WisDOT contract 20260210024 bid tabulation
1500-49-60. Let by Wisconsin DOT on February 10, 2026, Calumet. 4 bids received; low bid $4,156,597 by Northeast Asphalt, Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 179
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northeast Asphalt, Inc | $4,156,597 | Low |
| 2 | Sommers Construction Co., Inc. | $4,183,726 | +1.0% |
| 3 | Vinton Construction Company | $4,266,291 | +3.0% |
| 4 | Zignego Company, Inc. | $4,281,494 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northeast Asphalt, Inc | 2. Sommers Construction Co., Inc. | 3. Vinton Construction Company | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $820.00 | $550.00 | $820.00 | $1,000.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 1,025 | $10.70 | $18.15 | $10.70 | $20.00 |
| 3 | Removing concrete pavement butt joints (204.0105) | SY | 520 | $13.10 | $17.00 | $17.00 | $17.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 3,667 | $5.47 | $4.25 | $5.47 | $5.00 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 500 | $12.45 | $17.00 | $17.00 | $17.00 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 50,740 | $1.00 | $2.88 | $2.88 | $2.88 |
| 7 | Removing curb & gutter (204.0150) | LF | 1,595 | $8.00 | $7.75 | $8.00 | $13.50 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 90 | $13.50 | $19.00 | $13.50 | $20.00 |
| 9 | Removing guardrail (204.0165) | LF | 1,405 | $2.00 | $2.00 | $2.00 | $2.25 |
| 10 | Removing delineators and markers (204.0180) | EACH | 3 | $50.00 | $50.00 | $50.00 | $10.00 |
| 11 | Removing (item description) 01. apron endwalls (204.9060.S) | EACH | 3 | $440.00 | $400.00 | $440.00 | $500.00 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 1500-49-60 (211.0101) | EACH | 1 | $19,100 | $8,736.00 | $8,736.00 | $8,736.00 |
| 13 | Prepare foundation for asphaltic paving (project) 02. 1500-49-61 (211.0101) | EACH | 1 | $13,100 | $13,538 | $13,538 | $13,538 |
| 14 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 5 | $395.00 | $460.00 | $460.00 | $460.00 |
| 15 | Finishing roadway (project) 01. 1500-49-60 (213.0100) | EACH | 1 | $2,150.00 | $2,000.00 | $2,500.00 | $1,000.00 |
| 16 | Finishing roadway (project) 02. 1500-49-61 (213.0100) | EACH | 1 | $2,150.00 | $2,000.00 | $2,500.00 | $1,000.00 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 3,210 | $28.99 | $28.30 | $28.99 | $40.00 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,339 | $20.25 | $25.15 | $20.25 | $24.00 |
| 19 | Removing pavement for base patching (390.0100) | CY | 670 | $0.01 | $49.95 | $0.01 | $100.00 |
| 20 | Base patching concrete hes (390.0305) | CY | 595 | $436.76 | $299.00 | $436.76 | $312.00 |
| 21 | Base patching concrete shes (390.0405) | CY | 75 | $525.00 | $365.00 | $525.00 | $412.00 |
| 22 | Coloring concrete wisdot red (405.0100) | CY | 6 | $100.00 | $150.00 | $100.00 | $200.00 |
| 23 | Concrete pavement 9-inch (415.0090) | SY | 300 | $82.30 | $85.00 | $82.30 | $94.00 |
| 24 | Concrete pavement 12-inch (415.0120) | SY | 18 | $175.00 | $145.00 | $175.00 | $200.00 |
| 25 | Drilled tie bars (416.0610) | EACH | 1,690 | $9.00 | $7.65 | $9.00 | $15.00 |
| 26 | Drilled dowel bars (416.0620) | EACH | 5,095 | $17.50 | $13.95 | $17.50 | $15.00 |
| 27 | Concrete pavement repair (416.1710) | SY | 585 | $105.19 | $95.00 | $105.19 | $96.00 |
| 28 | Concrete pavement replacement (416.1720) | SY | 2,050 | $109.19 | $95.00 | $109.19 | $96.00 |
| 29 | Continuous diamond grinding concrete pavement (420.1000) | SY | 58,780 | $0.65 | $4.95 | $4.50 | $4.45 |
| 30 | HMA cold weather paving (450.4000) | TON | 1,555 | $4.25 | $0.01 | $0.01 | $0.01 |
| 31 | Tack coat (455.0605) | GAL | 10,495 | $3.10 | $2.05 | $2.05 | $2.05 |
