2984-21-71. Let by Wisconsin DOT on November 11, 2025, Milwaukee. 4 bids received; low bid $2,860,142 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 167
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $2,860,142 | Low |
| 2 | Zenith Tech., Inc. - Waukesha | $2,950,343 | +3.0% |
| 3 | Wandel Contractors Inc | $2,989,160 | +5.0% |
| 4 | Zignego Company, Inc. | $2,997,191 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Zenith Tech., Inc. - Waukesha | 3. Wandel Contractors Inc | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 75 | $44.00 | $104.78 | $104.78 | $40.00 |
| 2 | Grubbing (201.0220) | ID | 75 | $4.00 | $10.60 | $10.60 | $40.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 1,080 | $23.00 | $19.43 | $19.75 | $20.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 44 | $17.71 | $11.88 | $15.00 | $20.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 250 | $18.50 | $30.49 | $10.50 | $10.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 832 | $18.00 | $15.36 | $18.65 | $10.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 12 | $483.33 | $900.00 | $400.00 | $500.00 |
| 8 | Removing catch basins (204.0215) | EACH | 3 | $300.00 | $300.00 | $300.00 | $936.00 |
| 9 | Abandoning catch basins (204.0255) | EACH | 2 | $300.00 | $300.00 | $300.00 | $936.00 |
| 10 | Abandoning culvert pipes (204.0270) | EACH | 2 | $800.00 | $800.00 | $800.00 | $937.00 |
| 11 | Removing (item description) 001. aerial cable (204.9090.S) | LF | 3,000 | $12.99 | $12.99 | $12.99 | $12.99 |
| 12 | Excavation common (205.0100) | CY | 67 | $83.35 | $184.03 | $140.50 | $100.00 |
| 13 | Finishing roadway (project) 001. 2984-21-71 (213.0100) | EACH | 1 | $1,940.00 | $1,103.92 | $1,775.00 | $1,000.00 |
| 14 | Finishing roadway (project) 002. 2984-21-72 (213.0100) | EACH | 1 | $1,940.00 | $1,085.34 | $3,550.00 | $1,000.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 51 | $54.17 | $76.50 | $70.75 | $100.00 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 254 | $56.80 | $76.57 | $35.75 | $80.00 |
| 17 | Concrete base 9-inch (320.0155) | SY | 72 | $94.30 | $116.86 | $86.15 | $140.00 |
| 18 | Concrete pavement 9-inch (415.0090) | SY | 843 | $93.10 | $112.46 | $107.75 | $140.00 |
| 19 | Drilled tie bars (416.0610) | EACH | 544 | $18.00 | $20.06 | $15.50 | $15.00 |
| 20 | Drilled dowel bars (416.0620) | EACH | 170 | $25.00 | $25.46 | $20.00 | $15.00 |
| 21 | Tack coat (455.0605) | GAL | 6 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Asphaltic surface (465.0105) | TON | 15 | $235.00 | $235.00 | $235.00 | $235.00 |
| 23 | Concrete curb & gutter 22-inch (601.0322) | LF | 100 | $57.83 | $64.32 | $60.75 | $60.00 |
| 24 | Concrete curb & gutter 31-inch (601.0331) | LF | 326 | $65.00 | $67.82 | $66.00 | $60.00 |
| 25 | Concrete sidewalk 5-inch (602.0410) | SF | 7,902 | $12.85 | $13.35 | $10.50 | $10.72 |
| 26 | Curb ramp detectable warning field natural patina (602.0515) | SF | 200 | $43.97 | $42.05 | $55.00 | $50.00 |
| 27 | Concrete driveway 8-inch (602.0820) | SY | 27 | $141.35 | $133.60 | $113.75 | $140.00 |
| 28 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 96 | $150.00 | $150.00 | $150.00 | $246.00 |
| 29 | Storm sewer pipe composite 8-inch (608.6008) | LF | 15 | $130.00 | $130.00 | $130.00 | $446.00 |
| 30 | Inlets 2X2.5-FT (611.3225) | EACH | 9 | $3,000.00 | $3,000.00 | $3,000.00 | $1,541.00 |
| 31 | Mobilization (619.1000) | EACH | 1 | $276,696 | $280,058 | $383,004 | $371,000 |
| 32 | Water (624.0100) | MGAL | 0.20 | $251.00 | $56.05 | $2,500.00 | $1,000.00 |
| 33 | Topsoil (625.0100) | SY | 166 | $12.00 | $12.00 | $18.00 | $15.00 |
| 34 | Mobilizations erosion control (628.1905) | EACH | 3 | $125.00 | $125.00 | $200.00 | $150.00 |
| 35 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $1.00 | $1.00 | $200.00 | $150.00 |
| 36 | Inlet protection type C (628.7015) | EACH | 20 | $70.00 | $70.00 | $62.50 | $65.00 |
| 37 | Inlet protection type D (628.7020) | EACH | 12 | $130.00 | $130.00 | $120.00 | $95.00 |
| 38 | Sod water (631.0300) | MGAL | 4.50 | $101.00 | $101.00 | $40.00 | $150.00 |
| 39 | Sod lawn (631.1000) | SY | 166 | $30.00 | $30.00 | $12.00 | $25.00 |
| 40 | Signs type II reflective SH (637.2220) | SF | 30 | $30.00 | $30.00 | $33.00 | $45.00 |
| 41 | Field office type C (642.5201) | EACH | 1 | $18,864 | $28,033 | $5,500.00 | $20,000 |
| 42 | Traffic control drums (643.0300) | DAY | 19,760 | $0.19 | $0.19 | $0.19 | $0.19 |
| 43 | Traffic control barricades type III (643.0420) | DAY | 2,201 | $0.51 | $0.51 | $0.51 | $0.51 |
| 44 | Traffic control flexible tubular marker posts (643.0500) | EACH | 119 | $22.19 | $22.19 | $22.19 | $22.19 |
| 45 | Traffic control flexible tubular marker bases (643.0600) | EACH | 119 | $9.43 | $9.43 | $9.43 | $9.43 |
| 46 | Traffic control warning lights type A (643.0705) | DAY | 4,402 | $0.21 | $0.21 | $0.21 | $0.21 |
| 47 | Traffic control warning lights type C (643.0715) | DAY | 6,320 | $0.21 | $0.21 | $0.21 | $0.21 |
| 48 | Traffic control signs (643.0900) | DAY | 16,184 | $0.36 | $0.36 | $0.36 | $0.36 |
| 49 | Traffic control signs PCMS (643.1050) | DAY | 60 | $33.50 | $33.50 | $33.50 | $33.50 |
| 50 | Temporary marking line removable tape 4-inch (643.3150) | LF | 19,252 | $0.66 | $0.66 | $0.66 | $0.66 |
| 51 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,215 | $1.59 | $1.59 | $1.59 | $1.59 |
| 52 | Temporary marking line removable tape 8-inch (643.3250) | LF | 552 | $2.10 | $2.10 | $2.10 | $2.10 |
| 53 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 298 | $4.36 | $4.36 | $4.36 | $4.36 |
| 54 | Temporary marking arrow removable tape (643.3550) | EACH | 9 | $167.67 | $167.67 | $167.67 | $167.67 |
| 55 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 212 | $6.22 | $6.22 | $6.22 | $6.22 |
| 56 | Traffic control (643.5000) | EACH | 1 | $14,827 | $14,827 | $14,827 | $14,827 |
| 57 | Temporary pedestrian barricade (644.1810) | LF | 414 | $5.77 | $5.77 | $5.77 | $5.77 |
| 58 | Temporary audible message devices (644.1900.S) | DAY | 3,708 | $2.08 | $2.08 | $2.08 | $2.08 |
| 59 | Marking line epoxy 4-inch (646.1020) | LF | 17,138 | $0.85 | $0.85 | $0.38 | $0.85 |
| 60 | Marking line epoxy 8-inch (646.3020) | LF | 1,718 | $1.70 | $1.70 | $1.00 | $1.70 |
| 61 | Marking arrow epoxy (646.5020) | EACH | 24 | $235.00 | $235.00 | $402.00 | $235.00 |
| 62 | Marking symbol epoxy (646.5220) | EACH | 12 | $215.00 | $215.00 | $391.00 | $215.00 |
| 63 | Marking diagonal epoxy 12-inch (646.7120) | LF | 656 | $10.00 | $10.00 | $16.45 | $10.00 |
| 64 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,183 | $10.50 | $10.50 | $16.00 | $10.50 |
| 65 | Marking removal line 4-inch (646.9000) | LF | 6,951 | $0.55 | $0.55 | $0.55 | $0.55 |
| 66 | Marking removal line 6-inch (646.9002) | LF | 740 | $1.00 | $1.00 | $1.00 | $1.00 |
| 67 | Marking removal line wide (646.9200) | LF | 142 | $2.52 | $2.52 | $2.52 | $2.52 |
| 68 | Marking removal special marking (646.9300) | EACH | 16 | $116.50 | $116.50 | $116.50 | $116.50 |
| 69 | Construction staking storm sewer (650.4000) | EACH | 12 | $125.00 | $150.00 | $160.00 | $150.00 |
| 70 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,016 | $2.00 | $1.75 | $5.00 | $1.75 |
| 71 | Construction staking electrical installations (project) 001. 2984-21- 71 (650.8501) | EACH | 1 | $500.00 | $2,000.00 | $1,875.00 | $2,000.00 |
| 72 | Construction staking electrical installations (project) 002. 2984-21- 72 (650.8501) | EACH | 1 | $500.00 | $3,000.00 | $3,675.00 | $3,000.00 |
| 73 | Construction staking curb ramps (650.9000) | EACH | 20 | $125.00 | $275.00 | $220.00 | $275.00 |
| 74 | Construction staking sidewalk (project) 001. 2984-21-71 (650.9500) | EACH | 1 | $1,000.00 | $1,000.00 | $2,000.00 | $1,000.00 |
| 75 | Construction staking sidewalk (project) 002. 2984-21-72 (650.9500) | EACH | 1 | $1,500.00 | $1,500.00 | $3,400.00 | $1,500.00 |
| 76 | Construction staking supplemental control (project) 001. 2984-21-71 (650.9911) | EACH | 1 | $750.00 | $1,500.00 | $2,000.00 | $1,500.00 |
| 77 | Construction staking supplemental control (project) 002. 2984-21-72 (650.9911) | EACH | 1 | $750.00 | $2,500.00 | $3,500.00 | $2,500.00 |
| 78 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 35 | $14.32 | $14.32 | $14.32 | $14.32 |
| 79 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 2,545 | $15.66 | $15.66 | $15.66 | $15.66 |
| 80 | Conduit special 3-inch (652.0615) | LF | 1,560 | $48.40 | $48.40 | $48.40 | $48.40 |
| 81 | Removing pull boxes (653.0905) | EACH | 16 | $203.00 | $203.00 | $203.00 | $203.00 |
| 82 | Concrete bases type 1 (654.0101) | EACH | 1 | $1,080.00 | $1,080.00 | $1,080.00 | $1,080.00 |
| 83 | Concrete bases type 10 (654.0110) | EACH | 10 | $9,732.00 | $9,732.00 | $9,732.00 | $9,732.00 |
| 84 | Concrete bases type 10-special (654.0120) | EACH | 2 | $11,214 | $11,214 | $11,214 | $11,214 |
| 85 | Cable traffic signal 5-14 AWG (655.0230) | LF | 2,355 | $3.39 | $3.39 | $3.39 | $3.39 |
| 86 | Cable traffic signal 9-14 AWG (655.0250) | LF | 20 | $4.36 | $4.36 | $4.36 | $4.36 |
| 87 | Cable traffic signal 19-14 AWG (655.0280) | LF | 1,715 | $6.83 | $6.83 | $6.83 | $6.83 |
| 88 | Cable traffic signal 21-14 AWG (655.0290) | LF | 1,250 | $7.40 | $7.40 | $7.40 | $7.40 |
| 89 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 4,795 | $2.65 | $2.65 | $2.65 | $2.65 |
| 90 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 400 | $3.59 | $3.59 | $3.59 | $3.59 |
| 91 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,935 | $2.62 | $2.62 | $2.62 | $2.62 |
| 92 | Traffic signal evp detector cable (655.0900) | LF | 2,075 | $2.96 | $2.96 | $2.96 | $2.96 |
| 93 | Pedestal bases (657.0100) | EACH | 1 | $310.00 | $310.00 | $310.00 | $310.00 |
| 94 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 5 | $726.00 | $726.00 | $726.00 | $726.00 |
| 95 | Poles type 10 (657.0350) | EACH | 10 | $12,923 | $12,923 | $12,923 | $12,923 |
| 96 | Poles type 10-special (657.0352) | EACH | 2 | $14,073 | $14,073 | $14,073 | $14,073 |
| 97 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 1 | $309.00 | $309.00 | $309.00 | $309.00 |
| 98 | Monotube arms 20-FT (657.0520) | EACH | 1 | $6,825.00 | $6,825.00 | $6,825.00 | $6,825.00 |
| 99 | Monotube arms 25-FT (657.0525) | EACH | 1 | $7,400.00 | $7,400.00 | $7,400.00 | $7,400.00 |
| 100 | Monotube arms 30-FT (657.0530) | EACH | 8 | $8,060.00 | $8,060.00 | $8,060.00 | $8,060.00 |
| 101 | Monotube arms 35-FT-special (657.0536) | EACH | 2 | $8,517.00 | $8,517.00 | $8,517.00 | $8,517.00 |
| 102 | Traffic signal face 3S 12-inch (658.0173) | EACH | 56 | $1,472.00 | $1,472.00 | $1,472.00 | $1,472.00 |
| 103 | Pedestrian signal face 12-inch (658.0412) | EACH | 24 | $1,249.00 | $1,249.00 | $1,249.00 | $1,249.00 |
| 104 | Signal mounting hardware (location) 001. W center ST (658.5070) | EACH | 1 | $7,870.00 | $7,870.00 | $7,870.00 | $7,870.00 |
| 105 | Signal mounting hardware (location) 002. W lisbon ave (658.5070) | EACH | 1 | $6,352.00 | $6,352.00 | $6,352.00 | $6,352.00 |
| 106 | Signal mounting hardware (location) 003. W north ave (658.5070) | EACH | 1 | $7,645.00 | $7,645.00 | $7,645.00 | $7,645.00 |
| 107 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 60 | $9.10 | $9.10 | $9.10 | $9.10 |
| 108 | Temporary traffic signals for intersections (location) 001. W center ST (661.0201) | EACH | 1 | $61,500 | $61,500 | $61,500 | $61,500 |
| 109 | Temporary traffic signals for intersections (location) 002. W lisbon ave (661.0201) | EACH | 1 | $62,017 | $62,017 | $62,017 | $62,017 |
| 110 | Temporary traffic signals for intersections (location) 003. W north ave (661.0201) | EACH | 1 | $62,362 | $62,362 | $62,362 | $62,362 |
| 111 | Remove cable (674.0300) | LF | 200 | $3.65 | $3.65 | $3.65 | $3.65 |
| 112 | Sawing asphalt (690.0150) | LF | 92 | $1.15 | $1.15 | $2.00 | $1.15 |
| 113 | Sawing concrete (690.0250) | LF | 1,749 | $2.25 | $2.25 | $2.00 | $2.25 |
| 114 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 115 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 116 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,800 | $5.00 | $5.00 | $5.00 | $5.00 |
| 117 | Special 001. utility line opening (SPV.0060) | EACH | 3 | $1,703.03 | $800.00 | $800.00 | $2,000.00 |
| 118 | Special 002. adjusting water valve boxes (SPV.0060) | EACH | 9 | $700.00 | $700.00 | $700.00 | $289.00 |
| 119 | Special 003. section corner monuments (SPV.0060) | EACH | 2 | $1,692.00 | $2,860.25 | $1,500.00 | $1,950.00 |
| 120 | Special 004. water main protection (SPV.0060) | EACH | 3 | $500.00 | $500.00 | $500.00 | $1.00 |
| 121 | Special 102. inlet covers type MS 57 (SPV.0060) | EACH | 12 | $900.00 | $900.00 | $900.00 | $966.00 |
| 122 | Special 103. manhole covers type MS 58-A (SPV.0060) | EACH | 9 | $1,050.00 | $1,050.00 | $1,050.00 | $954.00 |
| 123 | Special 110. catch basin type 44A (SPV.0060) | EACH | 3 | $6,000.00 | $6,000.00 | $6,000.00 | $4,531.00 |
| 124 | Special 201. install city precast controller base (SPV.0060) | EACH | 3 | $1,322.00 | $1,322.00 | $1,322.00 | $1,322.00 |
| 125 | Special 205. atc controller and cabinet installed (SPV.0060) | EACH | 3 | $39,662 | $39,662 | $39,662 | $39,662 |
| 126 | Special 212. fiber optic patch panel (SPV.0060) | EACH | 3 | $4,516.00 | $4,516.00 | $4,516.00 | $4,516.00 |
| 127 | Special 213. ethernet switch (SPV.0060) | EACH | 3 | $5,746.00 | $5,746.00 | $5,746.00 | $5,746.00 |
| 128 | Special 215. electrical service pedestal (SPV.0060) | EACH | 3 | $2,150.00 | $2,150.00 | $2,150.00 | $2,150.00 |
| 129 | Special 218. evp 1 direction detector (SPV.0060) | EACH | 12 | $1,445.00 | $1,445.00 | $1,445.00 | $1,445.00 |
| 130 | Special 221. evp phase selector card 4 channel (SPV.0060) | EACH | 3 | $5,616.00 | $5,616.00 | $5,616.00 | $5,616.00 |
| 131 | Special 223. evp confirmation light (SPV.0060) | EACH | 12 | $434.00 | $434.00 | $434.00 | $434.00 |
| 132 | Special 228. electrical riser (SPV.0060) | EACH | 8 | $811.00 | $811.00 | $811.00 | $811.00 |
| 133 | Special 243 remove traffic signals (W center ST) (SPV.0060) | EACH | 1 | $8,610.00 | $8,610.00 | $8,610.00 | $8,610.00 |
| 134 | Special 244. remove traffic signals (W lisbon ave) (SPV.0060) | EACH | 1 | $8,610.00 | $8,610.00 | $8,610.00 | $8,610.00 |
| 135 | Special 245. remove traffic signals (W north ave) (SPV.0060) | EACH | 1 | $8,610.00 | $8,610.00 | $8,610.00 | $8,610.00 |
| 136 | Special 267. pedestrian countdown signal face 12-inch (SPV.0060) | EACH | 24 | $1,187.00 | $1,187.00 | $1,187.00 | $1,187.00 |
| 137 | Special 268. voice instruction audible pushbutton (SPV.0060) | EACH | 24 | $865.00 | $865.00 | $865.00 | $865.00 |
| 138 | Special 269. voice instruction audible control unit (SPV.0060) | EACH | 3 | $3,401.00 | $3,401.00 | $3,401.00 | $3,401.00 |
| 139 | Special 291. street name sign mounting hardware on mast arm (SPV.0060) | EACH | 4 | $30.00 | $30.00 | $250.00 | $300.00 |
| 140 | Special 302. pull boxes 13-inch X 24-inch X 24-inch (SPV.0060) | EACH | 26 | $2,280.00 | $2,280.00 | $2,280.00 | $2,280.00 |
| 141 | Special 303. pull boxes 17-inch X 30-inch X 24-inch (SPV.0060) | EACH | 26 | $2,526.00 | $2,526.00 | $2,526.00 | $2,526.00 |
| 142 | Special 310. remove poles complete (SPV.0060) | EACH | 23 | $587.20 | $587.20 | $587.20 | $587.20 |
| 143 | Special 321. poles type 30-AL-BD (SPV.0060) | EACH | 5 | $2,732.00 | $2,732.00 | $2,732.00 | $2,732.00 |
| 144 | Special 324. 40 FT. wood pole (SPV.0060) | EACH | 16 | $2,269.00 | $2,269.00 | $2,269.00 | $2,269.00 |
| 145 | Special 334. inline 5A fast acting fuse with holder (SPV.0060) | EACH | 31 | $182.00 | $182.00 | $182.00 | $182.00 |
| 146 | Special 339. primary or secondary riser (SPV.0060) | EACH | 14 | $1,454.00 | $1,454.00 | $1,454.00 | $1,454.00 |
| 147 | Special 345. luminaire arms single member 6-FT. (SPV.0060) | EACH | 9 | $347.00 | $347.00 | $347.00 | $347.00 |
| 148 | Special 346. luminaire arms single member 6-FT. WP mount (SPV.0060) | EACH | 17 | $386.00 | $386.00 | $386.00 | $386.00 |
| 149 | Special 353. equipment grounding electrode (SPV.0060) | EACH | 24 | $179.00 | $179.00 | $179.00 | $179.00 |
| 150 | Special 357. luminaire arms mounting clamps poles type -3 single bracket (SPV.0060) | EACH | 11 | $1,204.00 | $1,204.00 | $1,204.00 | $1,204.00 |
| 151 | Special 360. water tight splices and connections (SPV.0060) | EACH | 130 | $190.00 | $190.00 | $190.00 | $190.00 |
| 152 | Special 376. luminaire utility 3LED2 (SPV.0060) | EACH | 22 | $2,195.00 | $2,195.00 | $2,195.00 | $2,195.00 |
| 153 | Special 400. adjusting cuc manhole cover (SPV.0060) | EACH | 6 | $1,500.00 | $1,500.00 | $1,500.00 | $653.00 |
| 154 | Special 801. poles type H17 (SPV.0060) | EACH | 3 | $4,700.00 | $4,700.00 | $4,700.00 | $4,700.00 |
| 155 | Special 819. poles type A31-BD (SPV.0060) | EACH | 11 | $7,224.00 | $7,224.00 | $7,224.00 | $7,224.00 |
| 156 | Special 820. concrete base type 5 modified (SPV.0060) | EACH | 5 | $1,178.00 | $1,178.00 | $1,178.00 | $1,178.00 |
| 157 | Special 821. concrete base type 2 modified (SPV.0060) | EACH | 11 | $1,390.00 | $1,390.00 | $1,390.00 | $1,390.00 |
| 158 | Special 865. luminaire historic milwaukee harp LED 1 (SPV.0060) | EACH | 3 | $3,221.00 | $3,221.00 | $3,221.00 | $3,221.00 |
| 159 | Special 867. luminaire historic milwaukee lantern LED 3 (SPV.0060) | EACH | 19 | $3,204.00 | $3,204.00 | $3,204.00 | $3,204.00 |
| 160 | Special 001. marking stop line epoxy 24-inch (SPV.0090) | LF | 329 | $18.00 | $18.00 | $17.30 | $18.00 |
| 161 | Special 011. concrete curb & gutter integral 31-inch (SPV.0090) | LF | 590 | $27.80 | $72.73 | $66.50 | $60.00 |
| 162 | Special 240. electrical cable 3#4/1#8 XLP (SPV.0090) | LF | 440 | $15.11 | $15.11 | $15.11 | $15.11 |
| 163 | Special 302. electrical cable type 3#6 AL (SPV.0090) | LF | 800 | $9.22 | $9.22 | $9.22 | $9.22 |
| 164 | Special 304. electrical cable type 2#2/1#4 AL (SPV.0090) | LF | 1,450 | $9.52 | $9.52 | $9.52 | $9.52 |
| 165 | Special 319. liquidtight flexible nonmetallic 1 ½ - inch conduit (SPV.0090) | LF | 295 | $48.00 | $48.00 | $48.00 | $48.00 |
| 166 | Special 324. electrical cable type 4#2/1#8 XLP (SPV.0090) | LF | 4,515 | $21.05 | $21.05 | $21.05 | $21.05 |
| 167 | Special 325. conduit 3-inch HDPE schedule 40 (SPV.0090) | LF | 3,535 | $24.80 | $24.80 | $24.80 | $24.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.