WisDOT contract 20251111019 bid tabulation

6180-30-71. Let by Wisconsin DOT on November 11, 2025, Winnebago. 4 bids received; low bid $11,804,523 by Northeast Asphalt, Inc.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
304
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northeast Asphalt, Inc$11,804,523Low
2Michels Road & Stone, Inc.$11,979,476+1.0%
3Vinton Construction Company$12,158,280+3.0%
4Zignego Company, Inc.$14,052,592+19%
WisDOT contract 20251111019: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northeast Asphalt, Inc2. Michels Road & Stone, Inc.3. Vinton Construction Company4. Zignego Company, Inc.
1RBC progress schedule (108.4300)EACH2$2,000.00$2,500.00$1,000.00$1,000.00
2Clearing (201.0105)STA16$989.31$989.31$989.31$600.00
3Clearing (201.0120)ID45$54.77$54.77$54.77$30.00
4Grubbing (201.0205)STA16$366.22$366.22$366.22$400.00
5Grubbing (201.0220)ID45$23.27$23.27$23.27$30.00
6Removing small pipe culverts (203.0100)EACH28$630.00$630.00$630.00$238.00
7Removing concrete pavement (204.0100)SY25,499$1.30$1.30$1.00$7.60
8Removing concrete pavement butt joints (204.0105)SY2,097$15.70$15.70$15.70$15.70
9Removing concrete surface partial depth (204.0109.S)SF145,440$0.29$0.29$0.29$0.29
10Removing asphaltic surface (204.0110)SY44$50.00$50.00$10.00$25.00
11Removing asphaltic surface butt joints (204.0115)SY1,688$15.70$15.70$15.70$15.70
12Removing asphaltic surface milling (204.0120)SY95$15.70$15.70$15.70$15.70
13Removing curb & gutter (204.0150)LF3,849$12.00$6.00$5.49$10.00
14Removing concrete sidewalk (204.0155)SY857$18.80$18.80$18.00$9.40
15Removing guardrail (204.0165)LF1,610$3.00$3.00$3.00$3.00
16Removing fence (204.0170)LF579$3.00$3.00$3.00$3.00
17Removing concrete bases (204.0195)EACH11$500.00$450.00$200.00$500.00
18Excavation common (205.0100)CY60,519$12.10$12.10$14.99$16.00
19Excavation for structures culverts (structure) 01. B-70-0098 (206.2001)EACH1$3,500.00$3,500.00$3,300.00$3,550.00
20Excavation for structures culverts (structure) 02. B-70-0099 (206.2001)EACH1$3,500.00$3,500.00$3,300.00$3,550.00
21Prepare foundation for asphaltic paving (project) 01. 6180-30-71 (211.0101)EACH1$74,500$74,500$74,500$74,500
22Prepare foundation for asphaltic paving (project) 02. 6180-31-71 (211.0101)EACH1$32,500$32,500$32,500$32,500
23Finishing roadway (project) 01. 6180-30-71 (213.0100)EACH1$4,200.00$2,500.00$2,500.00$1,000.00
24Finishing roadway (project) 02. 6180-30-72 (213.0100)EACH1$4,200.00$2,500.00$2,500.00$1,000.00
25Finishing roadway (project) 03. 6180-30-73 (213.0100)EACH1$4,200.00$2,500.00$2,500.00$1,000.00
26Finishing roadway (project) 04. 6180-31-71 (213.0100)EACH1$4,200.00$2,500.00$2,500.00$1,000.00
27Base aggregate dense 3/4-inch (305.0110)TON5,285$29.50$29.50$28.96$23.00
28Base aggregate dense 1 1/4-inch (305.0120)TON24,295$11.90$11.90$11.32$18.00
29Base aggregate open-graded (310.0115)CY9.80$100.00$42.00$42.00$73.00
30Select crushed material (312.0110)TON47,751$11.90$11.90$17.20$19.50
31QMP base aggregate dense 1 1/4- inch compaction (371.2000.S)EACH23$500.00$500.00$1,000.00$1,200.00
32Removing pavement for base patching (390.0100)CY2,330$49.95$103.49$68.70$100.00
