WisDOT contract 20260210010 bid tabulation

C Greenfield, Cudahy, Layton Ave; Intersections 84th, 68th, Nicholson (CTH Y, Milwaukee County C Greenfield, Cudahy, Layton Ave). Let by Wisconsin DOT on February 10, 2026, Milwaukee. 3 bids received; low bid $978,509 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
10 FEB 2026
Pay items
139
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$978,509Low
2Zenith Tech., Inc. - Waukesha$1,018,160+4.0%
3Zignego Company, Inc.$1,154,058+18%
WisDOT contract 20260210010: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. Zenith Tech., Inc. - Waukesha3. Zignego Company, Inc.
1Removing concrete pavement (204.0100)SY98$21.14$30.00$28.00
2Removing curb & gutter (204.0150)LF235$14.99$25.00$40.00
3Removing concrete sidewalk (204.0155)SY197$15.63$20.00$40.00
4Removing concrete bases (204.0195)EACH14$350.00$297.10$300.00
5Removing (item description) 01. traffic signal equipment at CTH Y and 84TH (204.9060.S)EACH1$5,198.00$5,318.81$5,318.81
6Removing (item description) 02. traffic signal equipment at CTH Y and 68TH (204.9060.S)EACH1$2,789.00$405.93$405.93
7Removing (item description) 03. traffic signal equipment at CTH Y and nicholson (204.9060.S)EACH1$5,198.00$5,318.81$5,318.81
8Removing (item description) 04. concrete base bolts (204.9060.S)EACH4$2,315.00$326.31$326.31
9Excavation common (205.0100)CY130$76.10$65.00$100.00
10Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON44.50$515.07$300.00$200.00
11Finishing roadway (project) 01. 2070-03-77 (213.0100)EACH1$3,110.00$1,904.97$1,000.00
12Base aggregate dense 1 1/4-inch (305.0120)TON137$46.51$46.00$50.00
13Base aggregate open-graded (310.0110)TON59$50.44$46.00$50.00
14Stamping colored concrete (405.1000)CY3$381.99$634.02$500.00
15Concrete pavement 9-inch (415.0090)SY47$147.93$262.85$260.00
16Drilled tie bars (416.0610)EACH202$17.96$7.93$30.00
17Concrete curb & gutter 31-inch (601.0331)LF344$63.12$66.36$110.00
18Concrete curb pedestrian (601.0600)LF65$54.23$63.11$110.00
19Concrete sidewalk 7-inch (602.0420)SF2,025$14.33$15.55$26.00
20Curb ramp detectable warning field natural patina (602.0515)SF172$43.20$33.01$60.00
21Pipe underdrain wrapped 4-inch (612.0404)LF135$49.47$8.47$40.00
22Pipe underdrain wrapped 6-inch (612.0406)LF86$50.33$12.69$60.00
23Mobilization (619.1000)EACH1$76,096$62,600$165,000
24Concrete median sloped nose (620.0300)SF114$32.76$29.22$50.00
25Topsoil (625.0100)SY178$5.95$8.00$8.00
26Mobilizations erosion control (628.1905)EACH2$150.00$100.00$100.00
27Mobilizations emergency erosion control (628.1910)EACH2$150.00$100.00$100.00
28Soil stabilizer type B (628.6510)ACRE0.04$1,500.00$1.00$1.00
29Inlet protection type B (628.7010)EACH24$55.00$60.00$60.00
30Inlet protection type C (628.7015)EACH13$55.00$70.00$70.00
31Fertilizer type B (629.0210)CWT0.12$950.00$80.00$80.00
32Sod water (631.0300)MGAL5$65.00$50.00$50.00
33Sod lawn (631.1000)SY178$9.95$7.00$7.50
34Posts tubular steel 2X2-inch X 11- FT (634.0811)EACH9$205.00$215.00$215.00
35Signs type II reflective H (637.2210)SF154.26$23.00$24.00$24.00
36Signs type II reflective H folding (637.2215)SF93.24$28.00$28.00$28.00
37Removing signs type II (638.2602)EACH18$28.00$20.00$20.00
38Removing small sign supports (638.3000)EACH2$25.00$20.00$20.00
39Field office type B (642.5001)EACH1$26,864$11,473$15,000
40Traffic control drums (643.0300)DAY20,700$0.19$0.14$0.19
41Traffic control barricades type III (643.0420)DAY2,775$0.60$0.21$0.60
42Traffic control warning lights type A (643.0705)DAY5,550$0.13$0.05$0.13
43Traffic control warning lights type C (643.0715)DAY2,910$0.13$0.05$0.13
44Traffic control signs (643.0900)DAY11,215$0.49$0.32$0.49
45Traffic control signs PCMS (643.1050)DAY70$45.00$39.14$45.00
46Temporary marking line removable tape 6-inch (643.3180)LF260$1.76$1.87$1.76
47Traffic control (643.5000)EACH1$16,560$31,818$16,560
48Temporary pedestrian surface matting (644.1440)SF145$6.99$9.93$6.99
49Temporary pedestrian curb ramp (644.1601)DAY55$16.81$15.15$16.81
50Temporary pedestrian detectable warning field (644.1605)SF46$10.24$20.20$10.24
51Temporary pedestrian barricade (644.1810)LF735$3.73$6.06$3.73
52Temporary audible message devices (644.1900.S)DAY1,185$3.75$5.05$3.75
53Geotextile type DF schedule A (645.0111)SY163$2.71$9.03$5.00
54Marking line epoxy 6-inch (646.2020)LF650$1.25$2.32$1.25
55Marking line epoxy 10-inch (646.4020)LF130$1.70$3.89$1.70
56Marking arrow epoxy (646.5020)EACH21$320.00$237.37$320.00
57Marking word epoxy (646.5120)EACH11$350.00$267.68$350.00
58Marking stop line epoxy 18-inch (646.6120)LF350$16.25$12.27$16.25
59Marking yield line epoxy 18-inch (646.6220)EACH20$28.50$45.45$28.50
60Cold weather marking epoxy 6-inch (646.6466)LF650$2.75$5.05$2.75
61Cold weather marking epoxy 10- inch (646.6470)LF110$3.50$8.33$3.50
62Marking diagonal epoxy 12-inch (646.7120)LF40$14.75$10.10$14.75
63Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,410$10.50$11.36$10.50
64Marking removal line 4-inch (646.9000)LF520$0.50$0.66$0.50
65Marking removal line 6-inch (646.9002)LF1,420$0.66$0.76$0.66
66Marking removal line 8-inch (646.9100)LF90$1.15$1.01$1.15
67Marking removal line wide (646.9200)LF85$1.83$1.01$1.83
68Marking removal special marking (646.9300)EACH2$78.83$101.01$78.83
69Construction staking subgrade (650.4500)LF93$1.50$1.91$1.50
70Construction staking base (650.5000)LF93$1.50$1.91$1.50
71Construction staking curb gutter and curb & gutter (650.5500)LF344$2.50$3.19$2.50
72Construction staking concrete pavement (650.7000)LF93$4.00$5.10$4.00
73Construction staking electrical installations (project) 01. 2070-03- 77 (650.8501)EACH1$1,900.00$2,422.09$1,900.00
74Construction staking curb ramps (650.9000)EACH15$200.00$254.96$200.00
75Construction staking sidewalk (project) 01. 2070-03-77 (650.9500)EACH1$1,650.00$2,103.39$1,650.00
76Construction staking supplemental control (project) 01. 2070-03-77 (650.9911)EACH1$1,500.00$1,912.18$1,500.00
77Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF95$10.68$10.12$10.12
78Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF115$11.74$11.87$11.87
79Install conduit into existing item (652.0700.S)EACH17$432.00$302.15$302.15
80Adjusting pull boxes (653.0900)EACH4$498.00$671.22$671.22
81Concrete bases type 1 (654.0101)EACH7$1,168.00$932.13$932.13
82Concrete bases type 2 (654.0102)EACH3$1,434.00$1,133.23$1,133.23
83Concrete bases type 10 (654.0110)EACH1$8,976.00$9,168.78$9,168.78
84Concrete bases type 13 (654.0113)EACH1$14,565$15,327$15,327
85Concrete bases type 10-special (654.0120)EACH6$9,908.00$10,948$10,948
86Cable traffic signal 3-14 AWG (655.0210)LF1,495$1.76$1.73$1.73
87Cable traffic signal 5-14 AWG (655.0230)LF1,776$1.98$1.83$1.83
88Cable traffic signal 7-14 AWG (655.0240)LF975$2.48$2.52$2.52
89Cable traffic signal 12-14 AWG (655.0260)LF1,995$3.62$3.65$3.65
90Cable traffic signal 15-14 AWG (655.0270)LF340$3.74$4.69$4.69
91Cable traffic signal 19-14 AWG (655.0280)LF160$3.92$6.40$6.40
92Cable type UF 2-12 AWG grounded (655.0305)LF645$1.67$1.62$1.62
93Electrical wire traffic signals 10 AWG (655.0515)LF1,915$1.33$1.68$1.68
94Electrical wire lighting 12 AWG (655.0610)LF699$1.08$0.94$0.94
95Traffic signal evp detector cable (655.0900)LF1,615$1.74$1.40$1.40
96Pedestal bases (657.0100)EACH16$345.00$430.11$430.11
97Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH3$698.00$716.61$716.61
98Poles type 2 (657.0305)EACH2$4,133.00$3,066.50$3,066.50
99Poles type 4 (657.0315)EACH1$3,851.00$2,768.86$2,768.86
100Poles type 9 - over height special (657.0348)EACH1$11,465$13,029$13,029
101Poles type 10 (657.0350)EACH1$9,717.00$11,024$11,024
102Poles type 10-special (657.0352)EACH4$12,517$14,402$14,402
103Poles type 10 - over height special (657.0353)EACH1$12,778$14,638$14,638
104Poles type 13 (657.0360)EACH1$16,578$19,738$19,738
105Traffic signal standards aluminum 3.5-FT (657.0405)EACH1$399.00$531.22$531.22
106Traffic signal standards aluminum 15-FT (657.0425)EACH9$790.00$1,176.90$1,176.90
107Traffic signal standards aluminum 10-FT (657.0430)EACH6$730.00$971.22$971.22
108Monotube arms 30-FT (657.0530)EACH1$5,856.00$6,804.44$6,804.44
109Monotube arms 40-FT-special (657.0541)EACH1$6,935.00$6,798.67$6,798.67
110Monotube arms 45-FT-special (657.0546)EACH5$7,123.00$7,090.88$7,090.88
111Monotube arms 55-FT (657.0555)EACH1$16,978$17,890$17,890
112Trombone arms 15-FT (657.0585)EACH1$1,879.00$2,199.70$2,199.70
113Trombone arms 25-FT (657.0595)EACH1$2,079.00$3,048.09$3,048.09
114Luminaire arms single member 4- inch clamp 8-FT (657.0614)EACH1$543.00$478.16$478.16
115Luminaire arms steel 15-FT (657.0815)EACH8$996.00$1,168.86$1,168.86
116Traffic signal face 3S 12-inch (658.0173)EACH31$740.00$783.63$783.63
117Traffic signal face 4S 12-inch (658.0174)EACH14$900.00$988.14$988.14
118Pedestrian signal face 16-inch (658.0416)EACH18$560.00$528.27$528.27
119Signal mounting hardware (location) 01. CTH Y and 84TH (658.5070)EACH1$6,754.00$6,490.42$6,490.42
120Signal mounting hardware (location) 02. CTH Y and 68TH (658.5070)EACH1$3,421.00$2,698.38$2,698.38
121Signal mounting hardware (location) 03. CTH Y and nicholson (658.5070)EACH1$4,700.00$5,076.44$5,076.44
122Luminaires utility LED C (659.1125)EACH5$425.00$587.67$587.67
123Temporary traffic signals for intersections (location) 01. CTH Y and 84TH (661.0201)EACH1$46,000$51,054$51,054
124Temporary traffic signals for intersections (location) 02. CTH Y and nicholson (661.0201)EACH1$46,000$53,960$53,960
125Sawing concrete (690.0250)LF571$2.25$1.65$2.00
126On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS3,000$5.00$5.00$5.00
127On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS5,700$5.00$5.00$5.00
128Special 01. backfill slurry (SPV.0035)CY20$150.50$456.03$300.00
129Special 01. adjusting water valve boxes (SPV.0060)EACH3$463.00$1,350.67$1,000.00
130Special 02. remove and reinstall video detection system (SPV.0060)EACH3$3,248.00$6,375.26$6,375.26
131Special 03. remove and reinstall evp detectors (SPV.0060)EACH3$2,180.00$2,358.79$2,358.79
132Special 04. remove and reinstall accessible pedestrian push button system, 8 buttons (SPV.0060)EACH1$2,567.00$3,566.02$3,566.02
133Special 05. transport and install traffic signal cabinet (SPV.0060)EACH1$3,498.00$4,538.91$4,538.91
134Special 06. cored sign post holes 12-inch (SPV.0060)EACH4$115.00$400.00$400.00
135Special 07. accessible pedestrian push button system, 8 buttons (SPV.0060)EACH1$9,764.00$11,665$11,665
136Special 08. utility line opening (ulo) (SPV.0060)EACH9$1,300.00$1,382.68$0.01
137Special 09. cabinet modification (SPV.0060)EACH2$2,543.00$3,852.18$3,852.18
138Special 10. section corner monuments (SPV.0060)EACH2$1,624.00$2,718.70$2,000.00
139Special 01. furnish and install camera cable (SPV.0090)LF2,045$1.98$2.76$2.76
WisDOT contract 20260210010: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy