WisDOT contract 20251014007 bid tabulation
C Greenfield/Milwaukee, S 27th St; W Bottsford Ave to W Howard Ave (STH 241, Milwaukee County C Greenfield/Milwauke, S 27th St). Let by Wisconsin DOT on October 14, 2025, Milwaukee. 4 bids received; low bid $1,677,377 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 132
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $1,677,377 | Low |
| 2 | Rock Road Companies, Inc. | $1,860,808 | +11% |
| 3 | Stark Pavement Corporation | $1,876,309 | +12% |
| 4 | Payne and Dolan, Inc | $1,935,723 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Rock Road Companies, Inc. | 3. Stark Pavement Corporation | 4. Payne and Dolan, Inc |
|---|---|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $2,500.00 | $0.01 | $5,000.00 | $2,525.25 |
| 2 | Clearing (201.0105) | STA | 1 | $4,750.00 | $4,750.00 | $4,750.00 | $4,797.98 |
| 3 | Grubbing (201.0205) | STA | 1 | $500.00 | $500.00 | $500.00 | $505.05 |
| 4 | Removing asphaltic surface (204.0110) | SY | 850 | $17.20 | $7.80 | $7.00 | $7.80 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 82 | $18.00 | $10.63 | $42.00 | $21.25 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 29,800 | $2.60 | $4.97 | $3.30 | $2.60 |
| 7 | Removing curb & gutter (204.0150) | LF | 1,140 | $17.18 | $8.70 | $15.00 | $8.70 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 680 | $9.39 | $24.45 | $15.00 | $24.45 |
| 9 | Removing fence (204.0170) | LF | 14 | $10.00 | $55.00 | $25.00 | $25.25 |
| 10 | Removing concrete bases (204.0195) | EACH | 5 | $346.00 | $346.00 | $346.00 | $350.00 |
| 11 | Removing (item description) 01. loop detector wire and lead-in cable STH 241 & coldspring RD (204.9060.S) | EACH | 1 | $799.00 | $799.00 | $799.00 | $4,488.00 |
| 12 | Removing (item description) 02. loop detector wire and lead-in cable STH 241 & W. howard ave (204.9060.S) | EACH | 1 | $799.00 | $799.00 | $799.00 | $1,122.00 |
| 13 | Removing (item description) 03. electrical service meter breaker pedestal (204.9060.S) | EACH | 1 | $160.00 | $160.00 | $160.00 | $764.00 |
| 14 | Cofferdams (structure) 01. C-40-42 (206.5001) | EACH | 1 | $7,909.00 | $7,909.00 | $7,909.00 | $175,000 |
| 15 | Prepare foundation for asphaltic paving (project) 01. 2265-11-72 (211.0101) | EACH | 1 | $1,000.00 | $0.01 | $5,050.00 | $1,450.00 |
| 16 | Finishing roadway (project) 01. 2265-11-72 (213.0100) | EACH | 1 | $2,610.00 | $8,414.81 | $6,650.00 | $1,450.00 |
| 17 | Removing pavement for base patching (390.0100) | CY | 120 | $62.33 | $74.35 | $200.00 | $74.35 |
| 18 | Base patching concrete hes (390.0305) | CY | 128 | $329.00 | $289.85 | $350.00 | $289.85 |
| 19 | Drilled tie bars (416.0610) | EACH | 66 | $14.00 | $15.75 | $15.00 | $15.75 |
| 20 | Drilled dowel bars (416.0620) | EACH | 328 | $18.55 | $20.00 | $30.00 | $20.00 |
| 21 | Tack coat (455.0605) | GAL | 4,363 | $2.30 | $2.99 | $3.00 | $2.30 |
| 22 | Incentive density HMA pavement (460.2000) | DOL | 4,720 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 4,140 | $66.70 | $86.32 | $91.00 | $70.30 |
| 24 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 3,220 | $81.60 | $101.84 | $99.90 | $85.10 |
| 25 | Asphaltic surface (465.0105) | TON | 67 | $195.00 | $192.05 | $221.20 | $195.00 |
| 26 | Asphaltic surface patching (465.0110) | TON | 76 | $195.00 | $192.05 | $221.20 | $195.00 |
| 27 | Asphaltic surface temporary (465.0125) | TON | 101 | $195.00 | $192.05 | $179.00 | $195.00 |
| 28 | Concrete surface repair (509.1500) | SF | 94 | $80.00 | $80.00 | $80.00 | $600.00 |
| 29 | Concrete curb & gutter 31-inch (601.0331) | LF | 1,012 | $66.55 | $64.00 | $50.00 | $64.00 |
| 30 | Concrete curb pedestrian (601.0600) | LF | 185 | $65.48 | $35.25 | $75.00 | $35.25 |
| 31 | Concrete sidewalk 5-inch (602.0410) | SF | 5,830 | $9.82 | $9.25 | $9.50 | $9.25 |
| 32 | Curb ramp detectable warning field natural patina (602.0515) | SF | 300 | $41.70 | $48.50 | $55.00 | $48.50 |
| 33 | Inlet covers type WM (611.0660) | EACH | 2 | $2,000.00 | $1,613.40 | $1,900.00 | $1,919.95 |
| 34 | Adjusting manhole covers (611.8110) | EACH | 2 | $1,905.00 | $300.00 | $2,000.00 | $665.38 |
| 35 | Adjusting inlet covers (611.8115) | EACH | 5 | $1,090.00 | $300.00 | $1,500.00 | $665.38 |
| 36 | Pipe underdrain 6-inch (612.0106) | LF | 44 | $58.44 | $61.29 | $20.00 | $71.11 |
| 37 | Fence chain link 6-FT (616.0206) | LF | 10 | $85.00 | $328.00 | $250.00 | $328.00 |
| 38 | Gates chain link (width) 01. 4-FT (616.0329) | EACH | 1 | $2,600.00 | $3,788.00 | $3,000.00 | $3,788.00 |
| 39 | Maintenance and repair of haul roads (project) 01. 2265-11-72 (618.0100) | EACH | 1 | $0.01 | $0.01 | $1.00 | $1.00 |
| 40 | Mobilization (619.1000) | EACH | 1 | $133,542 | $118,940 | $85,319 | $173,500 |
| 41 | Concrete median sloped nose (620.0300) | SF | 367 | $20.81 | $19.95 | $15.00 | $19.95 |
| 42 | Mobilizations erosion control (628.1905) | EACH | 3 | $100.00 | $250.00 | $250.00 | $252.53 |
| 43 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $125.00 | $250.00 | $252.53 |
| 44 | Inlet protection type B (628.7010) | EACH | 10 | $55.00 | $45.00 | $50.00 | $50.51 |
| 45 | Inlet protection type C (628.7015) | EACH | 55 | $55.00 | $45.00 | $60.00 | $60.61 |
| 46 | Inlet protection type D (628.7020) | EACH | 40 | $95.00 | $88.00 | $125.00 | $126.26 |
| 47 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 67 | $130.00 | $94.10 | $100.00 | $101.01 |
| 48 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 10 | $220.00 | $170.00 | $200.00 | $202.02 |
| 49 | Signs type II reflective H (637.2210) | SF | 780.38 | $21.00 | $20.10 | $18.50 | $18.69 |
| 50 | Signs type II reflective F (637.2230) | SF | 78.25 | $24.00 | $21.25 | $21.00 | $21.21 |
| 51 | Removing signs type II (638.2602) | EACH | 110 | $28.00 | $18.00 | $35.00 | $35.35 |
| 52 | Removing small sign supports (638.3000) | EACH | 70 | $28.00 | $18.00 | $35.00 | $35.35 |
| 53 | Field office type D (642.5401) | EACH | 1 | $11,064 | $11,000 | $16,000 | $5,800.00 |
| 54 | Traffic control drums (643.0300) | DAY | 96,265 | $0.14 | $0.14 | $0.14 | $0.14 |
| 55 | Traffic control barricades type III (643.0420) | DAY | 11,050 | $0.48 | $0.48 | $0.48 | $0.48 |
| 56 | Traffic control warning lights type A (643.0705) | DAY | 22,590 | $0.11 | $0.11 | $0.11 | $0.11 |
| 57 | Traffic control warning lights type C (643.0715) | DAY | 6,870 | $0.12 | $0.12 | $0.12 | $0.12 |
| 58 | Connected arrow board (643.0810.S) | DAY | 663 | $6.18 | $6.18 | $6.18 | $6.18 |
| 59 | Traffic control signs (643.0900) | DAY | 34,680 | $0.17 | $0.17 | $0.17 | $0.17 |
| 60 | Traffic control signs PCMS (643.1050) | DAY | 27 | $60.00 | $60.00 | $60.00 | $60.00 |
| 61 | Connected work zone start and end location markers (643.1220.S) | DAY | 825 | $4.27 | $4.27 | $4.27 | $4.27 |
| 62 | Temporary marking line paint 6- inch (643.3165) | LF | 14,420 | $1.00 | $1.00 | $1.00 | $1.00 |
| 63 | Temporary marking line removable tape 6-inch (643.3180) | LF | 27,280 | $2.24 | $2.24 | $2.24 | $2.24 |
| 64 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 3,938 | $2.49 | $2.49 | $2.49 | $2.49 |
| 65 | Traffic control (643.5000) | EACH | 1 | $5,605.62 | $5,605.62 | $5,605.62 | $5,605.62 |
| 66 | Temporary pedestrian surface asphalt (644.1410) | SF | 3,063 | $6.74 | $10.35 | $5.50 | $4.40 |
| 67 | Temporary pedestrian surface matting (644.1440) | SF | 1,600 | $2.20 | $2.20 | $2.20 | $2.20 |
| 68 | Temporary pedestrian curb ramp (644.1601) | DAY | 282 | $12.09 | $12.09 | $12.09 | $12.09 |
| 69 | Temporary pedestrian detectable warning field (644.1605) | SF | 338 | $5.48 | $5.48 | $5.48 | $5.48 |
| 70 | Temporary pedestrian barricade (644.1810) | LF | 2,975 | $4.11 | $4.11 | $4.11 | $4.11 |
| 71 | Temporary audible message devices (644.1900.S) | DAY | 745 | $1.54 | $1.54 | $1.54 | $1.54 |
| 72 | Marking line epoxy 4-inch (646.1020) | LF | 130 | $1.00 | $1.00 | $1.00 | $1.00 |
| 73 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 3,080 | $1.35 | $1.35 | $1.35 | $1.20 |
| 74 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 14,500 | $1.60 | $1.60 | $1.60 | $1.70 |
| 75 | Marking line epoxy 8-inch (646.3020) | LF | 370 | $2.00 | $2.00 | $2.00 | $1.99 |
| 76 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,900 | $2.60 | $2.60 | $2.60 | $3.30 |
| 77 | Marking arrow epoxy (646.5020) | EACH | 13 | $285.00 | $285.00 | $285.00 | $320.00 |
| 78 | Marking word epoxy (646.5120) | EACH | 4 | $325.00 | $325.00 | $325.00 | $350.00 |
| 79 | Marking stop line epoxy 18-inch (646.6120) | LF | 240 | $16.00 | $16.00 | $16.00 | $18.00 |
| 80 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 870 | $10.00 | $10.00 | $10.00 | $15.00 |
| 81 | Marking curb epoxy (646.8120) | LF | 870 | $8.00 | $8.00 | $8.00 | $7.50 |
| 82 | Marking island nose epoxy (646.8220) | EACH | 13 | $300.00 | $300.00 | $300.00 | $475.00 |
| 83 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,197 | $2.00 | $2.00 | $1.95 | $2.02 |
| 84 | Construction staking resurfacing reference (650.8000) | LF | 13,400 | $0.20 | $0.20 | $0.25 | $0.20 |
| 85 | Construction staking electrical installations (project) 01. 2265-11- 72 (650.8501) | EACH | 1 | $1,500.00 | $1,500.00 | $1,850.00 | $1,515.15 |
| 86 | Construction staking curb ramps (650.9000) | EACH | 32 | $200.00 | $200.00 | $265.00 | $202.02 |
| 87 | Construction staking sidewalk (project) 01. 2265-11-72 (650.9500) | EACH | 1 | $1,000.00 | $1,000.00 | $3,250.00 | $1,010.10 |
| 88 | Construction staking supplemental control (project) 01. 2265-11-72 (650.9911) | EACH | 1 | $1,800.00 | $1,800.00 | $4,595.00 | $1,818.18 |
| 89 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 88 | $1.91 | $1.91 | $1.91 | $8.48 |
| 90 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 220 | $2.88 | $2.88 | $2.88 | $9.68 |
| 91 | Conduit special 2-inch (652.0605) | LF | 655 | $18.38 | $18.38 | $18.38 | $21.65 |
| 92 | Conduit loop detector (652.0800) | LF | 2,310 | $7.37 | $7.37 | $7.37 | $9.34 |
| 93 | Pull boxes steel 24X36-inch (653.0135) | EACH | 1 | $1,287.00 | $1,287.00 | $1,287.00 | $1,248.00 |
| 94 | Pull boxes steel 24X42-inch (653.0140) | EACH | 4 | $1,288.00 | $1,288.00 | $1,288.00 | $1,356.00 |
| 95 | Adjusting pull boxes (653.0900) | EACH | 1 | $218.00 | $218.00 | $218.00 | $257.00 |
| 96 | Removing pull boxes (653.0905) | EACH | 2 | $176.00 | $176.00 | $176.00 | $195.00 |
| 97 | Concrete bases type 1 (654.0101) | EACH | 3 | $901.00 | $901.00 | $901.00 | $1,338.00 |
| 98 | Cable traffic signal 5-14 AWG (655.0230) | LF | 80 | $1.79 | $1.79 | $1.79 | $2.12 |
| 99 | Cable traffic signal 7-14 AWG (655.0240) | LF | 200 | $2.11 | $2.11 | $2.11 | $2.52 |
| 100 | Cable traffic signal 12-14 AWG (655.0260) | LF | 590 | $3.27 | $3.27 | $3.27 | $3.79 |
| 101 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 520 | $1.20 | $1.20 | $1.20 | $1.52 |
| 102 | Loop detector lead in cable (655.0700) | LF | 9,979 | $1.91 | $1.91 | $1.91 | $2.02 |
| 103 | Loop detector wire (655.0800) | LF | 9,525 | $1.26 | $1.26 | $1.26 | $1.18 |
| 104 | Pedestal bases (657.0100) | EACH | 3 | $347.00 | $347.00 | $347.00 | $272.00 |
| 105 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 1 | $356.00 | $356.00 | $356.00 | $302.00 |
| 106 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $857.00 | $857.00 | $857.00 | $656.00 |
| 107 | Traffic signal face 4S 12-inch (658.0174) | EACH | 2 | $1,171.00 | $1,171.00 | $1,171.00 | $1,446.00 |
| 108 | Pedestrian signal face 16-inch (658.0416) | EACH | 2 | $611.00 | $611.00 | $611.00 | $701.20 |
| 109 | Pedestrian push buttons (658.0500) | EACH | 7 | $430.00 | $430.00 | $430.00 | $408.00 |
| 110 | Signal mounting hardware (location) 01. STH 241 & coldspring RD (658.5070) | EACH | 1 | $1,664.00 | $1,664.00 | $1,664.00 | $3,783.00 |
| 111 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 4 | $19.00 | $19.00 | $19.00 | $18.00 |
| 112 | Sawing asphalt (690.0150) | LF | 1,676 | $1.75 | $1.45 | $5.00 | $1.75 |
| 113 | Sawing concrete (690.0250) | LF | 766 | $2.35 | $2.95 | $5.00 | $2.35 |
| 114 | Incentive iri ride (740.0440) | DOL | 7,600 | $1.00 | $1.00 | $1.00 | $1.00 |
| 115 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 250 | $5.00 | $5.00 | $5.00 | $5.00 |
| 116 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 900 | $5.00 | $5.00 | $5.00 | $5.00 |
| 117 | Special 01. pedestrian push button extension (SPV.0060) | EACH | 2 | $441.00 | $441.00 | $441.00 | $642.20 |
| 118 | Special 02. modify traffic signal STH 241 & coldspring (SPV.0060) | EACH | 1 | $1,860.00 | $1,860.00 | $1,860.00 | $6,320.00 |
| 119 | Special 03. adjusting cuc manhole cover (SPV.0060) | EACH | 2 | $2,561.00 | $387.50 | $2,300.00 | $1,523.77 |
| 120 | Special 04. adjusting sanitary manhole with internal/external seal (SPV.0060) | EACH | 8 | $2,022.27 | $805.15 | $1,800.00 | $1,376.47 |
| 121 | Special 05. adjusting water valve boxes (SPV.0060) | EACH | 6 | $559.00 | $166.67 | $500.00 | $294.60 |
| 122 | Special 06. temporary bus stop (SPV.0060) | EACH | 8 | $1,529.00 | $2,874.88 | $3,200.00 | $750.00 |
| 123 | Special 07. curb ramp grading, shaping, and finishing (SPV.0060) | EACH | 32 | $737.24 | $500.00 | $1,500.00 | $500.00 |
| 124 | Special 08. cleaning storm sewer structure & pipes (SPV.0060) | EACH | 5 | $785.00 | $514.00 | $750.00 | $801.02 |
| 125 | Special 09. section corner monument (SPV.0060) | EACH | 1 | $1,652.00 | $1,350.00 | $1,000.00 | $1.00 |
| 126 | Special 10. tuck point storm sewer structure (SPV.0060) | EACH | 4 | $557.00 | $462.50 | $600.00 | $558.72 |
| 127 | Special 302. pullboxes 13" X 24" X 24" (SPV.0060) | EACH | 12 | $1,111.00 | $1,111.00 | $1,111.00 | $884.00 |
| 128 | Special 01. construction staking fence (SPV.0090) | LF | 10 | $10.00 | $10.00 | $8.50 | $10.10 |
| 129 | Special 351. split duct conduit (SPV.0090) | LF | 10 | $16.48 | $16.48 | $16.48 | $152.20 |
| 130 | Special 01. concrete surface repair full-depth (SPV.0165) | SF | 15 | $558.00 | $558.00 | $558.00 | $900.00 |
| 131 | Special 02. remove, salvage, and reinstall landscaping rocks (SPV.0165) | SF | 60 | $10.00 | $40.00 | $25.00 | $25.25 |
| 132 | Special 01. asphaltic repair (SPV.0195) | TON | 368 | $160.00 | $185.32 | $145.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.