WisDOT contract 20251209041 bid tabulation
Siren - Danbury; Lanquist St to STH 70 E (STH 035, Burnett County Lanquist St - STH 70 E). Let by Wisconsin DOT on December 9, 2025, Burnett. 4 bids received; low bid $8,550,353 by Chippewa Concrete Services, Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 219
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chippewa Concrete Services, Inc. | $8,550,353 | Low |
| 2 | James Peterson Sons, Inc. | $9,021,354 | +6.0% |
| 3 | Haas Sons, Inc. | $9,597,544 | +12% |
| 4 | Stout Construction, Inc. | $10,127,114 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chippewa Concrete Services, Inc. | 2. James Peterson Sons, Inc. | 3. Haas Sons, Inc. | 4. Stout Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 2 | $2,095.08 | $1,132.00 | $820.00 | $300.00 |
| 2 | Grubbing (201.0205) | STA | 2 | $1,287.15 | $2,000.00 | $820.00 | $360.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 1,290 | $11.76 | $8.76 | $10.15 | $9.50 |
| 4 | Removing asphaltic surface (204.0110) | SY | 1,765 | $5.86 | $7.22 | $4.15 | $5.60 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 700 | $22.80 | $22.57 | $22.57 | $28.95 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 73,760 | $4.42 | $4.38 | $4.38 | $4.60 |
| 7 | Removing curb & gutter (204.0150) | LF | 7,025 | $2.98 | $3.50 | $8.05 | $2.55 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 1,440 | $4.95 | $8.07 | $8.50 | $5.35 |
| 9 | Removing guardrail (204.0165) | LF | 920 | $3.03 | $3.00 | $3.00 | $3.15 |
| 10 | Removing surface drains (204.0190) | EACH | 1 | $388.85 | $1,250.00 | $682.00 | $260.00 |
| 11 | Removing concrete bases (204.0195) | EACH | 11 | $181.80 | $500.00 | $460.00 | $200.00 |
| 12 | Removing manholes (204.0210) | EACH | 7 | $304.52 | $500.00 | $682.00 | $1,025.00 |
| 13 | Removing inlets (204.0220) | EACH | 21 | $277.44 | $400.00 | $550.00 | $650.00 |
| 14 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 625 | $6.42 | $21.85 | $35.50 | $30.00 |
| 15 | Removing storm sewer (size) 02. 18-inch (204.0245) | LF | 915 | $8.39 | $22.48 | $24.50 | $14.25 |
| 16 | Removing storm sewer (size) 03. 21-inch (204.0245) | LF | 40 | $9.25 | $23.18 | $35.50 | $34.50 |
| 17 | Removing storm sewer (size) 04. 24-inch (204.0245) | LF | 16 | $9.34 | $23.97 | $72.00 | $78.00 |
| 18 | Removing storm sewer (size) 05. 36-inch (204.0245) | LF | 705 | $9.91 | $26.99 | $25.50 | $18.75 |
| 19 | Removing (item description) 01. removing electrical conductors from existing conduit (204.9090.S) | LF | 1,265 | $1.01 | $1.00 | $1.00 | $1.05 |
| 20 | Removing (item description) 02. removing or abandoning conduit (204.9090.S) | LF | 840 | $3.03 | $3.00 | $3.00 | $3.15 |
| 21 | Excavation common (205.0100) | CY | 17,263 | $12.80 | $16.72 | $22.50 | $31.55 |
| 22 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 6,900 | $52.81 | $51.73 | $51.75 | $60.00 |
| 23 | Prepare foundation for asphaltic paving (project) 01. 8010-01-79 (211.0101) | EACH | 1 | $38,986 | $38,600 | $38,600 | $189,500 |
| 24 | Finishing roadway (project) 01. 8010-01-79 (213.0100) | EACH | 1 | $5,050.00 | $5,000.00 | $15,300 | $119,000 |
| 25 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,430 | $25.28 | $27.48 | $28.40 | $24.75 |
| 26 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 12,110 | $22.00 | $23.41 | $22.02 | $23.75 |
