WisDOT contract 20251209041 bid tabulation

Siren - Danbury; Lanquist St to STH 70 E (STH 035, Burnett County Lanquist St - STH 70 E). Let by Wisconsin DOT on December 9, 2025, Burnett. 4 bids received; low bid $8,550,353 by Chippewa Concrete Services, Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
219
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Chippewa Concrete Services, Inc.$8,550,353Low
2James Peterson Sons, Inc.$9,021,354+6.0%
3Haas Sons, Inc.$9,597,544+12%
4Stout Construction, Inc.$10,127,114+18%
WisDOT contract 20251209041: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Chippewa Concrete Services, Inc.2. James Peterson Sons, Inc.3. Haas Sons, Inc.4. Stout Construction, Inc.
1Clearing (201.0105)STA2$2,095.08$1,132.00$820.00$300.00
2Grubbing (201.0205)STA2$1,287.15$2,000.00$820.00$360.00
3Removing concrete pavement (204.0100)SY1,290$11.76$8.76$10.15$9.50
4Removing asphaltic surface (204.0110)SY1,765$5.86$7.22$4.15$5.60
5Removing asphaltic surface butt joints (204.0115)SY700$22.80$22.57$22.57$28.95
6Removing asphaltic surface milling (204.0120)SY73,760$4.42$4.38$4.38$4.60
7Removing curb & gutter (204.0150)LF7,025$2.98$3.50$8.05$2.55
8Removing concrete sidewalk (204.0155)SY1,440$4.95$8.07$8.50$5.35
9Removing guardrail (204.0165)LF920$3.03$3.00$3.00$3.15
10Removing surface drains (204.0190)EACH1$388.85$1,250.00$682.00$260.00
11Removing concrete bases (204.0195)EACH11$181.80$500.00$460.00$200.00
12Removing manholes (204.0210)EACH7$304.52$500.00$682.00$1,025.00
13Removing inlets (204.0220)EACH21$277.44$400.00$550.00$650.00
14Removing storm sewer (size) 01. 12-inch (204.0245)LF625$6.42$21.85$35.50$30.00
15Removing storm sewer (size) 02. 18-inch (204.0245)LF915$8.39$22.48$24.50$14.25
16Removing storm sewer (size) 03. 21-inch (204.0245)LF40$9.25$23.18$35.50$34.50
17Removing storm sewer (size) 04. 24-inch (204.0245)LF16$9.34$23.97$72.00$78.00
18Removing storm sewer (size) 05. 36-inch (204.0245)LF705$9.91$26.99$25.50$18.75
19Removing (item description) 01. removing electrical conductors from existing conduit (204.9090.S)LF1,265$1.01$1.00$1.00$1.05
20Removing (item description) 02. removing or abandoning conduit (204.9090.S)LF840$3.03$3.00$3.00$3.15
21Excavation common (205.0100)CY17,263$12.80$16.72$22.50$31.55
22Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON6,900$52.81$51.73$51.75$60.00
23Prepare foundation for asphaltic paving (project) 01. 8010-01-79 (211.0101)EACH1$38,986$38,600$38,600$189,500
24Finishing roadway (project) 01. 8010-01-79 (213.0100)EACH1$5,050.00$5,000.00$15,300$119,000
25Base aggregate dense 3/4-inch (305.0110)TON1,430$25.28$27.48$28.40$24.75
26Base aggregate dense 1 1/4-inch (305.0120)TON12,110$22.00$23.41$22.02$23.75
27Shaping shoulders (305.0500)STA200$75.49$30.00$283.00$130.00
28Concrete pavement 8-inch (415.0080)SY17,805$68.39$67.71$67.71$81.85
29Concrete pavement gaps (415.0210)EACH14$1,515.00$1,500.00$1,500.00$900.00
30Concrete pavement hes 8-inch (415.1080)SY420$81.49$80.68$80.68$84.95
31Concrete pavement joint filling (415.4100)SY19,519$3.08$3.05$3.05$2.50
32Tack coat (455.0605)GAL10,985$3.73$3.69$3.69$3.85
33HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$8,282.00$8,200.00$8,200.00$8,600.00
34HMA percent within limits (PWL) test strip density (460.0110.S)EACH1$2,242.20$2,220.00$2,220.00$2,325.00
35Incentive density PWL HMA pavement (460.2005)DOL7,826$1.00$1.00$1.00$1.00
36Incentive density HMA pavement longitudinal joints (460.2007)DOL6,682$1.00$1.00$1.00$1.00
37Incentive air voids HMA pavement (460.2010)DOL13,821$1.00$1.00$1.00$1.00
38HMA pavement 4 MT 58-34 S (460.6244)TON894$161.05$159.46$159.46$188.00
39HMA pavement 5 MT 58-34 S (460.6245)TON13,938$125.71$124.47$124.47$131.00
40Material transfer vehicle (460.9000.S)EACH1$28,886$28,600$28,600$30,000
41Asphaltic surface (465.0105)TON66$361.91$358.33$358.33$376.25
42Asphaltic surface patching (465.0110)TON150$158.59$157.02$157.02$165.00
43Asphaltic surface driveways and field entrances (465.0120)TON72$272.29$269.59$269.59$390.00
44Asphaltic surface temporary (465.0125)TON950$160.12$158.53$158.53$200.00
45Asphaltic curb (465.0310)LF710$9.09$14.06$9.00$22.35
46Asphaltic rumble strips, shoulder (465.0520)LF16,450$0.27$0.27$0.55$0.30
47Concrete collars for pipe (520.8000)EACH3$1,188.87$587.00$1,900.00$650.00
48Cleaning culvert pipes (520.8700)EACH2$1,010.00$1,000.00$1,000.00$1,050.00
49Concrete curb & gutter 30-inch type A (601.0409)LF4,065$24.04$23.80$23.80$36.10
50Concrete curb & gutter 30-inch type D (601.0411)LF850$31.21$30.90$30.90$40.80
51Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF190$41.53$41.12$41.12$51.65
52Concrete curb pedestrian (601.0600)LF226$41.87$41.46$41.46$78.35
53Concrete sidewalk 4-inch (602.0405)SF17,395$9.07$8.98$8.98$6.35
54Curb ramp detectable warning field yellow (602.0505)SF380$62.62$62.00$62.00$57.30
55Curb ramp detectable warning field radial yellow (602.0605)SF35$66.66$66.00$66.00$89.75
56Concrete driveway 6-inch (602.0810)SY1,100$64.02$63.39$63.39$71.15
57Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF12$145.17$237.81$208.34$259.00
58Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF376$208.63$250.10$221.84$157.00
59Storm sewer pipe reinforced concrete class III 42-inch (608.0342)LF1,306$246.52$326.30$287.85$216.75
60Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF883$97.95$106.33$135.43$96.35
61Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF122$93.85$115.85$119.55$158.10
62Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF71$103.92$121.06$139.45$208.00
63Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF55$142.16$148.54$166.61$170.50
64Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF417$171.72$179.10$186.18$149.15
65Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424)LF154$223.01$241.41$249.43$201.15
66Storm sewer pipe class III-A 12- inch (608.3012)LF944$71.90$107.20$79.48$57.15
67Storm sewer pipe class III-A 18- inch (608.3018)LF145$86.16$113.33$99.95$90.00
68Storm sewer pipe class III-A 30- inch (608.3030)LF401$99.54$129.40$111.37$100.00
69Reconstructing manholes (611.0420)EACH5$979.10$1,186.00$4,160.00$4,200.00
70Reconstructing inlets (611.0430)EACH2$946.46$1,118.00$3,400.00$2,100.00
71Manhole covers type J (611.0530)EACH16$752.68$1,102.00$1,170.00$925.00
72Inlet covers type B (611.0606)EACH1$1,161.21$1,621.00$1,512.00$1,285.00
73Inlet covers type C (611.0612)EACH4$793.97$1,102.00$1,204.00$960.00
74Inlet covers type H (611.0624)EACH16$1,109.07$1,497.00$1,022.00$1,175.00
75Inlet covers type H-S (611.0639)EACH33$1,109.07$1,497.00$1,022.00$1,175.00
76Manholes 4-FT diameter (611.2004)EACH3$4,034.25$2,827.00$4,358.00$3,075.00
77Manholes 5-FT diameter (611.2005)EACH3$5,259.13$4,352.00$5,724.00$4,175.00
78Manholes 6-FT diameter (611.2006)EACH12$9,166.76$7,932.00$8,700.00$7,355.00
79Manholes 7-FT diameter (611.2007)EACH2$12,275$12,330$12,166$10,850
80Inlets 3-FT diameter (611.3003)EACH1$2,388.94$1,530.00$3,258.00$1,885.00
81Inlets 4-FT diameter (611.3004)EACH11$3,386.37$2,453.00$4,150.00$2,865.00
82Inlets 2X3-FT (611.3230)EACH35$2,717.05$1,876.00$3,576.00$2,125.00
83Adjusting manhole covers (611.8110)EACH17$329.90$628.00$2,252.00$765.00
84Adjusting inlet covers (611.8115)EACH5$344.11$742.00$2,000.00$765.00
85Cover plates temporary (611.8120.S)EACH6$502.26$371.00$106.00$350.00
86Fence safety (616.0700.S)LF250$7.07$7.00$7.00$7.35
87Maintenance and repair of haul roads (project) 01. 8010-01-79 (618.0100)EACH1$1,212.00$150.00$250.00$30,750
88Mobilization (619.1000)EACH1$550,955$714,410$918,000$850,250
89Water (624.0100)MGAL265$10.10$45.00$1.00$47.55
90Topsoil (625.0100)SY12,765$6.65$9.21$12.99$9.70
91Mulching (627.0200)SY8,800$0.39$0.39$0.39$0.40
92Silt fence (628.1504)LF4,500$2.02$2.00$2.00$2.10
93Silt fence maintenance (628.1520)LF22,500$0.03$0.03$0.03$0.03
94Mobilizations erosion control (628.1905)EACH10$235.33$233.00$233.00$245.00
95Mobilizations emergency erosion control (628.1910)EACH10$356.53$353.00$353.00$370.00
96Erosion mat urban class I type A (628.2006)SY5,665$1.77$1.75$1.75$1.85
97Erosion mat urban class I type B (628.2008)SY13,050$1.77$1.75$1.75$1.85
98Inlet protection type A (628.7005)EACH57$126.25$125.00$125.00$130.00
99Inlet protection type B (628.7010)EACH4$70.70$70.00$70.00$70.00
100Inlet protection type C (628.7015)EACH83$65.65$65.00$65.00$75.00
101Temporary ditch checks (628.7504)LF910$6.06$6.00$6.00$6.30
102Culvert pipe checks (628.7555)EACH26$25.25$25.00$25.00$26.25
103Fertilizer type A (629.0205)CWT30$95.95$95.00$95.00$99.75
104Seeding mixture no. 30 (630.0130)LB711$7.20$7.13$7.13$7.50
105Seeding mixture no. 40 (630.0140)LB375$8.01$7.93$7.93$8.35
106Seeding borrow pit (630.0300)LB335$5.38$5.33$5.33$5.60
107Seed water (630.0500)MGAL630$5.05$5.00$5.00$5.25
108Posts wood 4X6-inch X 14-FT (634.0614)EACH8$98.98$98.00$98.00$102.90
109Posts wood 4X6-inch X 16-FT (634.0616)EACH8$103.02$102.00$102.00$107.10
110Posts wood 4X6-inch X 18-FT (634.0618)EACH8$106.05$105.00$105.00$110.25
111Signs type II reflective H (637.2210)SF194.25$21.21$21.00$21.00$22.05
112Signs type II reflective H folding (637.2215)SF29.84$50.50$50.00$50.00$52.50
113Signs type II reflective F (637.2230)SF20.75$25.25$25.00$25.00$26.25
114Moving signs type II (638.2102)EACH94$75.75$75.00$75.00$78.75
115Removing signs type II (638.2602)EACH29$25.25$25.00$25.00$26.25
116Removing small sign supports (638.3000)EACH20$25.25$25.00$25.00$26.25
117Moving small sign supports (638.4000)EACH66$75.75$75.00$75.00$78.75
118Field office type C (642.5201)EACH1$7,575.00$12,000$31,500$10,500
119Traffic control drums (643.0300)DAY59,200$0.15$0.15$0.35$0.20
120Temporary tape rumble strip orange (643.0320.S)LF288$11.36$11.25$2.25$11.85
121Traffic control barricades type III (643.0420)DAY7,876$0.51$0.50$1.00$0.55
122Traffic control warning lights type A (643.0705)DAY15,800$0.12$0.12$1.00$0.15
123Traffic control warning lights type C (643.0715)DAY3,880$0.19$0.19$1.00$0.20
124Traffic control connected arrow boards (643.0810)DAY430$6.06$6.00$25.00$6.30
125Traffic control signs (643.0900)DAY143,000$0.17$0.17$0.25$0.20
126Traffic control covering signs type II (643.0920)EACH20$111.10$110.00$30.00$115.50
127Traffic control signs fixed message (643.1000)SF72$24.75$24.50$22.00$25.75
128Traffic control signs PCMS (643.1050)DAY196$25.25$25.00$50.00$26.25
129Traffic control connected work zone start and end location markers (643.1220)DAY430$4.29$4.25$12.50$4.50
130Temporary marking line paint 6- inch (643.3165)LF112,935$0.37$0.37$0.30$0.40
131Temporary marking crosswalk paint 6-inch (643.3305)LF1,113$3.54$3.50$1.20$3.70
132Temporary marking stop line paint 18-inch (643.3805)LF225$3.94$3.90$5.00$4.10
133Traffic control (643.5000)EACH1$140,037$138,650$79,000$162,000
134Temporary pedestrian surface asphalt (644.1410)SF2,460$9.08$13.99$8.99$9.45
135Temporary pedestrian surface matting (644.1440)SF305$3.54$3.50$6.50$3.70
136Temporary pedestrian curb ramp (644.1601)DAY235$11.11$11.00$12.00$11.55
137Temporary pedestrian detectable warning field (644.1605)SF210$4.24$4.20$9.90$4.40
138Temporary pedestrian barricade (644.1810)LF8,500$7.58$7.50$6.00$7.90
139Temporary audible message devices (644.1900.S)DAY1,970$3.79$3.75$8.50$3.95
140Marking line grooved black epoxy 6-inch (646.2025)LF2,293$1.41$1.40$1.40$1.10
141Marking line grooved wet ref epoxy 6-inch (646.2040)LF53,575$1.78$1.76$1.76$1.80
142Marking line grooved wet ref epoxy 10-inch (646.4040)LF3,476$3.69$3.65$3.65$3.60
143Marking arrow epoxy (646.5020)EACH92$348.45$345.00$345.00$490.00
144Marking word epoxy (646.5120)EACH14$358.55$355.00$355.00$490.00
145Marking stop line epoxy 18-inch (646.6120)LF568$25.25$25.00$25.00$20.40
146Marking diagonal epoxy 12-inch (646.7120)LF1,388$8.33$8.25$8.25$19.85
147Marking crosswalk epoxy transverse line 6-inch (646.7420)LF2,408$14.14$14.00$14.00$19.40
148Marking parking stall epoxy (646.8320)LF225$22.22$22.00$22.00$6.65
149Marking removal line 6-inch (646.9002)LF12,851$1.41$0.60$0.44$0.65
150Marking removal line 10-inch (646.9102)LF113$2.88$0.55$2.00$0.60
151Marking removal line wide (646.9200)LF253$4.34$3.30$5.00$3.50
152Marking removal special marking (646.9300)EACH108$60.60$82.65$50.00$90.00
153Construction staking storm sewer (650.4000)EACH81$70.70$300.00$300.00$315.00
154Construction staking subgrade (650.4500)LF7,878$0.45$0.01$0.01$0.55
155Construction staking base (650.5000)LF875$0.51$2.00$2.00$2.10
156Construction staking curb gutter and curb & gutter (650.5500)LF1,040$1.41$2.00$2.00$2.10
157Construction staking concrete pavement (650.7000)LF3,217$5.56$5.00$5.00$5.25
158Construction staking resurfacing reference (650.8000)LF18,384$0.10$0.15$0.15$0.20
159Construction staking electrical installations (project) 01. STH 35 & STH 70 west JCT./CTH B (650.8501)EACH1$3,030.00$5,000.00$5,000.00$5,250.00
160Construction staking curb ramps (650.9000)EACH31$353.50$125.00$125.00$131.25
161Construction staking sidewalk (project) 01. 8010-01-79 (650.9500)EACH1$2,525.00$5,000.00$5,000.00$5,250.00
162Construction staking supplemental control (project) 01. 8010-01-79 (650.9911)EACH1$2,525.00$15,000$15,000$63,175
163Construction staking slope stakes (650.9920)LF7,878$0.40$1.00$1.00$1.05
164Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,430$12.12$12.00$12.00$12.60
165Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,129$15.15$15.00$15.00$15.75
166Conduit rigid nonmetallic schedule 80 2-inch (652.0325)LF420$13.13$13.00$13.00$13.65
167Conduit loop detector (652.0800)LF1,514$10.10$10.00$10.00$10.50
168Pull boxes non-conductive 24X36- inch (653.0154)EACH4$2,020.00$2,000.00$2,000.00$2,100.00
169Pull boxes non-conductive 24X42- inch (653.0164)EACH15$2,121.00$2,100.00$2,100.00$2,205.00
170Removing pull boxes (653.0905)EACH12$101.00$100.00$100.00$105.00
171Concrete bases type 1 (654.0101)EACH8$1,464.50$1,450.00$1,450.00$1,525.00
172Concrete bases type 5 (654.0105)EACH1$2,727.00$2,700.00$2,700.00$2,835.00
173Concrete bases type 10-special (654.0120)EACH4$13,231$13,100$13,100$13,755
174Concrete control cabinet bases type 9 special (654.0217)EACH1$3,939.00$3,900.00$3,900.00$4,095.00
175Cable traffic signal 5-14 AWG (655.0230)LF923$4.04$4.00$4.00$4.20
176Cable traffic signal 7-14 AWG (655.0240)LF858$5.05$5.00$5.00$5.25
177Cable traffic signal 12-14 AWG (655.0260)LF1,664$5.56$5.50$5.50$5.80
178Cable type UF 2-12 AWG grounded (655.0305)LF658$3.03$3.00$3.00$3.15
179Electrical wire traffic signals 10 AWG (655.0515)LF1,395$1.26$1.25$1.25$1.35
180Electrical wire lighting 12 AWG (655.0610)LF620$1.01$1.00$1.00$1.05
181Loop detector lead in cable (655.0700)LF4,486$1.52$1.50$1.50$1.60
182Loop detector wire (655.0800)LF4,758$1.26$1.25$1.25$1.30
183Traffic signal evp detector cable (655.0900)LF827$2.12$2.10$2.10$2.25
184Electrical service meter breaker pedestal (location) 01. STH 35 & STH 70 west JCT./CTH B (656.0201)EACH1$3,181.50$3,150.00$3,150.00$3,300.00
185Pedestal bases (657.0100)EACH8$378.75$375.00$375.00$400.00
186Poles type 10-special (657.0352)EACH4$15,150$15,000$15,000$15,750
187Traffic signal standards aluminum 15-FT (657.0425)EACH4$909.00$900.00$900.00$945.00
188Traffic signal standards aluminum 10-FT (657.0430)EACH4$858.50$850.00$850.00$900.00
189Monotube arms 35-FT-special (657.0536)EACH2$7,070.00$7,000.00$7,000.00$7,350.00
190Monotube arms 45-FT-special (657.0546)EACH2$8,080.00$8,000.00$8,000.00$8,400.00
191Luminaire arms steel 8-FT (657.0808)EACH2$1,818.00$1,800.00$1,800.00$1,890.00
192Luminaire arms steel 15-FT (657.0815)EACH2$1,969.50$1,950.00$1,950.00$2,050.00
193Traffic signal face 3S 12-inch (658.0173)EACH12$1,121.10$1,110.00$1,110.00$1,165.00
194Traffic signal face 4S 12-inch (658.0174)EACH8$1,515.00$1,500.00$1,500.00$1,575.00
195Pedestrian signal face 16-inch (658.0416)EACH8$616.10$610.00$610.00$640.00
196Signal mounting hardware (location) 01. STH 35 & STH 70 west JCT./CTH B (658.5070)EACH1$7,575.00$7,500.00$7,500.00$7,875.00
197Luminaires utility LED C (659.1125)EACH4$505.00$500.00$500.00$525.00
198Lamp, ballast, LED, switch disposal by contractor 01. STH 35 & STH 70 west JCT./CTH B (659.5000.S)EACH4$60.60$60.00$60.00$63.00
199Temporary traffic signals for intersections (location) 01. STH 35 & STH 70 west JCT./CTH B (661.0201)EACH1$90,678$89,780$89,780$94,275
200Sawing asphalt (690.0150)LF9,645$1.83$1.81$1.81$2.15
201Sawing concrete (690.0250)LF1,820$3.02$2.99$2.99$3.40
202Incentive flexural strength concrete pavement (715.0715)DOL5,470$1.00$1.00$1.00$1.00
203Incentive iri ride (740.0440)DOL12,572$1.00$1.00$1.00$1.00
204On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,500$5.00$5.00$5.00$5.00
205On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,000$5.00$5.00$5.00$5.00
206Special 01. project concrete crack mitigation and repair (SPV.0060)EACH1$5,050.00$5,000.00$5,000.00$1,050.00
207Special 02. adjusting water valve (SPV.0060)EACH22$404.00$200.00$1,275.00$300.00
208Special 04. reconnect storm sewer laterals (SPV.0060)EACH7$1,457.43$889.00$1,414.00$1,785.00
209Special 21. install state furnished APS push buttons (SPV.0060)EACH8$151.50$150.00$150.00$160.00
210Special 22. install state furnished evp system (STH 35 & STH 70 west JCT./CTH B) (SPV.0060)EACH1$1,262.50$1,250.00$1,250.00$1,315.00
211Special 24. remove, salvage, disassemble, and deliever aboveground equipment (SPV.0060)EACH1$7,070.00$7,000.00$7,000.00$7,350.00
212Special 50. remove & salvage street lighting unit (SPV.0060)EACH1$353.50$350.00$350.00$375.00
213Special 51. reinstall salvaged street lighting unit (SPV.0060)EACH1$959.50$950.00$950.00$1,000.00
214Special 01. concrete curb & gutter 30-inch special (SPV.0090)LF2,090$43.54$43.11$43.11$35.85
215Special 02. cure and seal treatment, curb and gutter (SPV.0090)LF7,195$0.45$0.45$0.45$1.05
216Special 03. ditch cleaning (SPV.0090)LF4,500$6.13$7.84$22.75$4.70
217Special 50. furnish and install equivalent lighting conductors (SPV.0090)LF1,595$2.53$2.50$2.50$2.65
218Special 51. install state furnished CAT5E cable (SPV.0090)LF76$1.01$1.00$1.00$1.05
219Special 01. cure and seal treatment, sidewalk and driveways (SPV.0165)SF27,410$0.15$0.15$0.15$0.30
WisDOT contract 20251209041: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy