WisDOT contract 20250610006 bid tabulation

Delavan - Lake Geneva; Lake Lawn to STH 67 (STH 050, Walworth County Lake Lawn Dr to STH 67). Let by Wisconsin DOT on June 10, 2025, Walworth. 2 bids received; low bid $2,841,664 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
10 JUN 2025
Pay items
215
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$2,841,664Low
2Rock Road Companies, Inc.$2,884,992+2.0%
WisDOT contract 20250610006: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Rock Road Companies, Inc.
1CPM progress schedule (108.4400)EACH1$3,282.83$0.01
2Grubbing (201.0205)STA16$397.98$100.00
3Removing small pipe culverts (203.0100)EACH3$122.91$240.00
4Removing asphaltic surface (204.0110)SY108$4.70$15.00
5Removing asphaltic surface butt joints (204.0115)SY804$0.01$9.96
6Removing asphaltic surface milling (204.0120)SY98,347$1.50$1.00
7Removing curb & gutter (204.0150)LF869$10.00$11.25
8Removing concrete sidewalk (204.0155)SY83$40.00$15.00
9Removing guardrail (204.0165)LF230$7.00$7.00
10Removing fence (204.0170)LF2,100$2.00$2.00
11Removing concrete bases (204.0195)EACH15$285.00$298.19
12Removing inlets (204.0220)EACH3$245.84$600.00
13Removing storm sewer (size) 01. (8-inch) (204.0245)LF50$14.75$15.00
14Removing storm sewer (size) 02. (12-inch) (204.0245)LF10$14.75$30.00
15Removing storm sewer (size) 03. (24-inch) (204.0245)LF125$16.66$1.00
16Abandoning sewer (204.0291.S)CY70$166.56$130.00
17Removing (item description) 01. traffic signal (STH 50/CTH F & town hall RD/southshore DR) (204.9060.S)EACH1$4,174.27$4,174.27
18Removing (item description) 02. traffic signal (STH 50 & STH 67) (204.9060.S)EACH1$4,174.27$4,174.27
19Removing (item description) 03. removing loop detector wire & lea(STH 50/CTH F & town hall RD/southshore DR) (204.9060.S)EACH1$1,391.42$1,391.42
20Removing (item description) 04. removing loop detector wire & lead-in cable (STH 50 & STH 67) (204.9060.S)EACH1$834.85$834.85
21Excavation common (205.0100)CY1,101$36.50$10.00
22Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON19$140.00$145.00
23Finishing roadway (project) 01. 3170-11-70 (213.0100)EACH1$2,023.01$5,380.68
24Base aggregate dense 3/4-inch (305.0110)TON767$34.25$20.00
25Base aggregate dense 1 1/4-inch (305.0120)TON194$51.50$18.00
26Drilled tie bars (416.0610)EACH100$10.00$10.00
27Drilled dowel bars (416.0620)EACH27$15.00$15.00
28Concrete pavement repair (416.1710)SY12$120.00$120.00
29Concrete pavement repair shes (416.1715)SY13$120.00$120.00
30Concrete pavement replacement shes (416.1725)SY115$120.00$120.00
31Tack coat (455.0605)GAL10,936$2.22$2.65
32Incentive density HMA pavement (460.2000)DOL11,460$1.00$1.00
33HMA pavement 3 MT 58-28 S (460.6223)TON7,434$70.00$70.00
34HMA pavement 4 MT 58-28 H (460.6424)TON10,531$78.00$80.70
35Asphaltic surface patching (465.0110)TON50$72.00$139.40
36Asphaltic surface driveways and field entrances (465.0120)TON135$93.00$226.66
37Asphaltic surface temporary (465.0125)TON54$150.00$118.41
38Asphaltic flumes (465.0315)SY9$94.00$58.87
39Apron endwalls for culvert pipe 15- inch (520.1015)EACH2$143.16$225.00
40Cleaning culvert pipes (520.8700)EACH9$638.00$1,250.00
41Culvert pipe corrugated steel 15- inch (521.3115)LF26$95.62$55.00
42Concrete curb & gutter 30-inch type D (601.0411)LF596$25.99$25.99
43Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415)LF34$55.00$55.00
44Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF27$45.00$45.00
45Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF373$38.80$38.80
46Concrete curb pedestrian (601.0600)LF13$50.00$50.00
47Concrete sidewalk 5-inch (602.0410)SF1,903$8.15$8.15
48Curb ramp detectable warning field yellow (602.0505)SF60$40.00$40.00
49Riprap medium (606.0200)CY11$140.00$75.00
50Reconstructing inlets (611.0430)EACH3$1,567.53$1,698.22
51Guardrail mow strip emulsified asphalt (614.0397)SY93$50.00$50.00
52Adjusting steel plate beam guard (614.0400)LF201$16.00$16.00
53Replacing guardrail posts and blocks (614.0950)EACH9$110.00$110.00
54Replacing guardrail rail and hardware (614.0951)LF25$20.00$20.00
55Replacing guardrail reflectors (614.0952)EACH10$10.00$10.00
56MGS guardrail 3 (614.2300)LF150$30.00$30.00
57MGS thrie beam transition (614.2500)LF34$88.00$88.00
58MGS guardrail terminal eat (614.2610)EACH1$4,500.00$4,500.00
59Maintenance and repair of haul roads (project) 01. 3170-11-70 (618.0100)EACH1$0.01$0.01
60Mobilization (619.1000)EACH1$23,245$62,000
61Water (624.0100)MGAL19$75.00$0.01
62Topsoil (625.0100)SY1,926$9.00$0.01
63Salvaged topsoil (625.0500)SY2,163$3.15$3.50
64Mulching (627.0200)SY773$1.00$1.00
65Silt fence (628.1504)LF2,999$2.25$2.25
66Silt fence maintenance (628.1520)LF2,999$0.01$0.01
67Mobilizations erosion control (628.1905)EACH5$100.00$100.00
68Mobilizations emergency erosion control (628.1910)EACH5$100.00$100.00
69Erosion mat urban class I type B (628.2008)SY3,006$2.10$2.10
70Erosion mat class III type D (628.2039)SY323$17.00$17.00
71Inlet protection type A (628.7005)EACH1$150.00$150.00
72Inlet protection type B (628.7010)EACH11$60.00$60.00
73Inlet protection type C (628.7015)EACH52$65.00$65.00
74Inlet protection type D (628.7020)EACH5$120.00$120.00
75Temporary ditch checks (628.7504)LF8$15.00$15.00
76Culvert pipe checks (628.7555)EACH9$18.00$18.00
77Rock bags (628.7570)EACH158$18.00$18.00
78Fertilizer type B (629.0210)CWT2.39$85.00$85.00
79Seeding mixture no. 30 (630.0130)LB118$8.50$8.50
80Seeding mixture no. 40 (630.0140)LB68$14.00$14.00
81Seeding temporary (630.0200)LB113$3.75$3.75
82Seed water (630.0500)MGAL95$10.00$10.00
83Markers culvert end (633.5200)EACH21$60.00$60.00
84Posts wood 4X6-inch X 18-FT (634.0618)EACH38$95.00$95.00
85Signs type II reflective H (637.2210)SF155.56$21.00$21.00
86Signs type II reflective H folding (637.2215)SF43.10$26.00$26.00
87Signs type II reflective F (637.2230)SF143.75$22.00$22.00
88Moving signs type II (638.2102)EACH13$200.00$200.00
89Removing signs type II (638.2602)EACH34$30.00$30.00
90Removing small sign supports (638.3000)EACH23$30.00$30.00
91Moving small sign supports (638.4000)EACH1$150.00$150.00
92Field office type D (642.5401)EACH1$7,850.00$10,000
93Traffic control drums (643.0300)DAY9,262$0.20$0.20
94Traffic control barricades type II (643.0410)EACH36$1.00$1.00
95Traffic control barricades type III (643.0420)DAY3,064$1.00$1.00
96Traffic control warning lights type A (643.0705)DAY6,128$0.10$0.10
97Traffic control warning lights type C (643.0715)DAY816$0.10$0.10
98Traffic control arrow boards (643.0800)DAY24$14.00$14.00
99Traffic control signs (643.0900)DAY15,516$0.50$0.50
100Traffic control covering signs type I (643.0910)EACH5$250.00$250.00
101Traffic control covering signs type II (643.0920)EACH10$45.00$45.00
102Traffic control signs fixed message (643.1000)SF52$16.50$16.50
103Traffic control signs PCMS (643.1050)DAY14$40.00$40.00
104Traffic control cones 42-inch (643.1070)DAY490$0.20$0.20
105Temporary marking line paint 6- inch (643.3165)LF6,959$0.55$0.55
106Temporary marking line removable tape 6-inch (643.3180)LF8,815$1.35$1.35
107Temporary marking line paint 10- inch (643.3265)LF764$1.00$1.00
108Temporary marking line removable tape 10-inch (643.3280)LF868$2.00$2.00
109Temporary marking stop line paint 18-inch (643.3805)LF66$3.00$3.00
110Traffic control (643.5000)EACH1$28,821$28,821
111Geotextile type HR (645.0120)SY21$2.90$15.00
112Marking line epoxy 4-inch (646.1020)LF732$0.63$0.62
113Marking line epoxy 6-inch (646.2020)LF3,808$0.93$0.92
114Marking line grooved wet ref epoxy 6-inch (646.2040)LF72,524$1.25$1.24
115Marking line epoxy 8-inch (646.3020)LF125$1.26$1.25
116Marking line epoxy 10-inch (646.4020)LF3,309$1.57$1.55
117Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,464$2.07$2.05
118Marking arrow epoxy (646.5020)EACH51$202.02$200.00
119Marking word epoxy (646.5120)EACH11$303.03$300.00
120Marking stop line epoxy 18-inch (646.6120)LF426$12.12$12.00
121Marking yield line epoxy 18-inch (646.6220)EACH87$65.66$65.00
122Marking diagonal epoxy 12-inch (646.7120)LF2,233$9.09$9.00
123Marking crosswalk epoxy block style 24-inch (646.7520)LF318$15.15$15.00
124Marking curb epoxy (646.8120)LF180$8.08$8.00
125Marking island nose epoxy (646.8220)EACH18$277.78$275.00
126Marking removal line 4-inch (646.9000)LF1,722$0.65$0.65
127Marking removal line 8-inch (646.9100)LF470$1.00$1.00
128Marking removal line wide (646.9200)LF245$2.00$2.00
129Marking removal special marking (646.9300)EACH6$100.00$100.00
130Locating no-passing zones (648.0100)MI3.86$353.54$350.00
131Construction staking storm sewer (650.4000)EACH1$140.00$100.00
132Construction staking base (650.5000)LF445$2.00$0.01
133Construction staking curb gutter and curb & gutter (650.5500)LF628$3.00$1.00
134Construction staking pipe culverts (650.6000)EACH1$140.00$100.00
135Construction staking resurfacing reference (650.8000)LF21,957$0.17$0.02
136Construction staking electrical installations (project) 01. 3170-11- 70 (650.8501)EACH1$2,000.00$5,000.00
137Construction staking curb ramps (650.9000)EACH6$200.00$100.00
138Construction staking sidewalk (project) 01. 3170-11-70 (650.9500)EACH1$800.00$1,000.00
139Construction staking supplemental control (project) 01. 3170-11-70 (650.9911)EACH1$2,000.00$1,000.00
140Construction staking slope stakes (650.9920)LF1,300$0.75$0.03
141Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF434$7.14$7.14
142Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF506$9.22$9.22
143Conduit special 2-inch (652.0605)LF794$18.38$18.38
144Conduit special 3-inch (652.0615)LF580$27.20$27.20
145Conduit loop detector (652.0800)LF1,576$6.18$6.18
146Pull boxes steel 24X36-inch (653.0135)EACH7$1,331.70$1,331.70
147Pull boxes steel 24X42-inch (653.0140)EACH12$1,215.07$1,215.07
148Adjusting pull boxes (653.0900)EACH1$490.41$490.41
149Removing pull boxes (653.0905)EACH14$124.26$124.26
150Concrete bases type 1 (654.0101)EACH4$973.76$973.76
151Concrete bases type 2 (654.0102)EACH1$1,537.63$1,537.63
152Concrete bases type 5 (654.0105)EACH2$1,167.90$1,167.90
153Concrete bases type 10 (654.0110)EACH3$10,846$10,846
154Concrete bases type 10-special (654.0120)EACH5$12,869$12,869
155Concrete control cabinet bases type 9 special (654.0217)EACH1$2,820.95$2,820.95
156Cable traffic signal 5-14 AWG (655.0230)LF1,009$1.63$1.63
157Cable traffic signal 7-14 AWG (655.0240)LF413$2.08$2.08
158Cable traffic signal 12-14 AWG (655.0260)LF5,254$3.13$3.13
159Cable traffic signal 15-14 AWG (655.0270)LF263$3.86$3.86
160Cable type UF 2-10 AWG grounded (655.0320)LF2,108$1.97$1.97
161Electrical wire traffic signals 10 AWG (655.0515)LF4,350$1.21$1.21
162Electrical wire lighting 12 AWG (655.0610)LF1,926$1.04$1.04
163Loop detector lead in cable (655.0700)LF4,327$1.74$1.74
164Loop detector wire (655.0800)LF5,242$1.32$1.32
165Traffic signal evp detector cable (655.0900)LF3,250$1.47$1.47
166Electrical service meter breaker pedestal (location) 01. (STH 50/CTH F & town hall RD/south shore DR) (656.0201)EACH1$1,586.83$1,586.83
167Pedestal bases (657.0100)EACH8$343.06$343.06
168Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH4$794.46$794.46
169Poles type 2 (657.0305)EACH1$2,510.88$2,510.88
170Poles type 3 (657.0310)EACH1$5,260.88$5,260.88
171Poles type 5-aluminum (657.0322)EACH2$2,330.20$2,330.20
172Traffic signal standards aluminum 13-FT (657.0420)EACH2$991.88$991.88
173Traffic signal standards aluminum 15-FT (657.0425)EACH6$1,040.98$1,040.98
174Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH1$434.81$434.81
175Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH2$426.85$426.85
176Traffic signal face 3S 12-inch (658.0173)EACH24$931.90$931.90
177Traffic signal face 4S 12-inch (658.0174)EACH16$1,199.87$1,199.87
178Signal mounting hardware (location) 01. signal mounting hardware (STH 50/CTH F & town hall RD/south shore DR) (658.5070)EACH1$4,774.39$4,774.39
179Signal mounting hardware (location) 02. signal mounting hardware (STH 50 & STH 67) (658.5070)EACH1$6,930.86$6,930.86
180Luminaires utility LED C (659.1125)EACH14$390.72$390.72
181Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH53$76.21$76.21
182Temporary traffic signals for intersections (location) 01. (STH 50/CTH F & town hall RD/south shore DR) (661.0201)EACH1$47,880$47,880
183Temporary traffic signals for intersections (location) 02. (STH 50 & STH 67) (661.0201)EACH1$42,469$42,469
184Generators (661.0300)DAY2$543.70$543.70
185Install camera assembly (677.0200)EACH2$461.22$461.22
186Sawing asphalt (690.0150)LF628$1.25$1.39
187Sawing concrete (690.0250)LF533$2.65$2.25
188Incentive iri ride (740.0440)DOL15,110$1.00$1.00
189Special 01. RE-grade shoulder and hauling material (SPV.0035)CY5$75.00$734.04
190Special 01. install poles type 9 (SPV.0060)EACH1$926.15$926.15
191Special 02. install poles type 10 (SPV.0060)EACH2$926.15$926.15
192Special 03. install poles type 9 special (SPV.0060)EACH5$926.15$926.15
193Special 04. install monotube arms 20-FT (SPV.0060)EACH1$1,370.06$1,370.06
194Special 05. install monotube arms 30-FT (SPV.0060)EACH2$1,677.54$1,677.54
195Special 06. install monotube arms 40-FT type 9/10 spec pole (SPV.0060)EACH3$1,710.71$1,710.71
196Special 07. install monotube arms 45-FT type 9/10 spec pole (SPV.0060)EACH2$2,018.19$2,018.19
197Special 08. install luminaire arms steel 15-FT (SPV.0060)EACH2$376.22$376.22
198Special 09. TRNSPT & install state furn traffic signal cabinet STH 50 & TH. RD / SS DR (SPV.0060)EACH1$2,729.76$2,729.76
199Special 10. TRNSPT & install state furn traffic signal cabinet STH 50 & STH 67 (SPV.0060)EACH1$2,729.76$2,729.76
200Special 11. TRNSPT & install state furn radar detect sys STH 50 & STH 67 (SPV.0060)EACH1$2,729.76$2,729.76
201Special 12. TRNSPT traffic signal & inter lighting materials STH 50 & TH. RD / SS DR. (SPV.0060)EACH1$2,729.76$2,729.76
202Special 13. TRNSPT traffic signal & inter lighting materials STH 50 & STH 67 (SPV.0060)EACH1$2,729.76$2,729.76
203Special 14. TRNSPT & install state furn evp heads STH 50 & town hall RD/ south shore DR. (SPV.0060)EACH1$2,729.76$2,729.76
204Special 15. TRNSPT & install state furn evp heads STH 50 & STH 67 (SPV.0060)EACH1$2,729.76$2,729.76
205Special 16. temp infrared evp system STH 50 & town hall RD/ south shore DR. (SPV.0060)EACH1$3,127.88$3,127.88
206Special 17. drainage structure repair and cleaning (SPV.0060)EACH36$967.92$685.18
207Special 18. reset retie end section (SPV.0060)EACH7$210.72$1,350.00
208Special 19. ulo (SPV.0060)EACH1$353.54$800.00
209Special 20. reconnect storm sewer (SPV.0060)EACH1$1,475.00$450.00
210Special 21. grading shaping, and finishing endwalls (SPV.0060)EACH8$690.00$300.00
211Special 22. apron endwall for culvert pipe reinforced concrete 8- inch (SPV.0060)EACH1$778.64$600.00
212Special 01. ditching and shaping (SPV.0090)LF200$8.60$16.00
213Special 02. storm sewer pipe reinforced concrete class IV 8- inch (SPV.0090)LF50$109.10$50.00
214Special 01. wall modular block gravity landscape (SPV.0165)SF59$100.00$100.00
215Special 01. asphalt repair (SPV.0195)TON1,822$89.50$127.37
WisDOT contract 20250610006: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of June 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.