| 27 | Shaping shoulders (305.0500) | STA | 200 | $75.49 | $30.00 | $283.00 | $130.00 |
| 28 | Concrete pavement 8-inch (415.0080) | SY | 17,805 | $68.39 | $67.71 | $67.71 | $81.85 |
| 29 | Concrete pavement gaps (415.0210) | EACH | 14 | $1,515.00 | $1,500.00 | $1,500.00 | $900.00 |
| 30 | Concrete pavement hes 8-inch (415.1080) | SY | 420 | $81.49 | $80.68 | $80.68 | $84.95 |
| 31 | Concrete pavement joint filling (415.4100) | SY | 19,519 | $3.08 | $3.05 | $3.05 | $2.50 |
| 32 | Tack coat (455.0605) | GAL | 10,985 | $3.73 | $3.69 | $3.69 | $3.85 |
| 33 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $8,282.00 | $8,200.00 | $8,200.00 | $8,600.00 |
| 34 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $2,242.20 | $2,220.00 | $2,220.00 | $2,325.00 |
| 35 | Incentive density PWL HMA pavement (460.2005) | DOL | 7,826 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 6,682 | $1.00 | $1.00 | $1.00 | $1.00 |
| 37 | Incentive air voids HMA pavement (460.2010) | DOL | 13,821 | $1.00 | $1.00 | $1.00 | $1.00 |
| 38 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 894 | $161.05 | $159.46 | $159.46 | $188.00 |
| 39 | HMA pavement 5 MT 58-34 S (460.6245) | TON | 13,938 | $125.71 | $124.47 | $124.47 | $131.00 |
| 40 | Material transfer vehicle (460.9000.S) | EACH | 1 | $28,886 | $28,600 | $28,600 | $30,000 |
| 41 | Asphaltic surface (465.0105) | TON | 66 | $361.91 | $358.33 | $358.33 | $376.25 |
| 42 | Asphaltic surface patching (465.0110) | TON | 150 | $158.59 | $157.02 | $157.02 | $165.00 |
| 43 | Asphaltic surface driveways and field entrances (465.0120) | TON | 72 | $272.29 | $269.59 | $269.59 | $390.00 |
| 44 | Asphaltic surface temporary (465.0125) | TON | 950 | $160.12 | $158.53 | $158.53 | $200.00 |
| 45 | Asphaltic curb (465.0310) | LF | 710 | $9.09 | $14.06 | $9.00 | $22.35 |
| 46 | Asphaltic rumble strips, shoulder (465.0520) | LF | 16,450 | $0.27 | $0.27 | $0.55 | $0.30 |
| 47 | Concrete collars for pipe (520.8000) | EACH | 3 | $1,188.87 | $587.00 | $1,900.00 | $650.00 |
| 48 | Cleaning culvert pipes (520.8700) | EACH | 2 | $1,010.00 | $1,000.00 | $1,000.00 | $1,050.00 |
| 49 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 4,065 | $24.04 | $23.80 | $23.80 | $36.10 |
| 50 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 850 | $31.21 | $30.90 | $30.90 | $40.80 |
| 51 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 190 | $41.53 | $41.12 | $41.12 | $51.65 |
| 52 | Concrete curb pedestrian (601.0600) | LF | 226 | $41.87 | $41.46 | $41.46 | $78.35 |
| 53 | Concrete sidewalk 4-inch (602.0405) | SF | 17,395 | $9.07 | $8.98 | $8.98 | $6.35 |
| 54 | Curb ramp detectable warning field yellow (602.0505) | SF | 380 | $62.62 | $62.00 | $62.00 | $57.30 |
| 55 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 35 | $66.66 | $66.00 | $66.00 | $89.75 |
| 56 | Concrete driveway 6-inch (602.0810) | SY | 1,100 | $64.02 | $63.39 | $63.39 | $71.15 |
| 57 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 12 | $145.17 | $237.81 | $208.34 | $259.00 |
| 58 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 376 | $208.63 | $250.10 | $221.84 | $157.00 |
| 59 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 1,306 | $246.52 | $326.30 | $287.85 | $216.75 |
