WisDOT contract 20251111015 bid tabulation

1140-00-77. Let by Wisconsin DOT on November 11, 2025, Outagamie. 1 bid received; low bid $13,371,457 by Northeast Asphalt, Inc.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
280
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northeast Asphalt, Inc$13,371,457Low
WisDOT contract 20251111015: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northeast Asphalt, Inc
1Clearing (201.0110)SY383$35.00
2Grubbing (201.0210)SY383$25.00
3Removing small pipe culverts (203.0100)EACH6$650.00
4Removing concrete pavement (204.0100)SY2,276$7.10
5Removing asphaltic surface (204.0110)SY1,337$7.10
6Removing asphaltic surface butt joints (204.0115)SY289$4.70
7Removing asphaltic surface milling (204.0120)SY16,131$4.70
8Removing gutter (204.0140)LF1,123$6.50
9Removing curb & gutter (204.0150)LF9,202$7.90
10Removing concrete sidewalk (204.0155)SY563$13.50
11Removing guardrail (204.0165)LF10,230$1.75
12Removing concrete bases (204.0195)EACH16$725.00
13Removing manholes (204.0210)EACH1$455.00
14Removing inlets (204.0220)EACH28$384.00
15Removing storm sewer (size) 01. 12-inch (204.0245)LF807$17.20
16Removing storm sewer (size) 02. 18-inch (204.0245)LF119$17.50
17Excavation common (205.0100)CY52,889$17.49
18Borrow (208.0100)CY931$30.09
19Prepare foundation for asphaltic paving (project) 01. 1140-00-77 (211.0101)EACH1$370,000
20Prepare foundation for asphaltic paving (project) 02. 6220-04-76 (211.0101)EACH1$70,000
21Prepare foundation for asphaltic shoulders (211.0400)STA9$2,245.00
22Finishing roadway (project) 01. 1140-00-77 (213.0100)EACH1$3,950.00
23Finishing roadway (project) 02. 6220-04-76 (213.0100)EACH1$3,950.00
24Base aggregate dense 3/4-inch (305.0110)TON11,630$23.50
25Base aggregate dense 1 1/4-inch (305.0120)TON21,817$14.58
26Removing pavement for base patching (390.0100)CY25$100.00
27Base patching concrete hes (390.0305)CY25$185.00
28Coloring concrete wisdot red (405.0100)CY307$82.00
29Concrete pavement 7-inch (415.0070)SY385$85.00
30Concrete pavement 8 1/2-inch (415.0085)SY115$92.00
31Concrete pavement approach slab (415.0410)SY999$285.00
32Concrete truck apron 12-inch (415.2010)SY919$85.00
33Drilled tie bars (416.0610)EACH206$12.00
34Drilled dowel bars (416.0620)EACH73$22.00
35HMA cold weather paving (450.4000)TON2,400$0.01
36HMA pavement 3 MT 58-28 S (450.6223)TON58,241$63.15
37HMA pavement 4 MT 58-28 S (450.6224)TON21,511$72.35
38HMA pavement 3 HT 58-28 S (450.7223)TON2,890$74.10
39HMA pavement 4 HT 58-28 V (450.7624)TON1,110$94.10
40Tack coat (455.0605)GAL25,701$3.10
41Asphaltic surface (465.0105)TON473$101.80
42Asphaltic surface patching (465.0110)TON53$216.35
43Asphaltic surface driveways and field entrances (465.0120)TON46$186.20
44Asphaltic surface temporary (465.0125)TON1,181$99.90
45Asphaltic flumes (465.0315)SY175$65.00
46Asphaltic rumble strips, shoulder (465.0520)LF400$6.40
47Asphaltic rumble strips, centerline (465.0560)LF31,295$0.48
48Apron endwalls for culvert pipe 12- inch (520.1012)EACH5$395.00
49Culvert pipe class III-A non-metal 18-inch (520.3418)LF126$70.50
50Concrete collars for pipe (520.8000)EACH12$825.00
51Cleaning culvert pipes (520.8700)EACH29$756.50
52Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH3$395.00
53Apron endwalls for culvert pipe sloped side drains steel 18-inch 4 to 1 (521.1503)EACH2$1,661.00
54Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH7$1,431.00
55Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434)LF336$300.00
56Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634)EACH8$3,240.00
57Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643)EACH2$4,830.00
58Culvert pipe salvaged 24-inch (524.0124)LF24$130.00
59Apron endwalls for culvert pipe salvaged 12-inch (524.0612)EACH1$935.00
60Apron endwalls for culvert pipe salvaged 18-inch (524.0618)EACH1$935.00
61Apron endwalls for culvert pipe salvaged 24-inch (524.0624)EACH1$1,130.00
62Culvert pipe corrugated polyethylene 12-inch (530.0112)LF479$69.65
63Concrete gutter 24-inch (601.0205)LF1,126$39.00
64Concrete curb & gutter 18-inch type A (601.0405)LF166$23.00
65Concrete curb & gutter 18-inch type D (601.0407)LF1,261$39.00
66Concrete curb & gutter 30-inch type A (601.0409)LF131$77.00
67Concrete curb & gutter 30-inch type D (601.0411)LF8,142$28.35
68Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415)LF300$77.00
69Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF1,420$26.00
70Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF38$77.00
71Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF663$28.00
72Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF302$26.00
73Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF678$51.00
74Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF24$77.00
75Concrete curb pedestrian (601.0600)LF237$59.00
76Concrete sidewalk 4-inch (602.0405)SF11,800$7.25
77Concrete sidewalk 5-inch (602.0410)SF6,679$8.25
78Concrete sidewalk 6-inch (602.0415)SF510$9.25
79Curb ramp detectable warning field yellow (602.0505)SF280$35.00
80Curb ramp detectable warning field natural patina (602.0515)SF160$75.00
81Concrete driveway 6-inch (602.0810)SY32$83.25
82Slope paving crushed aggregate (604.0500)SY415$40.00
83Riprap light (606.0100)CY19$200.00
84Riprap medium (606.0200)CY109$102.00
85Relaid storm sewer 12-inch (608.0112)LF16$158.50
86Relaid storm sewer 18-inch (608.0118)LF16$195.00
87Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF284$79.30
88Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF518$94.30
89Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF269$108.30
90Storm sewer pipe class III-A 12- inch (608.3012)LF139$70.10
91Reconstructing inlets (611.0430)EACH17$1,815.00
92Manhole covers type J (611.0530)EACH4$517.00
93Inlet covers type F (611.0615)EACH20$1,642.00
94Inlet covers type H (611.0624)EACH8$743.00
95Inlet covers type H-S (611.0639)EACH5$743.00
96Inlet covers type T (611.0652)EACH2$994.00
97Inlet covers type V (611.0654)EACH12$688.00
98Manholes 4-FT diameter (611.2004)EACH4$4,177.00
99Inlets 4-FT diameter (611.3004)EACH2$4,164.00
100Inlets 2X2-FT (611.3220)EACH9$2,282.00
101Inlets 2X2.5-FT (611.3225)EACH5$2,614.00
102Inlets 2X3-FT (611.3230)EACH12$2,694.00
103Inlets 2.5X3-FT (611.3253)EACH20$3,293.00
104Adjusting manhole covers (611.8110)EACH1$600.00
105Adjusting inlet covers (611.8115)EACH40$525.00
106Steel thrie beam bullnose terminal (614.0220)EACH2$14,000
107Steel thrie beam (614.0230)LF200$33.00
108Guardrail mow strip asphalt (614.0396)SY407$39.95
109Guardrail mow strip emulsified asphalt (614.0397)SY206$21.00
110Crash cushions temporary (614.0905)EACH1$5,500.00
111MGS guardrail 3 (614.2300)LF8,937.50$24.53
112MGS thrie beam transition (614.2500)LF906.80$91.00
113MGS guardrail terminal eat (614.2610)EACH16$3,333.00
