WisDOT contract 20251111011 bid tabulation
Whitewater - Milwaukee; STH 67 to CTH X (STH 059, Waukesha County Whitewater - Milwaukee; STH 67 to CTH X). Let by Wisconsin DOT on November 11, 2025, Waukesha. 3 bids received; low bid $8,108,838 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 182
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $8,108,838 | Low |
| 2 | Rock Road Companies, Inc. | $8,558,095 | +6.0% |
| 3 | Stark Pavement Corporation | $10,071,000 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. | 3. Stark Pavement Corporation |
|---|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $8,640.00 | $0.01 | $22,500 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $290.38 | $375.00 | $275.00 |
| 3 | Abatement of asbestos containing material (structure) 01. B-67-224 (203.0211.S) | EACH | 1 | $11,544 | $11,750 | $5,000.00 |
| 4 | Debris containment over waterway (structure) 01. B-67-224 (203.0335) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 5 | Removing concrete pavement butt joints (204.0105) | SY | 600 | $58.25 | $48.86 | $61.00 |
| 6 | Removing asphaltic surface (204.0110) | SY | 269 | $10.00 | $10.46 | $37.85 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 1,959 | $22.00 | $5.20 | $8.20 |
| 8 | Removing asphaltic surface milling (204.0125) | TON | 44,253 | $23.45 | $18.00 | $0.01 |
| 9 | Removing curb & gutter (204.0150) | LF | 1,548 | $13.30 | $8.42 | $17.00 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 394 | $11.00 | $12.40 | $36.00 |
| 11 | Removing guardrail (204.0165) | LF | 2,022 | $2.00 | $2.00 | $2.00 |
| 12 | Removing concrete bases (204.0195) | EACH | 11 | $298.11 | $298.11 | $298.11 |
| 13 | Removing (item description) 01. removing traffic signals (STH 59 & CTH E) (204.9060.S) | EACH | 1 | $2,617.07 | $2,617.07 | $2,617.07 |
| 14 | Removing (item description) 02. removing loop detector wire & lead-in cable (STH 59 & CTH E) (204.9060.S) | EACH | 1 | $970.45 | $970.45 | $970.45 |
| 15 | Excavation common (205.0100) | CY | 786 | $37.00 | $36.39 | $54.30 |
| 16 | Borrow (208.0100) | CY | 975 | $21.40 | $28.34 | $39.05 |
| 17 | Prepare foundation for asphaltic shoulders 01. 3110-08-70 (211.0400) | STA | 1,480 | $8.00 | $11.50 | $18.20 |
| 18 | Finishing roadway (project) 01. 3110-08-70 (213.0100) | EACH | 1 | $2,500.00 | $5,104.25 | $3,200.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 8,333 | $25.70 | $21.94 | $27.00 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 20 | $150.00 | $26.30 | $66.00 |
| 21 | Shaping shoulders (305.0500) | STA | 1,083 | $55.00 | $6.22 | $33.92 |
| 22 | Hauling excess shoulder material (305.0504.S) | CY | 50 | $40.00 | $35.50 | $125.00 |
| 23 | Drilled tie bars (416.0610) | EACH | 228 | $6.56 | $10.00 | $14.00 |
| 24 | Tack coat (455.0605) | GAL | 40,988 | $2.00 | $2.85 | $1.50 |
| 25 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $12,000 | $7,000.00 | $4,500.00 |
| 26 | HMA pavement 3 MT 58-28 H (460.6423) | TON | 54,952 | $46.45 | $47.50 | $78.66 |
| 27 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 32,139 | $52.00 | $65.00 | $79.95 |
| 28 | Asphaltic surface (465.0105) | TON | 127 | $255.00 | $110.12 | $116.00 |
| 29 | Asphaltic surface patching (465.0110) | TON | 2,107 | $115.00 | $97.69 | $138.00 |
| 30 | Asphaltic surface driveways and field entrances (465.0120) | TON | 678 | $185.00 | $214.89 | $133.00 |
| 31 | Asphaltic surface temporary (465.0125) | TON | 500 | $45.00 | $116.85 | $116.00 |
| 32 | Asphaltic curb (465.0310) | LF | 48 | $45.00 | $23.29 | $74.00 |
| 33 | Asphaltic rumble strips, shoulder (465.0520) | LF | 67,280 | $0.39 | $0.14 | $0.20 |
| 34 | Asphaltic rumble strips, centerline (465.0560) | LF | 58,530 | $0.39 | $0.18 | $0.20 |
| 35 | Protective surface treatment reseal (502.3215) | SY | 255 | $12.00 | $12.00 | $12.00 |
| 36 | Preparation decks type 1 (509.0301) | SY | 1 | $325.00 | $325.00 | $325.00 |
| 37 | Sawing pavement deck preparation areas (509.0310.S) | LF | 5 | $12.00 | $12.00 | $12.00 |
| 38 | Curb repair (509.1200) | LF | 4 | $250.00 | $250.00 | $250.00 |
| 39 | Concrete surface repair (509.1500) | SF | 5 | $385.00 | $385.00 | $385.00 |
| 40 | HMA overlay polymer-modified (509.3500.S) | TON | 26 | $1,450.00 | $1,395.84 | $1,600.00 |
| 41 | Removing asphaltic concrete deck overlay (structure) 01. B-67-224 (509.9010.S) | SY | 190 | $63.07 | $33.29 | $37.00 |
| 42 | Cleaning culvert pipes (520.8700) | EACH | 4 | $1,250.00 | $1,250.00 | $1,615.00 |
| 43 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 1 | $464.36 | $392.50 | $439.77 |
| 44 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,091 | $36.51 | $46.68 | $77.25 |
| 45 | Concrete curb pedestrian (601.0600) | LF | 20 | $4.57 | $38.65 | $45.00 |
| 46 | Concrete sidewalk 5-inch (602.0410) | SF | 4,716 | $9.15 | $12.90 | $9.50 |
| 47 | Curb ramp detectable warning field yellow (602.0505) | SF | 210 | $35.31 | $50.00 | $50.00 |
| 48 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 49 | $58.85 | $68.00 | $58.00 |
| 49 | Adjusting manhole covers (611.8110) | EACH | 23 | $1,207.46 | $731.51 | $1,143.52 |
| 50 | Adjusting inlet covers (611.8115) | EACH | 73 | $1,234.55 | $671.00 | $1,169.17 |
| 51 | Barrier system grading shaping finishing (614.0010) | EACH | 8 | $5,550.00 | $3,412.50 | $3,830.50 |
| 52 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 918 | $10.00 | $12.50 | $18.94 |
| 53 | MGS guardrail 3 (614.2300) | LF | 163 | $28.00 | $28.00 | $28.00 |
| 54 | MGS guardrail 3 K (614.2330) | LF | 1,438 | $35.00 | $35.00 | $35.00 |
| 55 | MGS guardrail terminal eat (614.2610) | EACH | 8 | $3,750.00 | $3,750.00 | $3,750.00 |
| 56 | Mobilization (619.1000) | EACH | 1 | $98,500 | $486,851 | $329,823 |
| 57 | Topsoil (625.0100) | SY | 2,049 | $12.50 | $10.52 | $12.00 |
| 58 | Silt fence (628.1504) | LF | 2,768 | $1.95 | $1.95 | $1.95 |
| 59 | Silt fence maintenance (628.1520) | LF | 2,768 | $0.05 | $0.05 | $0.05 |
| 60 | Mobilizations erosion control (628.1905) | EACH | 1 | $600.00 | $600.00 | $600.00 |
| 61 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $400.00 | $400.00 | $400.00 |
| 62 | Erosion mat class I type B (628.2004) | SY | 2,038 | $1.00 | $1.00 | $1.00 |
| 63 | Inlet protection type B (628.7010) | EACH | 18 | $68.00 | $68.00 | $68.00 |
| 64 | Inlet protection type C (628.7015) | EACH | 64 | $64.00 | $64.00 | $64.00 |
| 65 | Fertilizer type B (629.0210) | CWT | 1.32 | $100.00 | $100.00 | $100.00 |
| 66 | Seeding mixture no. 75 (630.0175) | LB | 12 | $100.00 | $100.00 | $100.00 |
| 67 | Seed water (630.0500) | MGAL | 23 | $20.00 | $20.00 | $20.00 |
| 68 | Sod lawn (631.1000) | SY | 1,351 | $10.25 | $10.25 | $10.25 |
| 69 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 43 | $110.00 | $110.00 | $110.00 |
| 70 | Signs type II reflective H (637.2210) | SF | 220.13 | $24.00 | $24.00 | $24.00 |
| 71 | Signs type II reflective H folding (637.2215) | SF | 20.72 | $27.00 | $27.00 | $27.00 |
| 72 | Signs type II reflective F (637.2230) | SF | 113.28 | $25.00 | $25.00 | $25.00 |
| 73 | Moving signs type II (638.2102) | EACH | 11 | $85.00 | $85.00 | $85.00 |
| 74 | Removing signs type II (638.2602) | EACH | 50 | $25.00 | $25.00 | $25.00 |
| 75 | Removing small sign supports (638.3000) | EACH | 43 | $30.00 | $30.00 | $30.00 |
| 76 | Field office type D (642.5401) | EACH | 1 | $5,000.00 | $13,050 | $18,900 |
| 77 | Traffic control drums (643.0300) | DAY | 30,145 | $0.21 | $0.21 | $0.21 |
| 78 | Traffic control barricades type III (643.0420) | DAY | 16,530 | $0.43 | $0.43 | $0.43 |
| 79 | Traffic control flexible tubular marker posts (643.0500) | EACH | 60 | $13.06 | $13.06 | $13.06 |
| 80 | Traffic control flexible tubular marker bases (643.0600) | EACH | 60 | $16.26 | $16.26 | $16.26 |
| 81 | Traffic control warning lights type A (643.0705) | DAY | 6,080 | $0.14 | $0.14 | $0.14 |
| 82 | Traffic control warning lights type C (643.0715) | DAY | 6,860 | $0.13 | $0.13 | $0.13 |
| 83 | Traffic control connected arrow boards (643.0810) | DAY | 270 | $9.78 | $9.78 | $9.78 |
| 84 | Traffic control signs (643.0900) | DAY | 74,660 | $0.21 | $0.21 | $0.21 |
| 85 | Traffic control covering signs type I (643.0910) | EACH | 25 | $122.26 | $122.26 | $122.26 |
| 86 | Traffic control covering signs type II (643.0920) | EACH | 35 | $87.36 | $87.36 | $87.36 |
| 87 | Traffic control signs fixed message (643.1000) | SF | 15 | $60.00 | $60.00 | $60.00 |
| 88 | Traffic control signs PCMS (643.1050) | DAY | 34 | $60.49 | $60.49 | $60.49 |
| 89 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 480 | $8.77 | $8.77 | $8.77 |
| 90 | Temporary marking line removable tape 4-inch (643.3150) | LF | 500 | $2.47 | $2.47 | $2.47 |
| 91 | Temporary marking line paint 6- inch (643.3165) | LF | 2,950 | $0.90 | $0.90 | $0.90 |
| 92 | Traffic control (643.5000) | EACH | 1 | $10,530 | $10,530 | $10,530 |
| 93 | Temporary pedestrian surface plate (644.1430) | SF | 120 | $10.53 | $10.53 | $10.53 |
| 94 | Temporary pedestrian surface matting (644.1440) | SF | 1,245 | $3.10 | $3.10 | $3.10 |
| 95 | Temporary pedestrian curb ramp (644.1601) | DAY | 540 | $6.40 | $6.40 | $6.40 |
| 96 | Temporary pedestrian detectable warning field (644.1605) | SF | 190 | $9.11 | $9.11 | $9.11 |
| 97 | Temporary pedestrian barricade (644.1810) | LF | 1,279 | $4.41 | $4.41 | $4.41 |
| 98 | Temporary audible message devices (644.1900.S) | DAY | 345 | $2.73 | $2.73 | $2.73 |
| 99 | Marking line epoxy 4-inch (646.1020) | LF | 3,185 | $0.55 | $0.55 | $0.55 |
| 100 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 288 | $0.75 | $0.75 | $0.75 |
| 101 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 239,824 | $1.15 | $1.15 | $1.15 |
| 102 | Marking line epoxy 8-inch (646.3020) | LF | 249 | $1.05 | $1.05 | $1.05 |
| 103 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 462 | $1.40 | $1.40 | $1.40 |
| 104 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 9,332 | $2.25 | $2.25 | $2.25 |
| 105 | Marking arrow epoxy (646.5020) | EACH | 77 | $340.00 | $340.00 | $340.00 |
| 106 | Marking word epoxy (646.5120) | EACH | 27 | $345.00 | $345.00 | $345.00 |
| 107 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $1,600.00 | $1,600.00 | $1,600.00 |
| 108 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,217 | $24.00 | $24.00 | $24.00 |
| 109 | Marking yield line epoxy 18-inch (646.6220) | EACH | 9 | $110.00 | $110.00 | $110.00 |
| 110 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 156 | $14.00 | $14.00 | $14.00 |
| 111 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,242 | $15.00 | $15.00 | $15.00 |
| 112 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,008 | $15.00 | $15.00 | $15.00 |
| 113 | Marking removal line water blasting 4-inch (646.9010) | LF | 500 | $0.61 | $0.61 | $0.61 |
| 114 | Marking removal line water blasting 6-inch (646.9012) | LF | 1,000 | $0.96 | $0.96 | $0.96 |
| 115 | Marking removal line water blasting 8-inch (646.9110) | LF | 500 | $1.21 | $1.21 | $1.21 |
| 116 | Marking removal line water blasting 10-inch (646.9112) | LF | 1,000 | $1.14 | $1.14 | $1.14 |
| 117 | Marking removal line water blasting wide (646.9210) | LF | 100 | $2.27 | $2.27 | $2.27 |
| 118 | Marking removal special marking water blasting (646.9310) | EACH | 5 | $122.03 | $122.03 | $122.03 |
| 119 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,091 | $3.00 | $1.00 | $3.00 |
| 120 | Construction staking resurfacing reference (650.8000) | LF | 67,819 | $0.13 | $0.09 | $0.13 |
| 121 | Construction staking electrical installations (project) 01. 3110-08- 70 (650.8501) | EACH | 1 | $5,000.00 | $3,500.00 | $5,000.00 |
| 122 | Construction staking curb ramps (650.9000) | EACH | 14 | $250.00 | $100.00 | $250.00 |
| 123 | Construction staking sidewalk (project) 01. 3110-08-70 (650.9500) | EACH | 1 | $3,000.00 | $3,500.00 | $3,000.00 |
| 124 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 728 | $7.92 | $7.92 | $7.92 |
| 125 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 591 | $9.70 | $9.70 | $9.70 |
| 126 | Conduit special 3-inch (652.0615) | LF | 600 | $24.51 | $24.51 | $24.51 |
| 127 | Conduit loop detector (652.0800) | LF | 1,210 | $7.01 | $7.01 | $7.01 |
| 128 | Pull boxes steel 24X36-inch (653.0135) | EACH | 6 | $1,267.66 | $1,267.66 | $1,267.66 |
| 129 | Pull boxes steel 24X42-inch (653.0140) | EACH | 10 | $1,363.73 | $1,363.73 | $1,363.73 |
| 130 | Removing pull boxes (653.0905) | EACH | 14 | $116.37 | $116.37 | $116.37 |
| 131 | Concrete bases type 1 (654.0101) | EACH | 7 | $1,182.33 | $1,182.33 | $1,182.33 |
| 132 | Concrete bases type 10 (654.0110) | EACH | 1 | $6,587.00 | $6,587.00 | $6,587.00 |
| 133 | Concrete bases type 10-special (654.0120) | EACH | 3 | $7,562.06 | $7,562.06 | $7,562.06 |
| 134 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,036.83 | $2,036.83 | $2,036.83 |
| 135 | Cable traffic signal 5-14 AWG (655.0230) | LF | 642 | $1.66 | $1.66 | $1.66 |
| 136 | Cable traffic signal 7-14 AWG (655.0240) | LF | 816 | $2.04 | $2.04 | $2.04 |
| 137 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,115 | $3.35 | $3.35 | $3.35 |
| 138 | Cable traffic signal 15-14 AWG (655.0270) | LF | 194 | $3.84 | $3.84 | $3.84 |
| 139 | Cable traffic signal 19-14 AWG (655.0280) | LF | 449 | $4.04 | $4.04 | $4.04 |
| 140 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 483 | $1.88 | $1.88 | $1.88 |
| 141 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,454 | $1.54 | $1.54 | $1.54 |
| 142 | Loop detector lead in cable (655.0700) | LF | 3,519 | $1.78 | $1.78 | $1.78 |
| 143 | Loop detector wire (655.0800) | LF | 3,946 | $0.94 | $0.94 | $0.94 |
| 144 | Electrical service meter breaker pedestal (location) 01. STH 59 & CTH E (656.0201) | EACH | 1 | $1,417.25 | $1,417.25 | $1,417.25 |
| 145 | Pedestal bases (657.0100) | EACH | 7 | $383.77 | $383.77 | $383.77 |
| 146 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 1 | $441.27 | $441.27 | $441.27 |
| 147 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 3 | $744.17 | $744.17 | $744.17 |
| 148 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $814.28 | $814.28 | $814.28 |
| 149 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 1 | $662.37 | $662.37 | $662.37 |
| 150 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $759.92 | $759.92 | $759.92 |
| 151 | Traffic signal face 4S 12-inch (658.0174) | EACH | 6 | $1,011.16 | $1,011.16 | $1,011.16 |
| 152 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $448.04 | $448.04 | $448.04 |
| 153 | Pedestrian push buttons (658.0500) | EACH | 8 | $325.34 | $325.34 | $325.34 |
| 154 | Signal mounting hardware (location) 01. STH 59 & E (658.5070) | EACH | 1 | $2,987.84 | $2,987.84 | $2,987.84 |
| 155 | Luminaires utility LED C (659.1125) | EACH | 3 | $489.65 | $489.65 | $489.65 |
| 156 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 25 | $16.17 | $16.17 | $16.17 |
| 157 | Public land reference monument verify and reset (680.0100) | EACH | 6 | $482.62 | $500.00 | $1.00 |
| 158 | Sawing asphalt (690.0150) | LF | 1,897 | $1.50 | $1.39 | $1.75 |
| 159 | Sawing concrete (690.0250) | LF | 1,075 | $3.25 | $1.95 | $2.35 |
| 160 | Incentive iri ride (740.0440) | DOL | 20,000 | $1.00 | $1.00 | $1.00 |
| 161 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 7,000 | $5.00 | $5.00 | $5.00 |
| 162 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 21,600 | $5.00 | $5.00 | $5.00 |
| 163 | Special 01. rapid set deck repair (SPV.0035) | CY | 1 | $4,800.00 | $4,800.00 | $4,800.00 |
| 164 | Special 01. incentive density PWL HMA pavement (SPV.0055) | DOL | 57,440 | $1.00 | $1.00 | $1.00 |
| 165 | Special 02. incentive air voids HMA pavement (SPV.0055) | DOL | 87,280 | $1.00 | $1.00 | $1.00 |
| 166 | Special 03. incentive density HMA pavement longitudinal joints (SPV.0055) | DOL | 13,604 | $1.00 | $1.00 | $1.00 |
| 167 | Special 01. clean and RE-cauk guardrail base plates (SPV.0060) | EACH | 14 | $150.00 | $150.00 | $150.00 |
| 168 | Special 02. curb ramp grading, shaping and finishing (SPV.0060) | EACH | 14 | $570.00 | $926.81 | $931.00 |
| 169 | Special 03. adjusting water valves (SPV.0060) | EACH | 12 | $285.48 | $399.38 | $270.36 |
| 170 | Special 04. install poles type 9 (SPV.0060) | EACH | 1 | $1,323.14 | $1,323.14 | $1,323.14 |
| 171 | Special 05. install poles type 10 special (SPV.0060) | EACH | 3 | $1,323.14 | $1,323.14 | $1,323.14 |
| 172 | Special 06. install monotube arms 25-FT (SPV.0060) | EACH | 1 | $1,396.76 | $1,396.76 | $1,396.76 |
| 173 | Special 07. install monotube arms 40-FT type 9/10 spec pole (SPV.0060) | EACH | 2 | $1,720.25 | $1,720.25 | $1,720.25 |
| 174 | Special 08. install monotube arms 45-FT type 9/10 spec pole (SPV.0060) | EACH | 1 | $1,720.25 | $1,720.25 | $1,720.25 |
| 175 | Special 09. install luminaire arms steel 15-FT (SPV.0060) | EACH | 3 | $284.68 | $284.68 | $284.68 |
| 176 | Special 11. TRNSPT & install state furn traffic signal cabinet (STH 59 & CTH E) (SPV.0060) | EACH | 1 | $5,786.61 | $5,786.61 | $5,786.61 |
| 177 | Special 12. TRNSPT traffic signal & inter lighting materials (STH 59 & CTH E) (SPV.0060) | EACH | 1 | $646.96 | $646.96 | $646.96 |
| 178 | Special 01. flashing stainless steel (SPV.0090) | LF | 75 | $194.00 | $194.00 | $194.00 |
| 179 | Special 01. ditch cleaning (SPV.0165) | SF | 490 | $3.30 | $10.62 | $13.39 |
| 180 | Special 01. methacrylate flood seal (SPV.0180) | SY | 226 | $29.00 | $29.00 | $29.00 |
| 181 | Special 02. removing existing field entrance (SPV.0180) | SY | 68 | $47.00 | $25.81 | $63.00 |
| 182 | Special 01. asphaltic repair (SPV.0195) | TON | 1,000 | $135.00 | $129.38 | $159.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.