WisDOT contract 20251111019 bid tabulation
6180-30-71. Let by Wisconsin DOT on November 11, 2025, Winnebago. 4 bids received; low bid $11,804,523 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 304
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $11,804,523 | Low |
| 2 | Michels Road & Stone, Inc. | $11,979,476 | +1.0% |
| 3 | Vinton Construction Company | $12,158,280 | +3.0% |
| 4 | Zignego Company, Inc. | $14,052,592 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc | 2. Michels Road & Stone, Inc. | 3. Vinton Construction Company | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | RBC progress schedule (108.4300) | EACH | 2 | $2,000.00 | $2,500.00 | $1,000.00 | $1,000.00 |
| 2 | Clearing (201.0105) | STA | 16 | $989.31 | $989.31 | $989.31 | $600.00 |
| 3 | Clearing (201.0120) | ID | 45 | $54.77 | $54.77 | $54.77 | $30.00 |
| 4 | Grubbing (201.0205) | STA | 16 | $366.22 | $366.22 | $366.22 | $400.00 |
| 5 | Grubbing (201.0220) | ID | 45 | $23.27 | $23.27 | $23.27 | $30.00 |
| 6 | Removing small pipe culverts (203.0100) | EACH | 28 | $630.00 | $630.00 | $630.00 | $238.00 |
| 7 | Removing concrete pavement (204.0100) | SY | 25,499 | $1.30 | $1.30 | $1.00 | $7.60 |
| 8 | Removing concrete pavement butt joints (204.0105) | SY | 2,097 | $15.70 | $15.70 | $15.70 | $15.70 |
| 9 | Removing concrete surface partial depth (204.0109.S) | SF | 145,440 | $0.29 | $0.29 | $0.29 | $0.29 |
| 10 | Removing asphaltic surface (204.0110) | SY | 44 | $50.00 | $50.00 | $10.00 | $25.00 |
| 11 | Removing asphaltic surface butt joints (204.0115) | SY | 1,688 | $15.70 | $15.70 | $15.70 | $15.70 |
| 12 | Removing asphaltic surface milling (204.0120) | SY | 95 | $15.70 | $15.70 | $15.70 | $15.70 |
| 13 | Removing curb & gutter (204.0150) | LF | 3,849 | $12.00 | $6.00 | $5.49 | $10.00 |
| 14 | Removing concrete sidewalk (204.0155) | SY | 857 | $18.80 | $18.80 | $18.00 | $9.40 |
| 15 | Removing guardrail (204.0165) | LF | 1,610 | $3.00 | $3.00 | $3.00 | $3.00 |
| 16 | Removing fence (204.0170) | LF | 579 | $3.00 | $3.00 | $3.00 | $3.00 |
| 17 | Removing concrete bases (204.0195) | EACH | 11 | $500.00 | $450.00 | $200.00 | $500.00 |
| 18 | Excavation common (205.0100) | CY | 60,519 | $12.10 | $12.10 | $14.99 | $16.00 |
| 19 | Excavation for structures culverts (structure) 01. B-70-0098 (206.2001) | EACH | 1 | $3,500.00 | $3,500.00 | $3,300.00 | $3,550.00 |
| 20 | Excavation for structures culverts (structure) 02. B-70-0099 (206.2001) | EACH | 1 | $3,500.00 | $3,500.00 | $3,300.00 | $3,550.00 |
| 21 | Prepare foundation for asphaltic paving (project) 01. 6180-30-71 (211.0101) | EACH | 1 | $74,500 | $74,500 | $74,500 | $74,500 |
| 22 | Prepare foundation for asphaltic paving (project) 02. 6180-31-71 (211.0101) | EACH | 1 | $32,500 | $32,500 | $32,500 | $32,500 |
| 23 | Finishing roadway (project) 01. 6180-30-71 (213.0100) | EACH | 1 | $4,200.00 | $2,500.00 | $2,500.00 | $1,000.00 |
| 24 | Finishing roadway (project) 02. 6180-30-72 (213.0100) | EACH | 1 | $4,200.00 | $2,500.00 | $2,500.00 | $1,000.00 |
| 25 | Finishing roadway (project) 03. 6180-30-73 (213.0100) | EACH | 1 | $4,200.00 | $2,500.00 | $2,500.00 | $1,000.00 |
| 26 | Finishing roadway (project) 04. 6180-31-71 (213.0100) | EACH | 1 | $4,200.00 | $2,500.00 | $2,500.00 | $1,000.00 |
| 27 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,285 | $29.50 | $29.50 | $28.96 | $23.00 |
| 28 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 24,295 | $11.90 | $11.90 | $11.32 | $18.00 |
| 29 | Base aggregate open-graded (310.0115) | CY | 9.80 | $100.00 | $42.00 | $42.00 | $73.00 |
| 30 | Select crushed material (312.0110) | TON | 47,751 | $11.90 | $11.90 | $17.20 | $19.50 |
| 31 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 23 | $500.00 | $500.00 | $1,000.00 | $1,200.00 |
| 32 | Removing pavement for base patching (390.0100) | CY | 2,330 | $49.95 | $103.49 | $68.70 | $100.00 |
| 33 | Base patching concrete hes (390.0305) | CY | 2,310 | $269.70 | $306.60 | $300.00 | $363.00 |
| 34 | Base patching concrete shes (390.0405) | CY | 20 | $285.00 | $457.79 | $500.00 | $500.00 |
| 35 | Coloring concrete wisdot red (405.0100) | CY | 1,018 | $78.40 | $78.40 | $91.20 | $78.40 |
| 36 | Concrete truck apron 12-inch (415.2010) | SY | 1,863 | $85.45 | $85.45 | $91.89 | $85.45 |
| 37 | Drilled tie bars (416.0610) | EACH | 3,888 | $8.00 | $12.39 | $9.00 | $15.00 |
| 38 | Drilled dowel bars (416.0620) | EACH | 10,434 | $14.00 | $18.09 | $15.50 | $20.00 |
| 39 | Concrete pavement repair (416.1710) | SY | 122 | $88.00 | $157.22 | $95.41 | $200.00 |
| 40 | Concrete pavement replacement (416.1720) | SY | 608 | $88.00 | $171.29 | $99.41 | $200.00 |
| 41 | HMA cold weather paving (450.4000) | TON | 1,015 | $0.01 | $0.01 | $0.01 | $0.01 |
| 42 | Tack coat (455.0605) | GAL | 18,353 | $3.10 | $3.10 | $3.10 | $3.10 |
| 43 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,750.00 | $2,750.00 | $2,750.00 | $2,750.00 |
| 44 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,800.00 | $3,800.00 | $3,800.00 | $3,800.00 |
| 45 | Incentive density HMA pavement (460.2000) | DOL | 12,940 | $1.00 | $1.00 | $1.00 | $1.00 |
| 46 | Incentive density PWL HMA pavement (460.2005) | DOL | 7,850 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 4,920 | $1.00 | $1.00 | $1.00 | $1.00 |
| 48 | Incentive air voids HMA pavement (460.2010) | DOL | 14,520 | $1.00 | $1.00 | $1.00 | $1.00 |
| 49 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 14,520 | $86.40 | $86.40 | $86.40 | $86.40 |
| 50 | HMA pavement 3 HT 58-28 S (460.7223) | TON | 16,045 | $74.30 | $74.30 | $74.30 | $74.30 |
| 51 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 4,147 | $91.10 | $91.10 | $91.10 | $91.10 |
| 52 | Asphaltic surface (465.0105) | TON | 93 | $214.90 | $214.90 | $214.90 | $214.90 |
| 53 | Asphaltic surface driveways and field entrances (465.0120) | TON | 436 | $122.40 | $122.40 | $122.40 | $122.40 |
| 54 | Asphaltic surface temporary (465.0125) | TON | 13 | $214.90 | $214.90 | $214.90 | $214.90 |
| 55 | Asphaltic flumes (465.0315) | SY | 90 | $64.50 | $64.50 | $64.50 | $64.50 |
| 56 | Asphaltic rumble strips, centerline (465.0560) | LF | 741 | $2.50 | $2.50 | $2.50 | $2.50 |
| 57 | Culvert pipe class III-A 18-inch (520.3318) | LF | 294 | $62.00 | $62.00 | $62.00 | $102.00 |
| 58 | Culvert pipe class III-A 24-inch (520.3324) | LF | 34 | $73.00 | $73.00 | $73.00 | $125.00 |
| 59 | Concrete collars for pipe (520.8000) | EACH | 5 | $605.00 | $605.00 | $605.00 | $819.00 |
| 60 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 25 | $304.00 | $304.00 | $304.00 | $446.00 |
| 61 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 1 | $459.00 | $459.00 | $459.00 | $627.00 |
| 62 | Apron endwalls for pipe arch steel 17X13-inch (521.1217) | EACH | 2 | $257.00 | $257.00 | $257.00 | $352.00 |
| 63 | Apron endwalls for pipe arch steel 57X38-inch (521.1257) | EACH | 2 | $1,476.00 | $1,476.00 | $1,476.00 | $2,050.00 |
| 64 | Apron endwalls for culvert pipe sloped side drains steel 15-inch 6 to 1 (521.1515) | EACH | 2 | $1,030.00 | $1,030.00 | $1,030.00 | $1,170.00 |
| 65 | Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518) | EACH | 14 | $1,498.00 | $1,498.00 | $1,498.00 | $1,640.00 |
| 66 | Apron endwalls for culvert pipe sloped side drains steel 24-inch 6 to 1 (521.1524) | EACH | 4 | $2,097.00 | $2,097.00 | $2,097.00 | $3,160.00 |
| 67 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 194 | $69.00 | $69.00 | $69.00 | $109.00 |
| 68 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 36 | $79.00 | $79.00 | $79.00 | $119.00 |
| 69 | Pipe arch corrugated steel 17X13- inch (521.3717) | LF | 38 | $67.00 | $67.00 | $67.00 | $108.00 |
| 70 | Pipe arch corrugated steel 57X38- inch (521.3757) | LF | 56 | $169.00 | $169.00 | $169.00 | $199.00 |
| 71 | Culvert pipe reinforced concrete class III 42-inch (522.0142) | LF | 88 | $216.00 | $216.00 | $216.00 | $308.00 |
| 72 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 124 | $195.00 | $195.00 | $195.00 | $258.00 |
| 73 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 17 | $1,137.00 | $1,137.00 | $1,137.00 | $1,200.00 |
| 74 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 2 | $1,233.00 | $1,233.00 | $1,233.00 | $1,390.00 |
| 75 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,358.00 | $1,358.00 | $1,358.00 | $1,490.00 |
| 76 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 5 | $1,558.00 | $1,558.00 | $1,558.00 | $1,910.00 |
| 77 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $2,524.00 | $2,524.00 | $2,524.00 | $3,570.00 |
| 78 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 2 | $3,000.00 | $3,000.00 | $3,000.00 | $5,740.00 |
| 79 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 2 | $2,632.00 | $2,632.00 | $2,632.00 | $4,070.00 |
| 80 | Drilling shaft 42-inch (531.2042) | LF | 54 | $215.00 | $215.00 | $215.00 | $215.00 |
| 81 | Foundation single-shaft type MC-III (structure) 01. S-70-0390 (531.5130) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 82 | Foundation single-shaft type MC-III (structure) 02. S-70-0391 (531.5130) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 83 | Foundation single-shaft type MC-III (structure) 03. S-70-0392 (531.5130) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 84 | Monotube cantilever type III (structure) 01. S-70-0390 (532.5130) | EACH | 1 | $30,000 | $30,000 | $30,000 | $30,000 |
| 85 | Monotube cantilever type III (structure) 02. S-70-0391 (532.5130) | EACH | 1 | $30,000 | $30,000 | $30,000 | $30,000 |
| 86 | Monotube cantilever type III (structure) 03. S-70-0392 (532.5130) | EACH | 1 | $30,000 | $30,000 | $30,000 | $30,000 |
| 87 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,165 | $81.00 | $81.00 | $55.40 | $81.00 |
| 88 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 946 | $24.70 | $24.70 | $27.50 | $24.70 |
| 89 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 172 | $85.00 | $85.00 | $23.25 | $85.00 |
| 90 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 1,534 | $23.90 | $23.90 | $33.55 | $23.90 |
| 91 | Concrete curb pedestrian (601.0600) | LF | 1,132 | $65.00 | $65.00 | $45.00 | $65.00 |
| 92 | Concrete sidewalk 4-inch (602.0405) | SF | 44,350 | $6.25 | $6.25 | $6.55 | $6.25 |
| 93 | Concrete sidewalk 5-inch (602.0410) | SF | 19,141 | $7.00 | $7.00 | $8.60 | $7.00 |
| 94 | Concrete sidewalk 6-inch (602.0415) | SF | 3,501 | $7.60 | $7.60 | $8.35 | $7.60 |
| 95 | Curb ramp detectable warning field yellow (602.0505) | SF | 359 | $35.00 | $35.00 | $35.00 | $35.00 |
| 96 | Curb ramp detectable warning field natural patina (602.0515) | SF | 880 | $35.00 | $35.00 | $32.00 | $35.00 |
| 97 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 305 | $59.00 | $59.00 | $58.00 | $59.00 |
| 98 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 66 | $59.00 | $59.00 | $55.00 | $59.00 |
| 99 | Concrete driveway 6-inch (602.0810) | SY | 80 | $71.70 | $71.70 | $71.00 | $71.70 |
| 100 | Concrete driveway 8-inch (602.0820) | SY | 9 | $95.00 | $95.00 | $91.00 | $95.00 |
| 101 | Concrete rumble strips, centerline (602.3260) | LF | 18,045 | $0.90 | $0.95 | $0.95 | $0.95 |
| 102 | Riprap medium (606.0200) | CY | 124 | $160.00 | $100.00 | $125.00 | $124.00 |
| 103 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 133 | $73.00 | $73.00 | $73.00 | $93.00 |
| 104 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 131 | $80.00 | $80.00 | $80.00 | $128.00 |
| 105 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,227 | $72.00 | $72.00 | $72.00 | $105.00 |
| 106 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 108 | $73.00 | $73.00 | $73.00 | $130.00 |
| 107 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 87 | $78.00 | $78.00 | $78.00 | $125.00 |
| 108 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 613 | $104.00 | $104.00 | $104.00 | $141.00 |
| 109 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 87 | $185.00 | $185.00 | $185.00 | $279.00 |
| 110 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429) | LF | 138 | $298.00 | $298.00 | $298.00 | $297.00 |
| 111 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 84 | $52.00 | $52.00 | $52.00 | $107.00 |
| 112 | Storm sewer pipe class III-A 15- inch (608.3015) | LF | 146 | $60.00 | $60.00 | $60.00 | $90.00 |
| 113 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 67 | $68.00 | $68.00 | $68.00 | $98.50 |
| 114 | Manhole covers type J (611.0530) | EACH | 4 | $551.00 | $551.00 | $551.00 | $732.00 |
| 115 | Inlet covers type C (611.0612) | EACH | 3 | $578.00 | $578.00 | $578.00 | $756.00 |
| 116 | Inlet covers type H (611.0624) | EACH | 40 | $814.00 | $814.00 | $814.00 | $1,130.00 |
| 117 | Inlet covers type HM (611.0627) | EACH | 10 | $814.00 | $814.00 | $814.00 | $1,020.00 |
| 118 | Inlet covers type HM-S (611.0636) | EACH | 3 | $814.00 | $814.00 | $814.00 | $1,020.00 |
| 119 | Inlet covers type H-S (611.0639) | EACH | 7 | $814.00 | $814.00 | $814.00 | $1,020.00 |
| 120 | Inlet covers type MS (611.0642) | EACH | 1 | $565.00 | $565.00 | $565.00 | $559.00 |
| 121 | Inlet covers type T (611.0652) | EACH | 6 | $1,106.00 | $1,106.00 | $1,106.00 | $1,280.00 |
| 122 | Catch basins 5-FT diameter (611.1005) | EACH | 3 | $4,445.00 | $4,445.00 | $4,445.00 | $3,310.00 |
| 123 | Catch basins 2X3-FT (611.1230) | EACH | 3 | $2,255.00 | $2,255.00 | $2,255.00 | $1,740.00 |
| 124 | Manholes 3-FT diameter (611.2003) | EACH | 1 | $2,520.00 | $2,520.00 | $2,520.00 | $1,520.00 |
| 125 | Manholes 4-FT diameter (611.2004) | EACH | 3 | $3,314.00 | $3,314.00 | $3,314.00 | $2,410.00 |
| 126 | Manholes 5-FT diameter (611.2005) | EACH | 3 | $5,000.00 | $5,000.00 | $5,000.00 | $3,200.00 |
| 127 | Inlets 3-FT diameter (611.3003) | EACH | 2 | $2,577.00 | $2,577.00 | $2,577.00 | $1,440.00 |
| 128 | Inlets 4-FT diameter (611.3004) | EACH | 5 | $3,326.00 | $3,326.00 | $3,326.00 | $2,210.00 |
| 129 | Inlets 2X3-FT (611.3230) | EACH | 48 | $2,725.00 | $2,725.00 | $2,725.00 | $1,470.00 |
| 130 | Inlets median 1 grate (611.3901) | EACH | 1 | $2,900.00 | $2,900.00 | $2,900.00 | $2,360.00 |
| 131 | Adjusting manhole covers (611.8110) | EACH | 24 | $515.00 | $515.00 | $515.00 | $515.00 |
| 132 | Adjusting inlet covers (611.8115) | EACH | 5 | $515.00 | $515.00 | $515.00 | $635.00 |
| 133 | Pipe underdrain 6-inch (612.0106) | LF | 312 | $10.00 | $10.00 | $10.00 | $20.50 |
| 134 | Barrier system grading shaping finishing (614.0010) | EACH | 4 | $4,270.00 | $1,750.00 | $4,050.00 | $1,750.00 |
| 135 | MGS guardrail 3 (614.2300) | LF | 1,463 | $28.00 | $28.00 | $28.00 | $28.00 |
| 136 | MGS guardrail 3 HS (614.2310) | LF | 141 | $35.00 | $35.00 | $35.00 | $35.00 |
| 137 | MGS thrie beam transition (614.2500) | LF | 156 | $92.00 | $92.00 | $92.00 | $92.00 |
| 138 | MGS guardrail terminal eat (614.2610) | EACH | 8 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 139 | MGS guardrail terminal type 2 (614.2620) | EACH | 4 | $3,250.00 | $3,250.00 | $3,250.00 | $3,250.00 |
| 140 | Anchor post assembly top mount (614.8010) | EACH | 19 | $500.00 | $500.00 | $500.00 | $500.00 |
| 141 | Maintenance and repair of haul roads (project) 01. 6180-30-71 (618.0100) | EACH | 1 | $1.00 | $0.01 | $0.01 | $1.00 |
| 142 | Maintenance and repair of haul roads (project) 02. 6180-30-72 (618.0100) | EACH | 1 | $1.00 | $0.01 | $0.01 | $1.00 |
| 143 | Maintenance and repair of haul roads (project) 03. 6180-30-73 (618.0100) | EACH | 1 | $1.00 | $0.01 | $0.01 | $1.00 |
| 144 | Maintenance and repair of haul roads (project) 04. 6180-31-71 (618.0100) | EACH | 1 | $1.00 | $0.01 | $0.01 | $1.00 |
| 145 | Mobilization (619.1000) | EACH | 1 | $835,000 | $727,560 | $784,000 | $1,816,900 |
| 146 | Concrete median sloped nose (620.0300) | SF | 1,872 | $14.00 | $14.00 | $15.00 | $14.00 |
| 147 | Water (624.0100) | MGAL | 319.90 | $80.00 | $80.00 | $0.01 | $26.50 |
| 148 | Topsoil (625.0100) | SY | 36,235 | $3.50 | $3.50 | $0.01 | $1.50 |
| 149 | Salvaged topsoil (625.0500) | SY | 36,049 | $2.10 | $2.10 | $0.01 | $1.50 |
| 150 | Mulching (627.0200) | SY | 32,619 | $0.30 | $0.30 | $0.30 | $0.30 |
| 151 | Silt fence (628.1504) | LF | 8,264 | $2.00 | $2.00 | $2.00 | $2.00 |
| 152 | Silt fence maintenance (628.1520) | LF | 8,264 | $0.01 | $0.01 | $0.01 | $0.01 |
| 153 | Mobilizations erosion control (628.1905) | EACH | 30 | $1.00 | $1.00 | $1.00 | $1.00 |
| 154 | Mobilizations emergency erosion control (628.1910) | EACH | 11 | $1.00 | $1.00 | $1.00 | $1.00 |
| 155 | Erosion mat class I type B (628.2004) | SY | 20,555 | $1.15 | $1.15 | $1.15 | $1.15 |
| 156 | Erosion mat urban class I type A (628.2006) | SY | 575 | $2.00 | $2.00 | $2.00 | $2.00 |
| 157 | Erosion mat urban class I type B (628.2008) | SY | 18,530 | $2.00 | $2.00 | $2.00 | $2.00 |
| 158 | Inlet protection type A (628.7005) | EACH | 47 | $75.00 | $75.00 | $75.00 | $75.00 |
| 159 | Inlet protection type B (628.7010) | EACH | 2 | $75.00 | $75.00 | $75.00 | $75.00 |
| 160 | Inlet protection type C (628.7015) | EACH | 113 | $75.00 | $75.00 | $75.00 | $75.00 |
| 161 | Temporary ditch checks (628.7504) | LF | 970 | $8.00 | $8.00 | $8.00 | $8.00 |
| 162 | Culvert pipe checks (628.7555) | EACH | 100 | $10.00 | $10.00 | $10.00 | $10.00 |
| 163 | Tracking pads (628.7560) | EACH | 8 | $1,200.00 | $1,200.00 | $0.01 | $500.00 |
| 164 | Rock bags (628.7570) | EACH | 26 | $10.00 | $10.00 | $10.00 | $10.00 |
| 165 | Fertilizer type B (629.0210) | CWT | 50.60 | $115.00 | $115.00 | $115.00 | $115.00 |
| 166 | Seeding mixture no. 10 (630.0110) | LB | 165 | $7.00 | $7.00 | $7.00 | $7.00 |
| 167 | Seeding mixture no. 30 (630.0130) | LB | 2,011 | $7.00 | $7.00 | $7.00 | $7.00 |
| 168 | Seeding mixture no. 40 (630.0140) | LB | 320 | $10.00 | $10.00 | $10.00 | $10.00 |
| 169 | Seeding temporary (630.0200) | LB | 1,455 | $2.00 | $2.00 | $2.00 | $2.00 |
| 170 | Seed water (630.0500) | MGAL | 1,610 | $0.01 | $0.01 | $0.01 | $0.01 |
| 171 | Markers culvert end (633.5200) | EACH | 21 | $85.00 | $85.00 | $85.00 | $85.00 |
| 172 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 57 | $125.00 | $125.00 | $125.00 | $125.00 |
| 173 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 62 | $130.00 | $130.00 | $130.00 | $130.00 |
| 174 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 16 | $140.00 | $140.00 | $140.00 | $140.00 |
| 175 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 4 | $300.00 | $300.00 | $300.00 | $300.00 |
| 176 | Sign flags permanent type II (637.0620) | EACH | 2 | $300.00 | $300.00 | $300.00 | $300.00 |
| 177 | Signs type II reflective H (637.2210) | SF | 1,183.68 | $23.00 | $23.00 | $23.00 | $23.00 |
| 178 | Signs type II reflective F (637.2230) | SF | 200.67 | $25.00 | $25.00 | $25.00 | $25.00 |
| 179 | Removing signs type II (638.2602) | EACH | 47 | $50.00 | $50.00 | $50.00 | $50.00 |
| 180 | Removing small sign supports (638.3000) | EACH | 64 | $50.00 | $50.00 | $50.00 | $50.00 |
| 181 | Field office type D (642.5401) | EACH | 1 | $25,585 | $20,000 | $12,000 | $30,000 |
| 182 | Traffic control drums (643.0300) | DAY | 73,547 | $0.15 | $0.15 | $0.15 | $0.15 |
| 183 | Traffic control barricades type III (643.0420) | DAY | 20,191 | $0.60 | $0.60 | $0.60 | $0.60 |
| 184 | Traffic control warning lights type A (643.0705) | DAY | 37,027 | $0.12 | $0.12 | $0.12 | $0.12 |
| 185 | Traffic control warning lights type C (643.0715) | DAY | 10,044 | $0.14 | $0.14 | $0.14 | $0.14 |
| 186 | Traffic control connected arrow boards (643.0810) | DAY | 177 | $18.45 | $18.45 | $18.45 | $18.45 |
| 187 | Traffic control signs (643.0900) | DAY | 69,167 | $0.17 | $0.17 | $0.17 | $0.17 |
| 188 | Traffic control covering signs type I (643.0910) | EACH | 15 | $250.00 | $250.00 | $250.00 | $250.00 |
| 189 | Traffic control covering signs type II (643.0920) | EACH | 33 | $115.00 | $115.00 | $115.00 | $115.00 |
| 190 | Traffic control signs fixed message (643.1000) | SF | 372 | $22.75 | $22.75 | $22.75 | $22.75 |
| 191 | Traffic control signs PCMS (643.1050) | DAY | 315 | $22.00 | $22.00 | $22.00 | $22.00 |
| 192 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 177 | $7.45 | $7.45 | $7.45 | $7.45 |
| 193 | Temporary marking line paint 6- inch (643.3165) | LF | 28,276 | $0.35 | $0.35 | $0.35 | $0.35 |
| 194 | Temporary marking arrow epoxy (643.3520) | EACH | 2 | $381.00 | $381.00 | $381.00 | $381.00 |
| 195 | Temporary marking stop line paint 18-inch (643.3805) | LF | 36 | $20.00 | $20.00 | $20.00 | $20.00 |
| 196 | Traffic control (643.5000) | EACH | 1 | $127,915 | $127,915 | $127,915 | $127,915 |
| 197 | Temporary pedestrian curb ramp (644.1601) | DAY | 50 | $8.85 | $8.85 | $8.85 | $50.00 |
| 198 | Temporary pedestrian barricade (644.1810) | LF | 11,156 | $4.40 | $4.40 | $4.40 | $4.40 |
| 199 | Temporary audible message devices (644.1900.S) | DAY | 717 | $4.25 | $4.25 | $4.25 | $4.25 |
| 200 | Geotextile type DF schedule A (645.0111) | SY | 82 | $7.00 | $7.00 | $7.00 | $6.40 |
| 201 | Geotextile type HR (645.0120) | SY | 455 | $8.00 | $6.00 | $5.00 | $4.50 |
| 202 | Marking line epoxy 6-inch (646.2020) | LF | 23,515 | $0.47 | $0.47 | $0.47 | $0.47 |
| 203 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 125,600 | $1.41 | $1.41 | $1.41 | $1.41 |
| 204 | Marking line epoxy 8-inch (646.3020) | LF | 28 | $5.00 | $5.00 | $5.00 | $5.00 |
| 205 | Marking line epoxy 10-inch (646.4020) | LF | 1,007 | $1.25 | $1.25 | $1.25 | $1.25 |
| 206 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 4,307 | $2.80 | $2.80 | $2.80 | $2.80 |
| 207 | Marking arrow epoxy (646.5020) | EACH | 33 | $383.75 | $383.75 | $383.75 | $383.75 |
| 208 | Marking word epoxy (646.5120) | EACH | 12 | $388.25 | $388.25 | $388.25 | $388.25 |
| 209 | Marking symbol epoxy (646.5220) | EACH | 5 | $372.70 | $372.70 | $372.70 | $372.70 |
| 210 | Marking stop line epoxy 18-inch (646.6120) | LF | 405 | $16.00 | $16.00 | $16.00 | $16.00 |
| 211 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 272 | $16.00 | $16.00 | $16.00 | $16.00 |
| 212 | Marking diagonal epoxy 12-inch (646.7120) | LF | 897 | $15.65 | $15.65 | $15.65 | $15.65 |
| 213 | Marking chevron epoxy 24-inch (646.7220) | LF | 203 | $26.40 | $26.40 | $26.40 | $26.40 |
| 214 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,818 | $15.25 | $15.25 | $15.25 | $15.25 |
| 215 | Marking curb epoxy (646.8120) | LF | 1,619 | $7.70 | $7.70 | $7.70 | $7.70 |
| 216 | Marking island nose epoxy (646.8220) | EACH | 19 | $288.50 | $288.50 | $288.50 | $288.50 |
| 217 | Marking parking stall epoxy (646.8320) | LF | 235 | $6.00 | $6.00 | $6.00 | $6.00 |
| 218 | Marking removal line 4-inch (646.9000) | LF | 561 | $2.00 | $2.00 | $2.00 | $2.00 |
| 219 | Marking removal line 6-inch (646.9002) | LF | 1,386 | $2.50 | $2.50 | $2.50 | $2.50 |
| 220 | Marking removal line wide (646.9200) | LF | 24 | $20.00 | $20.00 | $20.00 | $20.00 |
| 221 | Marking removal special marking water blasting (646.9310) | EACH | 2 | $950.00 | $950.00 | $950.00 | $950.00 |
| 222 | Construction staking storm sewer (650.4000) | EACH | 106 | $75.00 | $75.00 | $75.00 | $75.00 |
| 223 | Construction staking subgrade (650.4500) | LF | 20,597 | $0.01 | $0.01 | $0.01 | $0.01 |
| 224 | Construction staking base (650.5000) | LF | 20,597 | $0.25 | $0.25 | $0.25 | $0.25 |
| 225 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 18,658 | $0.65 | $0.65 | $0.65 | $0.65 |
| 226 | Construction staking pipe culverts (650.6000) | EACH | 8 | $100.00 | $100.00 | $100.00 | $100.00 |
| 227 | Construction staking resurfacing reference (650.8000) | LF | 6,444 | $0.07 | $0.07 | $0.07 | $0.07 |
| 228 | Construction staking electrical installations (project) 01. 6180-30- 72 (650.8501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 229 | Construction staking electrical installations (project) 02. 6180-30- 73 (650.8501) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 230 | Construction staking curb ramps (650.9000) | EACH | 113 | $100.00 | $100.00 | $100.00 | $100.00 |
| 231 | Construction staking sidewalk (project) 01. 6180-30-71 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 232 | Construction staking sidewalk (project) 02. 6180-31-71 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 233 | Construction staking supplemental control (project) 01. 6180-30-71 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 234 | Construction staking supplemental control (project) 02. 6180-30-72 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 235 | Construction staking supplemental control (project) 03. 6180-30-73 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 236 | Construction staking supplemental control (project) 04. 6180-31-71 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 237 | Construction staking slope stakes (650.9920) | LF | 20,597 | $0.80 | $0.80 | $0.80 | $0.80 |
| 238 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 640 | $7.30 | $7.30 | $6.00 | $6.00 |
| 239 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 7,292 | $8.50 | $8.50 | $10.00 | $10.00 |
| 240 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 425 | $10.13 | $10.13 | $14.00 | $14.00 |
| 241 | Conduit special 3-inch (652.0615) | LF | 1,425 | $38.40 | $38.40 | $28.00 | $28.00 |
| 242 | Conduit loop detector (652.0800) | LF | 1,816 | $8.85 | $8.85 | $6.00 | $6.00 |
| 243 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 58 | $2,288.00 | $2,288.00 | $1,950.00 | $1,950.00 |
| 244 | Removing pull boxes (653.0905) | EACH | 41 | $137.50 | $137.50 | $75.00 | $75.00 |
| 245 | Concrete bases type 1 (654.0101) | EACH | 17 | $1,075.00 | $1,075.00 | $1,350.00 | $1,350.00 |
| 246 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,295.00 | $1,295.00 | $1,750.00 | $1,750.00 |
| 247 | Concrete bases type 5 (654.0105) | EACH | 53 | $1,205.00 | $1,205.00 | $1,600.00 | $1,600.00 |
| 248 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,925.00 | $2,925.00 | $2,200.00 | $2,200.00 |
| 249 | Concrete control cabinet bases type 10 (654.0220) | EACH | 3 | $2,365.00 | $2,365.00 | $2,200.00 | $2,200.00 |
| 250 | Cable traffic signal 5-14 AWG (655.0230) | LF | 6,561 | $2.15 | $2.15 | $2.50 | $2.50 |
| 251 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,132 | $2.55 | $2.55 | $2.75 | $2.75 |
| 252 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,914 | $3.83 | $3.83 | $4.75 | $4.75 |
| 253 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,939 | $2.66 | $2.66 | $2.00 | $2.00 |
| 254 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 3,461 | $1.55 | $1.55 | $1.00 | $1.00 |
| 255 | Electrical wire lighting 12 AWG (655.0610) | LF | 8,100 | $1.23 | $1.23 | $0.90 | $0.90 |
| 256 | Electrical wire lighting 10 AWG (655.0615) | LF | 25,841 | $1.55 | $1.55 | $1.00 | $1.00 |
| 257 | Loop detector lead in cable (655.0700) | LF | 5,915 | $2.50 | $2.50 | $2.00 | $2.00 |
| 258 | Loop detector wire (655.0800) | LF | 6,848 | $1.33 | $1.33 | $0.90 | $0.90 |
| 259 | Traffic signal evp detector cable (655.0900) | LF | 379 | $1.76 | $1.76 | $3.75 | $3.75 |
| 260 | Electrical service meter breaker pedestal (location) 01. CTH FF/reighmoor RD intersection (656.0201) | EACH | 1 | $1,975.00 | $1,975.00 | $1,950.00 | $1,950.00 |
| 261 | Electrical service meter breaker pedestal (location) 02. sand pit RD intersection (656.0201) | EACH | 1 | $1,975.00 | $1,975.00 | $1,950.00 | $1,950.00 |
| 262 | Electrical service meter breaker pedestal (location) 03. S-70-0645 (STH 21 & oakwood) (656.0201) | EACH | 1 | $1,975.00 | $1,975.00 | $1,950.00 | $1,950.00 |
| 263 | Electrical service meter breaker pedestal (location) 04. STH 21 & leonard point RD (656.0201) | EACH | 1 | $1,975.00 | $1,975.00 | $1,950.00 | $1,950.00 |
| 264 | Pedestal bases (657.0100) | EACH | 16 | $277.00 | $277.00 | $265.00 | $265.00 |
| 265 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 55 | $673.50 | $673.50 | $600.00 | $600.00 |
| 266 | Poles type 3 (657.0310) | EACH | 2 | $4,098.00 | $4,098.00 | $3,500.00 | $3,500.00 |
| 267 | Poles type 5-aluminum (657.0322) | EACH | 53 | $2,226.50 | $2,226.50 | $1,690.00 | $1,690.00 |
| 268 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 4 | $607.50 | $607.50 | $545.00 | $545.00 |
| 269 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $647.50 | $647.50 | $580.00 | $580.00 |
| 270 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 10 | $553.50 | $553.50 | $503.00 | $503.00 |
| 271 | Trombone arms 25-FT (657.0595) | EACH | 2 | $2,054.00 | $2,054.00 | $2,295.00 | $2,295.00 |
| 272 | Luminaire arms truss type 4-inch clamp 12-FT (657.0709) | EACH | 2 | $718.00 | $718.00 | $675.00 | $675.00 |
| 273 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 53 | $720.00 | $720.00 | $675.00 | $675.00 |
| 274 | Traffic signal face 3S 12-inch (658.0173) | EACH | 8 | $1,013.50 | $1,013.50 | $620.00 | $620.00 |
| 275 | Traffic signal face 4S 12-inch (658.0174) | EACH | 2 | $1,433.00 | $1,433.00 | $800.00 | $800.00 |
| 276 | Pedestrian signal face 16-inch (658.0416) | EACH | 16 | $658.00 | $658.00 | $510.00 | $510.00 |
| 277 | Pedestrian push buttons (658.0500) | EACH | 16 | $382.00 | $382.00 | $480.00 | $480.00 |
| 278 | Signal mounting hardware (location) 01. STH 21 & oakwood (658.5070) | EACH | 1 | $3,011.00 | $3,011.00 | $2,250.00 | $2,250.00 |
| 279 | Signal mounting hardware (location) 02. STH 21 & westhaven (658.5070) | EACH | 1 | $3,011.00 | $3,011.00 | $2,250.00 | $2,250.00 |
| 280 | Luminaires utility LED B (659.1120) | EACH | 55 | $425.00 | $425.00 | $360.00 | $360.00 |
| 281 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 34 | $12.10 | $12.10 | $75.00 | $75.00 |
| 282 | Temporary traffic signals for intersections (location) 01. leonard point road and omro road (661.0201) | EACH | 2 | $3,725.00 | $3,725.00 | $85,000 | $3,725.00 |
| 283 | Sawing asphalt (690.0150) | LF | 1,065 | $1.39 | $1.39 | $2.50 | $1.39 |
| 284 | Sawing concrete (690.0250) | LF | 33,980 | $2.00 | $2.00 | $2.50 | $2.00 |
| 285 | Incentive iri ride (740.0440) | DOL | 46,140 | $1.00 | $1.00 | $1.00 | $1.00 |
| 286 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 |
| 287 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 5,760 | $5.00 | $5.00 | $5.00 | $5.00 |
| 288 | Special 01. foundation backfill (SPV.0035) | CY | 583 | $40.00 | $37.00 | $28.00 | $47.50 |
| 289 | Special 01. inlet cover special (SPV.0060) | EACH | 1 | $830.00 | $830.00 | $830.00 | $1,630.00 |
| 290 | Special 02. inlets 2X2.5-FT special (SPV.0060) | EACH | 6 | $2,543.00 | $2,543.00 | $2,543.00 | $1,620.00 |
| 291 | Special 03. removing traffic signals STH 21 & oakwood (SPV.0060) | EACH | 1 | $8,662.50 | $8,662.50 | $7,500.00 | $7,500.00 |
| 292 | Special 04. removing traffic signals STH 21 & westhaven (SPV.0060) | EACH | 1 | $8,662.50 | $8,662.50 | $7,500.00 | $7,500.00 |
| 293 | Special 05. adjusting sanitary manhole covers (SPV.0060) | EACH | 26 | $600.00 | $600.00 | $600.00 | $800.00 |
| 294 | Special 06. adjusting water valve boxes (SPV.0060) | EACH | 18 | $350.00 | $350.00 | $350.00 | $500.00 |
| 295 | Special 07. temporary vehicle detection leonard point RD and omro RD (SPV.0060) | EACH | 1 | $1,250.00 | $1,250.00 | $35,000 | $1,250.00 |
| 296 | Special 08. removing sign, foundation, and various items - parcel 37 (SPV.0060) | EACH | 1 | $2,500.00 | $7,500.00 | $1,500.00 | $7,500.00 |
| 297 | Special 01. seeding low maintenance fescue (SPV.0085) | LB | 102 | $10.00 | $10.00 | $10.00 | $10.00 |
| 298 | Special 01. concrete joint and crack cleaning and repair (SPV.0090) | LF | 23,234 | $4.35 | $4.35 | $4.35 | $4.35 |
| 299 | Special 02. ditch regrading (SPV.0090) | LF | 965 | $10.00 | $10.00 | $11.71 | $7.80 |
| 300 | Special 03. concrete curb & gutter 18-inch, type A modified (SPV.0090) | LF | 738 | $24.00 | $24.00 | $24.95 | $24.00 |
| 301 | Special 04. concrete curb & gutter 30-inch, type D modified (SPV.0090) | LF | 7,520 | $25.00 | $25.00 | $23.65 | $25.00 |
| 302 | Special 05. concrete curb & gutter 4-inch sloped 30-inch, type R modified (SPV.0090) | LF | 1,018 | $25.00 | $25.00 | $28.40 | $25.00 |
| 303 | Special 06. concrete curb & gutter 4-inch sloped 36-inch, type D modified (SPV.0090) | LF | 5,814 | $27.00 | $27.00 | $26.25 | $27.00 |
| 304 | Special 01. excavation, hauling, and disposal of metal contaminated soil (SPV.0195) | TON | 2,200 | $61.00 | $61.00 | $57.56 | $58.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.