33Base patching concrete hes (390.0305)CY2,310$269.70$306.60$300.00$363.00
34Base patching concrete shes (390.0405)CY20$285.00$457.79$500.00$500.00
35Coloring concrete wisdot red (405.0100)CY1,018$78.40$78.40$91.20$78.40
36Concrete truck apron 12-inch (415.2010)SY1,863$85.45$85.45$91.89$85.45
37Drilled tie bars (416.0610)EACH3,888$8.00$12.39$9.00$15.00
38Drilled dowel bars (416.0620)EACH10,434$14.00$18.09$15.50$20.00
39Concrete pavement repair (416.1710)SY122$88.00$157.22$95.41$200.00
40Concrete pavement replacement (416.1720)SY608$88.00$171.29$99.41$200.00
41HMA cold weather paving (450.4000)TON1,015$0.01$0.01$0.01$0.01
42Tack coat (455.0605)GAL18,353$3.10$3.10$3.10$3.10
43HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$2,750.00$2,750.00$2,750.00$2,750.00
44HMA percent within limits (PWL) test strip density (460.0110.S)EACH1$3,800.00$3,800.00$3,800.00$3,800.00
45Incentive density HMA pavement (460.2000)DOL12,940$1.00$1.00$1.00$1.00
46Incentive density PWL HMA pavement (460.2005)DOL7,850$1.00$1.00$1.00$1.00
47Incentive density HMA pavement longitudinal joints (460.2007)DOL4,920$1.00$1.00$1.00$1.00
48Incentive air voids HMA pavement (460.2010)DOL14,520$1.00$1.00$1.00$1.00
49HMA pavement 4 MT 58-28 S (460.6224)TON14,520$86.40$86.40$86.40$86.40
50HMA pavement 3 HT 58-28 S (460.7223)TON16,045$74.30$74.30$74.30$74.30
51HMA pavement 4 HT 58-28 H (460.7424)TON4,147$91.10$91.10$91.10$91.10
52Asphaltic surface (465.0105)TON93$214.90$214.90$214.90$214.90
53Asphaltic surface driveways and field entrances (465.0120)TON436$122.40$122.40$122.40$122.40
54Asphaltic surface temporary (465.0125)TON13$214.90$214.90$214.90$214.90
55Asphaltic flumes (465.0315)SY90$64.50$64.50$64.50$64.50
56Asphaltic rumble strips, centerline (465.0560)LF741$2.50$2.50$2.50$2.50
57Culvert pipe class III-A 18-inch (520.3318)LF294$62.00$62.00$62.00$102.00
58Culvert pipe class III-A 24-inch (520.3324)LF34$73.00$73.00$73.00$125.00
59Concrete collars for pipe (520.8000)EACH5$605.00$605.00$605.00$819.00
60Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH25$304.00$304.00$304.00$446.00
61Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH1$459.00$459.00$459.00$627.00
62Apron endwalls for pipe arch steel 17X13-inch (521.1217)EACH2$257.00$257.00$257.00$352.00
63Apron endwalls for pipe arch steel 57X38-inch (521.1257)EACH2$1,476.00$1,476.00$1,476.00$2,050.00
64Apron endwalls for culvert pipe sloped side drains steel 15-inch 6 to 1 (521.1515)EACH2$1,030.00$1,030.00$1,030.00$1,170.00
65Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518)EACH14$1,498.00$1,498.00$1,498.00$1,640.00
66Apron endwalls for culvert pipe sloped side drains steel 24-inch 6 to 1 (521.1524)EACH4$2,097.00$2,097.00$2,097.00$3,160.00
67Culvert pipe corrugated steel 18- inch (521.3118)LF194$69.00$69.00$69.00$109.00
68Culvert pipe corrugated steel 24- inch (521.3124)LF36$79.00$79.00$79.00$119.00
69Pipe arch corrugated steel 17X13- inch (521.3717)LF38$67.00$67.00$67.00$108.00
70Pipe arch corrugated steel 57X38- inch (521.3757)LF56$169.00$169.00$169.00$199.00
71Culvert pipe reinforced concrete class III 42-inch (522.0142)LF88$216.00$216.00$216.00$308.00
72Culvert pipe reinforced concrete class IV 36-inch (522.0436)LF124$195.00$195.00$195.00$258.00
73Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH17$1,137.00$1,137.00$1,137.00$1,200.00
74Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH2$1,233.00$1,233.00$1,233.00$1,390.00
75Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$1,358.00$1,358.00$1,358.00$1,490.00
76Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH5$1,558.00$1,558.00$1,558.00$1,910.00
77Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH4$2,524.00$2,524.00$2,524.00$3,570.00
78Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH2$3,000.00$3,000.00$3,000.00$5,740.00
79Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629)EACH2$2,632.00$2,632.00$2,632.00$4,070.00
80Drilling shaft 42-inch (531.2042)LF54$215.00$215.00$215.00$215.00
81Foundation single-shaft type MC-III (structure) 01. S-70-0390 (531.5130)EACH1$9,500.00$9,500.00$9,500.00$9,500.00
82Foundation single-shaft type MC-III (structure) 02. S-70-0391 (531.5130)EACH1$9,500.00$9,500.00$9,500.00$9,500.00
83Foundation single-shaft type MC-III (structure) 03. S-70-0392 (531.5130)EACH1$9,500.00$9,500.00$9,500.00$9,500.00
84Monotube cantilever type III (structure) 01. S-70-0390 (532.5130)EACH1$30,000$30,000$30,000$30,000
85Monotube cantilever type III (structure) 02. S-70-0391 (532.5130)EACH1$30,000$30,000$30,000$30,000
86Monotube cantilever type III (structure) 03. S-70-0392 (532.5130)EACH1$30,000$30,000$30,000$30,000
87Concrete curb & gutter 30-inch type A (601.0409)LF1,165$81.00$81.00$55.40$81.00
88Concrete curb & gutter 30-inch type D (601.0411)LF946$24.70$24.70$27.50$24.70
89Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF172$85.00$85.00$23.25$85.00
90Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF1,534$23.90$23.90$33.55$23.90
91Concrete curb pedestrian (601.0600)LF1,132$65.00$65.00$45.00$65.00
92Concrete sidewalk 4-inch (602.0405)SF44,350$6.25$6.25$6.55$6.25
93Concrete sidewalk 5-inch (602.0410)SF19,141$7.00$7.00$8.60$7.00
94Concrete sidewalk 6-inch (602.0415)SF3,501$7.60$7.60$8.35$7.60
95Curb ramp detectable warning field yellow (602.0505)SF359$35.00$35.00$35.00$35.00
96Curb ramp detectable warning field natural patina (602.0515)SF880$35.00$35.00$32.00$35.00
97Curb ramp detectable warning field radial yellow (602.0605)SF305$59.00$59.00$58.00$59.00
98Curb ramp detectable warning field radial natural patina (602.0615)SF66$59.00$59.00$55.00$59.00
99Concrete driveway 6-inch (602.0810)SY80$71.70$71.70$71.00$71.70
100Concrete driveway 8-inch (602.0820)SY9$95.00$95.00$91.00$95.00
101Concrete rumble strips, centerline (602.3260)LF18,045$0.90$0.95$0.95$0.95
102Riprap medium (606.0200)CY124$160.00$100.00$125.00$124.00
103Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF133$73.00$73.00$73.00$93.00
104Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF131$80.00$80.00$80.00$128.00
105Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF1,227$72.00$72.00$72.00$105.00
106Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF108$73.00$73.00$73.00$130.00
107Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF87$78.00$78.00$78.00$125.00
108Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF613$104.00$104.00$104.00$141.00
109Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF87$185.00$185.00$185.00$279.00
110Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429)LF138$298.00$298.00$298.00$297.00
111Storm sewer pipe class III-A 12- inch (608.3012)LF84$52.00$52.00$52.00$107.00
112Storm sewer pipe class III-A 15- inch (608.3015)LF146$60.00$60.00$60.00$90.00
113Storm sewer pipe class III-A 18- inch (608.3018)LF67$68.00$68.00$68.00$98.50
114Manhole covers type J (611.0530)EACH4$551.00$551.00$551.00$732.00
115Inlet covers type C (611.0612)EACH3$578.00$578.00$578.00$756.00
116Inlet covers type H (611.0624)EACH40$814.00$814.00$814.00$1,130.00
117Inlet covers type HM (611.0627)EACH10$814.00$814.00$814.00$1,020.00
118Inlet covers type HM-S (611.0636)EACH3$814.00$814.00$814.00$1,020.00
119Inlet covers type H-S (611.0639)EACH7$814.00$814.00$814.00$1,020.00
120Inlet covers type MS (611.0642)EACH1$565.00$565.00$565.00$559.00
121Inlet covers type T (611.0652)EACH6$1,106.00$1,106.00$1,106.00$1,280.00
122Catch basins 5-FT diameter (611.1005)EACH3$4,445.00$4,445.00$4,445.00$3,310.00
123Catch basins 2X3-FT (611.1230)EACH3$2,255.00$2,255.00$2,255.00$1,740.00
124Manholes 3-FT diameter (611.2003)EACH1$2,520.00$2,520.00$2,520.00$1,520.00
125Manholes 4-FT diameter (611.2004)EACH3$3,314.00$3,314.00$3,314.00$2,410.00
126Manholes 5-FT diameter (611.2005)EACH3$5,000.00$5,000.00$5,000.00$3,200.00
127Inlets 3-FT diameter (611.3003)EACH2$2,577.00$2,577.00$2,577.00$1,440.00
128Inlets 4-FT diameter (611.3004)EACH5$3,326.00$3,326.00$3,326.00$2,210.00
129Inlets 2X3-FT (611.3230)EACH48$2,725.00$2,725.00$2,725.00$1,470.00
130Inlets median 1 grate (611.3901)EACH1$2,900.00$2,900.00$2,900.00$2,360.00
131Adjusting manhole covers (611.8110)EACH24$515.00$515.00$515.00$515.00
132Adjusting inlet covers (611.8115)EACH5$515.00$515.00$515.00$635.00
133Pipe underdrain 6-inch (612.0106)LF312$10.00$10.00$10.00$20.50
134Barrier system grading shaping finishing (614.0010)EACH4$4,270.00$1,750.00$4,050.00$1,750.00
135MGS guardrail 3 (614.2300)LF1,463$28.00$28.00$28.00$28.00
136MGS guardrail 3 HS (614.2310)LF141$35.00$35.00$35.00$35.00
137MGS thrie beam transition (614.2500)LF156$92.00$92.00$92.00$92.00
138MGS guardrail terminal eat (614.2610)EACH8$4,800.00$4,800.00$4,800.00$4,800.00
139MGS guardrail terminal type 2 (614.2620)EACH4$3,250.00$3,250.00$3,250.00$3,250.00
140Anchor post assembly top mount (614.8010)EACH19$500.00$500.00$500.00$500.00
141Maintenance and repair of haul roads (project) 01. 6180-30-71 (618.0100)EACH1$1.00$0.01$0.01$1.00
142Maintenance and repair of haul roads (project) 02. 6180-30-72 (618.0100)EACH1$1.00$0.01$0.01$1.00
143Maintenance and repair of haul roads (project) 03. 6180-30-73 (618.0100)EACH1$1.00$0.01$0.01$1.00
144Maintenance and repair of haul roads (project) 04. 6180-31-71 (618.0100)EACH1$1.00$0.01$0.01$1.00
145Mobilization (619.1000)EACH1$835,000$727,560$784,000$1,816,900
146Concrete median sloped nose (620.0300)SF1,872$14.00$14.00$15.00$14.00
147Water (624.0100)MGAL319.90$80.00$80.00$0.01$26.50
148Topsoil (625.0100)SY36,235$3.50$3.50$0.01$1.50
149Salvaged topsoil (625.0500)SY36,049$2.10$2.10$0.01$1.50
150Mulching (627.0200)SY32,619$0.30$0.30$0.30$0.30
151Silt fence (628.1504)LF8,264$2.00$2.00$2.00$2.00
152Silt fence maintenance (628.1520)LF8,264$0.01$0.01$0.01$0.01
153Mobilizations erosion control (628.1905)EACH30$1.00$1.00$1.00$1.00
154Mobilizations emergency erosion control (628.1910)EACH11$1.00$1.00$1.00$1.00
155Erosion mat class I type B (628.2004)SY20,555$1.15$1.15$1.15$1.15
156Erosion mat urban class I type A (628.2006)SY575$2.00$2.00$2.00$2.00
157Erosion mat urban class I type B (628.2008)SY18,530$2.00$2.00$2.00$2.00
158Inlet protection type A (628.7005)EACH47$75.00$75.00$75.00$75.00
159Inlet protection type B (628.7010)EACH2$75.00$75.00$75.00$75.00
160Inlet protection type C (628.7015)EACH113$75.00$75.00$75.00$75.00
161Temporary ditch checks (628.7504)LF970$8.00$8.00$8.00$8.00
162Culvert pipe checks (628.7555)EACH100$10.00$10.00$10.00$10.00
163Tracking pads (628.7560)EACH8$1,200.00$1,200.00$0.01$500.00
164Rock bags (628.7570)EACH26$10.00$10.00$10.00$10.00
165Fertilizer type B (629.0210)CWT50.60$115.00$115.00$115.00$115.00
166Seeding mixture no. 10 (630.0110)LB165$7.00$7.00$7.00$7.00
167Seeding mixture no. 30 (630.0130)LB2,011$7.00$7.00$7.00$7.00
168Seeding mixture no. 40 (630.0140)LB320$10.00$10.00$10.00$10.00
169Seeding temporary (630.0200)LB1,455$2.00$2.00$2.00$2.00
170Seed water (630.0500)MGAL1,610$0.01$0.01$0.01$0.01
171Markers culvert end (633.5200)EACH21$85.00$85.00$85.00$85.00
172Posts wood 4X6-inch X 14-FT (634.0614)EACH57$125.00$125.00$125.00$125.00
173Posts wood 4X6-inch X 16-FT (634.0616)EACH62$130.00$130.00$130.00$130.00
174Posts wood 4X6-inch X 18-FT (634.0618)EACH16$140.00$140.00$140.00$140.00
175Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH4$300.00$300.00$300.00$300.00
176Sign flags permanent type II (637.0620)EACH2$300.00$300.00$300.00$300.00
177Signs type II reflective H (637.2210)SF1,183.68$23.00$23.00$23.00$23.00
178Signs type II reflective F (637.2230)SF200.67$25.00$25.00$25.00$25.00
179Removing signs type II (638.2602)EACH47$50.00$50.00$50.00$50.00
180Removing small sign supports (638.3000)EACH64$50.00$50.00$50.00$50.00
181Field office type D (642.5401)EACH1$25,585$20,000$12,000$30,000
182Traffic control drums (643.0300)DAY73,547$0.15$0.15$0.15$0.15
183Traffic control barricades type III (643.0420)DAY20,191$0.60$0.60$0.60$0.60
184Traffic control warning lights type A (643.0705)DAY37,027$0.12$0.12$0.12$0.12
185Traffic control warning lights type C (643.0715)DAY10,044$0.14$0.14$0.14$0.14
186Traffic control connected arrow boards (643.0810)DAY177$18.45$18.45$18.45$18.45
187Traffic control signs (643.0900)DAY69,167$0.17$0.17$0.17$0.17
188Traffic control covering signs type I (643.0910)EACH15$250.00$250.00$250.00$250.00
189Traffic control covering signs type II (643.0920)EACH33$115.00$115.00$115.00$115.00
190Traffic control signs fixed message (643.1000)SF372$22.75$22.75$22.75$22.75
191Traffic control signs PCMS (643.1050)DAY315$22.00$22.00$22.00$22.00
192Traffic control connected work zone start and end location markers (643.1220)DAY177$7.45$7.45$7.45$7.45
193Temporary marking line paint 6- inch (643.3165)LF28,276$0.35$0.35$0.35$0.35
194Temporary marking arrow epoxy (643.3520)EACH2$381.00$381.00$381.00$381.00
195Temporary marking stop line paint 18-inch (643.3805)LF36$20.00$20.00$20.00$20.00
196Traffic control (643.5000)EACH1$127,915$127,915$127,915$127,915
197Temporary pedestrian curb ramp (644.1601)DAY50$8.85$8.85$8.85$50.00
198Temporary pedestrian barricade (644.1810)LF11,156$4.40$4.40$4.40$4.40
199Temporary audible message devices (644.1900.S)DAY717$4.25$4.25$4.25$4.25
200Geotextile type DF schedule A (645.0111)SY82$7.00$7.00$7.00$6.40
201Geotextile type HR (645.0120)SY455$8.00$6.00$5.00$4.50
202Marking line epoxy 6-inch (646.2020)LF23,515$0.47$0.47$0.47$0.47
203Marking line grooved wet ref epoxy 6-inch (646.2040)LF125,600$1.41$1.41$1.41$1.41
204Marking line epoxy 8-inch (646.3020)LF28$5.00$5.00$5.00$5.00
205Marking line epoxy 10-inch (646.4020)LF1,007$1.25$1.25$1.25$1.25
206Marking line grooved wet ref epoxy 10-inch (646.4040)LF4,307$2.80$2.80$2.80$2.80
207Marking arrow epoxy (646.5020)EACH33$383.75$383.75$383.75$383.75
208Marking word epoxy (646.5120)EACH12$388.25$388.25$388.25$388.25
209Marking symbol epoxy (646.5220)EACH5$372.70$372.70$372.70$372.70
210Marking stop line epoxy 18-inch (646.6120)LF405$16.00$16.00$16.00$16.00
211Marking dotted extension epoxy 18-inch (646.6320)LF272$16.00$16.00$16.00$16.00
212Marking diagonal epoxy 12-inch (646.7120)LF897$15.65$15.65$15.65$15.65
213Marking chevron epoxy 24-inch (646.7220)LF203$26.40$26.40$26.40$26.40
214Marking crosswalk epoxy transverse line 6-inch (646.7420)LF3,818$15.25$15.25$15.25$15.25
215Marking curb epoxy (646.8120)LF1,619$7.70$7.70$7.70$7.70
216Marking island nose epoxy (646.8220)EACH19$288.50$288.50$288.50$288.50
217Marking parking stall epoxy (646.8320)LF235$6.00$6.00$6.00$6.00
218Marking removal line 4-inch (646.9000)LF561$2.00$2.00$2.00$2.00
219Marking removal line 6-inch (646.9002)LF1,386$2.50$2.50$2.50$2.50
220Marking removal line wide (646.9200)LF24$20.00$20.00$20.00$20.00
221Marking removal special marking water blasting (646.9310)EACH2$950.00$950.00$950.00$950.00
222Construction staking storm sewer (650.4000)EACH106$75.00$75.00$75.00$75.00
223Construction staking subgrade (650.4500)LF20,597$0.01$0.01$0.01$0.01
224Construction staking base (650.5000)LF20,597$0.25$0.25$0.25$0.25
225Construction staking curb gutter and curb & gutter (650.5500)LF18,658$0.65$0.65$0.65$0.65
226Construction staking pipe culverts (650.6000)EACH8$100.00$100.00$100.00$100.00
227Construction staking resurfacing reference (650.8000)LF6,444$0.07$0.07$0.07$0.07
228Construction staking electrical installations (project) 01. 6180-30- 72 (650.8501)EACH1$3,000.00$3,000.00$3,000.00$3,000.00
229Construction staking electrical installations (project) 02. 6180-30- 73 (650.8501)EACH1$2,000.00$2,000.00$2,000.00$2,000.00
230Construction staking curb ramps (650.9000)EACH113$100.00$100.00$100.00$100.00
231Construction staking sidewalk (project) 01. 6180-30-71 (650.9500)EACH1$100.00$100.00$100.00$100.00
232Construction staking sidewalk (project) 02. 6180-31-71 (650.9500)EACH1$100.00$100.00$100.00$100.00
233Construction staking supplemental control (project) 01. 6180-30-71 (650.9911)EACH1$10.00$10.00$10.00$10.00
234Construction staking supplemental control (project) 02. 6180-30-72 (650.9911)EACH1$10.00$10.00$10.00$10.00
235Construction staking supplemental control (project) 03. 6180-30-73 (650.9911)EACH1$10.00$10.00$10.00$10.00
236Construction staking supplemental control (project) 04. 6180-31-71 (650.9911)EACH1$10.00$10.00$10.00$10.00
237Construction staking slope stakes (650.9920)LF20,597$0.80$0.80$0.80$0.80
238Conduit rigid nonmetallic schedule 40 1-inch (652.0210)LF640$7.30$7.30$6.00$6.00
239Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF7,292$8.50$8.50$10.00$10.00
240Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF425$10.13$10.13$14.00$14.00
241Conduit special 3-inch (652.0615)LF1,425$38.40$38.40$28.00$28.00
242Conduit loop detector (652.0800)LF1,816$8.85$8.85$6.00$6.00
243Pull boxes non-conductive 24X42- inch (653.0164)EACH58$2,288.00$2,288.00$1,950.00$1,950.00
244Removing pull boxes (653.0905)EACH41$137.50$137.50$75.00$75.00
245Concrete bases type 1 (654.0101)EACH17$1,075.00$1,075.00$1,350.00$1,350.00
246Concrete bases type 2 (654.0102)EACH2$1,295.00$1,295.00$1,750.00$1,750.00
247Concrete bases type 5 (654.0105)EACH53$1,205.00$1,205.00$1,600.00$1,600.00
248Concrete control cabinet bases type 9 special (654.0217)EACH1$2,925.00$2,925.00$2,200.00$2,200.00
249Concrete control cabinet bases type 10 (654.0220)EACH3$2,365.00$2,365.00$2,200.00$2,200.00
250Cable traffic signal 5-14 AWG (655.0230)LF6,561$2.15$2.15$2.50$2.50
251Cable traffic signal 7-14 AWG (655.0240)LF1,132$2.55$2.55$2.75$2.75
252Cable traffic signal 12-14 AWG (655.0260)LF1,914$3.83$3.83$4.75$4.75
253Cable type UF 2-12 AWG grounded (655.0305)LF1,939$2.66$2.66$2.00$2.00
254Electrical wire traffic signals 10 AWG (655.0515)LF3,461$1.55$1.55$1.00$1.00
255Electrical wire lighting 12 AWG (655.0610)LF8,100$1.23$1.23$0.90$0.90
256Electrical wire lighting 10 AWG (655.0615)LF25,841$1.55$1.55$1.00$1.00
257Loop detector lead in cable (655.0700)LF5,915$2.50$2.50$2.00$2.00
258Loop detector wire (655.0800)LF6,848$1.33$1.33$0.90$0.90
259Traffic signal evp detector cable (655.0900)LF379$1.76$1.76$3.75$3.75
260Electrical service meter breaker pedestal (location) 01. CTH FF/reighmoor RD intersection (656.0201)EACH1$1,975.00$1,975.00$1,950.00$1,950.00
261Electrical service meter breaker pedestal (location) 02. sand pit RD intersection (656.0201)EACH1$1,975.00$1,975.00$1,950.00$1,950.00
262Electrical service meter breaker pedestal (location) 03. S-70-0645 (STH 21 & oakwood) (656.0201)EACH1$1,975.00$1,975.00$1,950.00$1,950.00
263Electrical service meter breaker pedestal (location) 04. STH 21 & leonard point RD (656.0201)EACH1$1,975.00$1,975.00$1,950.00$1,950.00
264Pedestal bases (657.0100)EACH16$277.00$277.00$265.00$265.00
265Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH55$673.50$673.50$600.00$600.00
266Poles type 3 (657.0310)EACH2$4,098.00$4,098.00$3,500.00$3,500.00
267Poles type 5-aluminum (657.0322)EACH53$2,226.50$2,226.50$1,690.00$1,690.00
268Traffic signal standards aluminum 13-FT (657.0420)EACH4$607.50$607.50$545.00$545.00
269Traffic signal standards aluminum 15-FT (657.0425)EACH2$647.50$647.50$580.00$580.00
270Traffic signal standards aluminum 10-FT (657.0430)EACH10$553.50$553.50$503.00$503.00
271Trombone arms 25-FT (657.0595)EACH2$2,054.00$2,054.00$2,295.00$2,295.00
272Luminaire arms truss type 4-inch clamp 12-FT (657.0709)EACH2$718.00$718.00$675.00$675.00
273Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH53$720.00$720.00$675.00$675.00
274Traffic signal face 3S 12-inch (658.0173)EACH8$1,013.50$1,013.50$620.00$620.00
275Traffic signal face 4S 12-inch (658.0174)EACH2$1,433.00$1,433.00$800.00$800.00
276Pedestrian signal face 16-inch (658.0416)EACH16$658.00$658.00$510.00$510.00
277Pedestrian push buttons (658.0500)EACH16$382.00$382.00$480.00$480.00
278Signal mounting hardware (location) 01. STH 21 & oakwood (658.5070)EACH1$3,011.00$3,011.00$2,250.00$2,250.00
279Signal mounting hardware (location) 02. STH 21 & westhaven (658.5070)EACH1$3,011.00$3,011.00$2,250.00$2,250.00
280Luminaires utility LED B (659.1120)EACH55$425.00$425.00$360.00$360.00
281Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH34$12.10$12.10$75.00$75.00
282Temporary traffic signals for intersections (location) 01. leonard point road and omro road (661.0201)EACH2$3,725.00$3,725.00$85,000$3,725.00
283Sawing asphalt (690.0150)LF1,065$1.39$1.39$2.50$1.39
284Sawing concrete (690.0250)LF33,980$2.00$2.00$2.50$2.00
285Incentive iri ride (740.0440)DOL46,140$1.00$1.00$1.00$1.00
286On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,100$5.00$5.00$5.00$5.00
287On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS5,760$5.00$5.00$5.00$5.00
288Special 01. foundation backfill (SPV.0035)CY583$40.00$37.00$28.00$47.50
289Special 01. inlet cover special (SPV.0060)EACH1$830.00$830.00$830.00$1,630.00
290Special 02. inlets 2X2.5-FT special (SPV.0060)EACH6$2,543.00$2,543.00$2,543.00$1,620.00
291Special 03. removing traffic signals STH 21 & oakwood (SPV.0060)EACH1$8,662.50$8,662.50$7,500.00$7,500.00
292Special 04. removing traffic signals STH 21 & westhaven (SPV.0060)EACH1$8,662.50$8,662.50$7,500.00$7,500.00
293Special 05. adjusting sanitary manhole covers (SPV.0060)EACH26$600.00$600.00$600.00$800.00
294Special 06. adjusting water valve boxes (SPV.0060)EACH18$350.00$350.00$350.00$500.00
295Special 07. temporary vehicle detection leonard point RD and omro RD (SPV.0060)EACH1$1,250.00$1,250.00$35,000$1,250.00
296Special 08. removing sign, foundation, and various items - parcel 37 (SPV.0060)EACH1$2,500.00$7,500.00$1,500.00$7,500.00
297Special 01. seeding low maintenance fescue (SPV.0085)LB102$10.00$10.00$10.00$10.00
298Special 01. concrete joint and crack cleaning and repair (SPV.0090)LF23,234$4.35$4.35$4.35$4.35
299Special 02. ditch regrading (SPV.0090)LF965$10.00$10.00$11.71$7.80
300Special 03. concrete curb & gutter 18-inch, type A modified (SPV.0090)LF738$24.00$24.00$24.95$24.00
301Special 04. concrete curb & gutter 30-inch, type D modified (SPV.0090)LF7,520$25.00$25.00$23.65$25.00
302Special 05. concrete curb & gutter 4-inch sloped 30-inch, type R modified (SPV.0090)LF1,018$25.00$25.00$28.40$25.00
303Special 06. concrete curb & gutter 4-inch sloped 36-inch, type D modified (SPV.0090)LF5,814$27.00$27.00$26.25$27.00
304Special 01. excavation, hauling, and disposal of metal contaminated soil (SPV.0195)TON2,200$61.00$61.00$57.56$58.50
WisDOT contract 20251111019: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy