WisDOT contract 20250708003 bid tabulation

1100-20-77. Let by Wisconsin DOT on July 8, 2025, Milwaukee. 4 bids received; low bid $29,064,699 by Zignego Company, Inc..

Owner
Wisconsin DOT
Letting
08 JUL 2025
Pay items
426
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zignego Company, Inc.$29,064,699Low
2Michels Road & Stone, Inc.$32,541,439+12%
3Zenith Tech., Inc. - Waukesha$34,322,084+18%
4Lalonde Contractors Incorporated$41,734,439+44%
WisDOT contract 20250708003: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zignego Company, Inc.2. Michels Road & Stone, Inc.3. Zenith Tech., Inc. - Waukesha4. Lalonde Contractors Incorporated
1CPM progress schedule (108.4400)EACH1$1,000.00$5,000.00$0.01$24,440
2Removing structure (structure) 001. B-40-349 (203.0220)EACH1$400,000$400,000$300,000$168,000
3Removing structure (structure) 002. B-40-348 (203.0220)EACH1$400,000$400,000$300,000$168,000
4Removing structure (structure) 009. B-40-346 (203.0220)EACH1$45,000$45,000$100,000$35,000
5Removing structure (structure) 010. B-40-347 (203.0220)EACH1$45,000$45,000$100,000$35,000
6Removing structure (structure) 013. B-40-365 (203.0220)EACH1$80,000$80,000$50,000$25,000
7Removing structure (structure) 014. removing structure B-40-366 (203.0220)EACH1$80,000$80,000$50,000$25,000
8Debris containment (structure) 013. B-40-365 (203.0330)EACH1$1,000.00$1,000.00$15,000$11,000
9Debris containment (structure) 014. debris containment B-40-366 (203.0330)EACH1$1,000.00$1,000.00$15,000$11,000
10Removing concrete pavement (204.0100)SY11,045$20.00$5.00$5.00$11.07
11Removing concrete surface partial depth (204.0109.S)SF58,375$0.40$0.40$0.40$0.40
12Removing asphaltic surface butt joints (204.0115)SY317$10.75$10.75$25.00$10.75
13Removing asphaltic surface milling (204.0120)SY107,864$2.25$2.25$4.80$2.25
14Removing curb & gutter (204.0150)LF2,291$20.00$4.00$4.00$12.01
15Removing concrete sidewalk (204.0155)SY140$20.00$4.00$4.00$20.69
16Removing concrete barrier (204.0157)LF6,391$20.00$10.00$10.00$16.08
17Removing guardrail (204.0165)LF3,871$3.00$3.00$2.50$3.00
18Removing fence (204.0170)LF1,581$3.00$3.00$4.50$3.00
19Removing concrete slope paving (204.0175)SY309$20.00$52.00$52.00$18.32
20Removing concrete bases (204.0195)EACH17$1,000.00$250.00$250.00$1,500.00
21Removing inlets (204.0220)EACH11$500.00$500.00$500.00$1,200.00
22Removing storm sewer (size) 001. 12-inch (204.0245)LF362$35.00$32.00$32.00$152.00
23Removing ancillary structure (structure) 001. S-40-240 (204.0246)EACH1$9,500.00$9,500.00$13,000$9,500.00
24Removing (item description) 001. apron endwall (204.9060.S)EACH4$500.00$208.00$208.00$3,700.00
25Removing (item description) 301. remove traffic signals IH 41 SB off ramp/N115TH ST & CTH PP (204.9060.S)EACH1$5,610.00$5,610.00$5,610.00$5,610.00
26Removing (item description) 302. remove loop detector wire & lead-in cable IH 41 SB off/N 115TH ST & CTH PP (204.9060.S)EACH1$1,122.00$1,122.00$1,122.00$1,122.00
27Excavation common (205.0100)CY9,500$24.00$24.00$24.00$38.22
28Excavation for structures bridges (structure) 009. B-40-346 (206.1001)EACH1$10,000$3,219.00$3,219.00$11,000
29Excavation for structures bridges (structure) 010. B-40-347 (206.1001)EACH1$10,000$2,840.00$2,840.00$11,000
30Excavation for structures bridges (structure) 013. excavation for structures bridges B-40-365 (206.1001)EACH1$10,000$2,035.00$2,035.00$11,000
31Excavation for structures bridges (structure) 014. B-40-366 (206.1001)EACH1$10,000$2,083.00$2,083.00$11,000
32Excavation for structures retaining walls (structure) 001. R-40-714 (206.3001)EACH1$1.00$172,000$172,000$176,237
33Excavation for structures retaining walls (structure) 004. R-40-715 (206.3001)EACH1$1.00$178,000$178,000$179,728
34Borrow (208.0100)CY7,813$0.01$0.01$0.01$18.81
35Backfill granular grade 1 (209.1100)CY1,794$47.00$88.00$88.00$68.76
36Backfill structure type A (210.1100)CY66$100.00$50.00$50.00$92.92
37Backfill structure type A (210.1500)TON1,628$50.00$28.00$28.00$29.99
38Prepare foundation for asphaltic paving (project) 001. 1100-21-70 (211.0101)EACH1$1.00$0.01$7,005.00$12,500
39Prepare foundation for asphaltic paving (project) 002. 1100-21-71 (211.0101)EACH1$1.00$0.01$12,132$12,500
40Finishing roadway (project) 001. 1100-20-77 (213.0100)EACH1$1,000.00$3,000.00$3,500.00$3,680.00
41Finishing roadway (project) 002. 1100-21-70 (213.0100)EACH1$1,000.00$3,000.00$3,500.00$3,680.00
42Finishing roadway (project) 003. 1100-21-71 (213.0100)EACH1$1,000.00$3,000.00$3,500.00$3,680.00
43Base aggregate dense 3/4-inch (305.0110)TON594$50.00$39.00$39.00$39.37
44Base aggregate dense 1 1/4-inch (305.0120)TON9,261$19.50$22.00$22.00$25.03
45Base aggregate open-graded (310.0110)TON86$100.00$34.00$34.00$58.92
46Select crushed material (312.0110)TON12,118$18.00$25.00$25.00$29.64
47Removing pavement for base patching (390.0100)CY8,818$40.00$110.00$207.59$100.54
48Base patching concrete shes (390.0405)CY8,818$110.00$365.00$407.73$528.64
49Concrete pavement 6-inch (415.0060)SY34$300.00$150.00$135.20$90.28
50Concrete pavement 8-inch (415.0080)SY76$300.00$145.00$110.51$117.39
51Concrete pavement 9-inch (415.0090)SY9,679$67.00$85.00$64.69$77.15
52Concrete pavement approach slab (415.0410)SY472$0.01$275.00$169.99$197.64
53Concrete pavement hes 8-inch (415.1080)SY418$68.00$155.00$74.72$125.01
54Concrete pavement approach slab hes (415.1410)SY1,006$0.01$375.00$168.87$201.98
55Drilled tie bars (416.0610)EACH4,629$0.01$10.00$8.48$15.76
56Drilled dowel bars (416.0620)EACH10,061$0.01$5.00$26.98$19.05
57Concrete pavement repair shes (416.1715)SY414$200.00$180.00$219.58$304.71
58Concrete pavement replacement shes (416.1725)SY4,540$193.00$184.00$223.87$257.51
59Continuous diamond grinding concrete pavement (420.1000)SY29,802$4.74$4.74$12.62$4.97
60HMA cold weather paving (450.4000)TON183$5.00$5.00$1.50$5.00
61Tack coat (455.0605)GAL14,555$3.60$3.60$2.25$3.60
62HMA pavement test strip volumetrics (460.0115.S)EACH1$5,000.00$5,000.00$1,185.00$5,000.00
63HMA pavement test strip density (460.0120.S)EACH1$5,000.00$5,000.00$4,800.00$5,000.00
64Incentive density HMA pavement (460.2000)DOL10,221$1.00$1.00$1.00$1.00
65Incentive density HMA pavement longitudinal joints (460.2007)DOL8,863$1.00$1.00$1.00$1.00
66HMA pavement 3 HT 58-28 H (460.7423)TON15,787$96.05$96.05$102.80$96.05
67HMA pavement 5 SMA 58-28 V (460.8625)TON10,696$136.05$136.05$119.50$136.05
68Material transfer vehicle (460.9000.S)EACH1$0.01$0.01$32,000$0.01
69Asphaltic surface (465.0105)TON440$102.00$102.00$90.35$102.00
70Asphaltic surface temporary (465.0125)TON2,199$95.00$95.00$99.25$95.00
71Cold patch (495.1000.S)TON5$750.00$750.00$250.00$876.00
72Ice hot weather concreting (501.1000.S)LB9,440$0.01$0.01$0.90$1.00
73Concrete masonry bridges (502.0100)CY573$825.00$825.00$1,600.00$1,050.00
74Expansion device (502.3101)LF433$255.00$255.00$500.00$385.00
75Protective surface treatment (502.3200)SY2,413$5.00$5.00$5.00$4.00
76Pigmented surface sealer reseal (502.3205)SY1,272$15.00$15.00$25.00$20.00
77Pigmented surface sealer (502.3210)SY340$11.00$11.00$15.00$13.00
78Adhesive anchors no. 5 bar (502.4205)EACH761$18.00$18.00$30.00$25.00
79Prestressed girder type I 54W-inch (503.0155)LF1,442$275.00$275.00$275.00$240.00
80Bar steel reinforcement HS structures (505.0400)LB19,590$1.25$1.25$2.00$1.80
81Bar steel reinforcement HS coated structures (505.0600)LB208,210$1.40$1.40$1.65$1.55
82Bar steel reinforcement HS stainless structures (505.0800.S)LB4,480$3.80$3.80$4.00$3.85
83Bar couplers no. 4 (505.0904)EACH8$55.00$55.00$160.00$140.00
84Bar couplers no. 5 (505.0905)EACH54$35.00$35.00$61.00$55.00
85Bar couplers no. 6 (505.0906)EACH38$52.00$52.00$89.00$75.00
86Structural steel carbon (506.0105)LB80$150.00$150.00$300.00$300.00
87Structural steel HS (506.0605)LB890$37.50$37.50$35.00$25.00
88Bearing pads elastomeric non- laminated (506.2605)EACH28$100.00$100.00$155.00$155.00
89Bearing pads elastomeric laminated (506.2610)EACH19$2,500.00$2,500.00$2,000.00$2,000.00
90Steel diaphragms (structure) 001. B-40-1022 (506.4000)EACH12$1,800.00$1,800.00$2,500.00$2,500.00
91Steel diaphragms (structure) 002. B-40-1023 (506.4000)EACH12$1,800.00$1,800.00$2,500.00$2,500.00
92Removing bearings (structure) 011. B-40-350 (506.7050.S)EACH9$1,100.00$1,100.00$2,700.00$1,800.00
93Removing bearings (structure) 012. B-40-351 (506.7050.S)EACH10$1,100.00$1,100.00$2,700.00$1,800.00
94Preparation decks type 1 (509.0301)SY11$285.00$285.00$300.00$300.00
95Preparation decks type 2 (509.0302)SY9$285.00$285.00$550.00$550.00
96Sawing pavement deck preparation areas (509.0310.S)LF122$10.00$10.00$15.00$15.00
97Cleaning decks (509.0500)SY7,697$12.61$12.61$13.00$13.00
98Joint repair (509.1000)SY277$850.00$850.00$2,000.00$1,900.00
99Concrete surface repair (509.1500)SF371$210.00$210.00$350.00$350.00
100Full-depth deck repair (509.2000)SY2$500.00$500.00$1,650.00$1,650.00
101Concrete masonry deck repair (509.2100.S)CY30$600.00$600.00$2,500.00$2,500.00
102Epoxy crack sealing (509.9020.S)LF114$25.00$25.00$100.00$100.00
103Temporary shoring (511.1100)SF499$78.00$0.01$0.01$0.10
104Temporary shoring (structure) 001. B-40-1022 (511.1200)SF2,070$78.00$78.00$150.00$150.00
105Temporary shoring (structure) 013. B-40-365 (511.1200)SF60$55.00$55.00$300.00$210.00
106Temporary shoring (structure) 014. temporary shoring B-40-366 (511.1200)SF60$55.00$55.00$300.00$210.00
107Railing pipe (513.2001)LF554$200.00$200.00$250.00$225.00
108Rubberized membrane waterproofing (516.0500)SY121$35.00$35.00$75.00$70.00
109Painting epoxy system (structure) 015.painting epoxy system B-40- 369 (517.0601)EACH1$25,000$7,500.00$25,000$25,220
110Preparation and coating of top flanges (structure) 009. B-40-346 (517.0901.S)EACH1$20,000$9,500.00$20,000$20,176
111Preparation and coating of top flanges (structure) 010. B-40-347 (517.0901.S)EACH1$20,000$9,500.00$20,000$20,176
112Preparation and coating of top flanges (structure) 013. B-40-365 (517.0901.S)EACH1$20,000$9,500.00$20,000$20,176
113Preparation and coating of top flanges (structure) 014. B-40-366 (517.0901.S)EACH1$20,000$9,500.00$20,000$20,176
114Structure repainting recycled abrasive (structure) 007. B-40-248 (517.1801.S)EACH1$200,000$224,420$200,000$201,763
115Structure repainting recycled abrasive (structure) 008. B-40-249 (517.1801.S)EACH1$200,000$224,420$200,000$201,763
116Structure repainting recycled abrasive (structure) 009. B-40-346 (517.1801.S)EACH1$160,000$192,780$160,000$161,410
117Structure repainting recycled abrasive (structure) 010. B-40-347 (517.1801.S)EACH1$138,000$192,780$138,000$139,217
118Structure repainting recycled abrasive (structure) 013. B-40-365 (517.1801.S)EACH1$120,000$140,400$120,000$121,058
119Structure repainting recycled abrasive (structure) 014. B-40-366 (517.1801.S)EACH1$115,000$140,400$115,000$116,014
120Structure repainting recycled abrasive (structure) 015. B-40-369 (517.1801.S)EACH1$150,000$179,010$150,000$151,322
121Structure overcoating cleaning and priming (structure) 013. B-40-365 (517.3001.S)EACH1$75,000$82,500$75,000$75,661
122Structure overcoating cleaning and priming (structure) 014. B-40-366 (517.3001.S)EACH1$80,000$82,500$80,000$80,705
123Structure overcoating cleaning and priming (structure) 015. B-40-369 (517.3001.S)EACH1$2,500.00$3,000.00$2,500.00$2,522.04
124Containment and collection of waste materials (structure) 013. B- 40-365 (517.4001.S)EACH1$40,000$27,500$40,000$40,353
125Containment and collection of waste materials (structure) 014. B- 40-366 (517.4001.S)EACH1$45,000$27,500$45,000$45,397
126Containment and collection of waste materials (structure) 015. B- 40-369 (517.4001.S)EACH1$2,500.00$3,000.00$2,500.00$2,522.04
127Negative pressure containment and collection of waste materials (structure) 007. B-40-248 (517.4501.S)EACH1$110,000$128,240$110,000$110,970
128Negative pressure containment and collection of waste materials (structure) 008. B-40-249 (517.4501.S)EACH1$110,000$128,240$110,000$110,970
129Negative pressure containment and collection of waste materials (structure) 009. B-40-346 (517.4501.S)EACH1$105,000$123,930$105,000$105,926
130Negative pressure containment and collection of waste materials (structure) 010. B-40-347 (517.4501.S)EACH1$92,000$123,930$92,000$92,811
131Negative pressure containment and collection of waste materials (structure) 013. B-40-365 (517.4501.S)EACH1$80,000$93,600$80,000$80,705
132Negative pressure containment and collection of waste materials (structure) 014. B-40-366 (517.4501.S)EACH1$75,000$93,600$75,000$75,661
133Negative pressure containment and collection of waste materials (structure) 015. B-40-369 (517.4501.S)EACH1$110,000$119,340$110,000$110,970
134Portable decontamination facility (517.6001.S)EACH7$2,000.00$500.00$2,000.00$2,017.63
135Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH4$1,500.00$1,756.00$1,756.00$5,051.00
136Concrete masonry ancillary structures type NS (531.1100)CY34$1,100.00$1,100.00$1,050.00$1,100.00
137Steel reinforcement HS ancillary structures type NS (531.1140)LB3,988$4.25$4.25$5.00$4.25
138Steel reinforcement HS coated ancillary structures type NS (531.1160)LB890$4.50$4.50$5.50$4.50
139Drilling shaft 24-inch (531.2024)LF141$79.00$79.00$30.00$79.00
140Drilling shaft 30-inch (531.2030)LF30$225.00$225.00$150.00$225.00
141Drilling shaft 36-inch (531.2036)LF20$298.00$298.00$298.00$298.00
142Foundation camera pole 50-FT (531.4050)EACH2$4,180.00$4,180.00$4,180.00$4,180.00
143Butterfly 2-chord NS (structure) 001. S-40-3063 (532.5020)EACH1$31,500$31,500$41,000$31,500
144Pile points (550.0500)EACH48$150.00$150.00$145.00$145.00
145Piling steel HP 14-inch X 73 LB (550.1140)LF3,360$51.00$51.00$110.00$100.00
146Concrete curb & gutter 31-inch (601.0331)LF297$30.00$30.00$38.13$30.00
147Concrete curb & gutter 30-inch type A (601.0409)LF310$30.00$30.00$51.95$30.00
148Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF431$30.00$30.00$46.29$30.00
149Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF2,089$28.00$28.00$24.32$28.00
150Concrete curb pedestrian (601.0600)LF36$45.00$45.00$74.30$45.00
151Concrete sidewalk 5-inch (602.0410)SF2,742$12.00$12.00$7.71$12.00
152Curb ramp detectable warning field yellow (602.0505)SF183$48.00$48.00$51.80$48.00
153Concrete driveway 7-inch (602.0815)SY58$75.00$75.00$93.75$75.00
154Concrete barrier single-faced 32- inch (603.0105)LF1,115$200.00$200.00$122.49$200.00
155Concrete barrier type S42 (603.1142)LF5,132$125.00$125.00$94.36$125.00
156Concrete barrier type S56C (603.1456)LF281$265.00$265.00$202.81$265.00
157Concrete barrier transition type NJ32SF to S36 (603.3113)EACH1$7,500.00$7,500.00$4,786.41$7,500.00
158Concrete barrier transition type F32SF to S32 (603.3211)EACH4$7,500.00$7,500.00$4,683.26$7,500.00
159Concrete barrier transition type S36 to S42 (603.3535)EACH5$7,500.00$7,500.00$4,487.62$7,500.00
160Concrete barrier temporary precast delivered (603.8000)LF29,580$7.00$7.00$0.01$0.01
161Concrete barrier temporary precast installed (603.8125)LF29,580$3.50$3.50$19.50$19.50
162Anchoring concrete barrier temporary precast (603.8500)LF12,215$3.00$3.00$4.00$4.00
163Slope paving concrete (604.0400)SY426$150.00$125.00$390.00$194.69
164Slope paving crushed aggregate (604.0500)SY304$55.00$55.00$34.00$56.72
165Slope paving repair crushed aggregate (604.9010.S)CY24$175.00$175.00$100.00$1,018.75
166Reseal crushed aggregate slope paving (604.9015.S)SY1,731$15.61$24.00$24.00$30.44
167Riprap medium (606.0200)CY39$300.00$141.00$141.00$204.30
168Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF16$164.00$197.00$197.00$416.00
169Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF747$167.00$119.00$119.00$344.00
170Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF10$300.00$236.00$236.00$416.00
171Manhole covers type J-special (611.0535)EACH9$886.00$1,083.00$1,083.00$1,093.00
172Inlet covers type BW (611.0610)EACH56$1,110.00$1,509.00$1,509.00$1,425.00
173Inlet covers type H (611.0624)EACH2$1,093.00$1,486.00$1,486.00$1,195.00
174Inlet covers type MS (611.0642)EACH1$878.00$616.00$616.00$786.00
175Inlet covers type V (611.0654)EACH14$1,041.00$1,421.00$1,421.00$1,144.00
176Manholes 4-FT diameter (611.2004)EACH9$4,000.00$6,387.00$6,387.00$12,450
177Inlets 4-FT diameter (611.3004)EACH56$5,000.00$5,753.00$5,753.00$14,906
178Inlets 2X2.5-FT (611.3225)EACH14$5,000.00$2,543.00$2,543.00$7,661.00
179Inlets 2X3-FT (611.3230)EACH2$6,000.00$5,190.00$5,190.00$6,941.00
180Inlets median 1 grate (611.3901)EACH1$7,500.00$4,609.00$4,609.00$6,829.00
181Adjusting inlet covers (611.8115)EACH4$1,000.00$1,401.00$1,401.00$4,166.00
182Cover plates temporary (611.8120.S)EACH7$300.00$100.00$100.00$1,500.00
183Pipe underdrain 6-inch (612.0106)LF2,823$15.00$8.00$8.00$37.53
184Pipe underdrain unperforated 6- inch (612.0206)LF185$50.00$17.00$17.00$44.64
185Pipe underdrain wrapped 6-inch (612.0406)LF1,044$15.00$4.00$4.00$39.48
186Guardrail mow strip emulsified asphalt (614.0397)SY294$18.50$18.50$22.00$37.98
187Crash cushions temporary (614.0905)EACH23$3,215.11$3,215.11$3,000.00$3,215.11
188MGS guardrail 3 (614.2300)LF2,381$33.00$33.00$28.50$33.00
189MGS guardrail 3 QS (614.2320)LF94$47.00$47.00$48.00$47.00
190MGS guardrail 3 K (614.2330)LF1,289$39.00$39.00$38.50$39.00
191MGS thrie beam transition (614.2500)LF512.40$92.00$92.00$94.00$92.00
192MGS guardrail terminal eat (614.2610)EACH12$4,300.00$4,300.00$3,800.00$4,300.00
193MGS guardrail terminal type 2 (614.2620)EACH3$3,000.00$3,000.00$3,000.00$3,000.00
194Fence chain link 6-FT (616.0206)LF1,589$44.50$44.50$45.50$44.50
195Gates chain link (width) 001. 12-FT (616.0329)EACH1$3,521.00$3,521.00$3,400.00$3,521.00
196Fence track clearance (616.0800.S)LF540$5.00$5.00$10.50$5.00
197Maintenance and repair of haul roads (project) 001. 1100-20-77 (618.0100)EACH1$1.00$100.00$4,000.00$1.00
198Maintenance and repair of haul roads (project) 002. 1100-21-70 (618.0100)EACH1$1.00$100.00$4,000.00$1.00
199Maintenance and repair of haul roads (project) 003. 1100-21-71 (618.0100)EACH1$1.00$100.00$4,000.00$1.00
200Mobilization (619.1000)EACH1$4,474,000$3,607,302$1,650,000$5,785,704
201Dust control surface treatment (623.0200)SY8,774$0.01$0.01$0.01$0.01
202Water (624.0100)MGAL61$100.00$151.00$151.00$42.20
203Topsoil (625.0100)SY9,317$0.01$2.00$2.00$8.00
204Salvaged topsoil (625.0500)SY5,053$6.00$3.00$3.00$4.68
205Mulching (627.0200)SY3,286$0.65$0.65$0.32$0.65
206Silt fence (628.1504)LF8,061$2.50$2.50$2.25$2.50
207Silt fence maintenance (628.1520)LF8,061$0.01$0.01$0.05$0.01
208Mobilizations erosion control (628.1905)EACH46$100.00$100.00$250.00$100.00
209Mobilizations emergency erosion control (628.1910)EACH27$100.00$100.00$300.00$100.00
210Erosion mat class I type A (628.2002)SY11,097$1.25$1.25$0.93$1.25
211Erosion mat class I type B (628.2004)SY210$1.25$1.25$0.98$1.25
212Erosion mat class II type B (628.2023)SY12$2.50$2.50$1.75$2.50
213Inlet protection type A (628.7005)EACH15$150.00$150.00$160.00$150.00
214Inlet protection type C (628.7015)EACH16$75.00$75.00$60.00$75.00
215Inlet protection type D (628.7020)EACH210$110.00$110.00$215.00$110.00
216Temporary ditch checks (628.7504)LF360$9.00$9.00$9.50$9.00
217Tracking pads (628.7560)EACH9$1.00$2,330.00$2,330.00$1,694.50
218Fertilizer type B (629.0210)CWT5.30$125.00$125.00$75.00$125.00
219Seeding mixture no. 40 (630.0140)LB10$25.00$25.00$50.00$25.00
220Seeding mixture no. 70 (630.0170)LB52$155.00$155.00$100.00$155.00
221Seeding temporary (630.0200)LB6$10.00$10.00$50.00$10.00
222Seed water (630.0500)MGAL273.50$20.00$20.00$80.00$20.00
223Sod lawn (631.1000)SY114$25.00$25.00$20.00$25.00
224Delineators barrier wall (633.1000)EACH6$65.00$65.00$50.00$65.00
225Posts wood 4X6-inch X 18-FT (634.0618)EACH48$110.00$110.00$125.00$110.00
226Posts wood 4X6-inch X 22-FT (634.0622)EACH55$125.00$125.00$175.00$125.00
227Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH3$200.00$200.00$250.00$200.00
228Sign supports structural steel HS (635.0200)LB13,000$4.50$4.50$6.50$4.50
229Sign supports replacing base connection bolts (635.0300)EACH4$275.00$275.00$250.00$275.00
230Signs type I reflective SH (637.1220)SF4,152$26.00$26.00$29.50$26.00
231Signs type II reflective H (637.2210)SF1,236.63$20.00$20.00$24.50$20.00
232Signs type II reflective H folding (637.2215)SF92.22$26.00$26.00$30.00$26.00
233Signs type II reflective F (637.2230)SF486.50$22.00$22.00$24.50$22.00
234Moving signs type I (638.2101)EACH2$1,000.00$1,000.00$850.00$1,000.00
235Moving signs type II (638.2102)EACH15$225.00$225.00$75.00$225.00
236Removing signs type I (638.2601)EACH29$700.00$700.00$350.00$700.00
237Removing signs type II (638.2602)EACH129$40.00$40.00$35.00$40.00
238Removing small sign supports (638.3000)EACH97$40.00$40.00$35.00$40.00
239Removing structural steel sign supports (638.3100)EACH22$500.00$500.00$400.00$500.00
240Traffic control drums (643.0300)DAY200,663$0.16$0.16$0.12$0.16
241Traffic control barricades type III (643.0420)DAY5,793$0.92$0.92$0.55$0.92
242Traffic control warning lights type A (643.0705)DAY11,586$0.32$0.32$0.10$0.32
243Traffic control warning lights type C (643.0715)DAY41,228$0.13$0.13$0.10$0.13
244Traffic control arrow boards (643.0800)DAY1,583$12.25$12.25$6.50$12.25
245Traffic control signs (643.0900)DAY52,484$0.29$0.29$0.25$0.29
246Traffic control covering signs type I (643.0910)EACH30$200.00$200.00$150.00$200.00
247Traffic control covering signs type II (643.0920)EACH12$50.00$50.00$20.00$50.00
248Traffic control signs fixed message (643.1000)SF1,429$21.16$21.16$12.50$21.16
249Traffic control signs PCMS (643.1050)DAY170$50.00$50.00$22.00$50.00
250Dynamic late merge system (643.1100.S)DAY498$169.02$169.02$225.00$169.02
251Portable automated real-time traffic queue warning system (643.1200.S)DAY153$223.53$223.53$135.00$223.53
252Temporary marking line paint 4- inch (643.3105)LF6,994$0.28$0.28$0.40$0.28
253Temporary marking line removable tape 4-inch (643.3150)LF250$3.89$3.89$2.00$3.89
254Temporary marking line paint 6- inch (643.3165)LF287,106$0.30$0.30$0.30$0.30
255Temporary marking line paint 8- inch (643.3205)LF830$0.60$0.60$1.00$0.60
256Temporary marking line paint 10- inch (643.3265)LF6,499$0.65$0.65$1.00$0.65
257Temporary marking raised pavement marker type I (643.3760)EACH237$6.74$6.74$5.00$6.74
258Temporary marking stop line removable tape 18-inch (643.3850)LF182$8.57$8.57$5.00$8.57
259Traffic control interim lane closure (643.4100)EACH30$1,950.00$950.00$600.00$950.00
260Traffic control (643.5000)EACH1$100,000$100,000$302,239$100,000
261Temporary pedestrian barricade (644.1810)LF664$7.26$7.26$4.50$7.26
262Temporary audible message devices (644.1900.S)DAY248$8.21$8.21$3.50$8.21
263Geotextile type DF schedule A (645.0111)SY1,181$1.00$2.00$2.00$4.00
264Geotextile type HR (645.0120)SY6$100.00$204.00$204.00$20.00
265Marking line epoxy 4-inch (646.1020)LF8,016$0.80$0.80$0.32$0.80
266Marking line grooved wet ref epoxy 4-inch (646.1040)LF2,184$1.25$1.25$1.06$1.25
267Marking line grooved black epoxy 6-inch (646.2025)LF12,643$1.10$1.10$0.81$1.10
268Marking line grooved wet ref epoxy 6-inch (646.2040)LF75,001$1.65$1.65$1.33$1.65
269Marking line grooved permanent tape 6-inch (646.2050)LF12,643$9.20$9.20$6.97$9.20
270Marking line epoxy 8-inch (646.3020)LF980$1.60$1.60$0.87$1.60
271Marking line grooved wet ref epoxy 8-inch (646.3040)LF480$2.70$2.70$1.73$2.70
272Marking line grooved black epoxy 10-inch (646.4025)LF2,202$2.25$2.25$1.78$2.25
273Marking line grooved wet ref epoxy 10-inch (646.4040)LF15,926$3.00$3.00$2.65$3.00
274Marking line grooved permanent tape 10-inch (646.4050)LF18,845$12.00$12.00$11.55$12.00
275Marking arrow epoxy (646.5020)EACH37$300.00$300.00$233.23$300.00
276Marking word epoxy (646.5120)EACH13$400.00$400.00$352.02$400.00
277Marking symbol epoxy (646.5220)EACH25$405.00$405.00$225.15$405.00
278Marking stop line epoxy 18-inch (646.6120)LF700$22.00$22.00$14.60$22.00
279Marking yield line epoxy 18-inch (646.6220)EACH52$90.00$90.00$34.83$90.00
280Cold weather marking epoxy 4-inch (646.6464)LF6,421$0.60$0.60$0.32$0.60
281Cold weather marking epoxy 6-inch (646.6466)LF87,590$0.70$0.70$0.45$0.70
282Cold weather marking epoxy 10- inch (646.6470)LF15,926$1.20$1.20$1.00$1.20
283Marking diagonal epoxy 12-inch (646.7120)LF4,926$11.00$11.00$11.11$11.00
284Marking chevron epoxy 24-inch (646.7220)LF1,253$14.00$14.00$23.94$14.00
285Marking crosswalk epoxy transverse line 6-inch (646.7420)LF823$13.00$13.00$10.72$13.00
286Marking island nose epoxy (646.8220)EACH6$350.00$350.00$263.06$350.00
287Marking removal line 4-inch (646.9000)LF150$1.15$1.15$2.00$1.15
288Marking removal line grooved contrast permanent tape 4-inch (646.9055)LF45$1.50$1.50$5.00$1.50
289Marking removal line grooved contrast permanent tape 8-inch (646.9155)LF1,239$1.75$1.75$3.00$1.75
290Conduit rigid metallic 2-inch (652.0125)LF18$149.50$149.50$149.50$149.50
291Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,530$9.48$9.48$9.48$9.48
292Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF588$11.90$11.90$11.90$11.90
293Conduit special 3-inch (652.0615)LF788$31.70$31.70$31.70$31.70
294Install conduit into existing item (652.0700.S)EACH10$220.00$220.00$220.00$220.00
295Conduit loop detector (652.0800)LF1,618$8.05$8.05$8.05$8.05
296Pull boxes steel 24X36-inch (653.0135)EACH8$1,312.00$1,312.00$1,312.00$1,312.00
297Pull boxes steel 24X42-inch (653.0140)EACH15$1,409.00$1,409.00$1,409.00$1,409.00
298Removing pull boxes (653.0905)EACH16$108.00$108.00$108.00$108.00
299Concrete bases type 1 (654.0101)EACH6$1,054.00$1,054.00$1,054.00$1,054.00
300Concrete bases type 10 (654.0110)EACH2$6,875.00$6,875.00$6,875.00$6,875.00
301Concrete bases type 10-special (654.0120)EACH1$9,857.00$9,857.00$9,857.00$9,857.00
302Concrete control cabinet bases type 9 special (654.0217)EACH1$2,989.00$2,989.00$2,989.00$2,989.00
303Cable in duct 4-4 AWG (655.0144)LF3,936$14.34$14.34$14.34$14.34
304Cable in duct 4-6 AWG (655.0146)LF4,243$12.94$12.94$12.94$12.94
305Cable in duct 4-8 AWG (655.0148)LF1,254$11.34$11.34$11.34$11.34
306Cable traffic signal 5-14 AWG (655.0230)LF511$1.92$1.92$1.92$1.92
307Cable traffic signal 7-14 AWG (655.0240)LF153$2.27$2.27$2.27$2.27
308Cable traffic signal 12-14 AWG (655.0260)LF1,705$3.32$3.32$3.32$3.32
309Electrical wire traffic signals 12 AWG (655.0510)LF427$0.98$0.98$0.98$0.98
310Electrical wire traffic signals 10 AWG (655.0515)LF1,664$1.52$1.52$1.52$1.52
311Electrical wire lighting 12 AWG (655.0610)LF2,784$0.98$0.98$0.98$0.98
312Electrical wire lighting 6 AWG (655.0625)LF124$2.12$2.12$2.12$2.12
313Loop detector lead in cable (655.0700)LF5,559$2.17$2.17$2.17$2.17
314Loop detector wire (655.0800)LF6,478$1.29$1.29$1.29$1.29
315Electrical service meter breaker pedestal (location) 301.IH 41 SB off ramp/N 115TH ST & CTH PP (656.0201)EACH1$1,780.00$1,780.00$1,780.00$1,780.00
316Pedestal bases (657.0100)EACH6$247.00$247.00$247.00$247.00
317Poles type A (657.0375)EACH8$4,651.40$4,651.40$4,651.40$4,651.40
318Traffic signal standards aluminum 13-FT (657.0420)EACH3$555.00$555.00$555.00$555.00
319Traffic signal standards aluminum 15-FT (657.0425)EACH3$593.00$593.00$593.00$593.00
320Luminaire arms single member 6- inch clamp 4-FT (657.0620)EACH16$284.00$284.00$284.00$284.00
321Luminaire arms single member 6- inch clamp 15-FT (657.0640)EACH22$714.00$714.00$714.00$714.00
322Traffic signal face 3S 12-inch (658.0173)EACH12$886.60$886.60$886.60$886.60
323Traffic signal face 4S 12-inch (658.0174)EACH3$1,196.80$1,196.80$1,196.80$1,196.80
324Pedestrian signal face 16-inch (658.0416)EACH4$697.80$697.80$697.80$697.80
325Pedestrian push buttons (658.0500)EACH5$401.00$401.00$401.00$401.00
326Signal mounting hardware (location) 301. IH 41 SB off ramp/N115TH ST & CTH PP (658.5070)EACH1$5,888.00$5,888.00$5,888.00$5,888.00
327Luminaires utility LED D (659.1130)EACH38$375.20$375.20$375.20$375.20
328Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH30$8.60$8.60$8.60$8.60