114MGS guardrail terminal type 2 (614.2620)EACH3$2,853.00
115Maintenance and repair of haul roads (project) 01. 1140-00-77 (618.0100)EACH1$1.00
116Maintenance and repair of haul roads (project) 02. 6220-04-76 (618.0100)EACH1$1.00
117Mobilization (619.1000)EACH1$925,000
118Concrete median sloped nose (620.0300)SF1,589$14.00
119Water (624.0100)MGAL630$22.51
120Topsoil (625.0100)SY27,273$0.01
121Salvaged topsoil (625.0500)SY5,541$2.50
122Silt fence (628.1504)LF21,305$1.70
123Silt fence maintenance (628.1520)LF21,305$0.03
124Mobilizations erosion control (628.1905)EACH16$333.00
125Mobilizations emergency erosion control (628.1910)EACH7$533.00
126Erosion mat urban class I type B (628.2008)SY33,224$1.67
127Inlet protection type A (628.7005)EACH29$100.00
128Inlet protection type B (628.7010)EACH14$50.00
129Inlet protection type C (628.7015)EACH109$60.00
130Inlet protection type D (628.7020)EACH9$250.00
131Temporary ditch checks (628.7504)LF130$8.00
132Culvert pipe checks (628.7555)EACH41$20.00
133Rock bags (628.7570)EACH958$6.00
134Fertilizer type B (629.0210)CWT18.60$100.00
135Seeding mixture no. 20 (630.0120)LB700$7.13
136Seeding mixture no. 30 (630.0130)LB638$7.13
137Seeding mixture no. 40 (630.0140)LB159$12.00
138Seed water (630.0500)MGAL594$1.03
139Markers culvert end (633.5200)EACH18$75.00
140Posts wood 4X6-inch X 12-FT (634.0612)EACH2$95.00
141Posts wood 4X6-inch X 14-FT (634.0614)EACH9$98.00
142Posts wood 4X6-inch X 16-FT (634.0616)EACH40$98.00
143Signs type II reflective H (637.2210)SF476$20.00
144Signs type II reflective F (637.2230)SF87.25$23.00
145Moving signs type II (638.2102)EACH90$85.00
146Removing signs type II (638.2602)EACH33$25.00
147Removing small sign supports (638.3000)EACH35$25.00
148Moving small sign supports (638.4000)EACH70$85.00
149Field office type B (642.5001)EACH1$1.00
150Field office type C (642.5201)EACH1$19,750
151Traffic control drums (643.0300)DAY40,587$0.35
152Traffic control barricades type III (643.0420)DAY10,119$0.50
153Traffic control flexible tubular marker posts (643.0500)EACH322$26.00
154Traffic control flexible tubular marker bases (643.0600)EACH322$4.50
155Traffic control channelizing curb system (643.0650)LF448$5.00
156Traffic control warning lights type A (643.0705)DAY17,518$0.10
157Traffic control warning lights type C (643.0715)DAY7,116$0.10
158Traffic control connected arrow boards (643.0810)DAY63$15.00
159Traffic control signs (643.0900)DAY39,316$0.25
160Traffic control covering signs type I (643.0910)EACH3$250.00
161Traffic control covering signs type II (643.0920)EACH86$75.00
162Traffic control signs fixed message (643.1000)SF144$24.00
163Traffic control signs PCMS (643.1050)DAY34$85.00
164Traffic control connected work zone start and end location markers (643.1220)DAY63$5.00
165Temporary marking line paint 6- inch (643.3165)LF34,040$0.69
166Temporary marking line removable tape 6-inch (643.3180)LF54,424$1.85
167Temporary marking line paint 10- inch (643.3265)LF1,349$3.65
168Temporary marking line removable tape 10-inch (643.3280)LF346$4.00
169Temporary marking stop line paint 18-inch (643.3805)LF22$10.00
170Temporary marking stop line removable tape 18-inch (643.3850)LF157$7.50
171Traffic control (643.5000)EACH1$21,000
172Temporary pedestrian surface matting (644.1440)SF525$8.00
173Temporary pedestrian curb ramp (644.1601)DAY72$8.00
174Temporary pedestrian detectable warning field (644.1605)SF90$5.00
175Temporary pedestrian barricade (644.1810)LF1,110$7.35
176Geotextile type HR (645.0120)SY299$5.00
177Geotextile type R (645.0130)SY84$7.00
178Marking line epoxy 6-inch (646.2020)LF5,142$0.45
179Marking line grooved wet ref epoxy 6-inch (646.2040)LF164,313$1.33
180Marking line epoxy 10-inch (646.4020)LF1,640$1.00
181Marking line grooved wet ref epoxy 10-inch (646.4040)LF9,300$2.66
182Marking arrow epoxy (646.5020)EACH40$361.15
183Marking word epoxy (646.5120)EACH18$365.41
184Marking railroad crossing epoxy (646.5320)EACH2$3,545.00
185Marking stop line epoxy 18-inch (646.6120)LF322$15.15
186Marking dotted extension epoxy 18-inch (646.6320)LF56$15.00
187Cold weather marking epoxy 6-inch (646.6466)LF2,592$0.45
188Cold weather marking epoxy 10- inch (646.6470)LF636$1.00
189Marking diagonal epoxy 12-inch (646.7120)LF1,648$14.75
190Marking crosswalk epoxy transverse line 6-inch (646.7420)LF583$14.36
191Marking corrugated median epoxy (646.8020)SF1,435$8.52
192Marking curb epoxy (646.8120)LF663$7.25
193Marking island nose epoxy (646.8220)EACH43$271.44
194Marking removal line 4-inch (646.9000)LF3,269$2.00
195Marking removal line water blasting 4-inch (646.9010)LF1,182$2.00
196Marking removal line 8-inch (646.9100)LF247$3.00
197Marking removal line wide (646.9200)LF126$10.00
198Marking removal special marking (646.9300)EACH1$250.00
199Locating no-passing zones (648.0100)MI7.49$500.00
200Construction staking storm sewer (650.4000)EACH45$85.00
201Construction staking subgrade (650.4500)LF15,896$0.01
202Construction staking base (650.5000)LF66,888$0.51
203Construction staking curb gutter and curb & gutter (650.5500)LF13,819$0.75
204Construction staking pipe culverts (650.6000)EACH9$100.00
205Construction staking concrete pavement (650.7000)LF207$3.00
206Construction staking resurfacing reference (650.8000)LF56,608$0.07
207Construction staking curb ramps (650.9000)EACH28$150.00
208Construction staking sidewalk (project) 01. 6220-04-76 (650.9500)EACH1$100.00
209Construction staking supplemental control (project) 01. 1140-00-77 (650.9911)EACH1$10.00
210Construction staking supplemental control (project) 02. 6220-04-76 (650.9911)EACH1$10.00
211Construction staking slope stakes (650.9920)LF21,342$0.65
212Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF5,710$10.79
213Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,385$13.02
214Conduit rigid nonmetallic schedule 80 3-inch (652.0335)LF375$16.35
215Conduit special 2-inch (652.0605)LF293$41.38
216Conduit loop detector (652.0800)LF1,624$7.66
217Pull boxes non-conductive 24X42- inch (653.0164)EACH49$2,492.60
218Removing pull boxes (653.0905)EACH17$343.20
219Concrete bases type 1 (654.0101)EACH6$1,188.00
220Concrete bases type 2 (654.0102)EACH2$1,765.50
221Concrete bases type 5 (654.0105)EACH30$1,357.62
222Concrete bases type 10 (654.0110)EACH4$14,904
223Concrete control cabinet bases type 9 special (654.0217)EACH1$3,825.92
224Concrete control cabinet bases type L30 (654.0230)EACH1$3,039.30
225Cable traffic signal 7-14 AWG (655.0240)LF896$3.23
226Cable traffic signal 9-14 AWG (655.0250)LF1,250$4.16
227Cable traffic signal 12-14 AWG (655.0260)LF2,570$4.96
228Cable type UF 2-12 AWG grounded (655.0305)LF4,545$2.89
229Electrical wire traffic signals 10 AWG (655.0515)LF1,465$1.43
230Electrical wire lighting 12 AWG (655.0610)LF2,112$1.25
231Electrical wire lighting 10 AWG (655.0615)LF14,469$1.35
232Loop detector lead in cable (655.0700)LF6,285$2.07
233Loop detector wire (655.0800)LF3,815$1.37
234Electrical service meter breaker pedestal (location) 01. NW corner of CTH D & ush 45 (656.0201)EACH1$3,127.21
235Electrical service meter breaker pedestal (location) 01. STH 54 and CTH D (656.0201)EACH1$3,069.83
236Pedestal bases (657.0100)EACH6$392.70
237Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH32$803.33
238Poles type 4 (657.0315)EACH2$2,340.09
239Poles type 5-aluminum (657.0322)EACH30$2,964.60
240Poles type 10 (657.0350)EACH4$12,669
241Traffic signal standards aluminum 13-FT (657.0420)EACH4$933.90
242Traffic signal standards aluminum 15-FT (657.0425)EACH2$921.85
243Monotube arms 25-FT (657.0525)EACH2$5,257.98
244Monotube arms 30-FT (657.0530)EACH2$7,250.04
245Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH24$470.64
246Luminaire arms single member 4- inch clamp 8-FT (657.0614)EACH2$509.30
247Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH6$940.68
248Luminaire arms steel 8-FT (657.0808)EACH4$505.44
249Traffic signal face 3S 12-inch (658.0173)EACH18$824.68
250Traffic signal face 4S 12-inch (658.0174)EACH6$1,061.64
251Pedestrian signal face 16-inch (658.0416)EACH8$599.50
252Pedestrian push buttons (658.0500)EACH8$547.80
253Signal mounting hardware (location) 01. STH 54 and CTH D (658.5070)EACH1$7,360.20
254Luminaires utility LED A (659.1115)EACH24$337.90
255Luminaires utility LED C (659.1125)EACH12$383.76
256Lighting control cabinets 120/240 30-inch (659.2130)EACH1$10,802
257Temporary traffic signals for intersections (location) 01. STH 54 and CTH D (661.0201)EACH1$172,803
258Sawing asphalt (690.0150)LF27,330$1.10
259Sawing concrete (690.0250)LF1,325$2.00
260HMA percent within limits (PWL) test strip volumetrics (705.0105)EACH2$2,530.00
261Incentive density PWL HMA pavement (705.2005)DOL49,970$1.00
262Incentive density HMA pavement longitudinal joints (705.2007)DOL16,680$1.00
263Incentive air voids HMA pavement (705.2010)DOL79,750$1.00
264Incentive iri ride (729.0440)DOL35,040$1.00
265On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS4,500$5.00
266On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS4,140$5.00
267Special 01. fertilizer for lawn type turf (SPV.0030)CWT2.10$125.00
268Special 01. reestablish section corner monuments (SPV.0060)EACH3$800.00
269Special 02. apron endwalls for culvert pipe salvaged 43X68-inch (SPV.0060)EACH2$1,388.00
270Special 03. research and locate existing land parcel monuments (SPV.0060)EACH2$100.00
271Special 04. verify and replace existing land parcel monuments (SPV.0060)EACH2$100.00
272Special 05. inlet covers type H-D (SPV.0060)EACH6$754.00
273Special 06. temporary storm sewer connection (SPV.0060)EACH2$1,011.00
274Special 07. salvage traffic signals STH 54 and CTH D (SPV.0060)EACH1$14,445
275Special 08. adjusting sanitary manhole covers (SPV.0060)EACH2$950.00
276Special 01. culvert pipe reinforced conc. horizontal elliptical class HE- IV 43X68-inch (SPV.0090)LF136$418.00
277Special 02. culvert pipe salvaged 43X68-inch (SPV.0090)LF16$144.00
278Special 03. ditch restoration (SPV.0090)LF70$47.07
279Special 01. preparing topsoil for lawn type turf (SPV.0180)SY3,485$0.75
280Special 01. excavation, hauling, and disposal of contaminated soil (SPV.0195)TON30$150.00
WisDOT contract 20251111015: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy