WisDOT contract 20251209007 bid tabulation

Mazomanie - Sun Prairie; Division Street to River Road (STH 019, Dane County Mazomaine - Sun Prairie). Let by Wisconsin DOT on December 9, 2025, Dane. 5 bids received; low bid $7,074,843 by Mashuda Contractors, Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
230
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Mashuda Contractors, Inc.$7,074,843Low
2Payne and Dolan, Inc$7,080,6920.0%
3James Peterson Sons, Inc.$7,415,821+5.0%
4Integrity Grading and Excavating, Inc.$7,557,702+7.0%
5Hoffman Construction Company$7,749,378+10%
WisDOT contract 20251209007: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Mashuda Contractors, Inc.2. Payne and Dolan, Inc3. James Peterson Sons, Inc.4. Integrity Grading and Excavating, Inc.5. Hoffman Construction Company
1Grubbing (201.0210)SY2,156$0.01$3.25$6.28$3.25$3.25
2Removing small pipe culverts (203.0100)EACH11$1,000.00$1,000.00$1,200.00$252.89$850.00
3Removing asphaltic surface (204.0110)SY121$4.00$4.00$20.00$5.41$32.00
4Removing asphaltic surface butt joints (204.0115)SY651$4.60$40.00$12.00$1.96$12.00
5Removing asphaltic surface milling (204.0120)SY62,616$1.23$2.25$2.50$0.89$2.50
6Removing curb & gutter (204.0150)LF3,210$5.40$5.31$3.00$5.04$8.54
7Removing concrete sidewalk (204.0155)SY265$5.94$5.94$25.00$5.88$10.00
8Removing concrete bases (204.0195)EACH17$500.00$500.00$500.00$280.99$300.00
9Removing manholes (204.0210)EACH1$700.00$700.00$500.00$1,293.05$400.00
10Removing inlets (204.0220)EACH10$630.00$626.40$350.00$1,290.85$1,040.00
11Removing storm sewer (size) 01. 12-inch (204.0245)LF305$8.75$8.75$20.00$43.81$12.00
12Excavation common (205.0100)CY36,451$11.05$11.05$13.59$13.95$20.00
13Prepare foundation for asphaltic paving (project) 01. 5290-02-71 (211.0101)EACH1$100.00$6,524.02$33,000$500.00$100.00
14Finishing roadway (project) 01. 5290-02-71 (213.0100)EACH1$1,250.00$100.00$5,000.00$500.00$500.00
15Base aggregate dense 3/4-inch (305.0110)TON1,810$19.66$19.66$34.38$43.24$33.31
16Base aggregate dense 1 1/4-inch (305.0120)TON37,020$15.58$15.58$14.28$18.75$19.22
17Shaping shoulders (305.0500)STA261$35.00$0.01$45.00$148.22$36.00
18Select crushed material (312.0110)TON26,449$15.46$15.46$14.10$16.15$18.00
19Tack coat (455.0605)GAL12,636$2.75$0.01$2.75$2.75$2.75
20HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH3$15,000$1,500.00$15,000$5,000.00$15,000
21HMA percent within limits (PWL) test strip density (460.0110.S)EACH3$15,000$1,500.00$15,000$5,000.00$15,000
22Incentive density HMA pavement (460.2000)DOL15,540$1.00$1.00$1.00$1.00$1.00
23HMA pavement 4 MT 58-28 S (460.6224)TON14,946$75.85$80.00$75.85$75.85$75.85
24HMA pavement 4 MT 58-28 H (460.6424)TON9,760$85.00$85.00$85.00$85.00$85.00
25Asphaltic surface (465.0105)TON896$102.00$90.00$102.00$102.00$102.00
26Asphaltic surface temporary (465.0125)TON882$87.85$95.00$87.85$87.85$87.85
27Asphaltic flumes (465.0315)SY36$25.00$65.00$25.00$25.00$25.00
28Asphaltic rumble strips, shoulder (465.0520)LF25,862$0.25$0.47$0.47$0.25$0.25
29Asphaltic rumble strips, centerline (465.0560)LF10,406$0.44$0.66$1.02$0.44$0.44
30Resin binder high friction surface treatment (490.0100.S)SY7,240$22.55$22.55$22.55$22.55$22.55
31Adhesive anchors no. 4 bar (502.4204)EACH16$32.00$32.00$34.00$34.00$32.00
32Concrete masonry culverts (504.0100)CY1$4,650.00$4,650.00$4,500.00$4,500.00$4,650.00
33Bar steel reinforcement HS structures (505.0400)LB20$20.00$20.00$12.80$12.80$20.00
34Concrete surface repair (509.1500)SF20$52.00$52.00$425.00$425.00$52.00
35Negative pressure containment and collection of waste materials (structure) 01. B-13-188 (517.4501.S)EACH1$24,750$25,000$24,750$24,750$24,750
36Portable decontamination facility (517.6001.S)EACH1$2,000.00$10,000$2,000.00$2,000.00$2,000.00
37Culvert pipe reinforced concrete class III 30-inch (522.0130)LF94$182.75$182.75$272.46$248.12$250.00
38Culvert pipe reinforced concrete class III 36-inch (522.0136)LF95$212.25$212.25$325.50$272.48$275.00
39Culvert pipe reinforced concrete class III 42-inch (522.0142)LF99$264.75$264.75$400.74$298.34$325.00
40Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF100$99.75$99.75$201.39$127.49$190.00
41Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$868.00$868.00$686.00$1,495.23$1,500.00
42Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH1$914.00$914.00$1,237.12$1,541.39$1,900.00
43Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$983.00$983.00$1,358.45$1,610.44$1,700.00
44Apron endwalls for culvert pipe reinforced concrete 21-inch (522.1021)EACH2$1,043.00$1,043.00$1,421.49$1,670.62$1,750.00
45Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$1,139.00$1,139.00$1,548.81$1,739.66$1,800.00
46Apron endwalls for culvert pipe reinforced concrete 27-inch (522.1027)EACH1$1,250.00$1,250.00$1,665.07$1,850.63$2,000.00
47Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH2$1,337.00$1,337.00$1,756.88$2,591.17$2,100.00
48Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH2$1,878.00$1,878.00$2,349.66$3,098.82$2,700.00
49Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH2$2,224.00$2,224.00$2,838.05$3,444.75$3,600.00
50Culvert pipe reinforced concrete horizontal elliptical class HE-III 53X83-inch (522.2353)LF255$612.75$612.75$761.58$548.47$750.00
51Culvert pipe reinforced concrete horizontal elliptical class HE-IV 14X23-inch (522.2414)LF22$146.75$146.75$213.57$219.99$210.00
52Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419)LF88$154.25$154.25$248.36$274.99$230.00
53Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434)LF70$280.75$280.75$410.32$380.88$405.00
54Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 14X23-inch (522.2614)EACH2$1,015.00$1,015.00$1,392.48$2,278.45$1,700.00
55Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619)EACH2$1,208.00$1,208.00$1,621.52$3,715.64$1,900.00
56Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634)EACH2$2,219.00$2,219.00$2,833.40$4,694.02$3,600.00
57Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 53X83-inch (522.2653)EACH6$3,815.00$3,815.00$5,825.52$4,858.07$5,400.00
58Concrete curb & gutter 30-inch type D (601.0411)LF5,605$24.50$24.50$24.50$24.50$24.50
59Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF3,382$23.75$23.75$23.75$23.75$23.75
60Concrete sidewalk 4-inch (602.0405)SF28,652$4.75$4.75$4.75$4.75$4.75
61Concrete sidewalk 5-inch (602.0410)SF1,885$10.50$10.50$10.50$10.50$10.50
62Curb ramp detectable warning field yellow (602.0505)SF70$40.00$40.00$70.00$40.00$40.00
63Riprap light (606.0100)CY43$100.00$100.00$100.00$133.59$160.00
64Riprap medium (606.0200)CY63$80.00$80.00$100.00$133.59$160.00
65Riprap heavy (606.0300)CY14$105.00$105.00$200.00$133.59$180.00
66Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF334$110.75$110.75$118.40$126.50$78.00
67Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF520$88.50$88.50$129.02$129.27$80.00
68Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF51$153.50$153.50$125.68$134.53$84.00
69Storm sewer pipe reinforced concrete class IV 21-inch (608.0421)LF261$126.75$126.75$140.59$140.77$94.00
70Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF74$171.00$171.00$153.26$157.93$110.00
71Storm sewer pipe reinforced concrete class IV 27-inch (608.0427)LF47$203.75$203.75$174.91$175.23$152.00
72Manhole covers type J (611.0530)EACH2$790.00$790.00$1,382.72$735.58$800.00
73Inlet covers type DW (611.0613)EACH2$1,065.00$1,065.00$1,825.12$1,079.14$1,200.00
74Inlet covers type H (611.0624)EACH16$1,050.00$1,050.00$1,711.72$991.09$1,100.00
75Inlet covers type H-S (611.0639)EACH12$1,050.00$1,050.00$1,711.72$991.09$1,100.00
76Catch basins 4-FT diameter (611.1004)EACH1$3,723.00$3,723.00$2,675.71$4,019.99$3,500.00
77Catch basins 6-FT diameter (611.1006)EACH2$6,123.00$6,123.00$5,487.51$6,267.73$6,400.00
78Catch basins 2X3-FT (611.1230)EACH2$2,537.00$2,537.00$1,655.20$3,517.19$2,400.00
79Manholes 4-FT diameter (611.2004)EACH1$2,915.00$2,915.00$2,440.42$3,736.19$3,200.00
80Manholes 6-FT diameter (611.2006)EACH1$5,197.00$5,197.00$4,987.17$5,738.31$7,600.00
81Inlets 4-FT diameter (611.3004)EACH14$3,049.00$3,049.00$2,577.76$3,756.46$3,200.00
82Inlets 2X3-FT (611.3230)EACH11$2,342.00$2,342.00$1,729.47$3,425.06$2,200.00
83Adjusting manhole covers (611.8110)EACH1$1,750.00$1,750.00$818.52$297.45$1,100.00
84Pipe underdrain 6-inch (612.0106)LF326$28.00$28.00$12.33$13.75$24.00
85Maintenance and repair of haul roads (project) 01. 5290-02-71 (618.0100)EACH1$1.00$100.00$1,000.00$500.00$500.00
86Mobilization (619.1000)EACH1$500,000$470,000$401,151$549,230$327,480
87Concrete median blunt nose (620.0200)SF182$27.00$27.00$27.00$27.00$27.00
88Concrete median sloped nose (620.0300)SF573$16.00$16.00$16.00$16.00$16.00
89Water (624.0100)MGAL528$35.00$35.00$60.00$50.50$100.00
90Topsoil (625.0100)SY22,061$3.00$3.00$2.75$4.70$4.50
91Mulching (627.0200)SY172$1.00$1.00$1.00$1.00$1.00
92Silt fence (628.1504)LF10,656$1.95$1.95$1.95$1.95$1.95
93Silt fence maintenance (628.1520)LF10,656$0.01$0.01$0.01$0.01$0.01
94Erosion mat urban class I type A (628.2006)SY394$1.60$1.60$1.60$1.60$1.60
95Erosion mat urban class I type B (628.2008)SY21,847$1.60$1.60$1.60$1.60$1.60
96Erosion mat class II type B (628.2023)SY2,180$1.70$1.70$1.70$1.70$1.70
97Turbidity barriers (628.6005)SY38$60.00$60.00$60.00$60.00$60.00
98Inlet protection type A (628.7005)EACH29$75.00$75.00$75.00$75.00$75.00
99Inlet protection type C (628.7015)EACH16$75.00$75.00$75.00$75.00$75.00
100Inlet protection type D (628.7020)EACH13$120.00$120.00$120.00$120.00$120.00
101Temporary ditch checks (628.7504)LF240$8.50$8.50$8.50$8.50$8.50
102Culvert pipe checks (628.7555)EACH11$18.00$18.00$18.00$18.00$18.00
103Rock bags (628.7570)EACH187$18.00$18.00$18.00$18.00$18.00
104Fertilizer type B (629.0210)CWT1,390$0.01$0.01$0.01$0.01$0.01
105Seeding mixture no. 30 (630.0130)LB993$7.95$7.95$7.95$7.95$7.95
106Seed water (630.0500)MGAL4,953$0.01$0.01$0.01$0.01$0.01
107Shrubs (species, root, size) 01. prunus americana, 9-inch diameter 6-inch depth, 24-inch (632.0201)EACH25$75.00$75.00$75.00$75.00$75.00
108Shrubs (species, root, size) 02. viburnum triobum, 9-inch diameter 6-inch depth, 24-inch (632.0201)EACH25$75.00$75.00$75.00$75.00$75.00
109Markers culvert end (633.5200)EACH21$70.00$70.00$70.00$70.00$70.00
110Posts wood 4X6-inch X 12-FT (634.0612)EACH2$90.00$90.00$90.00$90.00$90.00
111Posts wood 4X6-inch X 14-FT (634.0614)EACH7$90.00$90.00$90.00$90.00$90.00
112Posts wood 4X6-inch X 16-FT (634.0616)EACH50$95.00$95.00$95.00$95.00$95.00
113Signs type II reflective H (637.2210)SF512.50$21.00$21.00$21.00$21.00$21.00
114Signs type II reflective F (637.2230)SF82.25$21.00$21.00$21.00$21.00$21.00
115Moving signs type II (638.2102)EACH18$150.00$150.00$150.00$150.00$150.00
116Removing signs type II (638.2602)EACH70$35.00$35.00$35.00$35.00$35.00
117Removing small sign supports (638.3000)EACH45$35.00$35.00$35.00$35.00$35.00
118Field office type B (642.5001)EACH1$17,500$1,500.00$15,000$15,750$10,000
119Traffic control drums (643.0300)DAY28,125$0.25$0.25$0.35$0.35$0.25
120Traffic control barricades type III (643.0420)DAY4,665$0.75$0.75$1.28$1.25$0.75
121Traffic control flexible tubular marker posts (643.0500)EACH299$24.00$24.00$26.24$26.24$24.00
122Traffic control flexible tubular marker bases (643.0600)EACH299$12.00$12.00$10.80$10.80$12.00
123Traffic control warning lights type A (643.0705)DAY9,320$0.15$0.15$0.23$0.23$0.15
124Traffic control warning lights type C (643.0715)DAY4,478$0.15$0.15$0.23$0.23$0.15
125Traffic control connected arrow boards (643.0810)DAY46$20.00$20.00$26.25$26.25$20.00
126Traffic control signs (643.0900)DAY13,050$0.35$0.35$0.80$0.80$0.35
127Traffic control covering signs type II (643.0920)EACH7$50.00$50.00$83.89$83.89$50.00
128Traffic control signs PCMS (643.1050)DAY135$25.00$25.00$79.85$79.85$25.00
129Temporary marking line epoxy 6- inch (643.3170)LF110,866$0.88$0.89$0.60$0.60$0.86
130Temporary marking line epoxy 10- inch (643.3270)LF4,023$1.50$1.52$1.20$1.20$1.50
131Temporary marking crosswalk epoxy 6-inch (643.3320)LF837$0.90$0.91$17.00$17.00$0.85
132Temporary marking stop line epoxy 18-inch (643.3820)LF633$9.00$9.09$16.00$16.00$9.00
133Traffic control (643.5000)EACH1$10,000$10,000$16,277$16,277$10,000
134Temporary pedestrian surface matting (644.1440)SF1,343$6.99$6.99$14.93$14.93$6.99
135Temporary pedestrian curb ramp (644.1601)DAY44$25.00$25.00$23.02$23.02$25.00
136Temporary pedestrian detectable warning field (644.1605)SF40$10.00$10.00$25.74$25.74$10.00
137Temporary pedestrian barricade (644.1810)LF1,033$5.00$5.00$7.11$7.11$5.00
138Temporary audible message devices (644.1900.S)DAY700$2.22$2.22$1.67$1.67$2.22
139Geotextile type HR (645.0120)SY740$4.00$4.00$2.50$2.05$5.00
140Geotextile type R (645.0130)SY665$5.00$5.00$2.00$1.55$5.00
141Marking line grooved black epoxy 6-inch (646.2025)LF7,055$1.35$1.36$1.10$1.10$1.35
142Marking line grooved wet ref epoxy 6-inch (646.2040)LF68,449$1.30$1.31$1.55$1.55$1.30
143Marking line grooved wet ref epoxy 10-inch (646.4040)LF4,911$3.00$3.03$3.00$3.00$3.00
144Marking arrow epoxy (646.5020)EACH52$225.00$227.27$340.00$340.00$225.00
145Marking word epoxy (646.5120)EACH20$245.00$247.47$440.00$440.00$245.00
146Marking symbol epoxy (646.5220)EACH3$300.00$303.03$330.00$330.00$300.00
147Marking stop line epoxy 18-inch (646.6120)LF382$12.00$12.12$20.00$20.00$12.00
148Marking diagonal epoxy 12-inch (646.7120)LF373$9.50$9.60$19.00$19.00$9.50
149Marking crosswalk epoxy transverse line 6-inch (646.7420)LF445$10.50$10.61$18.00$18.00$10.50
150Marking curb epoxy (646.8120)LF290$7.50$7.58$10.00$10.00$7.50
151Marking island nose epoxy (646.8220)EACH7$275.00$277.78$330.00$330.00$275.00
152Marking removal line 4-inch (646.9000)LF10,468$0.40$0.40$0.35$0.35$0.40
153Marking removal line 8-inch (646.9100)LF492$0.45$0.45$0.75$0.75$0.45
154Marking removal line 10-inch (646.9102)LF733$1.00$1.00$0.77$0.77$1.00
155Marking removal line wide (646.9200)LF590$1.00$1.00$1.20$1.20$1.00
156Marking removal special marking (646.9300)EACH12$50.00$50.00$85.00$85.00$50.00
157Locating no-passing zones (648.0100)MI0.02$50,000$50,505$100,000$100,000$50,000
158Construction staking storm sewer (650.4000)EACH33$200.00$200.00$200.00$200.00$200.00
159Construction staking subgrade (650.4500)LF20,957$0.01$0.01$0.01$0.01$0.50
160Construction staking base (650.5000)LF20,957$0.84$0.84$0.84$0.84$0.84
161Construction staking curb gutter and curb & gutter (650.5500)LF9,019$0.78$0.78$0.78$0.78$0.78
162Construction staking pipe culverts (650.6000)EACH10$200.00$200.00$200.00$200.00$200.00
163Construction staking resurfacing reference (650.8000)LF13,825$0.15$0.15$0.15$0.15$0.15
164Construction staking electrical installations (project) 01. 5290-02- 71 (650.8501)EACH1$1,800.00$1,800.00$1,800.00$1,800.00$1,800.00
165Construction staking curb ramps (650.9000)EACH5$200.00$200.00$200.00$200.00$200.00
166Construction staking sidewalk (project) 01. 5290-02-71 (650.9500)EACH1$900.00$900.00$900.00$900.00$900.00
167Construction staking supplemental control (project) 01. 5290-02-71 (650.9911)EACH1$1,200.00$1,200.00$1,200.00$1,200.00$1,200.00
168Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF8,882$10.00$10.00$10.00$10.00$10.00
169Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF2,921$12.00$12.00$12.00$12.00$12.00
170Conduit special 3-inch (652.0615)LF318$60.00$60.00$60.00$60.00$60.00
171Conduit loop detector (652.0800)LF4,520$8.00$8.00$8.00$8.00$8.00
172Pull boxes non-conductive 24X36- inch (653.0154)EACH37$1,700.00$1,700.00$1,700.00$1,700.00$1,700.00
173Pull boxes non-conductive 24X42- inch (653.0164)EACH27$1,800.00$1,800.00$1,800.00$1,800.00$1,800.00
174Removing pull boxes (653.0905)EACH25$300.00$500.00$250.00$150.00$200.00
175Concrete bases type 1 (654.0101)EACH11$950.00$950.00$950.00$950.00$950.00
176Concrete bases type 10 (654.0110)EACH1$8,000.00$8,000.00$8,000.00$8,000.00$8,000.00
177Concrete bases type 13 (654.0113)EACH1$9,500.00$9,500.00$9,500.00$9,500.00$9,500.00
178Concrete bases type 10-special (654.0120)EACH6$9,500.00$9,500.00$9,500.00$9,500.00$9,500.00
179Concrete control cabinet bases type 9 special (654.0217)EACH2$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00
180Cable traffic signal 5-14 AWG (655.0230)LF2,089$1.25$1.25$1.25$1.25$1.25
181Cable traffic signal 9-14 AWG (655.0250)LF382$1.75$1.75$1.75$1.75$1.75
182Cable traffic signal 12-14 AWG (655.0260)LF3,094$2.50$2.50$2.50$2.50$2.50
183Cable type UF 2-12 AWG grounded (655.0305)LF1,430$1.50$1.50$1.50$1.50$1.50
184Electrical wire traffic signals 10 AWG (655.0515)LF1,384$1.10$1.10$1.10$1.10$1.10
185Electrical wire lighting 12 AWG (655.0610)LF1,056$1.00$1.00$1.00$1.00$1.00
186Loop detector lead in cable (655.0700)LF5,688$1.25$1.25$1.25$1.25$1.25
187Loop detector wire (655.0800)LF9,668$1.00$1.00$1.00$1.00$1.00
188Electrical service meter breaker pedestal (location) 01. STH 19 & division street, STH 19 & raemisch road (656.0201)EACH2$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00
189Pedestal bases (657.0100)EACH11$260.00$260.00$260.00$260.00$260.00
190Poles type 9-special (657.0347)EACH1$10,500$10,500$10,500$10,500$10,500
191Poles type 10 (657.0350)EACH1$10,000$10,000$10,000$10,000$10,000
192Poles type 10-special (657.0352)EACH5$14,500$14,500$14,500$14,500$14,500
193Poles type 13 (657.0360)EACH1$18,000$18,000$18,000$18,000$18,000
194Traffic signal standards aluminum 15-FT (657.0425)EACH8$750.00$750.00$750.00$750.00$750.00
195Traffic signal standards aluminum 10-FT (657.0430)EACH3$625.00$625.00$625.00$625.00$625.00
196Monotube arms 30-FT (657.0530)EACH1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
197Monotube arms 35-FT-special (657.0536)EACH3$4,500.00$4,500.00$4,500.00$4,500.00$4,500.00
198Monotube arms 40-FT-special (657.0541)EACH1$4,750.00$4,750.00$4,750.00$4,750.00$4,750.00
199Monotube arms 45-FT-special (657.0546)EACH2$4,875.00$4,875.00$4,875.00$4,875.00$4,875.00
200Monotube arms 55-FT (657.0555)EACH1$15,500$15,500$15,500$15,500$15,500
201Luminaire arms steel 15-FT (657.0815)EACH7$840.00$840.00$840.00$840.00$840.00
202Traffic signal face 3S 12-inch (658.0173)EACH31$725.00$725.00$725.00$725.00$725.00
203Traffic signal face 4S 12-inch (658.0174)EACH8$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00
204Pedestrian signal face 16-inch (658.0416)EACH6$500.00$500.00$500.00$500.00$500.00
205Pedestrian push buttons (658.0500)EACH6$360.00$360.00$360.00$360.00$360.00
206Signal mounting hardware (location) 01. STH 19 and division street (658.5070)EACH1$7,500.00$7,500.00$7,500.00$7,500.00$7,500.00
207Signal mounting hardware (location) 02. STH 19 and raemisch road (658.5070)EACH1$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00
208Luminaires utility LED C (659.1125)EACH7$770.00$770.00$770.00$1,100.00$770.00
209Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH1$400.00$400.00$400.00$400.00$400.00
210Temporary traffic signals for intersections (location) 01. STH 19 and division street (661.0201)EACH1$60,000$60,000$60,000$60,000$60,000
211Temporary traffic signals for intersections (location) 02. STH 19 and schumacher road/raemsich road (661.0201)EACH1$60,000$60,000$60,000$60,000$60,000
212Install fiber optic cable outdoor plant 12-CT (678.0012)LF2,900$3.00$3.00$3.00$3.00$3.00
213Fiber optic termination (678.0400)EACH2$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00
214Sawing asphalt (690.0150)LF6,770$1.10$1.11$1.10$1.10$1.10
215Sawing concrete (690.0250)LF17$2.25$2.27$2.25$2.25$2.25
216Incentive iri ride (740.0440)DOL16,720$1.00$1.00$1.00$1.00$1.00
217On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00
218On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,200$5.00$5.00$5.00$5.00$5.00
219Special 01. utility line opening (ulo) (SPV.0060)EACH3$1,000.00$1,000.00$800.00$1,137.28$1,500.00
220Special 02. removing traffic signals (STH 19 and division street) (SPV.0060)EACH1$3,500.00$3,500.00$3,500.00$3,500.00$3,500.00
221Special 03. removing traffic signals (STH 19 and raemisch road) (SPV.0060)EACH1$3,500.00$3,500.00$3,500.00$3,500.00$3,500.00
222Special 04. railing repainting recycle abrasive, B-13-188 (SPV.0060)EACH1$41,250$20,000$41,250$41,250$41,250
223Special 05. salvage transformer bases breakaway 11 1/2-inch bolt circle (SPV.0060)EACH7$50.00$50.00$50.00$50.00$50.00
224Special 06. retroreflective backplate 3S (SPV.0060)EACH12$140.00$140.00$140.00$140.00$140.00
225Special 07. retroreflective backplate 4S (SPV.0060)EACH8$180.00$180.00$180.00$180.00$180.00
226Special 08. landmark reference monuments special (SPV.0060)EACH4$900.00$900.00$900.00$900.00$900.00
227Special 01. install state-supplied non-intrusive detection cable (SPV.0090)LF1,699$1.00$1.00$1.00$1.00$1.00
228Special 02. joint and crack plunge milling and patching (SPV.0090)LF395$17.02$30.00$50.00$17.02$50.00
229Special 03. concrete joint and crack cleaning (SPV.0090)LF395$12.34$15.00$50.00$1.00$50.00
230Special 01. removing distressed pavement milling (SPV.0180)SY6,262$4.42$6.00$6.00$1.96$6.00
WisDOT contract 20251209007: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy