type III (643.0420) | DAY | 3,064 | $1.00 | $1.00 |
| 96 | Traffic control warning lights type A (643.0705) | DAY | 6,128 | $0.10 | $0.10 |
| 97 | Traffic control warning lights type C (643.0715) | DAY | 816 | $0.10 | $0.10 |
| 98 | Traffic control arrow boards (643.0800) | DAY | 24 | $14.00 | $14.00 |
| 99 | Traffic control signs (643.0900) | DAY | 15,516 | $0.50 | $0.50 |
| 100 | Traffic control covering signs type I (643.0910) | EACH | 5 | $250.00 | $250.00 |
| 101 | Traffic control covering signs type II (643.0920) | EACH | 10 | $45.00 | $45.00 |
| 102 | Traffic control signs fixed message (643.1000) | SF | 52 | $16.50 | $16.50 |
| 103 | Traffic control signs PCMS (643.1050) | DAY | 14 | $40.00 | $40.00 |
| 104 | Traffic control cones 42-inch (643.1070) | DAY | 490 | $0.20 | $0.20 |
| 105 | Temporary marking line paint 6- inch (643.3165) | LF | 6,959 | $0.55 | $0.55 |
| 106 | Temporary marking line removable tape 6-inch (643.3180) | LF | 8,815 | $1.35 | $1.35 |
| 107 | Temporary marking line paint 10- inch (643.3265) | LF | 764 | $1.00 | $1.00 |
| 108 | Temporary marking line removable tape 10-inch (643.3280) | LF | 868 | $2.00 | $2.00 |
| 109 | Temporary marking stop line paint 18-inch (643.3805) | LF | 66 | $3.00 | $3.00 |
| 110 | Traffic control (643.5000) | EACH | 1 | $28,821 | $28,821 |
| 111 | Geotextile type HR (645.0120) | SY | 21 | $2.90 | $15.00 |
| 112 | Marking line epoxy 4-inch (646.1020) | LF | 732 | $0.63 | $0.62 |
| 113 | Marking line epoxy 6-inch (646.2020) | LF | 3,808 | $0.93 | $0.92 |
| 114 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 72,524 | $1.25 | $1.24 |
| 115 | Marking line epoxy 8-inch (646.3020) | LF | 125 | $1.26 | $1.25 |
| 116 | Marking line epoxy 10-inch (646.4020) | LF | 3,309 | $1.57 | $1.55 |
| 117 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,464 | $2.07 | $2.05 |
| 118 | Marking arrow epoxy (646.5020) | EACH | 51 | $202.02 | $200.00 |
| 119 | Marking word epoxy (646.5120) | EACH | 11 | $303.03 | $300.00 |
| 120 | Marking stop line epoxy 18-inch (646.6120) | LF | 426 | $12.12 | $12.00 |
| 121 | Marking yield line epoxy 18-inch (646.6220) | EACH | 87 | $65.66 | $65.00 |
| 122 | Marking diagonal epoxy 12-inch (646.7120) | LF | 2,233 | $9.09 | $9.00 |
| 123 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 318 | $15.15 | $15.00 |
| 124 | Marking curb epoxy (646.8120) | LF | 180 | $8.08 | $8.00 |
| 125 | Marking island nose epoxy (646.8220) | EACH | 18 | $277.78 | $275.00 |
| 126 | Marking removal line 4-inch (646.9000) | LF | 1,722 | $0.65 | $0.65 |
| 127 | Marking removal line 8-inch (646.9100) | LF | 470 | $1.00 | $1.00 |
| 128 | Marking removal line wide (646.9200) | LF | 245 | $2.00 | $2.00 |
| 129 | Marking removal special marking (646.9300) | EACH | 6 | $100.00 | $100.00 |
| 130 | Locating no-passing zones (648.0100) | MI | 3.86 | $353.54 | $350.00 |
| 131 | Construction staking storm sewer (650.4000) | EACH | 1 | $140.00 | $100.00 |
| 132 | Construction staking base (650.5000) | LF | 445 | $2.00 | $0.01 |
| 133 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 628 | $3.00 | $1.00 |
| 134 | Construction staking pipe culverts (650.6000) | EACH | 1 | $140.00 | $100.00 |
| 135 | Construction staking resurfacing reference (650.8000) | LF | 21,957 | $0.17 | $0.02 |
| 136 | Construction staking electrical installations (project) 01. 3170-11- 70 (650.8501) | EACH | 1 | $2,000.00 | $5,000.00 |
| 137 | Construction staking curb ramps (650.9000) | EACH | 6 | $200.00 | $100.00 |
| 138 | Construction staking sidewalk (project) 01. 3170-11-70 (650.9500) | EACH | 1 | $800.00 | $1,000.00 |
| 139 | Construction staking supplemental control (project) 01. 3170-11-70 (650.9911) | EACH | 1 | $2,000.00 | $1,000.00 |
| 140 | Construction staking slope stakes (650.9920) | LF | 1,300 | $0.75 | $0.03 |
| 141 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 434 | $7.14 | $7.14 |
| 142 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 506 | $9.22 | $9.22 |
| 143 | Conduit special 2-inch (652.0605) | LF | 794 | $18.38 | $18.38 |
| 144 | Conduit special 3-inch (652.0615) | LF | 580 | $27.20 | $27.20 |
| 145 | Conduit loop detector (652.0800) | LF | 1,576 | $6.18 | $6.18 |
| 146 | Pull boxes steel 24X36-inch (653.0135) | EACH | 7 | $1,331.70 | $1,331.70 |
| 147 | Pull boxes steel 24X42-inch (653.0140) | EACH | 12 | $1,215.07 | $1,215.07 |
| 148 | Adjusting pull boxes (653.0900) | EACH | 1 | $490.41 | $490.41 |
| 149 | Removing pull boxes (653.0905) | EACH | 14 | $124.26 | $124.26 |
| 150 | Concrete bases type 1 (654.0101) | EACH | 4 | $973.76 | $973.76 |
| 151 | Concrete bases type 2 (654.0102) | EACH | 1 | $1,537.63 | $1,537.63 |
| 152 | Concrete bases type 5 (654.0105) | EACH | 2 | $1,167.90 | $1,167.90 |
| 153 | Concrete bases type 10 (654.0110) | EACH | 3 | $10,846 | $10,846 |
| 154 | Concrete bases type 10-special (654.0120) | EACH | 5 | $12,869 | $12,869 |
| 155 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,820.95 | $2,820.95 |
| 156 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,009 | $1.63 | $1.63 |
| 157 | Cable traffic signal 7-14 AWG (655.0240) | LF | 413 | $2.08 | $2.08 |
| 158 | Cable traffic signal 12-14 AWG (655.0260) | LF | 5,254 | $3.13 | $3.13 |
| 159 | Cable traffic signal 15-14 AWG (655.0270) | LF | 263 | $3.86 | $3.86 |
| 160 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 2,108 | $1.97 | $1.97 |
| 161 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 4,350 | $1.21 | $1.21 |
| 162 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,926 | $1.04 | $1.04 |
| 163 | Loop detector lead in cable (655.0700) | LF | 4,327 | $1.74 | $1.74 |
| 164 | Loop detector wire (655.0800) | LF | 5,242 | $1.32 | $1.32 |
| 165 | Traffic signal evp detector cable (655.0900) | LF | 3,250 | $1.47 | $1.47 |
| 166 | Electrical service meter breaker pedestal (location) 01. (STH 50/CTH F & town hall RD/south shore DR) (656.0201) | EACH | 1 | $1,586.83 | $1,586.83 |
| 167 | Pedestal bases (657.0100) | EACH | 8 | $343.06 | $343.06 |
| 168 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 4 | $794.46 | $794.46 |
| 169 | Poles type 2 (657.0305) | EACH | 1 | $2,510.88 | $2,510.88 |
| 170 | Poles type 3 (657.0310) | EACH | 1 | $5,260.88 | $5,260.88 |
| 171 | Poles type 5-aluminum (657.0322) | EACH | 2 | $2,330.20 | $2,330.20 |
| 172 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $991.88 | $991.88 |
| 173 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 6 | $1,040.98 | $1,040.98 |
| 174 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 1 | $434.81 | $434.81 |
| 175 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 2 | $426.85 | $426.85 |
| 176 | Traffic signal face 3S 12-inch (658.0173) | EACH | 24 | $931.90 | $931.90 |
| 177 | Traffic signal face 4S 12-inch (658.0174) | EACH | 16 | $1,199.87 | $1,199.87 |
| 178 | Signal mounting hardware (location) 01. signal mounting hardware (STH 50/CTH F & town hall RD/south shore DR) (658.5070) | EACH | 1 | $4,774.39 | $4,774.39 |
| 179 | Signal mounting hardware (location) 02. signal mounting hardware (STH 50 & STH 67) (658.5070) | EACH | 1 | $6,930.86 | $6,930.86 |
| 180 | Luminaires utility LED C (659.1125) | EACH | 14 | $390.72 | $390.72 |
| 181 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 53 | $76.21 | $76.21 |
| 182 | Temporary traffic signals for intersections (location) 01. (STH 50/CTH F & town hall RD/south shore DR) (661.0201) | EACH | 1 | $47,880 | $47,880 |
| 183 | Temporary traffic signals for intersections (location) 02. (STH 50 & STH 67) (661.0201) | EACH | 1 | $42,469 | $42,469 |
| 184 | Generators (661.0300) | DAY | 2 | $543.70 | $543.70 |
| 185 | Install camera assembly (677.0200) | EACH | 2 | $461.22 | $461.22 |
| 186 | Sawing asphalt (690.0150) | LF | 628 | $1.25 | $1.39 |
| 187 | Sawing concrete (690.0250) | LF | 533 | $2.65 | $2.25 |
| 188 | Incentive iri ride (740.0440) | DOL | 15,110 | $1.00 | $1.00 |
| 189 | Special 01. RE-grade shoulder and hauling material (SPV.0035) | CY | 5 | $75.00 | $734.04 |
| 190 | Special 01. install poles type 9 (SPV.0060) | EACH | 1 | $926.15 | $926.15 |
| 191 | Special 02. install poles type 10 (SPV.0060) | EACH | 2 | $926.15 | $926.15 |
| 192 | Special 03. install poles type 9 special (SPV.0060) | EACH | 5 | $926.15 | $926.15 |
| 193 | Special 04. install monotube arms 20-FT (SPV.0060) | EACH | 1 | $1,370.06 | $1,370.06 |
| 194 | Special 05. install monotube arms 30-FT (SPV.0060) | EACH | 2 | $1,677.54 | $1,677.54 |
| 195 | Special 06. install monotube arms 40-FT type 9/10 spec pole (SPV.0060) | EACH | 3 | $1,710.71 | $1,710.71 |
| 196 | Special 07. install monotube arms 45-FT type 9/10 spec pole (SPV.0060) | EACH | 2 | $2,018.19 | $2,018.19 |
| 197 | Special 08. install luminaire arms steel 15-FT (SPV.0060) | EACH | 2 | $376.22 | $376.22 |
| 198 | Special 09. TRNSPT & install state furn traffic signal cabinet STH 50 & TH. RD / SS DR (SPV.0060) | EACH | 1 | $2,729.76 | $2,729.76 |
| 199 | Special 10. TRNSPT & install state furn traffic signal cabinet STH 50 & STH 67 (SPV.0060) | EACH | 1 | $2,729.76 | $2,729.76 |
| 200 | Special 11. TRNSPT & install state furn radar detect sys STH 50 & STH 67 (SPV.0060) | EACH | 1 | $2,729.76 | $2,729.76 |
| 201 | Special 12. TRNSPT traffic signal & inter lighting materials STH 50 & TH. RD / SS DR. (SPV.0060) | EACH | 1 | $2,729.76 | $2,729.76 |
| 202 | Special 13. TRNSPT traffic signal & inter lighting materials STH 50 & STH 67 (SPV.0060) | EACH | 1 | $2,729.76 | $2,729.76 |
| 203 | Special 14. TRNSPT & install state furn evp heads STH 50 & town hall RD/ south shore DR. (SPV.0060) | EACH | 1 | $2,729.76 | $2,729.76 |
| 204 | Special 15. TRNSPT & install state furn evp heads STH 50 & STH 67 (SPV.0060) | EACH | 1 | $2,729.76 | $2,729.76 |
| 205 | Special 16. temp infrared evp system STH 50 & town hall RD/ south shore DR. (SPV.0060) | EACH | 1 | $3,127.88 | $3,127.88 |
| 206 | Special 17. drainage structure repair and cleaning (SPV.0060) | EACH | 36 | $967.92 | $685.18 |
| 207 | Special 18. reset retie end section (SPV.0060) | EACH | 7 | $210.72 | $1,350.00 |
| 208 | Special 19. ulo (SPV.0060) | EACH | 1 | $353.54 | $800.00 |
| 209 | Special 20. reconnect storm sewer (SPV.0060) | EACH | 1 | $1,475.00 | $450.00 |
| 210 | Special 21. grading shaping, and finishing endwalls (SPV.0060) | EACH | 8 | $690.00 | $300.00 |
| 211 | Special 22. apron endwall for culvert pipe reinforced concrete 8- inch (SPV.0060) | EACH | 1 | $778.64 | $600.00 |
| 212 | Special 01. ditching and shaping (SPV.0090) | LF | 200 | $8.60 | $16.00 |
| 213 | Special 02. storm sewer pipe reinforced concrete class IV 8- inch (SPV.0090) | LF | 50 | $109.10 | $50.00 |
| 214 | Special 01. wall modular block gravity landscape (SPV.0165) | SF | 59 | $100.00 | $100.00 |
| 215 | Special 01. asphalt repair (SPV.0195) | TON | 1,822 | $89.50 | $127.37 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of June 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.