| 60 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 883 | $97.95 | $106.33 | $135.43 | $96.35 |
| 61 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 122 | $93.85 | $115.85 | $119.55 | $158.10 |
| 62 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 71 | $103.92 | $121.06 | $139.45 | $208.00 |
| 63 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 55 | $142.16 | $148.54 | $166.61 | $170.50 |
| 64 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 417 | $171.72 | $179.10 | $186.18 | $149.15 |
| 65 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 154 | $223.01 | $241.41 | $249.43 | $201.15 |
| 66 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 944 | $71.90 | $107.20 | $79.48 | $57.15 |
| 67 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 145 | $86.16 | $113.33 | $99.95 | $90.00 |
| 68 | Storm sewer pipe class III-A 30- inch (608.3030) | LF | 401 | $99.54 | $129.40 | $111.37 | $100.00 |
| 69 | Reconstructing manholes (611.0420) | EACH | 5 | $979.10 | $1,186.00 | $4,160.00 | $4,200.00 |
| 70 | Reconstructing inlets (611.0430) | EACH | 2 | $946.46 | $1,118.00 | $3,400.00 | $2,100.00 |
| 71 | Manhole covers type J (611.0530) | EACH | 16 | $752.68 | $1,102.00 | $1,170.00 | $925.00 |
| 72 | Inlet covers type B (611.0606) | EACH | 1 | $1,161.21 | $1,621.00 | $1,512.00 | $1,285.00 |
| 73 | Inlet covers type C (611.0612) | EACH | 4 | $793.97 | $1,102.00 | $1,204.00 | $960.00 |
| 74 | Inlet covers type H (611.0624) | EACH | 16 | $1,109.07 | $1,497.00 | $1,022.00 | $1,175.00 |
| 75 | Inlet covers type H-S (611.0639) | EACH | 33 | $1,109.07 | $1,497.00 | $1,022.00 | $1,175.00 |
| 76 | Manholes 4-FT diameter (611.2004) | EACH | 3 | $4,034.25 | $2,827.00 | $4,358.00 | $3,075.00 |
| 77 | Manholes 5-FT diameter (611.2005) | EACH | 3 | $5,259.13 | $4,352.00 | $5,724.00 | $4,175.00 |
| 78 | Manholes 6-FT diameter (611.2006) | EACH | 12 | $9,166.76 | $7,932.00 | $8,700.00 | $7,355.00 |
| 79 | Manholes 7-FT diameter (611.2007) | EACH | 2 | $12,275 | $12,330 | $12,166 | $10,850 |
| 80 | Inlets 3-FT diameter (611.3003) | EACH | 1 | $2,388.94 | $1,530.00 | $3,258.00 | $1,885.00 |
| 81 | Inlets 4-FT diameter (611.3004) | EACH | 11 | $3,386.37 | $2,453.00 | $4,150.00 | $2,865.00 |
| 82 | Inlets 2X3-FT (611.3230) | EACH | 35 | $2,717.05 | $1,876.00 | $3,576.00 | $2,125.00 |
| 83 | Adjusting manhole covers (611.8110) | EACH | 17 | $329.90 | $628.00 | $2,252.00 | $765.00 |
| 84 | Adjusting inlet covers (611.8115) | EACH | 5 | $344.11 | $742.00 | $2,000.00 | $765.00 |
| 85 | Cover plates temporary (611.8120.S) | EACH | 6 | $502.26 | $371.00 | $106.00 | $350.00 |
| 86 | Fence safety (616.0700.S) | LF | 250 | $7.07 | $7.00 | $7.00 | $7.35 |
| 87 | Maintenance and repair of haul roads (project) 01. 8010-01-79 (618.0100) | EACH | 1 | $1,212.00 | $150.00 | $250.00 | $30,750 |
| 88 | Mobilization (619.1000) | EACH | 1 | $550,955 | $714,410 | $918,000 | $850,250 |
| 89 | Water (624.0100) | MGAL | 265 | $10.10 | $45.00 | $1.00 | $47.55 |
| 90 | Topsoil (625.0100) | SY | 12,765 | $6.65 | $9.21 | $12.99 | $9.70 |
| 91 | Mulching (627.0200) | SY | 8,800 | $0.39 | $0.39 | $0.39 | $0.40 |
| 92 | Silt fence (628.1504) | LF | 4,500 | $2.02 | $2.00 | $2.00 | $2.10 |
| 93 | Silt fence maintenance (628.1520) | LF | 22,500 | $0.03 | $0.03 | $0.03 | $0.03 |
| 94 | Mobilizations erosion control (628.1905) | EACH | 10 | $235.33 | $233.00 | $233.00 | $245.00 |
| 95 | Mobilizations emergency erosion control (628.1910) | EACH | 10 | $356.53 | $353.00 | $353.00 | $370.00 |
| 96 | Erosion mat urban class I type A (628.2006) | SY | 5,665 | $1.77 | $1.75 | $1.75 | $1.85 |
| 97 | Erosion mat urban class I type B (628.2008) | SY | 13,050 | $1.77 | $1.75 | $1.75 | $1.85 |
| 98 | Inlet protection type A (628.7005) | EACH | 57 | $126.25 | $125.00 | $125.00 | $130.00 |
| 99 | Inlet protection type B (628.7010) | EACH | 4 | $70.70 | $70.00 | $70.00 | $70.00 |
| 100 | Inlet protection type C (628.7015) | EACH | 83 | $65.65 | $65.00 | $65.00 | $75.00 |
| 101 | Temporary ditch checks (628.7504) | LF | 910 | $6.06 | $6.00 | $6.00 | $6.30 |
| 102 | Culvert pipe checks (628.7555) | EACH | 26 | $25.25 | $25.00 | $25.00 | $26.25 |
| 103 | Fertilizer type A (629.0205) | CWT | 30 | $95.95 | $95.00 | $95.00 | $99.75 |
| 104 | Seeding mixture no. 30 (630.0130) | LB | 711 | $7.20 | $7.13 | $7.13 | $7.50 |
| 105 | Seeding mixture no. 40 (630.0140) | LB | 375 | $8.01 | $7.93 | $7.93 | $8.35 |
| 106 | Seeding borrow pit (630.0300) | LB | 335 | $5.38 | $5.33 | $5.33 | $5.60 |
| 107 | Seed water (630.0500) | MGAL | 630 | $5.05 | $5.00 | $5.00 | $5.25 |
| 108 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 8 | $98.98 | $98.00 | $98.00 | $102.90 |
| 109 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 8 | $103.02 | $102.00 | $102.00 | $107.10 |
| 110 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 8 | $106.05 | $105.00 | $105.00 | $110.25 |
| 111 | Signs type II reflective H (637.2210) | SF | 194.25 | $21.21 | $21.00 | $21.00 | $22.05 |
| 112 | Signs type II reflective H folding (637.2215) | SF | 29.84 | $50.50 | $50.00 | $50.00 | $52.50 |
| 113 | Signs type II reflective F (637.2230) | SF | 20.75 | $25.25 | $25.00 | $25.00 | $26.25 |
| 114 | Moving signs type II (638.2102) | EACH | 94 | $75.75 | $75.00 | $75.00 | $78.75 |
| 115 | Removing signs type II (638.2602) | EACH | 29 | $25.25 | $25.00 | $25.00 | $26.25 |
| 116 | Removing small sign supports (638.3000) | EACH | 20 | $25.25 | $25.00 | $25.00 | $26.25 |
| 117 | Moving small sign supports (638.4000) | EACH | 66 | $75.75 | $75.00 | $75.00 | $78.75 |
| 118 | Field office type C (642.5201) | EACH | 1 | $7,575.00 | $12,000 | $31,500 | $10,500 |
| 119 | Traffic control drums (643.0300) | DAY | 59,200 | $0.15 | $0.15 | $0.35 | $0.20 |
| 120 | Temporary tape rumble strip orange (643.0320.S) | LF | 288 | $11.36 | $11.25 | $2.25 | $11.85 |
| 121 | Traffic control barricades type III (643.0420) | DAY | 7,876 | $0.51 | $0.50 | $1.00 | $0.55 |
| 122 | Traffic control warning lights type A (643.0705) | DAY | 15,800 | $0.12 | $0.12 | $1.00 | $0.15 |
| 123 | Traffic control warning lights type C (643.0715) | DAY | 3,880 | $0.19 | $0.19 | $1.00 | $0.20 |
| 124 | Traffic control connected arrow boards (643.0810) | DAY | 430 | $6.06 | $6.00 | $25.00 | $6.30 |
| 125 | Traffic control signs (643.0900) | DAY | 143,000 | $0.17 | $0.17 | $0.25 | $0.20 |
| 126 | Traffic control covering signs type II (643.0920) | EACH | 20 | $111.10 | $110.00 | $30.00 | $115.50 |
| 127 | Traffic control signs fixed message (643.1000) | SF | 72 | $24.75 | $24.50 | $22.00 | $25.75 |
| 128 | Traffic control signs PCMS (643.1050) | DAY | 196 | $25.25 | $25.00 | $50.00 | $26.25 |
| 129 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 430 | $4.29 | $4.25 | $12.50 | $4.50 |
| 130 | Temporary marking line paint 6- inch (643.3165) | LF | 112,935 | $0.37 | $0.37 | $0.30 | $0.40 |
| 131 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 1,113 | $3.54 | $3.50 | $1.20 | $3.70 |
| 132 | Temporary marking stop line paint 18-inch (643.3805) | LF | 225 | $3.94 | $3.90 | $5.00 | $4.10 |
| 133 | Traffic control (643.5000) | EACH | 1 | $140,037 | $138,650 | $79,000 | $162,000 |
| 134 | Temporary pedestrian surface asphalt (644.1410) | SF | 2,460 | $9.08 | $13.99 | $8.99 | $9.45 |
| 135 | Temporary pedestrian surface matting (644.1440) | SF | 305 | $3.54 | $3.50 | $6.50 | $3.70 |
| 136 | Temporary pedestrian curb ramp (644.1601) | DAY | 235 | $11.11 | $11.00 | $12.00 | $11.55 |
| 137 | Temporary pedestrian detectable warning field (644.1605) | SF | 210 | $4.24 | $4.20 | $9.90 | $4.40 |
| 138 | Temporary pedestrian barricade (644.1810) | LF | 8,500 | $7.58 | $7.50 | $6.00 | $7.90 |
| 139 | Temporary audible message devices (644.1900.S) | DAY | 1,970 | $3.79 | $3.75 | $8.50 | $3.95 |
| 140 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 2,293 | $1.41 | $1.40 | $1.40 | $1.10 |
| 141 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 53,575 | $1.78 | $1.76 | $1.76 | $1.80 |
| 142 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 3,476 | $3.69 | $3.65 | $3.65 | $3.60 |
| 143 | Marking arrow epoxy (646.5020) | EACH | 92 | $348.45 | $345.00 | $345.00 | $490.00 |
| 144 | Marking word epoxy (646.5120) | EACH | 14 | $358.55 | $355.00 | $355.00 | $490.00 |
| 145 | Marking stop line epoxy 18-inch (646.6120) | LF | 568 | $25.25 | $25.00 | $25.00 | $20.40 |
| 146 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,388 | $8.33 | $8.25 | $8.25 | $19.85 |
| 147 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 2,408 | $14.14 | $14.00 | $14.00 | $19.40 |
| 148 | Marking parking stall epoxy (646.8320) | LF | 225 | $22.22 | $22.00 | $22.00 | $6.65 |
| 149 | Marking removal line 6-inch (646.9002) | LF | 12,851 | $1.41 | $0.60 | $0.44 | $0.65 |
| 150 | Marking removal line 10-inch (646.9102) | LF | 113 | $2.88 | $0.55 | $2.00 | $0.60 |
| 151 | Marking removal line wide (646.9200) | LF | 253 | $4.34 | $3.30 | $5.00 | $3.50 |
| 152 | Marking removal special marking (646.9300) | EACH | 108 | $60.60 | $82.65 | $50.00 | $90.00 |
| 153 | Construction staking storm sewer (650.4000) | EACH | 81 | $70.70 | $300.00 | $300.00 | $315.00 |
| 154 | Construction staking subgrade (650.4500) | LF | 7,878 | $0.45 | $0.01 | $0.01 | $0.55 |
| 155 | Construction staking base (650.5000) | LF | 875 | $0.51 | $2.00 | $2.00 | $2.10 |
| 156 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,040 | $1.41 | $2.00 | $2.00 | $2.10 |
| 157 | Construction staking concrete pavement (650.7000) | LF | 3,217 | $5.56 | $5.00 | $5.00 | $5.25 |
| 158 | Construction staking resurfacing reference (650.8000) | LF | 18,384 | $0.10 | $0.15 | $0.15 | $0.20 |
| 159 | Construction staking electrical installations (project) 01. STH 35 & STH 70 west JCT./CTH B (650.8501) | EACH | 1 | $3,030.00 | $5,000.00 | $5,000.00 | $5,250.00 |
| 160 | Construction staking curb ramps (650.9000) | EACH | 31 | $353.50 | $125.00 | $125.00 | $131.25 |
| 161 | Construction staking sidewalk (project) 01. 8010-01-79 (650.9500) | EACH | 1 | $2,525.00 | $5,000.00 | $5,000.00 | $5,250.00 |
| 162 | Construction staking supplemental control (project) 01. 8010-01-79 (650.9911) | EACH | 1 | $2,525.00 | $15,000 | $15,000 | $63,175 |
| 163 | Construction staking slope stakes (650.9920) | LF | 7,878 | $0.40 | $1.00 | $1.00 | $1.05 |
| 164 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,430 | $12.12 | $12.00 | $12.00 | $12.60 |
| 165 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,129 | $15.15 | $15.00 | $15.00 | $15.75 |
| 166 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 420 | $13.13 | $13.00 | $13.00 | $13.65 |
| 167 | Conduit loop detector (652.0800) | LF | 1,514 | $10.10 | $10.00 | $10.00 | $10.50 |
| 168 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 4 | $2,020.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 169 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 15 | $2,121.00 | $2,100.00 | $2,100.00 | $2,205.00 |
| 170 | Removing pull boxes (653.0905) | EACH | 12 | $101.00 | $100.00 | $100.00 | $105.00 |
| 171 | Concrete bases type 1 (654.0101) | EACH | 8 | $1,464.50 | $1,450.00 | $1,450.00 | $1,525.00 |
| 172 | Concrete bases type 5 (654.0105) | EACH | 1 | $2,727.00 | $2,700.00 | $2,700.00 | $2,835.00 |
| 173 | Concrete bases type 10-special (654.0120) | EACH | 4 | $13,231 | $13,100 | $13,100 | $13,755 |
| 174 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $3,939.00 | $3,900.00 | $3,900.00 | $4,095.00 |
| 175 | Cable traffic signal 5-14 AWG (655.0230) | LF | 923 | $4.04 | $4.00 | $4.00 | $4.20 |
| 176 | Cable traffic signal 7-14 AWG (655.0240) | LF | 858 | $5.05 | $5.00 | $5.00 | $5.25 |
| 177 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,664 | $5.56 | $5.50 | $5.50 | $5.80 |
| 178 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 658 | $3.03 | $3.00 | $3.00 | $3.15 |
| 179 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,395 | $1.26 | $1.25 | $1.25 | $1.35 |
| 180 | Electrical wire lighting 12 AWG (655.0610) | LF | 620 | $1.01 | $1.00 | $1.00 | $1.05 |
| 181 | Loop detector lead in cable (655.0700) | LF | 4,486 | $1.52 | $1.50 | $1.50 | $1.60 |
| 182 | Loop detector wire (655.0800) | LF | 4,758 | $1.26 | $1.25 | $1.25 | $1.30 |
| 183 | Traffic signal evp detector cable (655.0900) | LF | 827 | $2.12 | $2.10 | $2.10 | $2.25 |
| 184 | Electrical service meter breaker pedestal (location) 01. STH 35 & STH 70 west JCT./CTH B (656.0201) | EACH | 1 | $3,181.50 | $3,150.00 | $3,150.00 | $3,300.00 |
| 185 | Pedestal bases (657.0100) | EACH | 8 | $378.75 | $375.00 | $375.00 | $400.00 |
| 186 | Poles type 10-special (657.0352) | EACH | 4 | $15,150 | $15,000 | $15,000 | $15,750 |
| 187 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 4 | $909.00 | $900.00 | $900.00 | $945.00 |
| 188 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 4 | $858.50 | $850.00 | $850.00 | $900.00 |
| 189 | Monotube arms 35-FT-special (657.0536) | EACH | 2 | $7,070.00 | $7,000.00 | $7,000.00 | $7,350.00 |
| 190 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $8,080.00 | $8,000.00 | $8,000.00 | $8,400.00 |
| 191 | Luminaire arms steel 8-FT (657.0808) | EACH | 2 | $1,818.00 | $1,800.00 | $1,800.00 | $1,890.00 |
| 192 | Luminaire arms steel 15-FT (657.0815) | EACH | 2 | $1,969.50 | $1,950.00 | $1,950.00 | $2,050.00 |
| 193 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $1,121.10 | $1,110.00 | $1,110.00 | $1,165.00 |
| 194 | Traffic signal face 4S 12-inch (658.0174) | EACH | 8 | $1,515.00 | $1,500.00 | $1,500.00 | $1,575.00 |
| 195 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $616.10 | $610.00 | $610.00 | $640.00 |
| 196 | Signal mounting hardware (location) 01. STH 35 & STH 70 west JCT./CTH B (658.5070) | EACH | 1 | $7,575.00 | $7,500.00 | $7,500.00 | $7,875.00 |
| 197 | Luminaires utility LED C (659.1125) | EACH | 4 | $505.00 | $500.00 | $500.00 | $525.00 |
| 198 | Lamp, ballast, LED, switch disposal by contractor 01. STH 35 & STH 70 west JCT./CTH B (659.5000.S) | EACH | 4 | $60.60 | $60.00 | $60.00 | $63.00 |
| 199 | Temporary traffic signals for intersections (location) 01. STH 35 & STH 70 west JCT./CTH B (661.0201) | EACH | 1 | $90,678 | $89,780 | $89,780 | $94,275 |
| 200 | Sawing asphalt (690.0150) | LF | 9,645 | $1.83 | $1.81 | $1.81 | $2.15 |
| 201 | Sawing concrete (690.0250) | LF | 1,820 | $3.02 | $2.99 | $2.99 | $3.40 |
| 202 | Incentive flexural strength concrete pavement (715.0715) | DOL | 5,470 | $1.00 | $1.00 | $1.00 | $1.00 |
| 203 | Incentive iri ride (740.0440) | DOL | 12,572 | $1.00 | $1.00 | $1.00 | $1.00 |
| 204 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,500 | $5.00 | $5.00 | $5.00 | $5.00 |
| 205 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 206 | Special 01. project concrete crack mitigation and repair (SPV.0060) | EACH | 1 | $5,050.00 | $5,000.00 | $5,000.00 | $1,050.00 |
| 207 | Special 02. adjusting water valve (SPV.0060) | EACH | 22 | $404.00 | $200.00 | $1,275.00 | $300.00 |
| 208 | Special 04. reconnect storm sewer laterals (SPV.0060) | EACH | 7 | $1,457.43 | $889.00 | $1,414.00 | $1,785.00 |
| 209 | Special 21. install state furnished APS push buttons (SPV.0060) | EACH | 8 | $151.50 | $150.00 | $150.00 | $160.00 |
| 210 | Special 22. install state furnished evp system (STH 35 & STH 70 west JCT./CTH B) (SPV.0060) | EACH | 1 | $1,262.50 | $1,250.00 | $1,250.00 | $1,315.00 |
| 211 | Special 24. remove, salvage, disassemble, and deliever aboveground equipment (SPV.0060) | EACH | 1 | $7,070.00 | $7,000.00 | $7,000.00 | $7,350.00 |
| 212 | Special 50. remove & salvage street lighting unit (SPV.0060) | EACH | 1 | $353.50 | $350.00 | $350.00 | $375.00 |
| 213 | Special 51. reinstall salvaged street lighting unit (SPV.0060) | EACH | 1 | $959.50 | $950.00 | $950.00 | $1,000.00 |
| 214 | Special 01. concrete curb & gutter 30-inch special (SPV.0090) | LF | 2,090 | $43.54 | $43.11 | $43.11 | $35.85 |
| 215 | Special 02. cure and seal treatment, curb and gutter (SPV.0090) | LF | 7,195 | $0.45 | $0.45 | $0.45 | $1.05 |
| 216 | Special 03. ditch cleaning (SPV.0090) | LF | 4,500 | $6.13 | $7.84 | $22.75 | $4.70 |
| 217 | Special 50. furnish and install equivalent lighting conductors (SPV.0090) | LF | 1,595 | $2.53 | $2.50 | $2.50 | $2.65 |
| 218 | Special 51. install state furnished CAT5E cable (SPV.0090) | LF | 76 | $1.01 | $1.00 | $1.00 | $1.05 |
| 219 | Special 01. cure and seal treatment, sidewalk and driveways (SPV.0165) | SF | 27,410 | $0.15 | $0.15 | $0.15 | $0.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.