WisDOT contract 20251111011 bid tabulation

Whitewater - Milwaukee; STH 67 to CTH X (STH 059, Waukesha County Whitewater - Milwaukee; STH 67 to CTH X). Let by Wisconsin DOT on November 11, 2025, Waukesha. 3 bids received; low bid $8,108,838 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
182
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$8,108,838Low
2Rock Road Companies, Inc.$8,558,095+6.0%
3Stark Pavement Corporation$10,071,000+24%
WisDOT contract 20251111011: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Rock Road Companies, Inc.3. Stark Pavement Corporation
1CPM progress schedule (108.4400)EACH1$8,640.00$0.01$22,500
2Removing small pipe culverts (203.0100)EACH1$290.38$375.00$275.00
3Abatement of asbestos containing material (structure) 01. B-67-224 (203.0211.S)EACH1$11,544$11,750$5,000.00
4Debris containment over waterway (structure) 01. B-67-224 (203.0335)EACH1$3,500.00$3,500.00$3,500.00
5Removing concrete pavement butt joints (204.0105)SY600$58.25$48.86$61.00
6Removing asphaltic surface (204.0110)SY269$10.00$10.46$37.85
7Removing asphaltic surface butt joints (204.0115)SY1,959$22.00$5.20$8.20
8Removing asphaltic surface milling (204.0125)TON44,253$23.45$18.00$0.01
9Removing curb & gutter (204.0150)LF1,548$13.30$8.42$17.00
10Removing concrete sidewalk (204.0155)SY394$11.00$12.40$36.00
11Removing guardrail (204.0165)LF2,022$2.00$2.00$2.00
12Removing concrete bases (204.0195)EACH11$298.11$298.11$298.11
13Removing (item description) 01. removing traffic signals (STH 59 & CTH E) (204.9060.S)EACH1$2,617.07$2,617.07$2,617.07
14Removing (item description) 02. removing loop detector wire & lead-in cable (STH 59 & CTH E) (204.9060.S)EACH1$970.45$970.45$970.45
15Excavation common (205.0100)CY786$37.00$36.39$54.30
16Borrow (208.0100)CY975$21.40$28.34$39.05
17Prepare foundation for asphaltic shoulders 01. 3110-08-70 (211.0400)STA1,480$8.00$11.50$18.20
18Finishing roadway (project) 01. 3110-08-70 (213.0100)EACH1$2,500.00$5,104.25$3,200.00
19Base aggregate dense 3/4-inch (305.0110)TON8,333$25.70$21.94$27.00
20Base aggregate dense 1 1/4-inch (305.0120)TON20$150.00$26.30$66.00
21Shaping shoulders (305.0500)STA1,083$55.00$6.22$33.92
22Hauling excess shoulder material (305.0504.S)CY50$40.00$35.50$125.00
23Drilled tie bars (416.0610)EACH228$6.56$10.00$14.00
24Tack coat (455.0605)GAL40,988$2.00$2.85$1.50
25HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$12,000$7,000.00$4,500.00
26HMA pavement 3 MT 58-28 H (460.6423)TON54,952$46.45$47.50$78.66
27HMA pavement 4 MT 58-28 H (460.6424)TON32,139$52.00$65.00$79.95
28Asphaltic surface (465.0105)TON127$255.00$110.12$116.00
29Asphaltic surface patching (465.0110)TON2,107$115.00$97.69$138.00
30Asphaltic surface driveways and field entrances (465.0120)TON678$185.00$214.89$133.00
31Asphaltic surface temporary (465.0125)TON500$45.00$116.85$116.00
32Asphaltic curb (465.0310)LF48$45.00$23.29$74.00
33Asphaltic rumble strips, shoulder (465.0520)LF67,280$0.39$0.14$0.20
34Asphaltic rumble strips, centerline (465.0560)LF58,530$0.39$0.18$0.20
35Protective surface treatment reseal (502.3215)SY255$12.00$12.00$12.00
36Preparation decks type 1 (509.0301)SY1$325.00$325.00$325.00
37Sawing pavement deck preparation areas (509.0310.S)LF5$12.00$12.00$12.00
38Curb repair (509.1200)LF4$250.00$250.00$250.00
39Concrete surface repair (509.1500)SF5$385.00$385.00$385.00
40HMA overlay polymer-modified (509.3500.S)TON26$1,450.00$1,395.84$1,600.00
41Removing asphaltic concrete deck overlay (structure) 01. B-67-224 (509.9010.S)SY190$63.07$33.29$37.00
42Cleaning culvert pipes (520.8700)EACH4$1,250.00$1,250.00$1,615.00
43Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH1$464.36$392.50$439.77
44Concrete curb & gutter 30-inch type D (601.0411)LF1,091$36.51$46.68$77.25
45Concrete curb pedestrian (601.0600)LF20$4.57$38.65$45.00
46Concrete sidewalk 5-inch (602.0410)SF4,716$9.15$12.90$9.50
47Curb ramp detectable warning field yellow (602.0505)SF210$35.31$50.00$50.00
48Curb ramp detectable warning field radial yellow (602.0605)SF49$58.85$68.00$58.00
49Adjusting manhole covers (611.8110)EACH23$1,207.46$731.51$1,143.52
50Adjusting inlet covers (611.8115)EACH73$1,234.55$671.00$1,169.17
51Barrier system grading shaping finishing (614.0010)EACH8$5,550.00$3,412.50$3,830.50
52Guardrail mow strip emulsified asphalt (614.0397)SY918$10.00$12.50$18.94
53MGS guardrail 3 (614.2300)LF163$28.00$28.00$28.00
54MGS guardrail 3 K (614.2330)LF1,438$35.00$35.00$35.00
55MGS guardrail terminal eat (614.2610)EACH8$3,750.00$3,750.00$3,750.00
56Mobilization (619.1000)EACH1$98,500$486,851$329,823
57Topsoil (625.0100)SY2,049$12.50$10.52$12.00
58Silt fence (628.1504)LF2,768$1.95$1.95$1.95
59Silt fence maintenance (628.1520)LF2,768$0.05$0.05$0.05
60Mobilizations erosion control (628.1905)EACH1$600.00$600.00$600.00
61Mobilizations emergency erosion control (628.1910)EACH2$400.00$400.00$400.00
62Erosion mat class I type B (628.2004)SY2,038$1.00$1.00$1.00
63Inlet protection type B (628.7010)EACH18$68.00$68.00$68.00
64Inlet protection type C (628.7015)EACH64$64.00$64.00$64.00
65Fertilizer type B (629.0210)CWT1.32$100.00$100.00$100.00
66Seeding mixture no. 75 (630.0175)LB12$100.00$100.00$100.00
67Seed water (630.0500)MGAL23$20.00$20.00$20.00
68Sod lawn (631.1000)SY1,351$10.25$10.25$10.25
69Posts wood 4X6-inch X 18-FT (634.0618)EACH43$110.00$110.00$110.00
70Signs type II reflective H (637.2210)SF220.13$24.00$24.00$24.00
71Signs type II reflective H folding (637.2215)SF20.72$27.00$27.00$27.00
72Signs type II reflective F (637.2230)SF113.28$25.00$25.00$25.00
73Moving signs type II (638.2102)EACH11$85.00$85.00$85.00
74Removing signs type II (638.2602)EACH50$25.00$25.00$25.00
75Removing small sign supports (638.3000)EACH43$30.00$30.00$30.00
76Field office type D (642.5401)EACH1$5,000.00$13,050$18,900
77Traffic control drums (643.0300)DAY30,145$0.21$0.21$0.21
78Traffic control barricades type III (643.0420)DAY16,530$0.43$0.43$0.43
79Traffic control flexible tubular marker posts (643.0500)EACH60$13.06$13.06$13.06
80Traffic control flexible tubular marker bases (643.0600)EACH60$16.26$16.26$16.26
81Traffic control warning lights type A (643.0705)DAY6,080$0.14$0.14$0.14
82Traffic control warning lights type C (643.0715)DAY6,860$0.13$0.13$0.13
83Traffic control connected arrow boards (643.0810)DAY270$9.78$9.78$9.78
84Traffic control signs (643.0900)DAY74,660$0.21$0.21$0.21
85Traffic control covering signs type I (643.0910)EACH25$122.26$122.26$122.26
86Traffic control covering signs type II (643.0920)EACH35$87.36$87.36$87.36
87Traffic control signs fixed message (643.1000)SF15$60.00$60.00$60.00
88Traffic control signs PCMS (643.1050)DAY34$60.49$60.49$60.49
89Traffic control connected work zone start and end location markers (643.1220)DAY480$8.77$8.77$8.77
90Temporary marking line removable tape 4-inch (643.3150)LF500$2.47$2.47$2.47
91Temporary marking line paint 6- inch (643.3165)LF2,950$0.90$0.90$0.90
92Traffic control (643.5000)EACH1$10,530$10,530$10,530
93Temporary pedestrian surface plate (644.1430)SF120$10.53$10.53$10.53
94Temporary pedestrian surface matting (644.1440)SF1,245$3.10$3.10$3.10
95Temporary pedestrian curb ramp (644.1601)DAY540$6.40$6.40$6.40
96Temporary pedestrian detectable warning field (644.1605)SF190$9.11$9.11$9.11
97Temporary pedestrian barricade (644.1810)LF1,279$4.41$4.41$4.41
98Temporary audible message devices (644.1900.S)DAY345$2.73$2.73$2.73
99Marking line epoxy 4-inch (646.1020)LF3,185$0.55$0.55$0.55
100Marking line grooved black epoxy 6-inch (646.2025)LF288$0.75$0.75$0.75
101Marking line grooved wet ref epoxy 6-inch (646.2040)LF239,824$1.15$1.15$1.15
102Marking line epoxy 8-inch (646.3020)LF249$1.05$1.05$1.05
103Marking line grooved black epoxy 10-inch (646.4025)LF462$1.40$1.40$1.40
104Marking line grooved wet ref epoxy 10-inch (646.4040)LF9,332$2.25$2.25$2.25
105Marking arrow epoxy (646.5020)EACH77$340.00$340.00$340.00
106Marking word epoxy (646.5120)EACH27$345.00$345.00$345.00
107Marking railroad crossing epoxy (646.5320)EACH2$1,600.00$1,600.00$1,600.00
108Marking stop line epoxy 18-inch (646.6120)LF1,217$24.00$24.00$24.00
109Marking yield line epoxy 18-inch (646.6220)EACH9$110.00$110.00$110.00
110Marking dotted extension epoxy 18-inch (646.6320)LF156$14.00$14.00$14.00
111Marking diagonal epoxy 12-inch (646.7120)LF1,242$15.00$15.00$15.00
112Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,008$15.00$15.00$15.00
113Marking removal line water blasting 4-inch (646.9010)LF500$0.61$0.61$0.61
114Marking removal line water blasting 6-inch (646.9012)LF1,000$0.96$0.96$0.96
115Marking removal line water blasting 8-inch (646.9110)LF500$1.21$1.21$1.21
116Marking removal line water blasting 10-inch (646.9112)LF1,000$1.14$1.14$1.14
117Marking removal line water blasting wide (646.9210)LF100$2.27$2.27$2.27
118Marking removal special marking water blasting (646.9310)EACH5$122.03$122.03$122.03
119Construction staking curb gutter and curb & gutter (650.5500)LF1,091$3.00$1.00$3.00
120Construction staking resurfacing reference (650.8000)LF67,819$0.13$0.09$0.13
121Construction staking electrical installations (project) 01. 3110-08- 70 (650.8501)EACH1$5,000.00$3,500.00$5,000.00
122Construction staking curb ramps (650.9000)EACH14$250.00$100.00$250.00
123Construction staking sidewalk (project) 01. 3110-08-70 (650.9500)EACH1$3,000.00$3,500.00$3,000.00
124Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF728$7.92$7.92$7.92
125Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF591$9.70$9.70$9.70
126Conduit special 3-inch (652.0615)LF600$24.51$24.51$24.51
127Conduit loop detector (652.0800)LF1,210$7.01$7.01$7.01
128Pull boxes steel 24X36-inch (653.0135)EACH6$1,267.66$1,267.66$1,267.66
129Pull boxes steel 24X42-inch (653.0140)EACH10$1,363.73$1,363.73$1,363.73
130Removing pull boxes (653.0905)EACH14$116.37$116.37$116.37
131Concrete bases type 1 (654.0101)EACH7$1,182.33$1,182.33$1,182.33
132Concrete bases type 10 (654.0110)EACH1$6,587.00$6,587.00$6,587.00
133Concrete bases type 10-special (654.0120)EACH3$7,562.06$7,562.06$7,562.06
134Concrete control cabinet bases type 9 special (654.0217)EACH1$2,036.83$2,036.83$2,036.83
135Cable traffic signal 5-14 AWG (655.0230)LF642$1.66$1.66$1.66
136Cable traffic signal 7-14 AWG (655.0240)LF816$2.04$2.04$2.04
137Cable traffic signal 12-14 AWG (655.0260)LF1,115$3.35$3.35$3.35
138Cable traffic signal 15-14 AWG (655.0270)LF194$3.84$3.84$3.84
139Cable traffic signal 19-14 AWG (655.0280)LF449$4.04$4.04$4.04
140Cable type UF 2-10 AWG grounded (655.0320)LF483$1.88$1.88$1.88
141Electrical wire traffic signals 10 AWG (655.0515)LF1,454$1.54$1.54$1.54
142Loop detector lead in cable (655.0700)LF3,519$1.78$1.78$1.78
143Loop detector wire (655.0800)LF3,946$0.94$0.94$0.94
144Electrical service meter breaker pedestal (location) 01. STH 59 & CTH E (656.0201)EACH1$1,417.25$1,417.25$1,417.25
145Pedestal bases (657.0100)EACH7$383.77$383.77$383.77
146Traffic signal standards aluminum 3.5-FT (657.0405)EACH1$441.27$441.27$441.27
147Traffic signal standards aluminum 13-FT (657.0420)EACH3$744.17$744.17$744.17
148Traffic signal standards aluminum 15-FT (657.0425)EACH2$814.28$814.28$814.28
149Traffic signal standards aluminum 10-FT (657.0430)EACH1$662.37$662.37$662.37
150Traffic signal face 3S 12-inch (658.0173)EACH12$759.92$759.92$759.92
151Traffic signal face 4S 12-inch (658.0174)EACH6$1,011.16$1,011.16$1,011.16
152Pedestrian signal face 16-inch (658.0416)EACH8$448.04$448.04$448.04
153Pedestrian push buttons (658.0500)EACH8$325.34$325.34$325.34
154Signal mounting hardware (location) 01. STH 59 & E (658.5070)EACH1$2,987.84$2,987.84$2,987.84
155Luminaires utility LED C (659.1125)EACH3$489.65$489.65$489.65
156Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH25$16.17$16.17$16.17
157Public land reference monument verify and reset (680.0100)EACH6$482.62$500.00$1.00
158Sawing asphalt (690.0150)LF1,897$1.50$1.39$1.75
159Sawing concrete (690.0250)LF1,075$3.25$1.95$2.35
160Incentive iri ride (740.0440)DOL20,000$1.00$1.00$1.00
161On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS7,000$5.00$5.00$5.00
162On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS21,600$5.00$5.00$5.00
163Special 01. rapid set deck repair (SPV.0035)CY1$4,800.00$4,800.00$4,800.00
164Special 01. incentive density PWL HMA pavement (SPV.0055)DOL57,440$1.00$1.00$1.00
165Special 02. incentive air voids HMA pavement (SPV.0055)DOL87,280$1.00$1.00$1.00
166Special 03. incentive density HMA pavement longitudinal joints (SPV.0055)DOL13,604$1.00$1.00$1.00
167Special 01. clean and RE-cauk guardrail base plates (SPV.0060)EACH14$150.00$150.00$150.00
168Special 02. curb ramp grading, shaping and finishing (SPV.0060)EACH14$570.00$926.81$931.00
169Special 03. adjusting water valves (SPV.0060)EACH12$285.48$399.38$270.36
170Special 04. install poles type 9 (SPV.0060)EACH1$1,323.14$1,323.14$1,323.14
171Special 05. install poles type 10 special (SPV.0060)EACH3$1,323.14$1,323.14$1,323.14
172Special 06. install monotube arms 25-FT (SPV.0060)EACH1$1,396.76$1,396.76$1,396.76
173Special 07. install monotube arms 40-FT type 9/10 spec pole (SPV.0060)EACH2$1,720.25$1,720.25$1,720.25
174Special 08. install monotube arms 45-FT type 9/10 spec pole (SPV.0060)EACH1$1,720.25$1,720.25$1,720.25
175Special 09. install luminaire arms steel 15-FT (SPV.0060)EACH3$284.68$284.68$284.68
176Special 11. TRNSPT & install state furn traffic signal cabinet (STH 59 & CTH E) (SPV.0060)EACH1$5,786.61$5,786.61$5,786.61
177Special 12. TRNSPT traffic signal & inter lighting materials (STH 59 & CTH E) (SPV.0060)EACH1$646.96$646.96$646.96
178Special 01. flashing stainless steel (SPV.0090)LF75$194.00$194.00$194.00
179Special 01. ditch cleaning (SPV.0165)SF490$3.30$10.62$13.39
180Special 01. methacrylate flood seal (SPV.0180)SY226$29.00$29.00$29.00
181Special 02. removing existing field entrance (SPV.0180)SY68$47.00$25.81$63.00
182Special 01. asphaltic repair (SPV.0195)TON1,000$135.00$129.38$159.00
WisDOT contract 20251111011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy