WisDOT contract 20250812008 bid tabulation
Milton to Whitewater; Wcl to Willis Ray Road (STH 059, Walworth County Milton to Whitewater). Let by Wisconsin DOT on August 12, 2025, Walworth. 2 bids received; low bid $1,813,813 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 12 AUG 2025
- Pay items
- 169
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $1,813,813 | Low |
| 2 | Rock Road Companies, Inc. | $2,332,717 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. |
|---|---|---|---|---|---|
| 1 | Clearing (201.0110) | SY | 59 | $43.43 | $43.00 |
| 2 | Grubbing (201.0210) | SY | 59 | $43.43 | $43.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 200 | $14.30 | $9.40 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 270 | $0.01 | $18.19 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 56,733 | $1.35 | $3.85 |
| 6 | Removing curb & gutter (204.0150) | LF | 480 | $16.60 | $9.75 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 220 | $18.25 | $23.95 |
| 8 | Removing concrete bases (204.0195) | EACH | 9 | $275.79 | $275.79 |
| 9 | Removing (item description) 01. traffic signals (ush 12/STH 59/89 & STH 59/89) (204.9060.S) | EACH | 1 | $4,589.06 | $4,589.06 |
| 10 | Removing (item description) 02. loop detector wire & lead-in cable (ush 12/STH 59/89 & STH 59/89) (204.9060.S) | EACH | 1 | $1,378.93 | $1,378.93 |
| 11 | Excavation common (205.0100) | CY | 40 | $100.00 | $28.19 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 3110-03-73 (211.0101) | EACH | 1 | $0.01 | $0.01 |
| 13 | Finishing roadway (project) 01. 3110-03-73 (213.0100) | EACH | 1 | $1,600.00 | $5,999.34 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 600 | $31.30 | $40.07 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 70 | $68.75 | $22.72 |
| 16 | Concrete pavement 10-inch (415.0100) | SY | 21 | $179.30 | $179.30 |
| 17 | Drilled tie bars (416.0610) | EACH | 345 | $12.50 | $12.50 |
| 18 | Drilled dowel bars (416.0620) | EACH | 180 | $17.50 | $17.50 |
| 19 | Concrete pavement repair (416.1710) | SY | 45 | $120.65 | $120.65 |
| 20 | Concrete pavement repair shes (416.1715) | SY | 70 | $246.30 | $246.30 |
| 21 | Concrete pavement replacement (416.1720) | SY | 280 | $97.40 | $97.40 |
| 22 | Concrete pavement replacement shes (416.1725) | SY | 300 | $158.95 | $158.95 |
| 23 | Tack coat (455.0605) | GAL | 6,289 | $3.00 | $2.94 |
| 24 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $100.00 | $3,500.00 |
| 25 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $100.00 | $3,500.00 |
| 26 | Incentive density PWL HMA pavement (460.2005) | DOL | 8,770 | $1.00 | $1.00 |
| 27 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 5,470 | $1.00 | $1.00 |
| 28 | Incentive air voids HMA pavement (460.2010) | DOL | 10,010 | $1.00 | $1.00 |
| 29 | HMA pavement 4 LT 58-28 H (460.5424) | TON | 10,010 | $73.00 | $100.00 |
| 30 | Asphaltic surface patching (465.0110) | TON | 38 | $185.00 | $165.00 |
| 31 | Asphaltic surface driveways and field entrances (465.0120) | TON | 7 | $220.00 | $325.00 |
| 32 | Asphaltic rumble strips, shoulder (465.0520) | LF | 19,620 | $0.33 | $0.20 |
| 33 | Asphaltic rumble strips, centerline (465.0560) | LF | 9,400 | $0.33 | $0.20 |
| 34 | Cleaning culvert pipes (520.8700) | EACH | 1 | $2,165.00 | $1,500.00 |
| 35 | Apron endwalls for culvert pipe salvaged 24-inch (524.0624) | EACH | 2 | $1,014.00 | $2,083.60 |
| 36 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 15 | $65.00 | $65.00 |
| 37 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 112 | $60.90 | $60.90 |
| 38 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 72 | $55.70 | $70.10 |
| 39 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 15 | $70.10 | $59.60 |
| 40 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 381 | $59.60 | $55.70 |
| 41 | Concrete curb pedestrian (601.0600) | LF | 27 | $28.70 | $28.70 |
| 42 | Concrete sidewalk 5-inch (602.0410) | SF | 1,541 | $12.35 | $12.35 |
| 43 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $46.20 | $46.20 |
| 44 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 56 | $68.55 | $68.55 |
| 45 | Slope paving concrete (604.0400) | SY | 220 | $100.30 | $100.00 |
| 46 | Slope paving repair crushed aggregate (604.9010.S) | CY | 2 | $150.00 | $150.00 |
| 47 | Reseal crushed aggregate slope paving (604.9015.S) | SY | 460 | $16.46 | $16.46 |
| 48 | Riprap heavy (606.0300) | CY | 30 | $120.00 | $229.71 |
| 49 | Adjusting manhole covers (611.8110) | EACH | 1 | $1,190.00 | $1,510.77 |
| 50 | Adjusting inlet covers (611.8115) | EACH | 1 | $1,190.00 | $737.56 |
| 51 | Cover plates temporary (611.8120.S) | EACH | 2 | $275.00 | $679.53 |
| 52 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 210 | $24.70 | $10.00 |
| 53 | Maintenance and repair of haul roads (project) 01. 3110-03-73 (618.0100) | EACH | 1 | $0.01 | $0.01 |
| 54 | Mobilization (619.1000) | EACH | 1 | $20,058 | $97,087 |
| 55 | Water (624.0100) | MGAL | 13 | $36.00 | $0.01 |
| 56 | Topsoil (625.0100) | SY | 180 | $12.55 | $0.01 |
| 57 | Mulching (627.0200) | SY | 180 | $1.00 | $1.00 |
| 58 | Silt fence (628.1504) | LF | 224 | $3.00 | $3.00 |
| 59 | Silt fence maintenance (628.1520) | LF | 224 | $0.01 | $0.01 |
| 60 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $100.00 |
| 61 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $100.00 |
| 62 | Erosion mat class I type B (628.2004) | SY | 330 | $2.00 | $2.00 |
| 63 | Erosion mat urban class I type A (628.2006) | SY | 230 | $3.00 | $3.00 |
| 64 | Inlet protection type B (628.7010) | EACH | 6 | $75.00 | $75.00 |
| 65 | Inlet protection type C (628.7015) | EACH | 1 | $75.00 | $75.00 |
| 66 | Temporary ditch checks (628.7504) | LF | 48 | $15.00 | $15.00 |
| 67 | Fertilizer type B (629.0210) | CWT | 0.20 | $250.00 | $250.00 |
| 68 | Seeding mixture no. 20 (630.0120) | LB | 9 | $20.00 | $20.00 |
| 69 | Seeding temporary (630.0200) | LB | 2 | $20.00 | $20.00 |
| 70 | Seed water (630.0500) | MGAL | 7 | $10.00 | $10.00 |
| 71 | Markers culvert end (633.5200) | EACH | 11 | $70.00 | $70.00 |
| 72 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 27 | $95.00 | $95.00 |
| 73 | Signs type II reflective H (637.2210) | SF | 117.10 | $21.00 | $21.00 |
| 74 | Signs type II reflective F (637.2230) | SF | 53.75 | $23.00 | $23.00 |
| 75 | Moving signs type II (638.2102) | EACH | 5 | $225.00 | $225.00 |
| 76 | Removing signs type II (638.2602) | EACH | 34 | $35.00 | $35.00 |
| 77 | Removing small sign supports (638.3000) | EACH | 27 | $35.00 | $35.00 |
| 78 | Field office type B (642.5001) | EACH | 1 | $7,730.00 | $6,750.00 |
| 79 | Traffic control drums (643.0300) | DAY | 2,097 | $0.25 | $0.25 |
| 80 | Traffic control barricades type III (643.0420) | DAY | 705 | $0.95 | $0.95 |
| 81 | Traffic control warning lights type A (643.0705) | DAY | 1,410 | $0.12 | $0.12 |
| 82 | Traffic control warning lights type C (643.0715) | DAY | 196 | $0.77 | $0.77 |
| 83 | Connected arrow board (643.0810.S) | DAY | 28 | $14.67 | $14.67 |
| 84 | Traffic control signs (643.0900) | DAY | 10,402 | $0.25 | $0.25 |
| 85 | Traffic control covering signs type I (643.0910) | EACH | 24 | $150.00 | $150.00 |
| 86 | Traffic control covering signs type II (643.0920) | EACH | 8 | $56.98 | $56.98 |
| 87 | Traffic control signs fixed message (643.1000) | SF | 162 | $13.37 | $13.37 |
| 88 | Traffic control signs PCMS (643.1050) | DAY | 36 | $60.00 | $60.00 |
| 89 | Connected work zone start and end location markers (643.1220.S) | DAY | 56 | $13.54 | $13.54 |
| 90 | Temporary marking line paint 4- inch (643.3105) | LF | 2,030 | $0.61 | $0.61 |
| 91 | Temporary marking line paint 6- inch (643.3165) | LF | 19,880 | $0.64 | $0.64 |
| 92 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 414 | $11.00 | $11.00 |
| 93 | Traffic control (643.5000) | EACH | 1 | $5,966.41 | $5,966.41 |
| 94 | Temporary pedestrian surface matting (644.1440) | SF | 715 | $2.69 | $2.69 |
| 95 | Temporary pedestrian curb ramp (644.1601) | DAY | 50 | $17.54 | $17.54 |
| 96 | Temporary pedestrian detectable warning field (644.1605) | SF | 60 | $15.42 | $15.42 |
| 97 | Temporary pedestrian barricade (644.1810) | LF | 668 | $4.00 | $4.00 |
| 98 | Geotextile type HR (645.0120) | SY | 80 | $2.90 | $1.95 |
| 99 | Marking line epoxy 4-inch (646.1020) | LF | 8,510 | $0.60 | $0.60 |
| 100 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 41,720 | $1.35 | $1.35 |
| 101 | Marking line epoxy 8-inch (646.3020) | LF | 1,810 | $1.20 | $1.20 |
| 102 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,470 | $2.50 | $2.50 |
| 103 | Marking arrow epoxy (646.5020) | EACH | 29 | $280.00 | $280.00 |
| 104 | Marking word epoxy (646.5120) | EACH | 17 | $475.00 | $475.00 |
| 105 | Marking stop line epoxy 18-inch (646.6120) | LF | 244 | $17.00 | $17.00 |
| 106 | Marking diagonal epoxy 12-inch (646.7120) | LF | 360 | $14.00 | $14.00 |
| 107 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 190 | $15.00 | $15.00 |
| 108 | Marking curb epoxy (646.8120) | LF | 70 | $10.00 | $10.00 |
| 109 | Marking island nose epoxy (646.8220) | EACH | 5 | $285.00 | $285.00 |
| 110 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 610 | $3.50 | $1.75 |
| 111 | Construction staking concrete pavement (650.7000) | LF | 67 | $10.00 | $0.01 |
| 112 | Construction staking resurfacing reference (650.8000) | LF | 13,668 | $0.20 | $0.19 |
| 113 | Construction staking curb ramps (650.9000) | EACH | 6 | $220.00 | $235.00 |
| 114 | Construction staking supplemental control (project) 01. 3110-03-73 (650.9911) | EACH | 1 | $1,800.00 | $1,500.00 |
| 115 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,499 | $6.88 | $6.88 |
| 116 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 882 | $9.00 | $9.00 |
| 117 | Conduit special 3-inch (652.0615) | LF | 775 | $21.60 | $21.60 |
| 118 | Conduit loop detector (652.0800) | LF | 1,918 | $6.04 | $6.04 |
| 119 | Pull boxes steel 24X36-inch (653.0135) | EACH | 7 | $1,317.61 | $1,317.61 |
| 120 | Pull boxes steel 24X42-inch (653.0140) | EACH | 12 | $1,197.16 | $1,197.16 |
| 121 | Removing pull boxes (653.0905) | EACH | 20 | $123.98 | $123.98 |
| 122 | Concrete bases type 1 (654.0101) | EACH | 4 | $983.87 | $983.87 |
| 123 | Concrete bases type 13 (654.0113) | EACH | 2 | $16,372 | $16,372 |
| 124 | Concrete bases type 10-special (654.0120) | EACH | 2 | $12,062 | $12,062 |
| 125 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,837.15 | $2,837.15 |
| 126 | Cable traffic signal 5-14 AWG (655.0230) | LF | 488 | $1.66 | $1.66 |
| 127 | Cable traffic signal 7-14 AWG (655.0240) | LF | 392 | $2.12 | $2.12 |
| 128 | Cable traffic signal 12-14 AWG (655.0260) | LF | 2,317 | $3.20 | $3.20 |
| 129 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 884 | $2.02 | $2.02 |
| 130 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,157 | $1.43 | $1.43 |
| 131 | Electrical wire lighting 12 AWG (655.0610) | LF | 576 | $1.16 | $1.16 |
| 132 | Loop detector lead in cable (655.0700) | LF | 5,835 | $1.75 | $1.75 |
| 133 | Loop detector wire (655.0800) | LF | 6,852 | $1.30 | $1.30 |
| 134 | Traffic signal evp detector cable (655.0900) | LF | 1,312 | $1.48 | $1.48 |
| 135 | Electrical service meter breaker pedestal (location) 01. ush 12/STH 59/89 & STH 59/89 (656.0201) | EACH | 1 | $1,891.35 | $1,891.35 |
| 136 | Pedestal bases (657.0100) | EACH | 4 | $350.84 | $350.84 |
| 137 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 4 | $1,044.10 | $1,044.10 |
| 138 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $1,015.75 | $1,015.75 |
| 139 | Traffic signal face 4S 12-inch (658.0174) | EACH | 8 | $1,312.18 | $1,312.18 |
| 140 | Signal mounting hardware (location) 01. ush 12/STH 59/89 & STH 59/89 (658.5070) | EACH | 1 | $7,520.01 | $7,520.01 |
| 141 | Luminaires utility LED C (659.1125) | EACH | 4 | $375.94 | $375.94 |
| 142 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 21 | $88.13 | $88.13 |
| 143 | Temporary traffic signals for intersections (location) 01. ush 12/STH 59/89 & STH 59/89 (661.0201) | EACH | 1 | $40,402 | $40,402 |
| 144 | Generators (661.0300) | DAY | 1 | $542.50 | $542.50 |
| 145 | Install camera assembly (677.0200) | EACH | 1 | $3,179.36 | $3,179.36 |
| 146 | Sawing asphalt (690.0150) | LF | 805 | $1.75 | $1.60 |
| 147 | Sawing concrete (690.0250) | LF | 2,080 | $2.55 | $2.20 |
| 148 | Incentive iri ride (740.0440) | DOL | 10,360 | $1.00 | $1.00 |
| 149 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 400 | $5.00 | $5.00 |
| 150 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 900 | $5.00 | $5.00 |
| 151 | Special 01. section corner monuments (SPV.0060) | EACH | 2 | $0.01 | $550.00 |
| 152 | Special 02. install poles type 10 special (SPV.0060) | EACH | 2 | $1,533.53 | $1,533.53 |
| 153 | Special 03. install poles type 13 OH (SPV.0060) | EACH | 2 | $1,533.53 | $1,533.53 |
| 154 | Special 04. install monotube arms 45-FT type 9/10 special pole (SPV.0060) | EACH | 2 | $1,843.30 | $1,843.30 |
| 155 | Special 05. install monotube arms 40-FT type 12/13 OH pole (SPV.0060) | EACH | 1 | $1,537.36 | $1,537.36 |
| 156 | Special 06. install monotube arms 45-FT type 12/13 OH pole (SPV.0060) | EACH | 1 | $1,843.30 | $1,843.30 |
| 157 | Special 07. install luminaire arms steel 15-FT (SPV.0060) | EACH | 4 | $544.45 | $544.45 |
| 158 | Special 08. transport & install state furnished traffic signal cabinet ush 12/STH 59/89 (SPV.0060) | EACH | 1 | $2,757.87 | $2,757.87 |
| 159 | Special 09. temporary infrared emergency vehicle preemption system ush 12/STH 59/89 & ST (SPV.0060) | EACH | 1 | $2,684.00 | $2,684.00 |
| 160 | Special 10. transport and install state furnished radar detect system ush 12/STH 59/89 & (SPV.0060) | EACH | 1 | $2,684.00 | $2,684.00 |
| 161 | Special 11. transport traffic signal & intersection lighting materials ush 12/STH 59/89 (SPV.0060) | EACH | 1 | $2,684.00 | $2,684.00 |
| 162 | Special 12. transport & install state furnished evp detector heads ush 12/STH 59/89 & ST (SPV.0060) | EACH | 1 | $2,013.00 | $2,013.00 |
| 163 | Special 13. cleaning inlets (SPV.0060) | EACH | 1 | $1,090.00 | $341.55 |
| 164 | Special 14. grading, shaping, finishing driveway removal (SPV.0060) | EACH | 1 | $1,950.00 | $2,532.40 |
| 165 | Special 15. curb ramp grading, shaping and finishing (SPV.0060) | EACH | 6 | $685.00 | $819.65 |
| 166 | Special 16. wing grading, shaping and finishing (SPV.0060) | EACH | 1 | $2,575.00 | $2,762.34 |
| 167 | Special 17. adjusting water valve boxes (SPV.0060) | EACH | 2 | $275.00 | $679.53 |
| 168 | Special 01. resin binder high friction surface treatment (SPV.0180) | SY | 5,100 | $24.53 | $23.09 |
| 169 | Special 01. asphaltic repair (SPV.0195) | TON | 333 | $96.00 | $180.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.