| 32 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,450.00 | $4,284.00 | $4,284.00 | $4,284.00 |
| 33 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $4,750.00 | $5,319.00 | $5,319.00 | $5,319.00 |
| 34 | Incentive density PWL HMA pavement (460.2005) | DOL | 6,548 | $1.00 | $1.00 | $1.00 | $1.00 |
| 35 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 4,710 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | Incentive air voids HMA pavement (460.2010) | DOL | 17,265 | $1.00 | $1.00 | $1.00 | $1.00 |
| 37 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 17,265 | $91.10 | $75.50 | $75.50 | $75.50 |
| 38 | Asphaltic surface patching (465.0110) | TON | 503 | $174.90 | $144.00 | $144.00 | $144.00 |
| 39 | Asphaltic flumes (465.0315) | SY | 15 | $74.50 | $75.00 | $75.00 | $75.00 |
| 40 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 43,645 | $0.14 | $0.14 | $0.14 | $0.14 |
| 41 | Asphaltic rumble strips, shoulder (465.0520) | LF | 1,825 | $0.45 | $0.45 | $0.45 | $0.45 |
| 42 | Asphaltic rumble strips, centerline (465.0560) | LF | 600 | $1.75 | $1.75 | $1.75 | $1.75 |
| 43 | Cleaning culvert pipes (520.8700) | EACH | 35 | $490.00 | $630.00 | $490.00 | $700.00 |
| 44 | Apron endwalls for culvert pipe sloped side drains steel 18-inch 10 to 1 (521.1618) | EACH | 2 | $2,472.00 | $3,700.00 | $2,472.00 | $1,800.00 |
| 45 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 70 | $99.95 | $166.00 | $99.95 | $175.00 |
| 46 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $1,786.00 | $2,000.00 | $1,786.00 | $1,250.00 |
| 47 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 1 | $2,737.00 | $2,250.00 | $2,737.00 | $1,800.00 |
| 48 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 755 | $50.00 | $42.00 | $50.00 | $60.00 |
| 49 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 670 | $45.00 | $44.00 | $45.00 | $60.00 |
| 50 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 270 | $45.00 | $44.00 | $45.00 | $60.00 |
| 51 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 32 | $55.00 | $72.00 | $55.00 | $100.00 |
| 52 | Concrete curb pedestrian (601.0600) | LF | 30 | $50.00 | $72.00 | $50.00 | $100.00 |
| 53 | Concrete sidewalk 5-inch (602.0410) | SF | 2,615 | $8.60 | $8.25 | $8.60 | $10.10 |
| 54 | Concrete sidewalk 6-inch (602.0415) | SF | 760 | $9.00 | $8.95 | $9.00 | $12.00 |
| 55 | Curb ramp detectable warning field natural patina (602.0515) | SF | 60 | $45.00 | $35.00 | $45.00 | $50.00 |
| 56 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 50 | $53.00 | $65.00 | $53.00 | $100.00 |
| 57 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 10,320 | $0.75 | $0.75 | $0.75 | $0.75 |
| 58 | Riprap medium (606.0200) | CY | 60 | $100.00 | $116.50 | $100.00 | $150.00 |
| 59 | Adjusting manhole covers (611.8110) | EACH | 1 | $500.00 | $900.00 | $500.00 | $1,800.00 |
| 60 | Adjusting inlet covers (611.8115) | EACH | 8 | $480.00 | $900.00 | $480.00 | $1,000.00 |
| 61 | Pipe underdrain 6-inch (612.0106) | LF | 12 | $28.00 | $75.00 | $28.00 | $100.00 |
| 62 | Barrier system grading shaping finishing (614.0010) | EACH | 6 | $11,293 | $7,900.00 | $11,293 | $7,000.00 |
| 63 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $13,000 | $13,000 | $13,000 | $15,525 |
| 64 | Steel thrie beam (614.0230) | LF | 150 | $33.00 | $33.00 | $33.00 | $37.00 |
| 65 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 50 | $75.00 | $75.00 | $75.00 | $100.00 |
| 66 | MGS guardrail 3 (614.2300) | LF | 803.10 | $25.73 | $25.73 | $25.73 | $25.73 |
| 67 | MGS guardrail 3 K (614.2330) | LF | 62.50 | $45.33 | $45.33 | $45.33 | $45.33 |
| 68 | MGS guardrail 3 L (614.2340) | LF | 562.50 | $34.35 | $34.35 | $34.35 | $34.35 |
| 69 | MGS guardrail short radius (614.2350) | LF | 50 | $35.00 | $35.00 | $35.00 | $35.00 |
| 70 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $3,293.00 | $3,293.00 | $3,293.00 | $3,535.00 |
| 71 | MGS guardrail terminal type 2 (614.2620) | EACH | 3 | $2,393.00 | $2,393.00 | $2,393.00 | $2,393.00 |
| 72 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,133.00 | $2,133.00 | $2,133.00 | $2,133.00 |
| 73 | Anchor post assembly top mount (614.8010) | EACH | 3 | $1,033.00 | $1,033.00 | $1,033.00 | $1,033.00 |
| 74 | Maintenance and repair of haul roads (project) 01. 1500-49-60 (618.0100) | EACH | 1 | $1.00 | $0.01 | $0.01 | $1.00 |
| 75 | Maintenance and repair of haul roads (project) 02. 1500-49-61 (618.0100) | EACH | 1 | $1.00 | $0.01 | $0.01 | $1.00 |
| 76 | Mobilization (619.1000) | EACH | 1 | $225,450 | $259,855 | $309,000 | $292,000 |
| 77 | Concrete median sloped nose (620.0300) | SF | 535 | $20.00 | $15.00 | $20.00 | $20.00 |
| 78 | Water (624.0100) | MGAL | 15 | $50.00 | $100.00 | $50.00 | $200.00 |
| 79 | Topsoil (625.0100) | SY | 730 | $10.73 | $9.95 | $10.73 | $0.01 |
| 80 | Silt fence (628.1504) | LF | 3,200 | $1.70 | $1.70 | $1.70 | $2.00 |
| 81 | Silt fence maintenance (628.1520) | LF | 3,200 | $0.03 | $0.03 | $0.03 | $0.01 |
| 82 | Mobilizations erosion control (628.1905) | EACH | 5 | $293.00 | $293.00 | $293.00 | $300.00 |
| 83 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $353.00 | $353.00 | $353.00 | $0.01 |
| 84 | Erosion mat class I type A (628.2002) | SY | 730 | $2.50 | $2.50 | $2.50 | $0.01 |
| 85 | Inlet protection type A (628.7005) | EACH | 3 | $125.00 | $125.00 | $125.00 | $65.00 |
| 86 | Inlet protection type C (628.7015) | EACH | 11 | $55.00 | $55.00 | $55.00 | $65.00 |
| 87 | Temporary ditch checks (628.7504) | LF | 400 | $6.00 | $6.00 | $6.00 | $5.50 |
| 88 | Culvert pipe checks (628.7555) | EACH | 12 | $50.00 | $50.00 | $50.00 | $22.00 |
| 89 | Rock bags (628.7570) | EACH | 300 | $5.33 | $5.33 | $5.33 | $16.00 |
| 90 | Fertilizer type B (629.0210) | CWT | 1.10 | $150.00 | $150.00 | $150.00 | $100.00 |
| 91 | Seeding mixture no. 30 (630.0130) | LB | 10 | $25.00 | $25.00 | $25.00 | $413.00 |
| 92 | Seeding mixture no. 40 (630.0140) | LB | 7 | $30.00 | $30.00 | $30.00 | $413.00 |
| 93 | Seed water (630.0500) | MGAL | 22 | $50.00 | $50.00 | $50.00 | $0.01 |
| 94 | Markers culvert end (633.5200) | EACH | 13 | $75.00 | $75.00 | $75.00 | $80.00 |
| 95 | Moving signs type II (638.2102) | EACH | 6 | $150.00 | $150.00 | $150.00 | $100.00 |
| 96 | Field office type B (642.5001) | EACH | 1 | $100.00 | $10,000 | $12,000 | $20,000 |
| 97 | Traffic control drums (643.0300) | DAY | 64,120 | $0.15 | $0.15 | $0.15 | $0.15 |
| 98 | Traffic control barricades type III (643.0420) | DAY | 5,675 | $0.45 | $0.55 | $0.45 | $0.45 |
| 99 | Traffic control flexible tubular marker posts (643.0500) | EACH | 282 | $25.00 | $38.00 | $25.00 | $25.00 |
| 100 | Traffic control flexible tubular marker bases (643.0600) | EACH | 282 | $6.00 | $10.00 | $6.00 | $6.00 |
| 101 | Traffic control warning lights type A (643.0705) | DAY | 5,678 | $0.15 | $0.20 | $0.15 | $0.15 |
| 102 | Traffic control warning lights type C (643.0715) | DAY | 6,510 | $0.15 | $0.20 | $0.15 | $0.15 |
| 103 | Traffic control connected arrow boards (643.0810) | DAY | 309 | $15.00 | $8.55 | $15.00 | $15.00 |
| 104 | Traffic control signs (643.0900) | DAY | 16,852 | $0.35 | $0.20 | $0.35 | $0.35 |
| 105 | Traffic control covering signs type I (643.0910) | EACH | 3 | $150.00 | $275.00 | $150.00 | $150.00 |
| 106 | Traffic control covering signs type II (643.0920) | EACH | 11 | $75.00 | $105.00 | $75.00 | $75.00 |
| 107 | Traffic control signs fixed message (643.1000) | SF | 49 | $29.00 | $24.00 | $29.00 | $29.00 |
| 108 | Traffic control signs PCMS (643.1050) | DAY | 306 | $50.00 | $20.00 | $50.00 | $50.00 |
| 109 | Traffic control cones 42-inch (643.1070) | DAY | 65,110 | $0.25 | $0.15 | $0.25 | $0.25 |
| 110 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 309 | $5.00 | $7.25 | $5.00 | $5.00 |
| 111 | Temporary marking line paint 6- inch (643.3165) | LF | 67,770 | $0.35 | $0.25 | $0.35 | $0.35 |
| 112 | Temporary marking line removable tape 6-inch (643.3180) | LF | 26,940 | $1.50 | $1.75 | $1.50 | $1.50 |
| 113 | Temporary marking line removable tape 10-inch (643.3280) | LF | 975 | $4.05 | $3.50 | $4.05 | $4.05 |
| 114 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 360 | $1.50 | $2.50 | $1.50 | $1.50 |
| 115 | Temporary marking arrow removable tape (643.3550) | EACH | 3 | $55.00 | $145.00 | $55.00 | $55.00 |
| 116 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 52 | $8.50 | $6.45 | $8.50 | $8.50 |
| 117 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 982 | $1.05 | $2.75 | $1.05 | $1.05 |
| 118 | Traffic control (643.5000) | EACH | 1 | $15,000 | $86,185 | $15,000 | $15,000 |
| 119 | Temporary pedestrian surface asphalt (644.1410) | SF | 1,230 | $9.00 | $9.60 | $9.00 | $9.60 |
| 120 | Temporary pedestrian surface matting (644.1440) | SF | 80 | $12.00 | $5.15 | $12.00 | $12.00 |
| 121 | Temporary pedestrian curb ramp (644.1601) | DAY | 7 | $25.00 | $25.25 | $25.00 | $25.00 |
| 122 | Temporary pedestrian detectable warning field (644.1605) | SF | 248 | $3.00 | $4.55 | $3.00 | $3.00 |
| 123 | Temporary pedestrian barricade (644.1810) | LF | 1,035 | $4.75 | $5.45 | $4.75 | $4.75 |
| 124 | Temporary audible message devices (644.1900.S) | DAY | 21 | $2.50 | $6.25 | $2.50 | $2.50 |
| 125 | Geotextile type HR (645.0120) | SY | 185 | $4.27 | $6.15 | $4.27 | $6.85 |
| 126 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 9,970 | $0.87 | $0.87 | $0.87 | $0.87 |
| 127 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 83,930 | $1.32 | $1.32 | $1.32 | $1.32 |
| 128 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 9,970 | $7.24 | $7.24 | $7.24 | $7.24 |
| 129 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 30 | $2.82 | $2.82 | $2.82 | $2.82 |
| 130 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 5,450 | $12.89 | $12.89 | $12.89 | $12.89 |
| 131 | Marking arrow epoxy (646.5020) | EACH | 29 | $383.02 | $383.02 | $383.02 | $383.02 |
| 132 | Marking word epoxy (646.5120) | EACH | 6 | $387.68 | $387.68 | $387.68 | $387.68 |
| 133 | Marking symbol epoxy (646.5220) | EACH | 2 | $371.69 | $371.69 | $371.69 | $371.69 |
| 134 | Marking outfall epoxy (646.5520) | EACH | 250 | $49.80 | $49.80 | $49.80 | $49.80 |
| 135 | Marking stop line epoxy 18-inch (646.6120) | LF | 304 | $16.06 | $16.06 | $16.06 | $16.06 |
| 136 | Cold weather marking epoxy 6-inch (646.6466) | LF | 10,405 | $0.48 | $0.48 | $0.48 | $0.48 |
| 137 | Cold weather marking epoxy 10- inch (646.6470) | LF | 550 | $1.07 | $1.07 | $1.07 | $1.07 |
| 138 | Marking diagonal epoxy 12-inch (646.7120) | LF | 750 | $15.65 | $15.65 | $15.65 | $15.65 |
| 139 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 755 | $15.23 | $15.23 | $15.23 | $15.23 |
| 140 | Marking curb epoxy (646.8120) | LF | 90 | $7.68 | $7.68 | $7.68 | $7.68 |
| 141 | Marking island nose epoxy (646.8220) | EACH | 7 | $288.87 | $288.87 | $288.87 | $288.87 |
| 142 | Marking parking stall epoxy (646.8320) | LF | 1,060 | $5.22 | $5.22 | $5.22 | $5.22 |
| 143 | Marking removal line 4-inch (646.9000) | LF | 3,097 | $0.75 | $1.00 | $0.75 | $0.75 |
| 144 | Marking removal line 6-inch (646.9002) | LF | 90 | $0.75 | $1.00 | $0.75 | $0.75 |
| 145 | Marking removal line wide (646.9200) | LF | 40 | $3.25 | $3.25 | $3.25 | $3.25 |
| 146 | Marking removal special marking (646.9300) | EACH | 7 | $75.00 | $100.00 | $75.00 | $75.00 |
| 147 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,702 | $1.25 | $1.25 | $1.25 | $1.25 |
| 148 | Construction staking pipe culverts (650.6000) | EACH | 1 | $200.00 | $200.00 | $200.00 | $200.00 |
| 149 | Construction staking resurfacing reference (650.8000) | LF | 42,036 | $0.10 | $0.10 | $0.10 | $0.10 |
| 150 | Construction staking curb ramps (650.9000) | EACH | 5 | $50.00 | $50.00 | $50.00 | $50.00 |
| 151 | Construction staking sidewalk (project) 01. 1500-49-60 (650.9500) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 152 | Construction staking sidewalk (project) 02. 1500-49-61 (650.9500) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 153 | Construction staking supplemental control (project) 01.1500-49-60 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 154 | Construction staking supplemental control (project) 02. 1500-49-61 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 155 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 5 | $20.00 | $20.00 | $20.00 | $20.00 |
| 156 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 80 | $20.00 | $20.00 | $20.00 | $20.00 |
| 157 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 180 | $20.00 | $20.00 | $20.00 | $20.00 |
| 158 | Conduit loop detector (652.0800) | LF | 1,386 | $6.00 | $6.00 | $6.00 | $6.00 |
| 159 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 14 | $3,450.00 | $3,450.00 | $3,450.00 | $3,450.00 |
| 160 | Removing pull boxes (653.0905) | EACH | 21 | $100.00 | $100.00 | $100.00 | $100.00 |
| 161 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,979 | $2.00 | $2.00 | $2.00 | $2.00 |
| 162 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,147 | $2.35 | $2.35 | $2.35 | $2.35 |
| 163 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,057 | $4.75 | $4.75 | $4.75 | $4.75 |
| 164 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,929 | $1.80 | $1.80 | $1.80 | $1.80 |
| 165 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,813 | $1.00 | $1.00 | $1.00 | $1.00 |
| 166 | Loop detector lead in cable (655.0700) | LF | 6,679 | $2.00 | $2.00 | $2.00 | $2.00 |
| 167 | Loop detector wire (655.0800) | LF | 4,844 | $1.00 | $1.00 | $1.00 | $1.00 |
| 168 | Sawing asphalt (690.0150) | LF | 4,186 | $1.20 | $1.39 | $1.21 | $1.20 |
| 169 | Sawing concrete (690.0250) | LF | 12,496 | $2.25 | $2.15 | $2.28 | $2.25 |
| 170 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 171 | Incentive iri ride (740.0440) | DOL | 62,900 | $1.00 | $1.00 | $1.00 | $1.00 |
| 172 | Special 01. removing raised pavement markers without overlay (SPV.0060) | EACH | 180 | $125.00 | $125.00 | $125.00 | $50.00 |
| 173 | Special 02. removing raised pavement markers with overlay (SPV.0060) | EACH | 90 | $125.00 | $125.00 | $125.00 | $50.00 |
| 174 | Special 03. adjusting sanitary manhole covers (SPV.0060) | EACH | 2 | $872.50 | $1,200.00 | $872.50 | $2,800.00 |
| 175 | Special 04. salvage and reinstall apron endwall for underdrain (SPV.0060) | EACH | 2 | $627.75 | $350.00 | $627.75 | $250.00 |
| 176 | Special 05. remove traffic signal (USH10/STH114/oneida street) (SPV.0060) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 177 | Special 06. remove traffic signal (ush 10/STH 114/CTH LP) (SPV.0060) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 178 | Special 01. concrete joint and crack cleaning and repiar (SPV.0090) | LF | 1,083 | $11.90 | $9.88 | $9.88 | $9.88 |
| 179 | Special 02. ditch cleaning (SPV.0090) | LF | 255 | $19.25 | $27.00 | $19.25 | $18.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.