WisDOT contract 20260210022 bid tabulation
1130-64-73. Let by Wisconsin DOT on February 10, 2026, Outagamie. 3 bids received; low bid $95,310,340 by Michels Road & Stone, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 596
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Michels Road & Stone, Inc. | $95,310,340 | Low |
| 2 | Zignego Company, Inc. | $108,040,552 | +13% |
| 3 | Hoffman Construction Company | $109,880,295 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Michels Road & Stone, Inc. | 2. Zignego Company, Inc. | 3. Hoffman Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 71 | $585.00 | $400.00 | $585.00 |
| 2 | Grubbing (201.0205) | STA | 211 | $275.00 | $250.00 | $275.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 9 | $535.00 | $788.00 | $416.00 |
| 4 | Removing structure (structure) 0801. B-44-20 (203.0220) | EACH | 1 | $350,000 | $350,000 | $350,000 |
| 5 | Removing structure (structure) 0802. B-44-21 (203.0220) | EACH | 1 | $700,000 | $700,000 | $700,000 |
| 6 | Removing structure (structure) 0803. B-44-28 (203.0220) | EACH | 1 | $350,000 | $350,000 | $350,000 |
| 7 | Removing structure (structure) 0804. B-44-29 (203.0220) | EACH | 1 | $700,000 | $700,000 | $700,000 |
| 8 | Removing structure (structure) 0805. B-44-35 (203.0220) | EACH | 1 | $858,500 | $700,000 | $700,000 |
| 9 | Removing structure (structure) 0806. B-44-36 (203.0220) | EACH | 1 | $700,000 | $700,000 | $700,000 |
| 10 | Debris containment (structure) 0801. B-44-20 (203.0330) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 11 | Debris containment (structure) 0802. B-44-21 (203.0330) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 12 | Removing concrete pavement (204.0100) | SY | 92,400 | $1.00 | $0.95 | $20.00 |
| 13 | Removing asphaltic surface (204.0110) | SY | 1,850 | $5.00 | $3.00 | $5.00 |
| 14 | Removing asphaltic surface milling (204.0120) | SY | 2,590 | $4.75 | $4.75 | $4.75 |
| 15 | Removing curb & gutter (204.0150) | LF | 3,670 | $3.00 | $2.50 | $6.00 |
| 16 | Removing concrete sidewalk (204.0155) | SY | 4,300 | $5.00 | $2.50 | $5.00 |
| 17 | Removing concrete barrier (204.0157) | LF | 2,130 | $0.01 | $23.65 | $15.00 |
| 18 | Removing guardrail (204.0165) | LF | 9,390 | $2.50 | $2.00 | $2.00 |
| 19 | Removing cable barrier (204.0167) | LF | 10,900 | $3.50 | $3.00 | $3.00 |
| 20 | Removing fence (204.0170) | LF | 23,220 | $1.75 | $1.50 | $1.75 |
| 21 | Removing delineators and markers (204.0180) | EACH | 78 | $25.00 | $50.00 | $50.00 |
| 22 | Removing surface drains (204.0190) | EACH | 2 | $350.00 | $500.00 | $300.00 |
| 23 | Removing concrete bases (204.0195) | EACH | 9 | $200.00 | $250.00 | $300.00 |
| 24 | Removing manholes (204.0210) | EACH | 14 | $404.00 | $750.00 | $540.30 |
| 25 | Removing inlets (204.0220) | EACH | 63 | $228.00 | $450.00 | $263.10 |
| 26 | Removing storm sewer (size) 0001. 4-inch (204.0245) | LF | 3,387 | $2.20 | $23.75 | $1.50 |
| 27 | Removing storm sewer (size) 0002. 6-inch (204.0245) | LF | 134 | $2.20 | $23.75 | $1.50 |
| 28 | Removing storm sewer (size) 0003. 8-inch (204.0245) | LF | 60 | $3.30 | $23.75 | $14.00 |
| 29 | Removing storm sewer (size) 0004. 12-inch (204.0245) | LF | 695 | $6.40 | $22.67 | $13.40 |
| 30 | Removing storm sewer (size) 0005. 15-inch (204.0245) | LF | 1,140 | $9.80 | $20.35 | $16.15 |
| 31 | Removing storm sewer (size) 0006. 18-inch (204.0245) | LF | 1,847 | $14.00 | $21.26 | $17.75 |
| 32 | Removing storm sewer (size) 0007. 24-inch (204.0245) | LF | 685 | $15.50 | $24.18 | $18.80 |
| 33 | Removing storm sewer (size) 0008. 30-inch (204.0245) | LF | 259 | $15.50 | $26.12 | $25.00 |
| 34 | Removing storm sewer (size) 0009. 14X23-inch (204.0245) | LF | 76 | $12.00 | $23.32 | $19.60 |
| 35 | Removing ancillary structure (structure) 0001. S-44-31 (204.0246) | EACH | 1 | $12,000 | $10,000 | $10,000 |
| 36 | Removing ancillary structure (structure) 0002. S-44-32 (204.0246) | EACH | 1 | $12,000 | $10,000 | $10,000 |
| 37 | Abandoning inlets (204.0260) | EACH | 1 | $1,000.00 | $500.00 | $325.00 |
| 38 | Abandoning wells (204.0265) | EACH | 5 | $500.00 | $1,500.00 | $2,000.00 |
| 39 | Abandoning sewer (204.0291.S) | CY | 6 | $238.00 | $300.00 | $325.00 |
| 40 | Removing (item description) 0103. apron endwalls (204.9060.S) | EACH | 5 | $98.00 | $350.00 | $392.10 |
| 41 | Removing (item description) 0104. box culvert endwalls (204.9060.S) | EACH | 2 | $2,490.00 | $3,000.00 | $2,512.00 |
| 42 | Removing (item description) 0701. removing communication vault (204.9060.S) | EACH | 6 | $250.00 | $250.00 | $100.00 |
| 43 | Removing (item description) 0702. removing existing pole (204.9060.S) | EACH | 1 | $750.00 | $750.00 | $375.00 |
| 44 | Removing (item description) 0105. removing drain slotted vane (204.9090.S) | LF | 545 | $23.00 | $25.14 | $21.30 |
| 45 | Excavation common (205.0100) | CY | 370,305 | $11.45 | $10.92 | $34.00 |
| 46 | Excavation marsh (205.0400) | CY | 7,350 | $11.45 | $10.92 | $34.00 |
| 47 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 500 | $75.00 | $61.40 | $74.00 |
| 48 | Excavation for structures bridges (structure) 0801. B-44-318 (206.1001) | EACH | 1 | $74,500 | $97,200 | $95,000 |
| 49 | Excavation for structures bridges (structure) 0802. B-44-319 (206.1001) | EACH | 1 | $86,000 | $126,200 | $1,065,000 |
| 50 | Excavation for structures bridges (structure) 0803. B-44-320 (206.1001) | EACH | 1 | $63,000 | $94,200 | $85,000 |
| 51 | Excavation for structures bridges (structure) 0804. B-44-321 (206.1001) | EACH | 1 | $69,500 | $126,200 | $1,055,000 |
| 52 | Excavation for structures bridges (structure) 0805. B-44-322 (206.1001) | EACH | 1 | $18,000 | $46,200 | $1,018,000 |
| 53 | Excavation for structures bridges (structure) 0806. B-44-323 (206.1001) | EACH | 1 | $18,000 | $46,200 | $1,018,000 |
| 54 | Backfill structure type A (210.1500) | TON | 8,050 | $28.00 | $36.50 | $40.00 |
| 55 | Finishing roadway (project) 0001. project ID 1130-64-73 (213.0100) | EACH | 1 | $5,000.00 | $1,000.00 | $500.00 |
| 56 | Finishing roadway (project) 0002. project ID 1130-64-77 (213.0100) | EACH | 1 | $2,500.00 | $1,000.00 | $500.00 |
| 57 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,970 | $42.00 | $25.65 | $34.61 |
| 58 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 112,995 | $12.20 | $16.15 | $0.01 |
| 59 | Base aggregate open-graded (310.0110) | TON | 310 | $45.00 | $35.00 | $29.48 |
| 60 | Select crushed material (312.0110) | TON | 442,560 | $11.75 | $15.55 | $0.01 |
| 61 | Concrete base 4-inch (320.0105) | SY | 4,325 | $55.10 | $56.10 | $55.27 |
| 62 | Removing pavement for base patching (390.0100) | CY | 50 | $500.00 | $300.00 | $240.00 |
| 63 | Base patching asphaltic (390.0201) | TON | 100 | $315.00 | $315.00 | $315.00 |
| 64 | Coloring concrete wisdot red (405.0100) | CY | 125 | $75.00 | $200.00 | $90.00 |
| 65 | Coloring concrete custom (405.0200) | CY | 440 | $60.00 | $200.00 | $110.00 |
| 66 | Concrete pavement 9-inch (415.0090) | SY | 21,560 | $63.47 | $65.00 | $68.68 |
| 67 | Concrete pavement 10-inch (415.0100) | SY | 15,350 | $73.20 | $76.00 | $72.43 |
| 68 | Concrete pavement gaps (415.0210) | EACH | 4 | $500.00 | $1,000.00 | $1,500.00 |
| 69 | Concrete pavement approach slab (415.0410) | SY | 842 | $215.00 | $195.00 | $230.00 |
| 70 | Concrete truck apron 12-inch (415.2010) | SY | 370 | $85.00 | $150.00 | $108.00 |
| 71 | Concrete pavement joint filling (415.4100) | SY | 20,910 | $2.17 | $1.50 | $1.50 |
| 72 | Drilled tie bars (416.0610) | EACH | 1,130 | $11.54 | $20.00 | $10.00 |
| 73 | Drilled dowel bars (416.0620) | EACH | 260 | $20.40 | $20.00 | $16.50 |
| 74 | HMA cold weather paving (450.4000) | TON | 2,485 | $5.25 | $5.25 | $5.25 |
| 75 | Tack coat (455.0605) | GAL | 4,704 | $4.45 | $4.45 | $4.45 |
| 76 | Incentive density HMA pavement (460.2000) | DOL | 1,300 | $1.00 | $1.00 | $1.00 |
| 77 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 660 | $96.75 | $96.75 | $96.75 |
| 78 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 830 | $118.75 | $118.75 | $118.75 |
| 79 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 330 | $98.75 | $98.75 | $98.75 |
| 80 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 190 | $121.10 | $121.10 | $121.10 |
| 81 | Asphaltic surface (465.0105) | TON | 4,370 | $97.80 | $97.80 | $97.80 |
| 82 | Asphaltic surface driveways and field entrances (465.0120) | TON | 16 | $195.00 | $195.00 | $195.00 |
| 83 | Asphaltic surface temporary (465.0125) | TON | 13,740 | $97.80 | $97.80 | $97.80 |
| 84 | Asphaltic curb (465.0310) | LF | 47 | $36.00 | $36.00 | $36.00 |
| 85 | Asphaltic flumes (465.0315) | SY | 60 | $65.00 | $65.00 | $65.00 |
| 86 | Cold patch (495.1000.S) | TON | 10 | $1,000.00 | $1.00 | $650.00 |
| 87 | Ice hot weather concreting (501.1000.S) | LB | 41,005 | $0.01 | $0.01 | $0.01 |
| 88 | Concrete masonry bridges (502.0100) | CY | 1,969 | $800.00 | $800.00 | $800.00 |
| 89 | Protective surface treatment (502.3200) | SY | 8,636 | $3.00 | $3.00 | $3.00 |
| 90 | Pigmented surface sealer (502.3210) | SY | 2,495 | $8.00 | $8.00 | $8.00 |
| 91 | Adhesive anchors 3/4-inch (502.4106) | EACH | 25 | $26.00 | $200.00 | $26.00 |
| 92 | Prestressed girder type I 36W-inch (503.0137) | LF | 7,227 | $285.00 | $285.00 | $285.00 |
| 93 | Concrete masonry retaining walls (504.0500) | CY | 1,373 | $600.00 | $600.00 | $600.00 |
| 94 | Bar steel reinforcement HS structures (505.0400) | LB | 70,010 | $1.24 | $1.24 | $1.24 |
| 95 | Bar steel reinforcement HS coated structures (505.0600) | LB | 1,101,460 | $1.37 | $1.37 | $1.37 |
| 96 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 13,320 | $3.79 | $3.79 | $3.79 |
| 97 | Bar couplers no. 4 (505.0904) | EACH | 56 | $35.00 | $35.00 | $35.00 |
| 98 | Bar couplers no. 5 (505.0905) | EACH | 1,197 | $43.00 | $43.00 | $43.00 |
| 99 | Bar couplers no. 6 (505.0906) | EACH | 100 | $51.00 | $51.00 | $51.00 |
| 100 | Bar couplers no. 8 (505.0908) | EACH | 48 | $116.00 | $116.00 | $116.00 |
| 101 | Bar couplers no. 10 (505.0910) | EACH | 44 | $227.00 | $227.00 | $227.00 |
| 102 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 244 | $135.00 | $135.00 | $135.00 |
| 103 | Steel diaphragms (structure) 0801. B-44-318 (506.4000) | EACH | 21 | $1,200.00 | $1,200.00 | $1,200.00 |
| 104 | Steel diaphragms (structure) 0802. B-44-319 (506.4000) | EACH | 21 | $1,200.00 | $1,200.00 | $1,200.00 |
| 105 | Steel diaphragms (structure) 0803. B-44-320 (506.4000) | EACH | 21 | $1,200.00 | $1,200.00 | $1,200.00 |
| 106 | Steel diaphragms (structure) 0804. B-44-321 (506.4000) | EACH | 21 | $1,200.00 | $1,200.00 | $1,200.00 |
| 107 | Steel diaphragms (structure) 0805. B-44-322 (506.4000) | EACH | 10 | $1,200.00 | $1,200.00 | $1,200.00 |
| 108 | Steel diaphragms (structure) 0806. B-44-323 (506.4000) | EACH | 12 | $1,200.00 | $1,200.00 | $1,200.00 |
| 109 | Polymer overlay (509.5100.S) | SY | 13,960 | $37.41 | $41.48 | $41.48 |
| 110 | Temporary shoring (511.1100) | SF | 14,800 | $0.01 | $70.00 | $0.01 |
| 111 | Temporary shoring (structure) 0801. B-44-318 (511.1200) | SF | 3,010 | $0.01 | $0.01 | $0.01 |
| 112 | Temporary shoring (structure) 0802. B-44-319 (511.1200) | SF | 4,180 | $0.01 | $0.01 | $0.01 |
| 113 | Temporary shoring (structure) 0803. B-44-320 (511.1200) | SF | 470 | $0.01 | $0.01 | $0.01 |
| 114 | Temporary shoring (structure) 0804. B-44-321 (511.1200) | SF | 2,970 | $90.00 | $90.00 | $90.00 |
| 115 | Temporary shoring (structure) 0904. R-44-38 (511.1200) | SF | 1,050 | $0.01 | $0.01 | $0.01 |
| 116 | Railing pipe (513.2001) | LF | 307 | $190.00 | $190.00 | $190.00 |
| 117 | Railing tubular screening (513.4091) | LF | 766 | $225.00 | $225.00 | $225.00 |
| 118 | Rubberized membrane waterproofing (516.0500) | SY | 257 | $40.00 | $40.00 | $40.00 |
| 119 | Concrete staining (structure) 0801. B-44-318 (517.1010.S) | SF | 6,280 | $2.15 | $2.15 | $2.15 |
| 120 | Concrete staining (structure) 0802. B-44-319 (517.1010.S) | SF | 6,725 | $2.15 | $2.15 | $2.15 |
| 121 | Concrete staining (structure) 0803. B-44-320 (517.1010.S) | SF | 5,990 | $2.15 | $2.15 | $2.15 |
| 122 | Concrete staining (structure) 0804. B-44-321 (517.1010.S) | SF | 6,280 | $2.15 | $2.15 | $2.15 |
| 123 | Concrete staining (structure) 0805. B-44-322 (517.1010.S) | SF | 6,390 | $2.15 | $2.15 | $2.15 |
| 124 | Concrete staining (structure) 0806. B-44-323 (517.1010.S) | SF | 7,320 | $2.15 | $2.15 | $2.15 |
| 125 | Concrete staining (structure) 0807. B-44-171 (517.1010.S) | SF | 8,280 | $2.15 | $2.15 | $2.15 |
| 126 | Concrete staining (structure) 0810. B-44-140 (517.1010.S) | SF | 9,870 | $2.15 | $2.15 | $2.15 |
| 127 | Concrete staining (structure) 0811. B-44-315 (517.1010.S) | SF | 6,100 | $2.15 | $2.15 | $2.15 |
| 128 | Concrete staining (structure) 0812. B-44-316 (517.1010.S) | SF | 5,700 | $2.15 | $2.15 | $2.15 |
| 129 | Concrete staining (structure) 0813. B-44-317 (517.1010.S) | SF | 9,270 | $2.15 | $2.15 | $2.15 |
| 130 | Concrete staining (structure) 0814. B-44-339 (517.1010.S) | SF | 8,590 | $2.15 | $2.15 | $2.15 |
| 131 | Concrete staining (structure) 0815. B-44-340 (517.1010.S) | SF | 11,950 | $2.15 | $2.15 | $2.15 |
| 132 | Concrete staining (structure) 0901. R-44-35 (517.1010.S) | SF | 8,430 | $2.15 | $2.15 | $2.15 |
| 133 | Concrete staining (structure) 0902. R-44-36 (517.1010.S) | SF | 13,504 | $2.15 | $2.15 | $2.15 |
| 134 | Concrete staining (structure) 0903. R-44-37 (517.1010.S) | SF | 12,355 | $2.15 | $2.15 | $2.15 |
| 135 | Concrete staining (structure) 0904. R-44-38 (517.1010.S) | SF | 4,350 | $2.15 | $2.15 | $2.15 |
| 136 | Concrete staining (structure) 0905. R-44-39 (517.1010.S) | SF | 4,100 | $2.15 | $2.15 | $2.15 |
| 137 | Concrete staining (structure) 0910. R-44-30 (517.1010.S) | SF | 4,390 | $2.15 | $2.15 | $2.15 |
| 138 | Concrete staining (structure) 0911. R-44-31 (517.1010.S) | SF | 4,450 | $2.15 | $2.15 | $2.15 |
| 139 | Concrete staining (structure) 0912. R-44-32 (517.1010.S) | SF | 2,640 | $2.15 | $2.15 | $2.15 |
| 140 | Concrete staining (structure) 0913. R-44-33 (517.1010.S) | SF | 2,780 | $2.15 | $2.15 | $2.15 |
| 141 | Concrete staining (structure) 0914. R-44-28 (517.1010.S) | SF | 27,410 | $2.15 | $2.15 | $2.15 |
| 142 | Concrete staining (structure) 0915. R-44-52 (517.1010.S) | SF | 20,790 | $2.15 | $2.15 | $2.15 |
| 143 | Concrete staining (structure) 0916. R-44-53 (517.1010.S) | SF | 20,940 | $2.15 | $2.15 | $2.15 |
| 144 | Culvert pipe temporary 12-inch (520.2012) | LF | 94 | $73.50 | $33.33 | $240.30 |
| 145 | Concrete collars for pipe (520.8000) | EACH | 2 | $995.00 | $641.25 | $850.00 |
| 146 | Culvert pipe reinforced concrete class IV 15-inch (522.0415) | LF | 15 | $84.50 | $150.11 | $103.25 |
| 147 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 259 | $90.00 | $177.84 | $96.45 |
| 148 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $1,200.00 | $1,217.69 | $1,077.50 |
| 149 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 45 | $1,250.00 | $1,269.49 | $1,124.40 |
| 150 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 8 | $1,330.00 | $1,391.98 | $1,252.00 |
| 151 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 22 | $1,550.00 | $1,592.01 | $1,514.00 |
| 152 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $1,790.00 | $1,814.94 | $1,872.50 |
| 153 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 192 | $183.00 | $201.41 | $198.50 |
| 154 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $1,630.00 | $1,806.91 | $1,551.75 |
| 155 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 6 | $2,110.00 | $2,200.57 | $2,097.50 |
| 156 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 4 | $2,510.00 | $2,667.28 | $2,631.00 |
| 157 | Apron endwalls for culvert pipe salvaged 15-inch (524.0615) | EACH | 1 | $487.00 | $803.00 | $695.00 |
| 158 | Apron endwalls for culvert pipe salvaged 24-inch (524.0624) | EACH | 1 | $574.00 | $1,105.00 | $890.50 |
| 159 | Apron endwalls for culvert pipe salvaged 30-inch (524.0630) | EACH | 3 | $713.00 | $1,410.00 | $1,174.00 |
| 160 | Concrete masonry ancillary structures type NS (531.1100) | CY | 6 | $900.00 | $1,800.00 | $1,800.00 |
| 161 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 900 | $4.50 | $4.00 | $4.00 |
| 162 | Drilling shaft 24-inch (531.2024) | LF | 50 | $40.00 | $100.00 | $100.00 |
| 163 | Drilling shaft 30-inch (531.2030) | LF | 60 | $125.00 | $175.00 | $175.00 |
| 164 | Drilling shaft 36-inch (531.2036) | LF | 362 | $150.00 | $175.00 | $175.00 |
| 165 | Drilling shaft 42-inch (531.2042) | LF | 184 | $450.00 | $175.00 | $175.00 |
| 166 | Foundation camera pole 50-FT (531.4050) | EACH | 1 | $2,500.00 | $2,500.00 | $2,960.00 |
| 167 | Foundation two-shaft butterfly type B-1 (structure) 1010. S-44-351 (531.5030) | EACH | 1 | $18,750 | $15,500 | $15,500 |
| 168 | Foundation two-shaft butterfly type B-1 (structure) 1011. S-44-361 (531.5030) | EACH | 1 | $18,750 | $15,500 | $15,500 |
| 169 | Foundation single-shaft type TF-IV (structure) 1001. S-44-354 (531.5440) | EACH | 2 | $14,000 | $10,500 | $10,500 |
| 170 | Foundation single-shaft type TF-IV (structure) 1002. S-44-356 (531.5440) | EACH | 2 | $14,000 | $10,500 | $10,500 |
| 171 | Foundation single-shaft type TF-IV (structure) 1003. S-44-357 (531.5440) | EACH | 2 | $14,000 | $10,500 | $10,500 |
| 172 | Foundation single-shaft type TF-IV (structure) 1005. S-44-359 (531.5440) | EACH | 2 | $14,000 | $10,500 | $10,500 |
| 173 | Foundation two-shaft type FF-II (structure) 1006. S-44-352 (531.6120) | EACH | 2 | $31,220 | $23,525 | $23,525 |
| 174 | Foundation two-shaft type FF-II (structure) 1007. S-44-353 (531.6120) | EACH | 2 | $31,220 | $23,525 | $23,525 |
| 175 | Foundation two-shaft type FF-II (structure) 1008. S-44-360 (531.6120) | EACH | 2 | $31,220 | $23,525 | $23,525 |
| 176 | Foundation two-shaft type FF-II (structure) 1009. S-44-362 (531.6120) | EACH | 2 | $31,220 | $23,525 | $23,525 |
| 177 | Anchor assemblies poles on structures (531.8990) | EACH | 6 | $1,500.00 | $700.00 | $1,000.00 |
| 178 | Butterfly 2-chord type 1 (structure) 1010. S-44-351 (532.5030) | EACH | 1 | $32,400 | $42,000 | $42,000 |
| 179 | Butterfly 2-chord type 1 (structure) 1011. S-44-361 (532.5030) | EACH | 1 | $32,400 | $42,000 | $42,000 |
| 180 | Truss full span 2-chord type II (structure) 1002. S-44-355 (532.5420) | EACH | 1 | $51,700 | $87,000 | $87,000 |
| 181 | Truss full span 2-chord type IV (structure) 1001. S-44-354 (532.5440) | EACH | 1 | $58,300 | $106,000 | $106,000 |
| 182 | Truss full span 2-chord type IV (structure) 1002. S-44-356 (532.5440) | EACH | 1 | $72,300 | $159,000 | $159,000 |
| 183 | Truss full span 2-chord type IV (structure) 1003. S-44-357 (532.5440) | EACH | 1 | $72,300 | $159,000 | $159,000 |
| 184 | Truss full span 2-chord type IV (structure) 1004. S-44-358 (532.5440) | EACH | 1 | $58,000 | $105,000 | $105,000 |
| 185 | Truss full span 2-chord type IV (structure) 1005. S-44-359 (532.5440) | EACH | 1 | $60,000 | $105,000 | $105,000 |
| 186 | Truss full span 4-chord type II (structure) 1006. S-44-352 (532.6120) | EACH | 1 | $90,400 | $107,500 | $107,500 |
| 187 | Truss full span 4-chord type II (structure) 1007. S-44-353 (532.6120) | EACH | 1 | $90,400 | $107,500 | $107,500 |
| 188 | Truss full span 4-chord type II (structure) 1008. S-44-360 (532.6120) | EACH | 1 | $90,850 | $112,500 | $112,500 |
| 189 | Truss full span 4-chord type II (structure) 1009. S-44-362 (532.6120) | EACH | 1 | $90,850 | $112,500 | $112,500 |
| 190 | Noise barriers double-sided sound absorptive (structure) 0951. N-44- 12 (541.0300.S) | SF | 47,300 | $73.00 | $73.00 | $73.00 |
| 191 | Noise barriers double-sided sound absorptive (structure) 0952. N-44- 13 (541.0300.S) | SF | 21,620 | $72.00 | $72.00 | $72.00 |
| 192 | Noise barriers double-sided sound absorptive (structure) 0953. N-44- 14 (541.0300.S) | SF | 58,340 | $70.00 | $70.00 | $70.00 |
| 193 | Noise barriers double-sided sound absorptive (structure) 0954. N-44- 15 (541.0300.S) | SF | 45,470 | $68.00 | $68.00 | $68.00 |
| 194 | Noise barriers double-sided sound absorptive (structure) 0955. N-44- 16 (541.0300.S) | SF | 57,080 | $68.00 | $68.00 | $68.00 |
| 195 | Noise barriers double-sided sound absorptive (structure) 0956. N-44- 19 (541.0300.S) | SF | 7,080 | $68.00 | $68.00 | $68.00 |
| 196 | Pile points (550.0500) | EACH | 389 | $123.00 | $123.00 | $123.00 |
| 197 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 14,715 | $65.00 | $65.00 | $65.00 |
| 198 | Piling steel HP 14-inch X 73 LB (550.1140) | LF | 4,410 | $80.00 | $80.00 | $80.00 |
| 199 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 3,250 | $22.00 | $40.50 | $29.95 |
| 200 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 940 | $22.00 | $40.50 | $26.10 |
| 201 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 5,620 | $20.00 | $40.50 | $25.00 |
| 202 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 630 | $28.00 | $43.00 | $30.45 |
| 203 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 100 | $55.00 | $60.00 | $60.00 |
| 204 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 84 | $55.00 | $60.00 | $60.00 |
| 205 | Concrete curb pedestrian (601.0600) | LF | 660 | $60.00 | $60.00 | $48.00 |
| 206 | Concrete sidewalk 4-inch (602.0405) | SF | 37,900 | $6.75 | $6.80 | $6.55 |
| 207 | Concrete sidewalk 5-inch (602.0410) | SF | 17,700 | $7.25 | $8.00 | $7.30 |
| 208 | Concrete sidewalk 7-inch (602.0420) | SF | 390 | $7.75 | $15.00 | $8.00 |
| 209 | Curb ramp detectable warning field natural patina (602.0515) | SF | 160 | $45.00 | $50.00 | $35.00 |
| 210 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 211 | $65.00 | $100.00 | $55.00 |
| 211 | Concrete driveway 6-inch (602.0810) | SY | 367 | $71.60 | $100.00 | $72.00 |
| 212 | Concrete driveway hes 6-inch (602.0860) | SY | 50 | $81.00 | $150.00 | $76.75 |
| 213 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 43,600 | $0.81 | $0.91 | $0.91 |
| 214 | Concrete barrier type S42 (603.1142) | LF | 265 | $261.94 | $200.00 | $266.00 |
| 215 | Concrete barrier type S56C (603.1456) | LF | 650 | $266.37 | $400.00 | $276.00 |
| 216 | Concrete barrier transition type S36 to S42 (603.3535) | EACH | 2 | $5,799.20 | $10,000 | $3,650.00 |
| 217 | Concrete barrier transition type V32 to S36 (603.3613) | EACH | 2 | $7,102.38 | $10,000 | $3,550.00 |
| 218 | Concrete barrier temporary precast delivered (603.8000) | LF | 123,310 | $11.00 | $11.00 | $11.00 |
| 219 | Concrete barrier temporary precast installed (603.8125) | LF | 166,010 | $4.00 | $4.00 | $4.00 |
| 220 | Anchoring concrete barrier temporary precast (603.8500) | LF | 21,050 | $7.50 | $7.50 | $7.50 |
| 221 | Slope paving concrete (604.0400) | SY | 1,103 | $100.00 | $125.00 | $125.00 |
| 222 | Slope paving select crushed material (604.0600) | SY | 2,320 | $18.75 | $25.00 | $25.00 |
| 223 | Riprap light (606.0100) | CY | 250 | $78.00 | $125.00 | $100.00 |
| 224 | Riprap medium (606.0200) | CY | 1,240 | $108.00 | $125.00 | $100.00 |
| 225 | Riprap heavy (606.0300) | CY | 1,190 | $72.00 | $125.00 | $100.00 |
| 226 | Relaid storm sewer 15-inch (608.0115) | LF | 70 | $77.00 | $140.72 | $57.40 |
| 227 | Relaid storm sewer 24-inch (608.0124) | LF | 112 | $83.50 | $143.18 | $74.75 |
| 228 | Relaid storm sewer 30-inch (608.0130) | LF | 44 | $79.50 | $150.84 | $102.50 |
| 229 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 294 | $98.00 | $179.03 | $82.15 |
| 230 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 315 | $93.50 | $92.91 | $85.65 |
| 231 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 34 | $101.00 | $176.66 | $99.95 |
| 232 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 629 | $59.00 | $73.39 | $75.15 |
| 233 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 3,260 | $88.00 | $153.38 | $78.00 |
| 234 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 1,618 | $95.50 | $156.25 | $83.40 |
| 235 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 15,294 | $100.00 | $110.05 | $93.40 |
| 236 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 212 | $151.00 | $210.11 | $144.30 |
| 237 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (608.2319) | LF | 109 | $182.00 | $171.00 | $147.85 |
| 238 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 14X23-inch (608.2414) | LF | 191 | $133.00 | $143.72 | $135.85 |
| 239 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 516 | $165.00 | $164.32 | $161.50 |
| 240 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 535 | $179.00 | $201.80 | $199.70 |
| 241 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429) | LF | 419 | $254.00 | $291.93 | $271.80 |
| 242 | Reconstructing inlets (611.0430) | EACH | 1 | $346.00 | $1,617.18 | $1,700.00 |
| 243 | Manhole covers type J (611.0530) | EACH | 8 | $927.00 | $1,216.59 | $443.75 |
| 244 | Manhole covers type J-special (611.0535) | EACH | 2 | $948.00 | $1,217.99 | $461.50 |
| 245 | Manhole covers type L (611.0545) | EACH | 3 | $693.00 | $1,167.59 | $332.00 |
| 246 | Inlet covers type B (611.0606) | EACH | 6 | $1,110.00 | $1,387.39 | $693.20 |
| 247 | Inlet covers type BW (611.0610) | EACH | 11 | $1,190.00 | $1,764.12 | $673.20 |
| 248 | Inlet covers type C (611.0612) | EACH | 1 | $953.00 | $1,215.19 | $467.00 |
| 249 | Inlet covers type H (611.0624) | EACH | 66 | $1,070.00 | $1,629.72 | $657.40 |
| 250 | Inlet covers type HM (611.0627) | EACH | 4 | $1,070.00 | $1,629.72 | $657.40 |
| 251 | Inlet covers type MS (611.0642) | EACH | 25 | $560.00 | $599.20 | $455.25 |
| 252 | Inlet covers type S (611.0651) | EACH | 2 | $1,060.00 | $1,801.92 | $651.00 |
| 253 | Inlet covers type V (611.0654) | EACH | 2 | $1,010.00 | $1,477.12 | $607.00 |
| 254 | Inlet covers type VV-B (611.0656) | EACH | 170 | $2,040.00 | $2,804.32 | $1,550.55 |
| 255 | Manholes 3-FT diameter (611.2003) | EACH | 2 | $1,580.00 | $1,907.15 | $3,290.50 |
| 256 | Manholes 4-FT diameter (611.2004) | EACH | 3 | $2,170.00 | $2,608.80 | $3,892.75 |
| 257 | Manholes 5-FT diameter (611.2005) | EACH | 176 | $3,620.00 | $4,138.55 | $6,025.20 |
| 258 | Manholes 6-FT diameter (611.2006) | EACH | 3 | $4,600.00 | $5,052.15 | $6,798.00 |
| 259 | Manholes 7-FT diameter (611.2007) | EACH | 2 | $6,040.00 | $6,541.53 | $8,883.75 |
| 260 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $10,300 | $10,352 | $12,686 |
| 261 | Manholes 9-FT diameter (611.2009) | EACH | 2 | $15,800 | $20,186 | $17,566 |
| 262 | Manholes 3X3-FT (611.2033) | EACH | 6 | $3,020.00 | $3,587.07 | $5,555.00 |
| 263 | Inlets 3-FT diameter (611.3003) | EACH | 6 | $1,530.00 | $1,587.25 | $3,125.00 |
| 264 | Inlets 4-FT diameter (611.3004) | EACH | 67 | $2,020.00 | $2,546.09 | $4,107.50 |
| 265 | Inlets 2X2.5-FT (611.3225) | EACH | 12 | $1,260.00 | $1,704.35 | $2,882.00 |
| 266 | Inlets median 1 grate (611.3901) | EACH | 13 | $2,140.00 | $2,043.02 | $3,213.75 |
| 267 | Inlets median 2 grate (611.3902) | EACH | 6 | $2,780.00 | $2,849.05 | $4,046.75 |
| 268 | Adjusting manhole covers (611.8110) | EACH | 2 | $458.00 | $660.79 | $475.00 |
| 269 | Adjusting inlet covers (611.8115) | EACH | 6 | $332.00 | $774.32 | $475.00 |
| 270 | Cover plates temporary (611.8120.S) | EACH | 21 | $164.00 | $150.00 | $190.00 |
| 271 | Pipe underdrain 6-inch (612.0106) | LF | 5,020 | $9.30 | $15.00 | $15.70 |
| 272 | Pipe underdrain unperforated 4- inch (612.0204) | LF | 98 | $31.00 | $40.00 | $28.95 |
| 273 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 510 | $7.00 | $10.00 | $14.00 |
| 274 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 4,223 | $7.00 | $10.00 | $5.00 |
| 275 | Steel plate beam guard temporary (614.0360) | LF | 350 | $24.50 | $26.00 | $26.00 |
| 276 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 238 | $42.00 | $35.00 | $35.00 |
| 277 | Crash cushions temporary (614.0905) | EACH | 22 | $4,725.00 | $4,725.00 | $4,725.00 |
| 278 | MGS guardrail temporary thrie beam transition (614.1100) | LF | 192 | $78.00 | $77.00 | $77.00 |
| 279 | MGS guardrail 3 (614.2300) | LF | 150 | $29.50 | $40.00 | $40.00 |
| 280 | MGS thrie beam transition (614.2500) | LF | 236.40 | $95.00 | $90.00 | $90.00 |
| 281 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $3,800.00 | $4,800.00 | $4,800.00 |
| 282 | Fence chain link 6-FT (616.0206) | LF | 17,305 | $24.15 | $24.15 | $24.15 |
| 283 | Fence safety (616.0700.S) | LF | 2,000 | $5.00 | $5.00 | $5.00 |
| 284 | Maintenance and repair of haul roads (project) 0001. project ID 1130-64-73 (618.0100) | EACH | 1 | $1.00 | $1.00 | $100.00 |
| 285 | Maintenance and repair of haul roads (project) 0002. project ID 1130-64-77 (618.0100) | EACH | 1 | $1.00 | $1.00 | $100.00 |
| 286 | Mobilization (619.1000) | EACH | 1 | $9,158,040 | $13,940,000 | $8,775,017 |
| 287 | Concrete median sloped nose (620.0300) | SF | 490 | $12.00 | $20.00 | $15.00 |
| 288 | Dust control surface treatment (623.0200) | SY | 354,870 | $0.01 | $0.01 | $0.01 |
| 289 | Water (624.0100) | MGAL | 1,650 | $65.00 | $35.00 | $110.00 |
| 290 | Topsoil (625.0100) | SY | 8,700 | $3.50 | $4.80 | $3.50 |
| 291 | Salvaged topsoil (625.0500) | SY | 172,800 | $1.50 | $1.40 | $3.50 |
| 292 | Silt fence (628.1504) | LF | 6,100 | $2.00 | $3.00 | $3.00 |
| 293 | Silt fence maintenance (628.1520) | LF | 26,410 | $0.01 | $0.01 | $0.01 |
| 294 | Mobilizations erosion control (628.1905) | EACH | 43 | $150.00 | $1.00 | $1.00 |
| 295 | Mobilizations emergency erosion control (628.1910) | EACH | 22 | $100.00 | $1.00 | $1.00 |
| 296 | Erosion mat class I type B (628.2004) | SY | 252,800 | $1.20 | $1.15 | $1.15 |
| 297 | Erosion mat urban class I type B (628.2008) | SY | 18,980 | $1.80 | $1.80 | $1.80 |
| 298 | Inlet protection type A (628.7005) | EACH | 268 | $5.00 | $1.00 | $1.00 |
| 299 | Inlet protection type B (628.7010) | EACH | 207 | $60.00 | $90.00 | $90.00 |
| 300 | Inlet protection type C (628.7015) | EACH | 80 | $65.00 | $90.00 | $90.00 |
| 301 | Temporary ditch checks (628.7504) | LF | 3,495 | $6.85 | $6.00 | $6.00 |
| 302 | Stone ditch checks (628.7515.S) | CY | 50 | $425.00 | $125.00 | $40.00 |
| 303 | Culvert pipe checks (628.7555) | EACH | 93 | $14.00 | $20.00 | $20.00 |
| 304 | Tracking pads (628.7560) | EACH | 27 | $1,100.00 | $1,685.00 | $500.00 |
| 305 | Rock bags (628.7570) | EACH | 10 | $14.00 | $20.00 | $20.00 |
| 306 | Fertilizer type B (629.0210) | CWT | 127 | $90.00 | $125.00 | $125.00 |
| 307 | Seeding mixture no. 30 (630.0130) | LB | 8,130 | $7.00 | $7.95 | $7.95 |
| 308 | Seeding mixture no. 40 (630.0140) | LB | 250 | $7.75 | $12.00 | $12.00 |
| 309 | Seeding temporary (630.0200) | LB | 4,100 | $4.50 | $2.00 | $2.00 |
| 310 | Seed water (630.0500) | MGAL | 6,020 | $1.00 | $0.01 | $0.01 |
| 311 | Trees (species, root, size) 0001. baldcypress, B&B, 2.5" cal. (632.0101) | EACH | 5 | $700.00 | $100.00 | $100.00 |
| 312 | Trees (species, root, size) 0002. buckeye, 'early glow', B&B, 2.5" cal. (632.0101) | EACH | 1 | $1,180.00 | $100.00 | $100.00 |
| 313 | Trees (species, root, size) 0003. elm, 'triumph', B&B, 2.5" cal. (632.0101) | EACH | 2 | $560.00 | $100.00 | $100.00 |
| 314 | Trees (species, root, size) 0004. hackberry, B&B, 2.5" cal. (632.0101) | EACH | 4 | $657.00 | $100.00 | $100.00 |
| 315 | Trees (species, root, size) 0005. maple, 'siena glen', B&B, 2.5" cal. (632.0101) | EACH | 3 | $682.50 | $100.00 | $100.00 |
| 316 | Trees (species, root, size) 0006. oak, hybrid swamp X bur, B&B, 2.5" cal. (632.0101) | EACH | 7 | $1,075.00 | $100.00 | $100.00 |
| 317 | Trees (species, root, size) 0007. oak, swamp white, B&B, 2.5" cal. (632.0101) | EACH | 9 | $682.50 | $100.00 | $100.00 |
| 318 | Trees (species, root, size) 0008. hawthorn, 'winter king' (shrub form tree), B&B, 6' HT. (632.0101) | EACH | 14 | $500.00 | $100.00 | $100.00 |
| 319 | Trees (species, root, size) 0009. serviceberry, 'autumn brilliance' (shrub form tree), B&B, 6' HT. (632.0101) | EACH | 5 | $455.00 | $100.00 | $100.00 |
| 320 | Trees (species, root, size) 0010. witchhazel (shrub form tree), B&B, 6' HT. (632.0101) | EACH | 13 | $790.00 | $100.00 | $100.00 |
| 321 | Shrubs (species, root, size) 0001. black chokeberry 'iroquois beauty', cont., 24" SPRD. / #3 (632.0201) | EACH | 42 | $65.00 | $10.00 | $10.00 |
| 322 | Shrubs (species, root, size) 0002. juniper, 'broadmoor', cont., 24" SPRD. / #3 (632.0201) | EACH | 47 | $105.00 | $10.00 | $10.00 |
| 323 | Shrubs (species, root, size) 0003. juniper, 'kallay'S compact' pfitzer, cont., 24" SPRD. / #3 (632.0201) | EACH | 63 | $79.00 | $10.00 | $10.00 |
| 324 | Shrubs (species, root, size) 0004. honeysuckle, dwarf bush, cont., 24" SPRD. / #3 (632.0201) | EACH | 82 | $75.00 | $10.00 | $10.00 |
| 325 | Shrubs (species, root, size) 0005. viburnum, 'lil' ditty', 24" SPRD. / #3 (632.0201) | EACH | 462 | $95.00 | $10.00 | $10.00 |
| 326 | Landscape planting surveillance and care cycles (632.9101) | EACH | 40 | $800.00 | $1,100.00 | $1,100.00 |
| 327 | Delineator posts steel (633.0100) | EACH | 6 | $28.00 | $90.00 | $90.00 |
| 328 | Delineator reflectors (633.0500) | EACH | 6 | $6.00 | $20.00 | $20.00 |
| 329 | Delineators barrier wall (633.1000) | EACH | 453 | $65.00 | $48.00 | $48.00 |
| 330 | Markers culvert end (633.5200) | EACH | 82 | $66.00 | $85.00 | $85.00 |
| 331 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 37 | $80.00 | $125.00 | $125.00 |
| 332 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 17 | $84.00 | $135.00 | $135.00 |
| 333 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 20 | $88.00 | $145.00 | $145.00 |
| 334 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 22 | $200.00 | $300.00 | $300.00 |
| 335 | Sign supports structural steel HS (635.0200) | LB | 3,800 | $4.75 | $7.00 | $7.00 |
| 336 | Signs type I reflective SH (637.1220) | SF | 3,727 | $28.50 | $29.00 | $29.00 |
| 337 | Signs type II reflective H (637.2210) | SF | 1,145 | $22.45 | $23.00 | $23.00 |
| 338 | Signs type II reflective H folding (637.2215) | SF | 102.88 | $30.45 | $40.00 | $40.00 |
| 339 | Signs type II reflective F (637.2230) | SF | 215.75 | $23.40 | $24.00 | $24.00 |
| 340 | Moving signs type II (638.2102) | EACH | 60 | $50.00 | $150.00 | $150.00 |
| 341 | Removing signs type I (638.2601) | EACH | 7 | $350.00 | $500.00 | $500.00 |
| 342 | Removing signs type II (638.2602) | EACH | 107 | $30.00 | $50.00 | $50.00 |
| 343 | Removing small sign supports (638.3000) | EACH | 118 | $30.00 | $50.00 | $50.00 |
| 344 | Removing structural steel sign supports (638.3100) | EACH | 10 | $350.00 | $925.00 | $925.00 |
| 345 | Moving small sign supports (638.4000) | EACH | 32 | $75.00 | $50.00 | $50.00 |
| 346 | Traffic control drums (643.0300) | DAY | 389,121 | $0.15 | $0.15 | $0.15 |
| 347 | Traffic control barricades type III (643.0420) | DAY | 14,997 | $0.50 | $0.50 | $0.50 |
| 348 | Traffic control flexible tubular marker posts (643.0500) | EACH | 12 | $50.00 | $50.00 | $50.00 |
| 349 | Traffic control flexible tubular marker bases (643.0600) | EACH | 12 | $20.00 | $20.00 | $20.00 |
| 350 | Traffic control warning lights type A (643.0705) | DAY | 29,622 | $0.10 | $0.10 | $0.10 |
| 351 | Traffic control warning lights type C (643.0715) | DAY | 130,801 | $0.10 | $0.10 | $0.10 |
| 352 | Traffic control connected arrow boards (643.0810) | DAY | 2,771 | $7.85 | $7.85 | $7.85 |
| 353 | Traffic control signs (643.0900) | DAY | 323,976 | $0.15 | $0.15 | $0.15 |
| 354 | Traffic control covering signs type I (643.0910) | EACH | 69 | $230.00 | $230.00 | $230.00 |
| 355 | Traffic control covering signs type II (643.0920) | EACH | 82 | $78.00 | $78.00 | $78.00 |
| 356 | Traffic control signs fixed message (643.1000) | SF | 1,868.75 | $21.00 | $21.00 | $21.00 |
| 357 | Traffic control signs PCMS (643.1050) | DAY | 4,165 | $10.25 | $10.25 | $10.25 |
| 358 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 2,988 | $4.55 | $4.55 | $4.55 |
| 359 | Temporary marking line epoxy 6- inch (643.3170) | LF | 339,900 | $0.44 | $0.44 | $0.44 |
| 360 | Temporary marking line removable tape 6-inch (643.3180) | LF | 3,150 | $2.25 | $2.25 | $2.25 |
| 361 | Temporary marking line epoxy 10- inch (643.3270) | LF | 17,210 | $1.52 | $1.52 | $1.52 |
| 362 | Temporary marking raised pavement marker type II (643.3770) | EACH | 420 | $3.15 | $3.15 | $3.15 |
| 363 | Traffic control (643.5000) | EACH | 1 | $725,500 | $725,500 | $725,500 |
| 364 | Temporary pedestrian barricade (644.1810) | LF | 325 | $7.25 | $7.25 | $7.25 |
| 365 | Temporary audible message devices (644.1900.S) | DAY | 10,732 | $2.25 | $2.25 | $2.25 |
| 366 | Geotextile type C (645.0105) | SY | 3,800 | $3.00 | $2.30 | $3.00 |
| 367 | Geotextile type DF schedule A (645.0111) | SY | 3,570 | $3.00 | $1.00 | $5.00 |
| 368 | Geotextile type HR (645.0120) | SY | 4,174 | $6.00 | $4.00 | $4.00 |
| 369 | Geotextile type MS (645.0125) | SY | 20 | $30.00 | $50.00 | $60.00 |
| 370 | Geotextile type R (645.0130) | SY | 640 | $8.00 | $3.40 | $3.50 |
| 371 | Geotextile type sas (645.0140) | SY | 3,075 | $5.00 | $3.40 | $3.00 |
| 372 | Marking line epoxy 4-inch (646.1020) | LF | 1,100 | $0.50 | $0.50 | $0.50 |
| 373 | Marking line epoxy 6-inch (646.2020) | LF | 17,680 | $0.50 | $0.50 | $0.50 |
| 374 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 179,300 | $1.35 | $1.35 | $1.35 |
| 375 | Marking line epoxy 10-inch (646.4020) | LF | 890 | $1.10 | $1.10 | $1.10 |
| 376 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 23,260 | $2.90 | $2.90 | $2.90 |
| 377 | Marking arrow epoxy (646.5020) | EACH | 77 | $394.05 | $394.05 | $394.05 |
| 378 | Marking word epoxy (646.5120) | EACH | 26 | $398.85 | $398.85 | $398.85 |
| 379 | Marking symbol epoxy (646.5220) | EACH | 13 | $382.40 | $382.40 | $382.40 |
| 380 | Marking stop line epoxy 18-inch (646.6120) | LF | 570 | $16.53 | $16.53 | $16.53 |
| 381 | Cold weather marking epoxy 6-inch (646.6466) | LF | 66,300 | $0.50 | $0.50 | $0.50 |
| 382 | Cold weather marking epoxy 10- inch (646.6470) | LF | 10,510 | $1.10 | $1.10 | $1.10 |
| 383 | Marking chevron epoxy 24-inch (646.7220) | LF | 160 | $27.12 | $27.12 | $27.12 |
| 384 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,300 | $15.67 | $15.67 | $15.67 |
| 385 | Marking corrugated median epoxy (646.8020) | SF | 410 | $9.33 | $9.33 | $9.33 |
| 386 | Marking curb epoxy (646.8120) | LF | 60 | $7.91 | $7.91 | $7.91 |
| 387 | Marking island nose epoxy (646.8220) | EACH | 7 | $297.19 | $297.19 | $297.19 |
| 388 | Marking removal line 4-inch (646.9000) | LF | 11,280 | $0.40 | $0.40 | $0.40 |
| 389 | Marking removal line water blasting 4-inch (646.9010) | LF | 1,100 | $0.40 | $0.40 | $0.40 |
| 390 | Marking removal line water blasting 6-inch (646.9012) | LF | 95,960 | $0.40 | $0.40 | $0.40 |
| 391 | Marking removal line 8-inch (646.9100) | LF | 2,440 | $0.75 | $0.75 | $0.75 |
| 392 | Marking removal line water blasting 10-inch (646.9112) | LF | 9,020 | $1.25 | $1.25 | $1.25 |
| 393 | Marking removal special marking (646.9300) | EACH | 17 | $75.00 | $75.00 | $75.00 |
| 394 | Marking removal special marking water blasting (646.9310) | EACH | 16 | $250.00 | $250.00 | $250.00 |
| 395 | Conduit rigid metallic 2-inch (652.0125) | LF | 135 | $475.00 | $475.00 | $225.00 |
| 396 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 270 | $9.00 | $9.00 | $8.50 |
| 397 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 23,139 | $10.00 | $10.00 | $10.00 |
| 398 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 6,471 | $14.00 | $14.00 | $13.80 |
| 399 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 1,690 | $16.00 | $16.00 | $15.90 |
| 400 | Install conduit into existing item (652.0700.S) | EACH | 2 | $275.00 | $275.00 | $400.00 |
| 401 | Conduit loop detector (652.0800) | LF | 2,562 | $6.00 | $6.00 | $6.00 |
| 402 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 6 | $2,400.00 | $2,400.00 | $2,400.00 |
| 403 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 78 | $2,475.00 | $2,475.00 | $2,500.00 |
| 404 | Junction boxes 18X12X6-inch (653.0222) | EACH | 5 | $2,950.00 | $2,950.00 | $2,050.00 |
| 405 | Adjusting pull boxes (653.0900) | EACH | 1 | $875.00 | $875.00 | $75.00 |
| 406 | Removing pull boxes (653.0905) | EACH | 35 | $100.00 | $100.00 | $100.00 |
| 407 | Concrete bases type 1 (654.0101) | EACH | 12 | $1,250.00 | $1,250.00 | $1,250.00 |
| 408 | Concrete bases type 2 (654.0102) | EACH | 7 | $1,700.00 | $1,700.00 | $1,665.00 |
| 409 | Concrete bases type 5 (654.0105) | EACH | 33 | $1,575.00 | $1,575.00 | $1,550.00 |
| 410 | Concrete bases type 7 (654.0107) | EACH | 9 | $1,750.00 | $1,750.00 | $1,750.00 |
| 411 | Concrete bases type 13 (654.0113) | EACH | 2 | $18,000 | $18,000 | $18,000 |
| 412 | Concrete bases type 10-special (654.0120) | EACH | 4 | $7,500.00 | $7,500.00 | $13,750 |
| 413 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 2 | $2,400.00 | $2,400.00 | $2,600.00 |
| 414 | Concrete control cabinet bases type L30 (654.0230) | EACH | 2 | $2,400.00 | $2,400.00 | $2,190.00 |
| 415 | Cable traffic signal 5-14 AWG (655.0230) | LF | 9,050 | $2.65 | $2.65 | $2.25 |
| 416 | Cable traffic signal 12-14 AWG (655.0260) | LF | 506 | $4.05 | $4.05 | $4.80 |
| 417 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 2,475 | $1.90 | $1.90 | $2.50 |
| 418 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 3,679 | $1.10 | $1.10 | $1.25 |
| 419 | Electrical wire lighting 12 AWG (655.0610) | LF | 45,807 | $1.00 | $1.00 | $1.10 |
| 420 | Electrical wire lighting 6 AWG (655.0625) | LF | 30,692 | $3.00 | $3.00 | $2.25 |
| 421 | Electrical wire lighting 4 AWG (655.0630) | LF | 23,215 | $2.75 | $2.75 | $3.10 |
| 422 | Electrical wire lighting 2 AWG (655.0635) | LF | 8,455 | $3.75 | $3.75 | $4.25 |
| 423 | Loop detector lead in cable (655.0700) | LF | 4,765 | $1.90 | $1.90 | $2.30 |
| 424 | Loop detector wire (655.0800) | LF | 8,048 | $1.00 | $1.00 | $2.00 |
| 425 | Electrical service meter breaker pedestal (location) 0001. S44-1400 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $2,250.00 |
| 426 | Electrical service meter breaker pedestal (location) 0002. S44-0580 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $2,250.00 |
| 427 | Electrical service meter breaker pedestal (location) 0003. CB500 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $2,250.00 |
| 428 | Electrical service meter breaker pedestal (location) 0701. MB3-1 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $2,250.00 |
| 429 | Electrical service main lugs only meter pedestal (location) 0001. CB400 (656.0401) | EACH | 1 | $1,850.00 | $1,850.00 | $1,575.00 |
| 430 | Electrical service breaker disconnect box (location) 0001. CB3-1 (656.0501) | EACH | 1 | $850.00 | $850.00 | $1,050.00 |
| 431 | Electrical service breaker disconnect box (location) 0002. CB3-2 (656.0501) | EACH | 1 | $850.00 | $850.00 | $1,050.00 |
| 432 | Pedestal bases (657.0100) | EACH | 12 | $270.00 | $270.00 | $525.00 |
| 433 | Transformer bases breakaway 15- 17 inch bolt circle (657.0210) | EACH | 14 | $748.00 | $748.00 | $1,075.00 |
| 434 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 42 | $641.00 | $641.00 | $945.00 |
| 435 | Poles type 3 (657.0310) | EACH | 7 | $3,100.00 | $3,100.00 | $3,850.00 |
| 436 | Poles type 5-aluminum (657.0322) | EACH | 31 | $1,762.00 | $1,762.00 | $2,550.00 |
| 437 | Poles type 17-aluminum (657.0337) | EACH | 14 | $3,655.00 | $3,655.00 | $5,100.00 |
| 438 | Poles type 9 - over height special (657.0348) | EACH | 2 | $12,137 | $12,137 | $14,800 |
| 439 | Poles type 10 - over height special (657.0353) | EACH | 2 | $13,126 | $13,126 | $16,175 |
| 440 | Poles type 13-over height (657.0361) | EACH | 2 | $15,995 | $15,995 | $19,900 |
| 441 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 7 | $567.00 | $567.00 | $1,025.00 |
| 442 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 5 | $519.00 | $519.00 | $950.00 |
| 443 | Monotube arms 35-FT-special (657.0536) | EACH | 2 | $5,580.00 | $5,580.00 | $6,800.00 |
| 444 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $5,777.00 | $5,777.00 | $7,500.00 |
| 445 | Monotube arms 50-FT (657.0550) | EACH | 2 | $11,848 | $11,848 | $15,600 |
| 446 | Luminaire arms single member 6- inch clamp 4-FT (657.0620) | EACH | 19 | $352.00 | $352.00 | $510.00 |
| 447 | Luminaire arms truss type 4-inch clamp 12-FT (657.0709) | EACH | 6 | $705.00 | $705.00 | $1,125.00 |
| 448 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 35 | $687.00 | $687.00 | $2,000.00 |
| 449 | Luminaire arms steel 12-FT (657.0812) | EACH | 4 | $1,795.00 | $1,795.00 | $1,350.00 |
| 450 | Traffic signal face 3S 12-inch (658.0173) | EACH | 30 | $680.00 | $680.00 | $1,200.00 |
| 451 | Pedestrian signal face 16-inch (658.0416) | EACH | 12 | $505.00 | $505.00 | $900.00 |
| 452 | Pedestrian push buttons (658.0500) | EACH | 12 | $480.00 | $480.00 | $645.00 |
| 453 | Signal mounting hardware (location) 0001. S44-1400 (658.5070) | EACH | 1 | $6,235.00 | $6,235.00 | $5,900.00 |
| 454 | Signal mounting hardware (location) 0002. S44-0580 (658.5070) | EACH | 1 | $6,235.00 | $6,235.00 | $5,900.00 |
| 455 | Underdeck lighting (structure) 0001. B-44-320 (659.0601) | EACH | 1 | $10,060 | $10,060 | $9,300.00 |
| 456 | Underdeck lighting (structure) 0002. B-44-321 (659.0601) | EACH | 1 | $8,650.00 | $8,650.00 | $9,300.00 |
| 457 | Luminaires utility LED B (659.1120) | EACH | 45 | $400.00 | $400.00 | $725.00 |
| 458 | Luminaires utility LED C (659.1125) | EACH | 19 | $426.00 | $426.00 | $750.00 |
| 459 | Luminaires underdeck LED B (659.1210) | EACH | 4 | $550.00 | $550.00 | $745.00 |
| 460 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 1 | $8,575.00 | $8,575.00 | $10,500 |
| 461 | Lighting control cabinets 240/480 30-inch (659.2230) | EACH | 1 | $9,975.00 | $9,975.00 | $12,300 |
| 462 | Lamp, ballast, LED, switch disposal by contractor 0001. S44-1400 (659.5000.S) | EACH | 46 | $75.00 | $75.00 | $85.00 |
| 463 | Lamp, ballast, LED, switch disposal by contractor 0002. S44-0580 (659.5000.S) | EACH | 45 | $75.00 | $75.00 | $85.00 |
| 464 | Ramp closure gates 30-FT (662.1030.S) | EACH | 1 | $28,245 | $28,245 | $31,400 |
| 465 | Ramp closure gates 32-FT (662.1032.S) | EACH | 1 | $28,475 | $28,475 | $31,700 |
| 466 | Ramp closure gates 40-FT (662.1040.S) | EACH | 2 | $29,225 | $29,225 | $32,700 |
| 467 | Field system integrator (670.0101) | EACH | 1 | $35,025 | $35,025 | $45,400 |
| 468 | ITS documentation (670.0201) | EACH | 1 | $6,500.00 | $6,500.00 | $9,900.00 |
| 469 | Conduit HDPE 3-duct 2-inch (671.0132) | LF | 6,328 | $10.00 | $10.00 | $37.55 |
| 470 | Conduit HDPE 4-duct 2-inch (671.0142) | LF | 5,453 | $12.00 | $12.00 | $42.85 |
| 471 | Fiber optic cable marker (671.0300) | EACH | 42 | $75.00 | $75.00 | $30.00 |
| 472 | Communication vault type 1 (673.0105) | EACH | 10 | $2,450.00 | $2,450.00 | $525.00 |
| 473 | Tracer wire marker posts (673.0200) | EACH | 20 | $150.00 | $150.00 | $43.00 |
| 474 | Install pole mounted cabinet (673.1225.S) | EACH | 6 | $2,875.00 | $2,875.00 | $2,800.00 |
| 475 | Cable microwave detector (674.0200) | LF | 6,023 | $4.00 | $4.00 | $5.75 |
| 476 | Remove cable (674.0300) | LF | 14,112 | $2.00 | $2.00 | $1.00 |
| 477 | Install mounted controller microwave detector assembly (675.0300) | EACH | 4 | $3,400.00 | $3,400.00 | $2,400.00 |
| 478 | Install camera pole 50-FT (677.0150) | EACH | 1 | $4,325.00 | $4,325.00 | $3,275.00 |
| 479 | Install camera assembly (677.0200) | EACH | 2 | $2,705.00 | $2,705.00 | $2,300.00 |
| 480 | Removing 50-FT camera pole (677.9051.S) | EACH | 1 | $2,870.00 | $2,870.00 | $3,700.00 |
| 481 | Install fiber optic cable outdoor plant 12-CT (678.0012) | LF | 1,474 | $2.00 | $2.00 | $1.10 |
| 482 | Install fiber optic cable outdoor plant 72-CT (678.0072) | LF | 9,479 | $2.00 | $2.00 | $1.32 |
| 483 | Fiber optic splice enclosure (678.0200) | EACH | 1 | $1,500.00 | $1,500.00 | $2,100.00 |
| 484 | Fiber optic splice (678.0300) | EACH | 80 | $150.00 | $150.00 | $190.00 |
| 485 | Fiber optic termination (678.0400) | EACH | 12 | $225.00 | $225.00 | $470.00 |
| 486 | Communication system testing (678.0501) | EACH | 1 | $6,500.00 | $6,500.00 | $8,200.00 |
| 487 | Install ethernet switches (678.0600) | EACH | 3 | $1,000.00 | $1,000.00 | $1,250.00 |
| 488 | Install wireless antennas (678.0700) | EACH | 2 | $3,100.00 | $3,100.00 | $2,100.00 |
| 489 | Sawing asphalt (690.0150) | LF | 35,005 | $1.35 | $1.35 | $1.35 |
| 490 | Sawing concrete (690.0250) | LF | 13,760 | $2.50 | $2.50 | $2.50 |
| 491 | Incentive strength concrete structures (715.0502) | DOL | 32,808 | $1.00 | $1.00 | $1.00 |
| 492 | Incentive strength concrete barrier (715.0603) | DOL | 22,018 | $1.00 | $1.00 | $1.00 |
| 493 | Incentive flexural strength concrete pavement (715.0715) | DOL | 64,113 | $1.00 | $1.00 | $1.00 |
| 494 | Railroad flagging reimbursement (801.0117) | DOL | 193,140 | $1.00 | $1.00 | $1.00 |
| 495 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 |
| 496 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 5,760 | $5.00 | $5.00 | $5.00 |
| 497 | Special 0100. roadway embankment (SPV.0035) | CY | 158,800 | $0.01 | $1.16 | $0.01 |
| 498 | Special 0125. abandoning box culvert (SPV.0035) | CY | 350 | $192.00 | $220.00 | $159.30 |
| 499 | Special 0800. HPC masonry structures (SPV.0035) | CY | 3,499 | $925.00 | $925.00 | $925.00 |
| 500 | Special 5000. planting mixture (SPV.0035) | CY | 583 | $125.00 | $85.00 | $85.00 |
| 501 | Special 5010. topsoil special (SPV.0035) | CY | 200 | $75.00 | $60.00 | $60.00 |
| 502 | Special 0100. incentive iri ride PCC surfaces (SPV.0055) | DOL | 111,231 | $1.00 | $1.00 | $1.00 |
| 503 | Special 0100. baseline CPM progress schedule (SPV.0060) | EACH | 1 | $5,000.00 | $5,000.00 | $100.00 |
| 504 | Special 0105. CPM progress schedule and accepted revisions (SPV.0060) | EACH | 20 | $100.00 | $1.00 | $100.00 |
| 505 | Special 0110. construction staking survey project 1130-64-73 (SPV.0060) | EACH | 1 | $305,157 | $350,000 | $305,657 |
| 506 | Special 0115. construction staking survey project 1130-64-77 (SPV.0060) | EACH | 1 | $82,308 | $75,000 | $82,308 |
| 507 | Special 0120. inlet covers type U (SPV.0060) | EACH | 1 | $1,630.00 | $1,678.72 | $662.50 |
| 508 | Special 0125. removing cover plates (SPV.0060) | EACH | 4 | $329.00 | $100.00 | $82.50 |
| 509 | Special 0126. removing storm sewer plug (SPV.0060) | EACH | 1 | $1,500.00 | $150.00 | $200.00 |
| 510 | Special 0140. utility line opening (SPV.0060) | EACH | 15 | $1,000.00 | $1,000.00 | $950.00 |
| 511 | Special 0200. removing casting bolts (SPV.0060) | EACH | 17 | $38.00 | $150.00 | $50.00 |
| 512 | Special 0210. storm sewer plug (SPV.0060) | EACH | 42 | $329.00 | $216.02 | $277.50 |
| 513 | Special 0215. reconnect storm sewer (SPV.0060) | EACH | 32 | $400.00 | $756.50 | $575.00 |
| 514 | Special 0230. inlet covers type Y (SPV.0060) | EACH | 13 | $3,290.00 | $1,391.59 | $1,399.50 |
| 515 | Special 0240. sealing storm structure (SPV.0060) | EACH | 4 | $1,140.00 | $500.00 | $600.00 |
| 516 | Special 0270. inlet marker (SPV.0060) | EACH | 171 | $22.00 | $50.00 | $50.00 |
| 517 | Special 0300. mobilizations emergency pavement repair (SPV.0060) | EACH | 4 | $7,775.00 | $6,000.00 | $9,125.00 |
| 518 | Special 0305. emergency response to traffic involving concrete barrier temporary (SPV.0060) | EACH | 20 | $1,815.00 | $1,500.00 | $1,815.00 |
| 519 | Special 0310. emergency response to traffic involving crash cushion temporary (SPV.0060) | EACH | 10 | $775.00 | $775.00 | $775.00 |
| 520 | Special 0315. maintain and remove crash cushions temporary left in place (SPV.0060) | EACH | 1 | $975.00 | $975.00 | $975.00 |
| 521 | Special 0320. temporary concrete barrier gate 24-FT (SPV.0060) | EACH | 5 | $7,625.00 | $7,625.00 | $7,625.00 |
| 522 | Special 0400. fixed message sign portable support (SPV.0060) | EACH | 94 | $350.00 | $350.00 | $350.00 |
| 523 | Special 0405. fire hydrant sign mounting (SPV.0060) | EACH | 18 | $375.00 | $375.00 | $375.00 |
| 524 | Special 0500. anchor bolt cover shroud (SPV.0060) | EACH | 35 | $525.00 | $525.00 | $375.00 |
| 525 | Special 0501. concrete bases type 7 tall (SPV.0060) | EACH | 40 | $3,275.00 | $3,275.00 | $2,000.00 |
| 526 | Special 0502. electrical service meter breaker pedestal special (MBP100) (SPV.0060) | EACH | 1 | $3,500.00 | $3,500.00 | $10,000 |
| 527 | Special 0601. removing traffic signals S44-1400 (SPV.0060) | EACH | 1 | $25,000 | $25,000 | $14,350 |
| 528 | Special 0602. removing traffic signals S44-0580 (SPV.0060) | EACH | 1 | $25,000 | $25,000 | $14,350 |
| 529 | Special 0701. salvaging ramp gate system (SPV.0060) | EACH | 4 | $1,750.00 | $1,750.00 | $1,350.00 |
| 530 | Special 0702. install ethernet extender (SPV.0060) | EACH | 8 | $450.00 | $450.00 | $580.00 |
| 531 | Special 0703. salvaging microwave detector equipment (SPV.0060) | EACH | 1 | $1,895.00 | $1,895.00 | $2,400.00 |
| 532 | Special 0704. salvaging wireless antennas (SPV.0060) | EACH | 2 | $1,895.00 | $1,895.00 | $1,000.00 |
| 533 | Special 0800. decorative silhouette (SPV.0060) | EACH | 6 | $4,000.00 | $4,000.00 | $4,000.00 |
| 534 | Special 0801. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure B-44-171 (SPV.0060) | EACH | 1 | $8,500.00 | $13,000 | $13,000 |
| 535 | Special 0802. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure B-44-315 (SPV.0060) | EACH | 1 | $8,500.00 | $13,000 | $13,000 |
| 536 | Special 0803. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure B-44-316 (SPV.0060) | EACH | 1 | $8,500.00 | $13,000 | $13,000 |
| 537 | Special 0804. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure B-44-317 (SPV.0060) | EACH | 1 | $8,500.00 | $13,000 | $13,000 |
| 538 | Special 0805. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure B-44-339 (SPV.0060) | EACH | 1 | $8,500.00 | $18,000 | $18,000 |
| 539 | Special 0806. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure B-44-340 (SPV.0060) | EACH | 1 | $8,500.00 | $18,000 | $18,000 |
| 540 | Special 0807. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure B-44-140 (SPV.0060) | EACH | 1 | $8,500.00 | $13,000 | $13,000 |
| 541 | Special 0901. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure R-44-28 (SPV.0060) | EACH | 1 | $8,500.00 | $22,000 | $22,000 |
| 542 | Special 0902. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure R-44-33 (SPV.0060) | EACH | 1 | $8,500.00 | $11,000 | $11,000 |
| 543 | Special 0903. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure R-44-52 (SPV.0060) | EACH | 1 | $8,500.00 | $19,700 | $19,700 |
| 544 | Special 0904. concrete staining- excavation,GRDNG,SHPNG,and finishing,structure R-44-53 (SPV.0060) | EACH | 1 | $8,500.00 | $18,000 | $18,000 |
| 545 | Special 0910. vibrating wire piezometer (SPV.0060) | EACH | 2 | $11,825 | $12,200 | $10,000 |
| 546 | Special 0925. geotechnical instrumentation, R-44-36 (SPV.0060) | EACH | 1 | $11,020 | $11,350 | $80,000 |
| 547 | Special 0950. anchor assemblies noise barrier structures (SPV.0060) | EACH | 32 | $550.00 | $550.00 | $550.00 |
| 548 | Special 1205. adjusting sanitary manhole covers (SPV.0060) | EACH | 6 | $648.00 | $1,089.96 | $766.75 |
| 549 | Special 1210. adjusting hydrant (SPV.0060) | EACH | 1 | $1,140.00 | $1,997.80 | $1,250.00 |
| 550 | Special 5000. accent boulder (SPV.0060) | EACH | 85 | $145.00 | $325.00 | $325.00 |
| 551 | Special 5010. perennials, junegrass, container, #1 (SPV.0060) | EACH | 280 | $32.00 | $5.00 | $5.00 |
| 552 | Special 5020. perennials, prairie dropseed (tara), container, #1 (SPV.0060) | EACH | 633 | $32.00 | $5.00 | $5.00 |
| 553 | Special 5030. perennials, purple love grass, container, #1 (SPV.0060) | EACH | 201 | $32.00 | $5.00 | $5.00 |
| 554 | Special 5040. perennials, side oats grama, container, #1 (SPV.0060) | EACH | 211 | $32.00 | $5.00 | $5.00 |
| 555 | Special 5050. perennials, switch grass (shenandoah), container, #1 (SPV.0060) | EACH | 29 | $32.00 | $5.00 | $5.00 |
| 556 | Special 5060. perennials, aster (october skies), container, #1 (SPV.0060) | EACH | 219 | $32.00 | $5.00 | $5.00 |
| 557 | Special 5070. perennials, black- eyed susan (american gold rush), container, #1 (SPV.0060) | EACH | 495 | $32.00 | $5.00 | $5.00 |
| 558 | Special 5080. perennials, butterfly milkweed, container, #1 (SPV.0060) | EACH | 249 | $32.00 | $5.00 | $5.00 |
| 559 | Special 5090. perennials, dwarf false indigo, container, #1 (SPV.0060) | EACH | 180 | $32.00 | $5.00 | $5.00 |
| 560 | Special 5100. perennials, prairie spiderwort, container, #1 (SPV.0060) | EACH | 539 | $32.00 | $5.00 | $5.00 |
| 561 | Special 5110. perennials, purple prairie clover, container, #1 (SPV.0060) | EACH | 335 | $32.00 | $5.00 | $5.00 |
| 562 | Special 0100. street sweeping (SPV.0075) | HRS | 820 | $190.00 | $300.00 | $275.00 |
| 563 | Special 0105. animal carcass removal (SPV.0075) | HRS | 45 | $110.00 | $200.00 | $300.00 |
| 564 | Special 5000. low maintenance seed mix (SPV.0085) | LB | 665 | $10.00 | $11.00 | $11.00 |
| 565 | Special 0100. concrete curb & gutter integral 30-inch special (SPV.0090) | LF | 61 | $20.00 | $100.00 | $65.00 |
| 566 | Special 0101. concrete curb & gutter 30-inch special (SPV.0090) | LF | 53 | $85.00 | $100.00 | $42.00 |
| 567 | Special 0105. concrete barrier type S42 special (SPV.0090) | LF | 20,350 | $73.66 | $89.00 | $72.64 |
| 568 | Special 0110. concrete barrier type S56 special (SPV.0090) | LF | 22,770 | $84.25 | $105.00 | $84.91 |
| 569 | Special 0120. HMA longitudinal joint repair (SPV.0090) | LF | 25,900 | $7.45 | $7.45 | $7.45 |
| 570 | Special 0200. drain slotted vane permanent (SPV.0090) | LF | 277 | $229.00 | $249.95 | $275.00 |
| 571 | Special 0205. drain slotted vane temporary (SPV.0090) | LF | 4,718 | $100.00 | $203.00 | $275.00 |
| 572 | Special 0300. maintain and remove concrete barrier temporary left in place (SPV.0090) | LF | 1,920 | $9.00 | $9.00 | $9.00 |
| 573 | Special 0305. glare screen temporary (SPV.0090) | LF | 1,310 | $7.00 | $7.00 | $7.00 |
| 574 | Special 0800. removing existing timber piling (SPV.0090) | LF | 280 | $40.00 | $40.00 | $40.00 |
| 575 | Special 0801. removing existing steel piling (SPV.0090) | LF | 220 | $40.00 | $40.00 | $40.00 |
| 576 | Special 0802. fence chain link polymer-coated 6-FT. B-44-171 (SPV.0090) | LF | 212 | $92.00 | $92.00 | $92.00 |
| 577 | Special 0803. fence chain link polymer-coated 8-FT. B-44-171 (SPV.0090) | LF | 212 | $98.00 | $98.00 | $98.00 |
| 578 | Special 0804. fence chain link polymer-coated 6-FT. B-44-140 (SPV.0090) | LF | 484 | $92.00 | $92.00 | $92.00 |
| 579 | Special 0805. removing existing bridge chain link fencing (SPV.0090) | LF | 908 | $10.00 | $10.00 | $22.00 |
| 580 | Special 0900. piling sleeves (SPV.0090) | LF | 176 | $75.00 | $75.00 | $75.00 |
| 581 | Special 0904. fence chain link polymer-coated 6-FT R-44-38 (SPV.0090) | LF | 206 | $92.00 | $92.00 | $92.00 |
| 582 | Special 0905. fence chain link polymer-coated 6-FT R-44-39 (SPV.0090) | LF | 200 | $92.00 | $92.00 | $92.00 |
| 583 | Special 5000. metal edging (SPV.0090) | LF | 1,938 | $19.50 | $11.00 | $11.00 |
| 584 | Special 0800. longitudinal grooving bridge deck (SPV.0165) | SF | 71,044 | $0.72 | $1.04 | $0.72 |
| 585 | Special 0801. temporary shoring railroad (SPV.0165) | SF | 4,420 | $0.01 | $0.01 | $0.01 |
| 586 | Special 0802. tinted sealer reseal (SPV.0165) | SF | 8,470 | $2.26 | $2.26 | $2.26 |
| 587 | Special 0900. temporary wall wire faced mechanically stabilized earth (SPV.0165) | SF | 17,440 | $0.01 | $0.01 | $80.30 |
| 588 | Special 0901. wall concrete panel mechanically stabilized earth R-44- 35 (SPV.0165) | SF | 7,930 | $103.00 | $96.00 | $127.30 |
| 589 | Special 0902. wall concrete panel mechanically stabilized earth R-44- 36 (SPV.0165) | SF | 12,386 | $88.00 | $96.00 | $127.30 |
| 590 | Special 0903. wall concrete panel mechanically stabilized earth R-44- 37 (SPV.0165) | SF | 10,531 | $88.00 | $96.00 | $127.30 |
| 591 | Special 0904. wall concrete panel mechanically stabilized earth LFCF R-44-38 (SPV.0165) | SF | 5,435 | $133.00 | $185.00 | $227.30 |
| 592 | Special 0905. wall concrete panel mechanically stabilized earth LFCF R-44-39 (SPV.0165) | SF | 5,160 | $130.00 | $185.00 | $227.30 |
| 593 | Special 0100. concrete pavement 10 1/2-inch special (SPV.0180) | SY | 176,800 | $59.77 | $63.61 | $65.60 |
| 594 | Special 0101. concrete base variable depth (SPV.0180) | SY | 37 | $65.00 | $300.00 | $67.27 |
| 595 | Special 5000. shredded hardwood bark mulch (SPV.0180) | SY | 1,872 | $7.25 | $11.00 | $11.00 |
| 596 | Special 5000. stone cobbles (SPV.0195) | TON | 345 | $120.00 | $122.00 | $122.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.