| 1 | Clearing (201.0105) | STA | 5 | $985.00 |
| 2 | Grubbing (201.0205) | STA | 5 | $60.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 14 | $72.00 |
| 4 | Removing concrete pavement butt joints (204.0105) | SY | 1,250 | $12.37 |
| 5 | Removing concrete surface partial depth (204.0109.S) | SF | 27,500 | $1.54 |
| 6 | Removing asphaltic surface (204.0110) | SY | 440 | $15.50 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 2,250 | $14.01 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 40,400 | $7.40 |
| 9 | Removing curb & gutter (204.0150) | LF | 1,250 | $10.60 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 160 | $9.30 |
| 11 | Removing guardrail (204.0165) | LF | 85 | $4.35 |
| 12 | Removing delineators and markers (204.0180) | EACH | 20 | $18.50 |
| 13 | Removing concrete bases (204.0195) | EACH | 4 | $750.00 |
| 14 | Excavation common (205.0100) | CY | 106 | $41.00 |
| 15 | Prepare foundation for asphaltic paving (project) 01. 8100-01-72 (211.0101) | EACH | 1 | $68,602 |
| 16 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 113 | $123.02 |
| 17 | Prepare foundation for cir base layer (project) 01. 8100-01-72 (211.0700.S) | EACH | 1 | $38,070 |
| 18 | Base repair for cir layer (211.0800.S) | CY | 450 | $118.30 |
| 19 | Finishing roadway (project) 01. 8100-01-72 (213.0100) | EACH | 1 | $5,146.26 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,810 | $41.70 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,455 | $15.30 |
| 22 | Shaping shoulders (305.0500) | STA | 61 | $122.34 |
| 23 | Select crushed material (312.0110) | TON | 30 | $35.65 |
| 24 | Cir asphaltic base layer (327.1000.S) | SY | 68,500 | $3.80 |
| 25 | Concrete pavement 7-inch (415.0070) | SY | 36 | $138.23 |
| 26 | Concrete pavement approach slab (415.0410) | SY | 96 | $309.58 |
| 27 | Drilled tie bars (416.0610) | EACH | 232 | $16.03 |
| 28 | Drilled dowel bars (416.0620) | EACH | 12 | $19.59 |
| 29 | Tack coat (455.0605) | GAL | 15,000 | $3.14 |
| 30 | Asphalt stabilizing agent (455.0770.S) | TON | 320 | $350.00 |
| 31 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $12,230 |
| 32 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $2,250.00 |
| 33 | Incentive density HMA pavement (460.2000) | DOL | 3,200 | $1.00 |
| 34 | Incentive density PWL HMA pavement (460.2005) | DOL | 8,460 | $1.00 |
| 35 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 16,470 | $1.00 |
| 36 | Incentive air voids HMA pavement (460.2010) | DOL | 17,650 | $1.00 |
| 37 | HMA pavement 5 MT 58-34 V (460.6645) | TON | 17,650 | $112.00 |
| 38 | Material transfer vehicle 01. 8100- 01-72 (460.9000.S) | EACH | 1 | $30,693 |
| 39 | Asphaltic surface (465.0105) | TON | 590 | $193.07 |
| 40 | Asphaltic surface patching (465.0110) | TON | 200 | $261.09 |
| 41 | Asphaltic surface driveways and field entrances (465.0120) | TON | 110 | $399.91 |
| 42 | Asphaltic rumble strips, centerline (465.0560) | LF | 18,220 | $1.07 |
| 43 | Cleaning culvert pipes (520.8700) | EACH | 8 | $1,450.00 |
| 44 | Culvert pipe liners (size) 01. 24- inch (520.9700.S) | LF | 97 | $150.00 |
| 45 | Culvert pipe liners (size) 02. 30- inch (520.9700.S) | LF | 83 | $233.00 |
| 46 | Cleaning culvert pipes for liner verification (520.9750.S) | EACH | 2 | $250.00 |
| 47 | Concrete curb type J (601.0120) | LF | 65 | $61.22 |
| 48 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 485 | $55.49 |
| 49 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 565 | $55.49 |
| 50 | Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584) | LF | 80 | $67.55 |
| 51 | Concrete curb & gutter 4-inch sloped 30-inch type TBTT (601.0586) | LF | 50 | $67.55 |
| 52 | Concrete curb pedestrian (601.0600) | LF | 70 | $44.03 |
| 53 | Concrete sidewalk 5-inch (602.0410) | SF | 2,340 | $16.52 |
| 54 | Curb ramp detectable warning field natural patina (602.0515) | SF | 116 | $60.51 |
| 55 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 45 | $67.84 |
| 56 | Concrete driveway 6-inch (602.0810) | SY | 15 | $157.68 |
| 57 | Concrete surface drains (602.3010) | CY | 16 | $1,224.54 |
| 58 | Concrete barrier temporary precast delivered (603.8000) | LF | 630 | $12.33 |
| 59 | Concrete barrier temporary precast installed (603.8125) | LF | 1,260 | $6.71 |
| 60 | Riprap medium (606.0200) | CY | 12 | $235.00 |
| 61 | Inlet covers type HM (611.0627) | EACH | 1 | $1,441.00 |
| 62 | Adjusting manhole covers (611.8110) | EACH | 4 | $1,020.00 |
| 63 | Adjusting inlet covers (611.8115) | EACH | 6 | $620.00 |
| 64 | Cover plates temporary (611.8120.S) | EACH | 6 | $60.00 |
| 65 | Adjusting steel plate beam guard (614.0400) | LF | 2,430 | $8.65 |
| 66 | Crash cushions temporary (614.0905) | EACH | 2 | $4,750.00 |
| 67 | Salvaged rail (614.0920) | LF | 1,130 | $3.25 |
| 68 | Salvaged guardrail end treatments (614.0925) | EACH | 19 | $400.00 |
| 69 | Replacing guardrail posts and blocks (614.0950) | EACH | 454 | $168.50 |
| 70 | Replacing guardrail rail and hardware (614.0951) | LF | 253 | $18.90 |
| 71 | MGS guardrail 3 (614.2300) | LF | 25 | $28.40 |
| 72 | MGS thrie beam transition (614.2500) | LF | 40 | $93.50 |
| 73 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $3,680.00 |
| 74 | Fence safety (616.0700.S) | LF | 1,000 | $3.85 |
| 75 | Maintenance and repair of haul roads (project) 01. 8100-01-72 (618.0100) | EACH | 1 | $1.00 |
| 76 | Mobilization (619.1000) | EACH | 1 | $491,186 |
| 77 | Concrete median sloped nose (620.0300) | SF | 162 | $16.52 |
| 78 | Water (624.0100) | MGAL | 140 | $52.37 |
| 79 | Topsoil (625.0100) | SY | 50 | $10.00 |
| 80 | Salvaged topsoil (625.0500) | SY | 1,050 | $3.50 |
| 81 | Mulching (627.0200) | SY | 780 | $1.00 |
| 82 | Silt fence (628.1504) | LF | 2,500 | $2.00 |
| 83 | Silt fence maintenance (628.1520) | LF | 2,500 | $0.01 |
| 84 | Mobilizations erosion control (628.1905) | EACH | 9 | $1.00 |
| 85 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $1.00 |
| 86 | Erosion mat class I type B (628.2004) | SY | 270 | $2.50 |
| 87 | Inlet protection type A (628.7005) | EACH | 5 | $190.00 |
| 88 | Inlet protection type C (628.7015) | EACH | 25 | $37.00 |
| 89 | Culvert pipe checks (628.7555) | EACH | 270 | $1.00 |
| 90 | Rock bags (628.7570) | EACH | 50 | $1.00 |
| 91 | Fertilizer type B (629.0210) | CWT | 1 | $500.00 |
| 92 | Seeding mixture no. 40 (630.0140) | LB | 47 | $50.00 |
| 93 | Seeding temporary (630.0200) | LB | 29 | $5.00 |
| 94 | Seed water (630.0500) | MGAL | 60 | $1.00 |
| 95 | Markers culvert end (633.5200) | EACH | 19 | $57.00 |
| 96 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 10 | $84.00 |
| 97 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 3 | $94.00 |
| 98 | Signs type II reflective H (637.2210) | SF | 28.50 | $22.00 |
| 99 | Moving signs type II (638.2102) | EACH | 23 | $46.50 |
| 100 | Removing signs type II (638.2602) | EACH | 1 | $19.00 |
| 101 | Removing small sign supports (638.3000) | EACH | 2 | $19.00 |
| 102 | Moving small sign supports (638.4000) | EACH | 6 | $94.50 |
| 103 | Field office type B (642.5001) | EACH | 1 | $19,457 |
| 104 | Traffic control drums (643.0300) | DAY | 38,450 | $0.17 |
| 105 | Traffic control barricades type III (643.0420) | DAY | 340 | $0.86 |
| 106 | Traffic control warning lights type A (643.0705) | DAY | 670 | $0.22 |
| 107 | Traffic control warning lights type C (643.0715) | DAY | 1,510 | $0.11 |
| 108 | Traffic control connected arrow boards (643.0810) | DAY | 150 | $9.04 |
| 109 | Traffic control signs (643.0900) | DAY | 9,300 | $0.32 |
| 110 | Traffic control signs PCMS (643.1050) | DAY | 28 | $54.96 |
| 111 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 300 | $2.73 |
| 112 | Temporary marking line paint 6- inch (643.3165) | LF | 167,110 | $0.30 |
| 113 | Temporary marking line epoxy 6- inch (643.3170) | LF | 36,180 | $0.90 |
| 114 | Temporary marking line removable tape 6-inch (643.3180) | LF | 3,340 | $3.06 |
| 115 | Temporary marking line paint 10- inch (643.3265) | LF | 5,500 | $0.60 |
| 116 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 920 | $10.00 |
| 117 | Temporary marking arrow paint (643.3505) | EACH | 54 | $220.00 |
| 118 | Temporary marking stop line paint 18-inch (643.3805) | LF | 840 | $9.00 |
| 119 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 48 | $14.22 |
| 120 | Traffic control (643.5000) | EACH | 1 | $13,031 |
| 121 | Temporary pedestrian surface plate (644.1430) | SF | 260 | $4.00 |
| 122 | Temporary pedestrian surface matting (644.1440) | SF | 2,540 | $1.68 |
| 123 | Temporary pedestrian curb ramp (644.1601) | DAY | 70 | $15.18 |
| 124 | Temporary pedestrian detectable warning field (644.1605) | SF | 100 | $10.45 |
| 125 | Temporary pedestrian barricade (644.1810) | LF | 590 | $2.46 |
| 126 | Temporary audible message devices (644.1900.S) | DAY | 80 | $6.06 |
| 127 | Geotextile type HR (645.0120) | SY | 187 | $4.00 |
| 128 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 920 | $0.80 |
| 129 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 83,550 | $1.40 |
| 130 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,745 | $2.30 |
| 131 | Marking arrow epoxy (646.5020) | EACH | 27 | $350.00 |
| 132 | Marking word epoxy (646.5120) | EACH | 8 | $430.00 |
| 133 | Marking stop line epoxy 18-inch (646.6120) | LF | 420 | $26.00 |
| 134 | Marking diagonal epoxy 12-inch (646.7120) | LF | 310 | $14.00 |
| 135 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 460 | $15.00 |
| 136 | Marking curb epoxy (646.8120) | LF | 135 | $15.00 |
| 137 | Marking island nose epoxy (646.8220) | EACH | 12 | $350.00 |
| 138 | Construction staking subgrade (650.4500) | LF | 1,062 | $0.01 |
| 139 | Construction staking base (650.5000) | LF | 992 | $0.01 |
| 140 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 710 | $0.60 |
| 141 | Construction staking concrete pavement (650.7000) | LF | 106 | $1.50 |
| 142 | Construction staking resurfacing reference (650.8000) | LF | 24,630 | $0.10 |
| 143 | Construction staking electrical installations (project) 01. 8100-01- 72 (650.8501) | EACH | 1 | $1,474.00 |
| 144 | Construction staking curb ramps (650.9000) | EACH | 10 | $210.00 |
| 145 | Construction staking sidewalk (project) 01. 8100-01-72 (650.9500) | EACH | 1 | $300.46 |
| 146 | Construction staking supplemental control (project) 01. 8100-01-72 (650.9911) | EACH | 1 | $790.00 |
| 147 | Construction staking slope stakes (650.9920) | LF | 992 | $0.25 |
| 148 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 85 | $11.00 |
| 149 | Install conduit into existing item (652.0700.S) | EACH | 7 | $275.00 |
| 150 | Conduit loop detector (652.0800) | LF | 508 | $9.00 |
| 151 | Concrete bases type 1 (654.0101) | EACH | 6 | $1,175.00 |
| 152 | Concrete bases type 2 (654.0102) | EACH | 1 | $1,875.00 |
| 153 | Cable traffic signal 5-14 AWG (655.0230) | LF | 221 | $2.25 |
| 154 | Cable traffic signal 7-14 AWG (655.0240) | LF | 802 | $2.50 |
| 155 | Cable traffic signal 12-14 AWG (655.0260) | LF | 106 | $4.25 |
| 156 | Cable traffic signal 15-14 AWG (655.0270) | LF | 414 | $4.50 |
| 157 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,364 | $1.75 |
| 158 | Loop detector lead in cable (655.0700) | LF | 2,030 | $1.75 |
| 159 | Loop detector wire (655.0800) | LF | 1,556 | $1.50 |
| 160 | Pedestal bases (657.0100) | EACH | 6 | $375.00 |
| 161 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 1 | $800.00 |
| 162 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 2 | $425.00 |
| 163 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 3 | $1,025.00 |
| 164 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 1 | $915.00 |
| 165 | Traffic signal face 3S 12-inch (658.0173) | EACH | 1 | $950.00 |
| 166 | Traffic signal face 4S 12-inch (658.0174) | EACH | 2 | $1,275.00 |
| 167 | Traffic signal face 5S 12-inch (658.0175) | EACH | 1 | $1,405.00 |
| 168 | Pedestrian signal face 16-inch (658.0416) | EACH | 3 | $625.00 |
| 169 | Pedestrian push buttons (658.0500) | EACH | 3 | $300.00 |
| 170 | Signal mounting hardware (location) 01. STH 25 & IH 94 WB ramps (658.5070) | EACH | 1 | $1,350.00 |
| 171 | Signal mounting hardware (location) 02. STH 25 & cedar falls road (658.5070) | EACH | 1 | $1,275.00 |
| 172 | Temporary traffic signals for bridges (structure) 01. B-17-45 (661.0101) | EACH | 1 | $5,384.14 |
| 173 | Public land reference monument verify and reset (680.0100) | EACH | 4 | $4.75 |
| 174 | Sawing asphalt (690.0150) | LF | 935 | $1.79 |
| 175 | Sawing concrete (690.0250) | LF | 835 | $2.89 |
| 176 | Incentive flexural strength concrete pavement (715.0715) | DOL | 500 | $1.00 |
| 177 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 |
| 178 | Incentive iri ride (740.0440) | DOL | 20,610 | $1.00 |
| 179 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,500 | $5.00 |
| 180 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 990 | $5.00 |
| 181 | Special 01. remove, salvage, and reinstall traffic sig equip (STH 25 & IH 94 WB ramps) (SPV.0060) | EACH | 1 | $1,050.00 |
| 182 | Special 02. remove and salvage traffic signals (STH 25 & cedar falls road) (SPV.0060) | EACH | 1 | $1,050.00 |
| 183 | Special 03. reinstall salvaged guardrail end treatments (SPV.0060) | EACH | 19 | $1,015.00 |
| 184 | Special 01. grading, shaping, and finishing ditch (SPV.0090) | LF | 1,085 | $12.90 |
| 185 | Special 02. concrete curb & gutter 48-inch special (SPV.0090) | LF | 150 | $73.89 |
| 186 | Special 03. reinstall salvaged guardrail rail (SPV.0090) | LF | 1,130 | $12.35 |