329Temporary traffic signals for intersections (location) 301. IH 41 SB off ramp/N115TH ST & CTH PP (661.0201)EACH1$45,109$45,109$45,109$45,109
330Generators (661.0300)DAY2$290.00$290.00$290.00$290.00
331Field system integrator (670.0101)EACH1$19,122$19,122$19,122$19,122
332ITS documentation (670.0201)EACH1$6,912.00$6,912.00$6,912.00$6,912.00
333Remove cable (674.0300)LF385$1.46$1.46$1.46$1.46
334Install camera pole 50-FT (677.0150)EACH2$3,630.00$3,630.00$3,630.00$3,630.00
335Install camera assembly (677.0200)EACH3$4,510.00$4,510.00$4,510.00$4,510.00
336Removing 50-FT camera pole (677.9051.S)EACH2$2,805.00$2,805.00$2,805.00$2,805.00
337Removing CCTV camera (677.9200.S)EACH2$830.00$830.00$830.00$830.00
338Fiber optic splice enclosure (678.0200)EACH1$1,376.00$1,376.00$1,376.00$1,376.00
339Fiber optic splice (678.0300)EACH4$301.40$301.40$301.40$301.40
340Communication system testing (678.0501)EACH1$6,912.00$6,912.00$6,912.00$6,912.00
341Install ethernet switches (678.0600)EACH1$1,211.00$1,211.00$1,211.00$1,211.00
342Sawing asphalt (690.0150)LF102$2.55$2.55$2.55$2.55
343Sawing concrete (690.0250)LF61,680$2.55$2.55$2.55$2.55
344Incentive strength concrete structures (715.0502)DOL9,566$1.00$1.00$1.00$1.00
345Incentive strength concrete barrier (715.0603)DOL3,264$1.00$1.00$1.00$1.00
346Incentive compressive strength concrete pavement (715.0720)DOL3,269$1.00$1.00$1.00$1.00
347Incentive iri ride (740.0440)DOL23,723$1.00$1.00$1.00$1.00
348Railroad flagging reimbursement (801.0117)DOL17,250$1.00$1.00$1.00$1.00
349Installing and maintaining bird deterrent system (station) 001. sta 398+50 SB (999.2000.S)EACH1$0.01$0.01$5,000.00$10,000
350On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,800$5.00$5.00$5.00$5.00
351On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS17,280$5.00$5.00$5.00$5.00
352Special 001. backfill slurry (SPV.0035)CY100$100.00$113.00$113.00$190.60
353Special 200. HPC masonry structures (SPV.0035)CY932$1,200.00$1,200.00$1,250.00$950.00
354Special 001. incentive density HMA pavement (SPV.0055)DOL14,169$1.00$1.00$1.00$1.00
355Special 002. incentive air voids HMA pavement (SPV.0055)DOL14,851$1.00$1.00$1.00$1.00
356Special 001. concrete barrier type S42 end anchor (SPV.0060)EACH4$6,000.00$6,000.00$4,564.27$6,000.00
357Special 002. concrete barrier transition type M1 (SPV.0060)EACH4$18,000$18,000$8,031.33$18,000
358Special 003. concrete barrier transition type M2 (SPV.0060)EACH2$19,000$19,000$11,400$19,000
359Special 004. concrete barrier transition type M3 (SPV.0060)EACH2$20,000$20,000$7,986.72$20,000
360Special 005. mobilizations emergency pavement repair (SPV.0060)EACH8$500.00$4,450.00$4,150.00$10,000
361Special 006. storm sewer pipe reinforced concrete special tee fitting (SPV.0060)EACH1$3,000.00$43,872$43,872$15,016
362Special 007. beehive grate on 12- inch pipe bell (SPV.0060)EACH1$1,000.00$991.00$991.00$3,495.00
363Special 009. utility line opening (SPV.0060)EACH21$1.00$1,985.00$1,309.52$1,985.00
364Special 010. field facilities office space (SPV.0060)EACH1$54,000$45,325$240,000$45,510
365Special 011. traffic control close- open freeway ramp (SPV.0060)EACH7$1,250.00$250.00$450.00$250.00
366Special 012. traffic control local road lane closures (SPV.0060)EACH3$150.00$150.00$450.00$150.00
367Special 013. traffic control full freeway closure (SPV.0060)EACH3$1,597.53$1,597.53$1,200.00$1,597.53
368Special 016. reconnect storm sewer (SPV.0060)EACH67$1,750.00$2,733.00$2,733.00$7,172.00
369Special 018. emergency inlet repair (SPV.0060)EACH5$6,000.00$9,641.00$9,641.00$15,000
370Special 019. emergency response to traffic involving concrete barrier temporary (SPV.0060)EACH5$6,000.00$958.52$2,800.00$958.52
371Special 020. emergency response to traffic involving crash cushion (SPV.0060)EACH5$958.52$958.52$650.00$958.52
372Special 021. survey project 1100- 21-70 (SPV.0060)EACH1$52,941$52,941$52,941$52,941
373Special 022. survey project 1100- 21-71 (SPV.0060)EACH1$77,941$77,941$77,941$77,941
374Special 025. marking median inlet epoxy 6-inch (SPV.0060)EACH95$150.00$150.00$34.83$90.00
375Special 027. concrete barrier type S56 end anchor (SPV.0060)EACH4$7,000.00$7,000.00$5,504.42$7,000.00
376Special 050. ground rod (SPV.0060)EACH2$145.00$145.00$145.00$145.00
377Special 051. loop detector splice (SPV.0060)EACH6$132.00$132.00$132.00$132.00
378Special 100. removing light poles (SPV.0060)EACH8$561.00$561.00$561.00$561.00
379Special 101. removing luminaire arms (SPV.0060)EACH16$68.00$68.00$68.00$68.00
380Special 102. temporary wood pole 60-FT (SPV.0060)EACH38$3,653.00$3,653.00$3,653.00$3,653.00
381Special 103. concrete bases type B (SPV.0060)EACH14$3,430.00$3,430.00$3,430.00$3,430.00
382Special 104. lighting system integrator 1100-21-70 (SPV.0060)EACH1$2,018.00$2,018.00$2,018.00$2,018.00
383Special 105. lighting system integrator 1100-21-71 (SPV.0060)EACH1$2,018.00$2,018.00$2,018.00$2,018.00
384Special 106. lighting system survey 1100-21-70 (SPV.0060)EACH1$2,040.00$2,040.00$2,040.00$2,040.00
385Special 107. lighting system survey 1100-21-71 (SPV.0060)EACH1$2,040.00$2,040.00$2,040.00$2,040.00
386Special 108. maintenance of lighting systems 1100-21-70 (SPV.0060)EACH1$7,504.00$7,504.00$7,504.00$7,504.00
387Special 109. maintenance of lighting system 1100-21-71 (SPV.0060)EACH1$7,504.00$7,504.00$7,504.00$7,504.00
388Special 200. embedded galvanic anodes (SPV.0060)EACH341$60.00$60.00$60.00$60.00
389Special 201. cleaning and sealing concrete girder ends (SPV.0060)EACH19$450.00$450.00$3,500.00$2,400.00
390Special 202. vegetation removal B- 40-365 (SPV.0060)EACH1$1,500.00$1,500.00$3,500.00$1,500.00
391Special 203. vegetation removal B- 40-366 (SPV.0060)EACH1$1,500.00$1,500.00$3,500.00$1,500.00
392Special 250. heat straightening of damaged girders (SPV.0060)EACH1$70,000$70,000$67,000$67,000
393Special 260. RE-epoxy bearing anchor bolt (SPV.0060)EACH50$650.00$650.00$700.00$700.00
394Special 261. bearing anchor bolt nut adjustment (SPV.0060)EACH3$1,600.00$1,600.00$265.00$265.00
395Special 301. install poles type 9 (SPV.0060)EACH2$1,646.00$1,646.00$1,646.00$1,646.00
396Special 302. install poles type 9- special (SPV.0060)EACH1$1,646.00$1,646.00$1,646.00$1,646.00
397Special 303. install monotube arms 20-FT (SPV.0060)EACH1$2,640.00$2,640.00$2,640.00$2,640.00
398Special 304. install monotube arms 30-FT (SPV.0060)EACH1$2,895.00$2,895.00$2,895.00$2,895.00
399Special 305. install monotube arms 35-FT-special (SPV.0060)EACH1$2,980.00$2,980.00$2,980.00$2,980.00
400Special 306. TRSNPT & inst state furn traff signal cab IH 41SB off /N 115TH ST & CTH PP (SPV.0060)EACH1$5,810.00$5,810.00$5,810.00$5,810.00
401Special 307. TRSNPT traffic signal materials IH 41SB off /N 115TH ST & CTH PP (SPV.0060)EACH1$680.00$680.00$680.00$680.00
402Special 308. temporary non- intrusive vehicle detection system for intersections (SPV.0060)EACH1$6,647.00$6,647.00$6,647.00$6,647.00
403Special 309. TRSNPT & inst S-F FO cable pigtail IH 41SB off /N 115TH ST & CTH PP (SPV.0060)EACH1$1,172.00$1,172.00$1,172.00$1,172.00
404Special 450. tension anchor rod (SPV.0060)EACH40$500.00$500.00$800.00$500.00
405Special 451. remove debris (SPV.0060)EACH2$1,500.00$1,500.00$1,000.00$1,500.00
406Special 452. remove catwalk (SPV.0060)EACH4$7,500.00$7,500.00$5,000.00$7,500.00
407Special 453. tension structural bolt (SPV.0060)EACH8$250.00$250.00$400.00$250.00
408Special 454. vertical sign support (SPV.0060)EACH2$800.00$800.00$1,000.00$800.00
409Special 455. replace junction box cover (SPV.0060)EACH1$350.00$1,234.40$250.00$1,234.40
410Special 456. conduit plug (SPV.0060)EACH1$150.00$254.00$200.00$254.00
411Special 001. pavement cleanup project 1100-21-71 (SPV.0075)HRS100$300.00$150.00$211.90$244.00
412Special 001. seeding mixture no. 90A (SPV.0085)LB64$120.00$120.00$125.00$120.00
413Special 001. glare screen temporary (SPV.0090)LF12,154$7.12$7.12$6.00$7.12
414Special 024. temporary precast trench drain (SPV.0090)LF1,157$250.00$231.00$231.00$2,181.00
415Special 110. temporary overhead cable quadruplex 2 AWG (SPV.0090)LF12,503$6.49$6.49$6.49$6.49
416Special 200. longitudinal grooving bridge deck (SPV.0165)SF18,054$0.50$0.50$1.08$1.06
417Special 201. wall concrete panel mechanically stabilized earth R-40- 714 (SPV.0165)SF6,470$123.00$137.00$160.00$171.47
418Special 202. wall concrete panel mechanically stabilized earth R-40- 715 (SPV.0165)SF6,550$123.00$137.00$160.00$172.03
419Special 203. temporary wire faced mechanically stabilized earth (SPV.0165)SF1,815$100.00$124.00$124.00$200.00
420Special 204. removing loose concrete (SPV.0165)SF75$75.00$75.00$100.00$65.00
421Special 450. repair galvanized coating (SPV.0165)SF3$150.00$150.00$250.00$150.00
422Special 001. resin binder high friction surface treatment (SPV.0180)SY3,806$24.90$25.50$24.90$24.90
423Special 002. removing concrete rumble strips (SPV.0180)SY642$35.00$35.00$49.50$35.00
424Special 200. polyester polymer concrete overlay (SPV.0180)SY7,697$118.00$118.00$143.00$144.26
425Special 201. abutment seat cleaning and sealing (SPV.0180)SY115$120.00$120.00$130.00$90.00
426Special 001. asphaltic repair (SPV.0195)TON40$337.00$337.00$350.00$337.00
WisDOT contract 20250708003: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of July 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy