WisDOT contract 20260512007 bid tabulation
6130-01-72. Let by Wisconsin DOT on May 12, 2026, Sauk. 3 bids received; low bid $45,593,502 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 12 MAY 2026
- Pay items
- 576
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $45,593,502 | Low |
| 2 | Hoffman Construction Company | $46,968,077 | +3.0% |
| 3 | Integrity Grading and Excavating, Inc. | $58,869,420 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Hoffman Construction Company | 3. Integrity Grading and Excavating, Inc. |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 110 | $63.30 | $63.30 | $63.30 |
| 2 | Grubbing (201.0220) | ID | 86 | $10.55 | $10.55 | $10.55 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 1 | $630.60 | $700.00 | $683.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 86,198 | $7.20 | $28.00 | $0.85 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 179 | $63.92 | $250.00 | $198.69 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 3,560 | $8.30 | $9.00 | $13.52 |
| 7 | Removing curb (204.0130) | LF | 1,294 | $3.37 | $5.50 | $13.30 |
| 8 | Removing curb & gutter (204.0150) | LF | 3,134 | $3.89 | $5.50 | $13.30 |
| 9 | Removing concrete sidewalk (204.0155) | SY | 13,492 | $5.81 | $5.00 | $5.70 |
| 10 | Removing fence (204.0170) | LF | 166 | $8.00 | $10.00 | $8.00 |
| 11 | Removing concrete bases (204.0195) | EACH | 56 | $300.00 | $500.00 | $715.00 |
| 12 | Removing manholes (204.0210) | EACH | 22 | $356.68 | $400.00 | $1,795.00 |
| 13 | Removing inlets (204.0220) | EACH | 75 | $361.26 | $400.00 | $1,795.00 |
| 14 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 759 | $7.58 | $15.00 | $52.00 |
| 15 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 875 | $7.40 | $15.00 | $52.00 |
| 16 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 445 | $8.08 | $15.00 | $52.00 |
| 17 | Removing storm sewer (size) 04. 24-inch (204.0245) | LF | 312 | $9.22 | $15.00 | $51.75 |
| 18 | Removing storm sewer (size) 05. 27-inch (204.0245) | LF | 1,227 | $7.62 | $15.00 | $52.75 |
| 19 | Removing storm sewer (size) 06. 30-inch (204.0245) | LF | 506 | $8.53 | $15.00 | $55.30 |
| 20 | Removing storm sewer (size) 07. 36-inch (204.0245) | LF | 259 | $8.35 | $30.00 | $85.00 |
| 21 | Removing storm sewer (size) 08. 60-inch (204.0245) | LF | 111 | $12.99 | $30.00 | $122.50 |
| 22 | Removing storm sewer (size) 09. 2X6-FT box culvert (204.0245) | LF | 82 | $8.79 | $64.00 | $221.00 |
| 23 | Removing storm sewer (size) 10. 24-inch X 38-inch (204.0245) | LF | 150 | $9.61 | $30.00 | $75.50 |
| 24 | Removing storm sewer (size) 11. 34-inch X 53-inch (204.0245) | LF | 24 | $30.03 | $30.00 | $152.00 |
| 25 | Removing ancillary structure (structure) 01. S-56-8001-02 (204.0246) | EACH | 1 | $8,500.00 | $5,000.00 | $8,500.00 |
| 26 | Removing ancillary structure (structure) 02. S-56-8001-06 (204.0246) | EACH | 1 | $8,500.00 | $5,000.00 | $8,500.00 |
| 27 | Removing ancillary structure (structure) 03. S-56-8002-02 (204.0246) | EACH | 1 | $8,500.00 | $5,000.00 | $8,500.00 |
| 28 | Removing ancillary structure (structure) 04. S-56-8002-06 (204.0246) | EACH | 1 | $8,500.00 | $5,000.00 | $8,500.00 |
| 29 | Removing ancillary structure (structure) 05. S-56-8003-02 (204.0246) | EACH | 1 | $8,500.00 | $5,000.00 | $8,500.00 |
| 30 | Removing ancillary structure (structure) 06. S-56-5003-06 (204.0246) | EACH | 1 | $8,500.00 | $5,000.00 | $8,500.00 |
| 31 | Removing ancillary structure (structure) 07. S-56-7 (204.0246) | EACH | 1 | $8,500.00 | $5,000.00 | $8,500.00 |
| 32 | Sealing pipes (204.0280) | EACH | 2 | $1,493.93 | $1,100.00 | $5,430.00 |
| 33 | Abandoning sewer (204.0291.S) | CY | 20 | $552.89 | $500.00 | $884.00 |
| 34 | Removing (item description) 01. traffic signals (ush 12 & STH 13/16/23) (204.9060.S) | EACH | 11 | $1,790.00 | $1,790.00 | $1,790.00 |
| 35 | Removing (item description) 02. lighting system (204.9060.S) | EACH | 1 | $54,875 | $54,875 | $54,875 |
| 36 | Removing (item description) 03. traffic signals (ush 12 & CTH A) (204.9060.S) | EACH | 10 | $1,790.00 | $1,790.00 | $1,790.00 |
| 37 | Removing (item description) 04. traffic signals (ush 12 at bonanza PHB) (204.9060.S) | EACH | 3 | $1,790.00 | $1,790.00 | $1,790.00 |
| 38 | Removing (item description) 05. traffic signals (ush 12 at olympus PHB) (204.9060.S) | EACH | 1 | $10,688 | $10,688 | $10,688 |
| 39 | Removing (item description) 06. traffic signals (ush 12 & lake ave) (204.9060.S) | EACH | 8 | $1,790.00 | $1,790.00 | $1,790.00 |
| 40 | Removing (item description) 08. traffic signals (ush 12 at newsom PHB) (204.9060.S) | EACH | 2 | $1,790.00 | $1,790.00 | $1,790.00 |
| 41 | Removing (item description) 09. bollard (204.9060.S) | EACH | 15 | $108.60 | $400.00 | $313.00 |
| 42 | Removing (item description) 10. curb stops (204.9060.S) | EACH | 9 | $1,261.88 | $1,261.88 | $236.00 |
| 43 | Removing (item description) 11. lighting unit (204.9060.S) | EACH | 11 | $1,420.00 | $1,420.00 | $1,420.00 |
| 44 | Removing (item description) 12. drainage chamber (204.9060.S) | EACH | 2 | $1,425.88 | $4,000.00 | $10,500 |
| 45 | Removing (item description) 13. trash recepticle (204.9060.S) | EACH | 1 | $250.00 | $250.00 | $500.00 |
| 46 | Removing (item description) 14. bench (204.9060.S) | EACH | 2 | $250.00 | $250.00 | $500.00 |
| 47 | Removing (item description) 02. existing boulder wall (204.9090.S) | LF | 913 | $20.79 | $18.00 | $23.00 |
| 48 | Removing (item description) 03. retaining wall and railing (204.9090.S) | LF | 4 | $326.21 | $350.00 | $1,499.00 |
| 49 | Removing (item description) 04. existing block retaining wall (204.9090.S) | LF | 814 | $4.56 | $14.00 | $25.00 |
| 50 | Removing (item description) 05. existing timber retaining wall (204.9090.S) | LF | 22 | $59.31 | $52.00 | $233.00 |
| 51 | Removing (item description) 06. existing tie wall (204.9090.S) | LF | 146 | $9.79 | $52.00 | $105.00 |
| 52 | Removing (item description) 07. railing (204.9090.S) | LF | 600 | $6.51 | $10.00 | $15.00 |
| 53 | Removing (item description) 08. decorative fence and concrete pillars (204.9090.S) | LF | 109 | $28.73 | $35.00 | $97.40 |
| 54 | Removing (item description) 01. elevated concrete patio and railing (204.9165.S) | SF | 592 | $7.55 | $13.00 | $32.50 |
| 55 | Removing (item description) 02. pavers (204.9165.S) | SF | 1,173 | $0.40 | $5.00 | $4.00 |
| 56 | Excavation common (205.0100) | CY | 79,901 | $10.60 | $32.00 | $35.50 |
| 57 | Excavation rock (205.0200) | CY | 263 | $87.53 | $40.00 | $250.00 |
| 58 | Excavation for structures retaining walls (structure) 01. R-56-37 (206.3001) | EACH | 1 | $100,000 | $50,000 | $35,000 |
| 59 | Backfill structure type A (210.1500) | TON | 774 | $40.00 | $52.00 | $40.00 |
| 60 | Finishing roadway (project) 01. 6130-01-72 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $500.00 |
| 61 | Finishing roadway (project) 02. 6145-01-72 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $500.00 |
| 62 | Finishing roadway (project) 03. 6145-01-73 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $500.00 |
| 63 | Finishing roadway (project) 04. 6145-01-74 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $500.00 |
| 64 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 51,868 | $15.22 | $33.21 | $37.00 |
| 65 | Breaker run (311.0110) | TON | 873 | $20.86 | $33.00 | $36.00 |
| 66 | Coloring concrete wisdot red (405.0100) | CY | 14 | $200.00 | $115.61 | $115.61 |
| 67 | Coloring concrete custom (405.0200) | CY | 1,580 | $100.00 | $103.91 | $103.91 |
| 68 | Concrete pavement 9-inch (415.0090) | SY | 766 | $75.00 | $99.15 | $99.15 |
| 69 | Concrete pavement gaps (415.0210) | EACH | 47 | $1,000.00 | $750.00 | $750.00 |
| 70 | Concrete pavement joint filling (415.4100) | SY | 96,780 | $1.50 | $1.70 | $4.46 |
| 71 | Drilled tie bars (416.0610) | EACH | 1,051 | $15.00 | $16.26 | $16.26 |
| 72 | Drilled dowel bars (416.0620) | EACH | 149 | $30.00 | $24.21 | $24.21 |
| 73 | HMA cold weather paving (450.4000) | TON | 618 | $7.00 | $7.00 | $7.00 |
| 74 | Tack coat (455.0605) | GAL | 1,247 | $3.00 | $3.00 | $3.00 |
| 75 | Incentive density HMA pavement (460.2000) | DOL | 550 | $1.00 | $1.00 | $1.00 |
| 76 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 570 | $119.00 | $119.00 | $119.00 |
| 77 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 444 | $120.00 | $120.00 | $120.00 |
| 78 | Asphaltic surface (465.0105) | TON | 21 | $145.00 | $145.00 | $145.00 |
| 79 | Asphaltic surface driveways and field entrances (465.0120) | TON | 1,538 | $145.00 | $145.00 | $145.00 |
| 80 | Asphaltic surface temporary (465.0125) | TON | 4,075 | $100.00 | $100.00 | $100.00 |
| 81 | Asphaltic curb (465.0310) | LF | 469 | $18.00 | $18.00 | $18.00 |
| 82 | Concrete masonry soldier pile footings (502.0110.S) | CY | 180 | $1,600.00 | $1,600.00 | $1,750.00 |
| 83 | Protective surface treatment (502.3200) | SY | 1,368 | $8.00 | $8.00 | $6.00 |
| 84 | Pigmented surface sealer (502.3210) | SY | 816 | $10.00 | $10.00 | $14.00 |
| 85 | Concrete masonry retaining walls (504.0500) | CY | 786 | $1,000.00 | $1,000.00 | $1,250.00 |
| 86 | Bar steel reinforcement HS coated structures (505.0600) | LB | 94,530 | $2.00 | $2.00 | $2.00 |
| 87 | Structural steel HS (506.0605) | LB | 102,805 | $3.00 | $3.00 | $1.70 |
| 88 | Concrete surface repair (509.1500) | SF | 15 | $250.00 | $250.00 | $850.00 |
| 89 | Railing pipe (513.2001) | LF | 53 | $300.00 | $500.00 | $320.00 |
| 90 | Railing steel type C3 (513.7016) | LF | 1,632 | $225.00 | $225.00 | $210.00 |
| 91 | Railing steel pedestrian type C3 (513.8016) | LF | 2,900 | $275.00 | $275.00 | $265.00 |
| 92 | Rubberized membrane waterproofing (516.0500) | SY | 60 | $25.00 | $25.00 | $68.00 |
| 93 | Painting epoxy system (structure) 01. R-56-37 (517.0601) | EACH | 1 | $15,000 | $15,000 | $30,000 |
| 94 | Concrete staining (structure) 01. R- 56-0043 (517.1010.S) | SF | 1,128 | $5.71 | $3.00 | $5.71 |
| 95 | Architectural surface treatment (structure) 01. R-56-0045 (517.1050.S) | SF | 2,378 | $5.00 | $5.00 | $16.00 |
| 96 | Architectural surface treatment (structure) 01. R-56-37 (517.1050.S) | SF | 2,406 | $5.00 | $5.00 | $3.00 |
| 97 | Architectural surface treatment (structure) 02. R-56-0047 (517.1050.S) | SF | 1,117 | $5.00 | $5.00 | $16.00 |
| 98 | Concrete collars for pipe (520.8000) | EACH | 32 | $1,637.32 | $850.00 | $4,232.00 |
| 99 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 1 | $2,601.93 | $2,600.00 | $2,970.00 |
| 100 | Drilling shaft 36-inch (531.2036) | LF | 40 | $600.00 | $600.00 | $250.00 |
| 101 | Foundation single-shaft type TF-II (structure) 01. S-56-0031 (531.5420) | EACH | 2 | $12,440 | $12,440 | $9,500.00 |
| 102 | Truss full span 2-chord type II (structure) 01. S-56-0031 (532.5420) | EACH | 1 | $75,000 | $75,000 | $62,000 |
| 103 | Precast panels for soldier pile walls (542.1000.S) | SF | 3,479 | $35.00 | $35.00 | $38.00 |
| 104 | Concrete curb type D (601.0110) | LF | 1,571 | $40.00 | $99.46 | $99.46 |
| 105 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 18,950 | $29.00 | $25.87 | $25.87 |
| 106 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 1,583 | $29.00 | $59.77 | $59.77 |
| 107 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 13,356 | $39.00 | $34.88 | $34.88 |
| 108 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,717 | $39.00 | $63.31 | $63.31 |
| 109 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 36 | $100.00 | $78.66 | $78.66 |
| 110 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 107 | $100.00 | $81.29 | $81.29 |
| 111 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 149 | $100.00 | $78.66 | $78.66 |
| 112 | Concrete curb pedestrian (601.0600) | LF | 523 | $60.00 | $59.09 | $59.09 |
| 113 | Concrete sidewalk 5-inch (602.0410) | SF | 166,174 | $8.11 | $10.17 | $10.17 |
| 114 | Concrete sidewalk 6-inch (602.0415) | SF | 73,989 | $9.50 | $10.51 | $10.51 |
| 115 | Curb ramp detectable warning field yellow (602.0505) | SF | 484 | $100.00 | $71.04 | $71.04 |
| 116 | Curb ramp detectable warning field natural patina (602.0515) | SF | 260 | $100.00 | $68.70 | $68.70 |
| 117 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 221 | $200.00 | $75.72 | $75.72 |
| 118 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 83 | $200.00 | $74.56 | $74.56 |
| 119 | Concrete driveway 7-inch (602.0815) | SY | 2,246 | $94.00 | $118.32 | $118.32 |
| 120 | Concrete steps (602.1500) | SF | 40 | $500.00 | $160.00 | $160.00 |
| 121 | Storm sewer rock excavation (608.0005) | CY | 768.70 | $94.03 | $10.00 | $300.00 |
| 122 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 4,287 | $76.03 | $74.00 | $150.00 |
| 123 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 1,263 | $73.52 | $76.00 | $155.00 |
| 124 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 1,412 | $69.08 | $78.00 | $150.00 |
| 125 | Storm sewer pipe reinforced concrete class III 21-inch (608.0321) | LF | 44 | $84.14 | $90.00 | $175.00 |
| 126 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 4,433 | $88.74 | $96.00 | $165.00 |
| 127 | Storm sewer pipe reinforced concrete class III 27-inch (608.0327) | LF | 403 | $107.02 | $126.00 | $190.00 |
| 128 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 1,427 | $122.76 | $142.00 | $200.00 |
| 129 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 1,209 | $145.83 | $180.00 | $230.00 |
| 130 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 14 | $239.63 | $290.00 | $345.00 |
| 131 | Storm sewer pipe reinforced concrete class III 54-inch (608.0354) | LF | 434 | $284.30 | $414.00 | $500.00 |
| 132 | Storm sewer pipe reinforced concrete class III 60-inch (608.0360) | LF | 15 | $350.80 | $466.00 | $500.00 |
| 133 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 66 | $72.26 | $80.00 | $160.00 |
| 134 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 43 | $141.36 | $150.00 | $250.00 |
| 135 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (608.2319) | LF | 13 | $214.48 | $226.00 | $270.00 |
| 136 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (608.2324) | LF | 60 | $179.62 | $206.00 | $230.00 |
| 137 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (608.2329) | LF | 8 | $325.94 | $324.00 | $430.00 |
| 138 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 34X53-inch (608.2334) | LF | 24 | $304.40 | $296.00 | $520.00 |
| 139 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 139 | $201.35 | $238.00 | $270.00 |
| 140 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 24 | $176.47 | $102.00 | $200.00 |
| 141 | Reconstructing manholes (611.0420) | EACH | 3 | $1,926.64 | $2,050.00 | $2,600.00 |
| 142 | Manhole covers type J (611.0530) | EACH | 71 | $832.30 | $870.00 | $816.00 |
| 143 | Inlet covers type A (611.0600) | EACH | 1 | $1,065.53 | $1,200.00 | $1,022.00 |
| 144 | Inlet covers type H (611.0624) | EACH | 91 | $1,086.26 | $1,200.00 | $1,047.00 |
| 145 | Inlet covers type H-S (611.0639) | EACH | 22 | $1,086.35 | $1,200.00 | $1,020.00 |
| 146 | Inlet covers type MS (611.0642) | EACH | 4 | $845.22 | $900.00 | $828.00 |
| 147 | Inlet covers type MS-A (611.0645) | EACH | 2 | $964.49 | $1,100.00 | $1,463.00 |
| 148 | Inlet covers type R (611.0648) | EACH | 2 | $1,842.29 | $2,200.00 | $1,473.00 |
| 149 | Inlet covers type S (611.0651) | EACH | 1 | $1,078.23 | $1,200.00 | $1,055.00 |
| 150 | Inlet covers type T (611.0652) | EACH | 1 | $1,370.45 | $1,600.00 | $1,313.00 |
| 151 | Inlet covers type Z (611.0666) | EACH | 51 | $1,097.87 | $1,200.00 | $1,052.00 |
| 152 | Manholes 4-FT diameter (611.2004) | EACH | 14 | $2,902.33 | $2,900.00 | $4,650.00 |
| 153 | Manholes 5-FT diameter (611.2005) | EACH | 43 | $4,279.43 | $5,300.00 | $9,250.00 |
| 154 | Manholes 6-FT diameter (611.2006) | EACH | 10 | $5,536.34 | $7,100.00 | $9,625.00 |
| 155 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $7,512.53 | $9,500.00 | $13,250 |
| 156 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $7,150.56 | $11,100 | $12,850 |
| 157 | Manholes 5X5-FT (611.2055) | EACH | 2 | $6,303.27 | $7,700.00 | $9,800.00 |
| 158 | Manholes 6X6-FT (611.2066) | EACH | 1 | $8,779.39 | $11,100 | $13,700 |
| 159 | Inlets 3-FT diameter (611.3003) | EACH | 41 | $2,500.48 | $2,000.00 | $4,500.00 |
| 160 | Inlets 4-FT diameter (611.3004) | EACH | 24 | $2,984.36 | $3,100.00 | $4,600.00 |
| 161 | Inlets 2X2-FT (611.3220) | EACH | 3 | $2,213.14 | $1,600.00 | $4,200.00 |
| 162 | Inlets 2X2.5-FT (611.3225) | EACH | 1 | $2,298.82 | $1,700.00 | $4,300.00 |
| 163 | Inlets 2X3-FT (611.3230) | EACH | 97 | $2,670.55 | $2,200.00 | $6,000.00 |
| 164 | Inlets median 1 grate (611.3901) | EACH | 6 | $3,505.13 | $3,500.00 | $5,000.00 |
| 165 | Adjusting manhole covers (611.8110) | EACH | 5 | $588.14 | $2,900.00 | $1,688.00 |
| 166 | Adjusting inlet covers (611.8115) | EACH | 11 | $713.76 | $2,900.00 | $1,688.00 |
| 167 | Salvaged inlet covers (611.9710) | EACH | 6 | $500.00 | $590.00 | $1,168.00 |
| 168 | Pipe underdrain unperforated 4- inch (612.0204) | LF | 34 | $39.01 | $12.00 | $27.30 |
| 169 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 280 | $39.46 | $12.00 | $25.00 |
| 170 | Pipe underdrain unperforated 12- inch (612.0212) | LF | 95 | $50.53 | $55.00 | $27.05 |
| 171 | Pipe underdrain unperforated 18- inch (612.0218) | LF | 16 | $99.15 | $77.00 | $65.00 |
| 172 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 4,196 | $21.81 | $8.14 | $10.00 |
| 173 | Fence chain link 4-FT (616.0204) | LF | 164 | $75.00 | $75.00 | $75.00 |
| 174 | Fence safety (616.0700.S) | LF | 13,793 | $4.50 | $4.50 | $4.50 |
| 175 | Maintenance and repair of haul roads (project) 01. 6130-01-72 (618.0100) | EACH | 1 | $1.00 | $500.00 | $500.00 |
| 176 | Maintenance and repair of haul roads (project) 02. 6145-01-72 (618.0100) | EACH | 1 | $1.00 | $500.00 | $500.00 |
| 177 | Maintenance and repair of haul roads (project) 03. 6145-01-73 (618.0100) | EACH | 1 | $1.00 | $500.00 | $500.00 |
| 178 | Maintenance and repair of haul roads (project) 04. 6145-01-74 (618.0100) | EACH | 1 | $1.00 | $500.00 | $500.00 |
| 179 | Mobilization (619.1000) | EACH | 1 | $9,475,000 | $4,589,722 | $8,804,429 |
| 180 | Concrete corrugated median (620.0100) | SF | 40 | $100.00 | $109.45 | $109.45 |
| 181 | Concrete median sloped nose (620.0300) | SF | 1,039 | $20.00 | $15.62 | $15.62 |
| 182 | Water (624.0100) | MGAL | 46 | $250.00 | $150.00 | $200.00 |
| 183 | Topsoil (625.0100) | SY | 33,291 | $1.05 | $10.00 | $20.50 |
| 184 | Silt fence (628.1504) | LF | 3,046 | $2.00 | $2.00 | $2.20 |
| 185 | Silt fence maintenance (628.1520) | LF | 3,046 | $0.05 | $0.05 | $0.01 |
| 186 | Mobilizations erosion control (628.1905) | EACH | 16 | $100.00 | $100.00 | $800.00 |
| 187 | Mobilizations emergency erosion control (628.1910) | EACH | 32 | $175.00 | $175.00 | $50.00 |
| 188 | Erosion mat urban class I type A (628.2006) | SY | 8,319 | $1.80 | $1.80 | $2.30 |
| 189 | Inlet protection type A (628.7005) | EACH | 256 | $10.00 | $10.00 | $106.00 |
| 190 | Inlet protection type B (628.7010) | EACH | 22 | $55.00 | $55.00 | $73.00 |
| 191 | Inlet protection type C (628.7015) | EACH | 264 | $55.00 | $55.00 | $72.00 |
| 192 | Inlet protection type D (628.7020) | EACH | 67 | $130.00 | $130.00 | $140.00 |
| 193 | Temporary ditch checks (628.7504) | LF | 20 | $10.00 | $10.00 | $8.95 |
| 194 | Culvert pipe checks (628.7555) | EACH | 1 | $100.00 | $100.00 | $15.00 |
| 195 | Tracking pads (628.7560) | EACH | 7 | $1,000.00 | $500.00 | $1,000.00 |
| 196 | Fertilizer type B (629.0210) | CWT | 21.47 | $75.00 | $75.00 | $110.00 |
| 197 | Seeding mixture no. 40 (630.0140) | LB | 595.34 | $7.50 | $7.50 | $15.00 |
| 198 | Seeding temporary (630.0200) | LB | 225 | $3.50 | $3.50 | $3.55 |
| 199 | Seed water (630.0500) | MGAL | 383 | $1.00 | $1.00 | $25.00 |
| 200 | Sod water (631.0300) | MGAL | 374 | $40.00 | $40.00 | $49.00 |
| 201 | Sod lawn (631.1000) | SY | 33,291 | $8.50 | $8.50 | $11.00 |
| 202 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $90.00 | $90.00 | $108.00 |
| 203 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 7 | $90.00 | $90.00 | $116.00 |
| 204 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 146 | $90.00 | $90.00 | $129.00 |
| 205 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 8 | $250.00 | $250.00 | $230.00 |
| 206 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 2 | $250.00 | $250.00 | $244.00 |
| 207 | Foundation drilling (diameter) 01. 30-inch (636.0050.S) | LF | 1,081 | $87.00 | $87.00 | $87.00 |
| 208 | Signs type II reflective H (637.2210) | SF | 1,688.87 | $22.50 | $22.50 | $24.00 |
| 209 | Signs type II reflective SH (637.2220) | SF | 274.50 | $23.00 | $23.00 | $25.00 |
| 210 | Signs type II reflective F (637.2230) | SF | 98.33 | $25.00 | $25.00 | $25.00 |
| 211 | Moving signs type II (638.2102) | EACH | 15 | $150.00 | $150.00 | $119.00 |
| 212 | Removing signs type II (638.2602) | EACH | 188 | $25.00 | $25.00 | $41.00 |
| 213 | Removing small sign supports (638.3000) | EACH | 113 | $25.00 | $25.00 | $34.30 |
| 214 | Field office type D (642.5401) | EACH | 1 | $180,000 | $200,000 | $435,000 |
| 215 | Traffic control drums (643.0300) | DAY | 520,988 | $0.14 | $0.14 | $0.14 |
| 216 | Traffic control barricades type III (643.0420) | DAY | 44,595 | $0.44 | $0.44 | $0.44 |
| 217 | Traffic control flexible tubular marker posts (643.0500) | EACH | 226 | $37.00 | $37.00 | $37.00 |
| 218 | Traffic control flexible tubular marker bases (643.0600) | EACH | 226 | $14.50 | $14.50 | $14.50 |
| 219 | Traffic control channelizing curb system (643.0650) | LF | 3,360 | $15.00 | $15.00 | $15.00 |
| 220 | Traffic control warning lights type A (643.0705) | DAY | 89,190 | $0.10 | $0.10 | $0.10 |
| 221 | Traffic control warning lights type C (643.0715) | DAY | 10,920 | $0.12 | $0.12 | $0.12 |
| 222 | Traffic control connected arrow boards (643.0810) | DAY | 2,220 | $7.25 | $7.25 | $7.25 |
| 223 | Traffic control signs (643.0900) | DAY | 158,401 | $0.15 | $0.15 | $0.15 |
| 224 | Traffic control signs PCMS (643.1050) | DAY | 112 | $34.50 | $34.50 | $34.50 |
| 225 | Traffic control cones 42-inch (643.1070) | DAY | 5,673 | $0.14 | $0.14 | $0.14 |
| 226 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 5,578 | $2.50 | $2.50 | $2.50 |
| 227 | Temporary marking line paint 6- inch (643.3165) | LF | 52,160 | $0.30 | $0.30 | $0.30 |
| 228 | Temporary marking line removable tape 6-inch (643.3180) | LF | 46,484 | $1.85 | $1.85 | $1.85 |
| 229 | Temporary marking line paint 10- inch (643.3265) | LF | 398 | $0.90 | $0.90 | $0.90 |
| 230 | Temporary marking line removable tape 10-inch (643.3280) | LF | 1,936 | $4.00 | $4.00 | $4.00 |
| 231 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 1,185 | $2.25 | $2.25 | $2.25 |
| 232 | Temporary marking stop line paint 18-inch (643.3805) | LF | 76 | $6.00 | $6.00 | $6.00 |
| 233 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 131 | $7.50 | $7.50 | $7.50 |
| 234 | Temporary marking removable mask out tape 12-inch (643.3990) | LF | 84 | $7.00 | $7.00 | $7.00 |
| 235 | Traffic control (643.5000) | EACH | 1 | $494,000 | $494,000 | $494,000 |
| 236 | Temporary pedestrian surface asphalt (644.1410) | SF | 1,421 | $8.00 | $12.00 | $12.00 |
| 237 | Temporary pedestrian surface matting (644.1440) | SF | 1,421 | $5.00 | $3.25 | $3.25 |
| 238 | Temporary pedestrian curb ramp (644.1601) | DAY | 560 | $25.00 | $8.55 | $8.55 |
| 239 | Temporary pedestrian detectable warning field (644.1605) | SF | 425 | $3.55 | $3.55 | $3.55 |
| 240 | Temporary pedestrian barricade (644.1810) | LF | 7,408 | $6.50 | $6.50 | $6.50 |
| 241 | Temporary audible message devices (644.1900.S) | DAY | 224 | $10.00 | $10.00 | $10.00 |
| 242 | Marking line epoxy 4-inch (646.1020) | LF | 2,844 | $0.41 | $0.41 | $0.41 |
| 243 | Marking line epoxy 6-inch (646.2020) | LF | 736 | $0.57 | $0.57 | $0.57 |
| 244 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 6,485 | $1.03 | $1.03 | $1.03 |
| 245 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 63,575 | $1.57 | $1.57 | $1.57 |
| 246 | Marking line epoxy 8-inch (646.3020) | LF | 395 | $1.12 | $1.12 | $1.12 |
| 247 | Marking line epoxy 10-inch (646.4020) | LF | 699 | $1.28 | $1.28 | $1.28 |
| 248 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 4,500 | $3.36 | $3.36 | $3.36 |
| 249 | Marking arrow epoxy (646.5020) | EACH | 79 | $235.96 | $235.96 | $235.96 |
| 250 | Marking word epoxy (646.5120) | EACH | 11 | $315.14 | $315.14 | $315.14 |
| 251 | Marking symbol epoxy (646.5220) | EACH | 4 | $222.52 | $222.52 | $222.52 |
| 252 | Marking stop line epoxy 18-inch (646.6120) | LF | 850 | $15.08 | $15.08 | $15.08 |
| 253 | Cold weather marking epoxy 6-inch (646.6466) | LF | 53,477 | $0.57 | $0.57 | $0.57 |
| 254 | Cold weather marking epoxy 10- inch (646.6470) | LF | 2,547 | $1.28 | $1.28 | $1.28 |
| 255 | Marking diagonal epoxy 12-inch (646.7120) | LF | 553 | $15.72 | $15.72 | $15.75 |
| 256 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,447 | $13.12 | $13.12 | $13.12 |
| 257 | Marking curb epoxy (646.8120) | LF | 280 | $9.17 | $9.17 | $9.17 |
| 258 | Marking island nose epoxy (646.8220) | EACH | 33 | $344.40 | $344.40 | $344.40 |
| 259 | Marking removal line 4-inch (646.9000) | LF | 1,565 | $2.00 | $2.00 | $2.00 |
| 260 | Marking removal line 8-inch (646.9100) | LF | 50 | $4.00 | $4.00 | $4.00 |
| 261 | Marking removal line wide (646.9200) | LF | 75 | $8.00 | $8.00 | $8.00 |
| 262 | Marking removal special marking (646.9300) | EACH | 4 | $80.00 | $80.00 | $80.00 |
| 263 | Construction staking storm sewer (650.4000) | EACH | 315 | $357.00 | $500.00 | $500.00 |
| 264 | Construction staking subgrade (650.4500) | LF | 14,580 | $0.01 | $0.01 | $0.01 |
| 265 | Construction staking base (650.5000) | LF | 137 | $7.00 | $10.00 | $10.00 |
| 266 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 5,199 | $1.50 | $10.00 | $10.00 |
| 267 | Construction staking structure layout (structure) 01. L01 - sta. 617+06 (650.6501) | EACH | 1 | $5,000.00 | $20,000 | $20,000 |
| 268 | Construction staking structure layout (structure) 02. L02 - sta. 618+16 (650.6501) | EACH | 1 | $5,000.00 | $20,000 | $20,000 |
| 269 | Construction staking structure layout (structure) 03. L03 - sta. 623+00 (650.6501) | EACH | 1 | $5,000.00 | $20,000 | $20,000 |
| 270 | Construction staking structure layout (structure) 04. L04 - sta. 633+90 (650.6501) | EACH | 1 | $5,000.00 | $20,000 | $20,000 |
| 271 | Construction staking structure layout (structure) 05. L05 - sta. 659+68 (650.6501) | EACH | 1 | $5,000.00 | $20,000 | $20,000 |
| 272 | Construction staking structure layout (structure) 06. R-56-38 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 273 | Construction staking structure layout (structure) 07. R-56-39 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 274 | Construction staking structure layout (structure) 08. R-56-41 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 275 | Construction staking structure layout (structure) 09. R-56-43 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 276 | Construction staking structure layout (structure) 10. R-56-44 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 277 | Construction staking structure layout (structure) 11. R-56-45 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 278 | Construction staking structure layout (structure) 12. R-56-46 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 279 | Construction staking structure layout (structure) 13. R-56-47 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 280 | Construction staking structure layout (structure) 14. R-56-48 (650.6501) | EACH | 1 | $5,000.00 | $30,000 | $30,000 |
| 281 | Construction staking concrete pavement (650.7000) | LF | 14,443 | $2.50 | $10.00 | $10.00 |
| 282 | Construction staking electrical installations (project) 01. 6130-01- 72 (650.8501) | EACH | 1 | $17,000 | $25,000 | $25,000 |
| 283 | Construction staking electrical installations (project) 02. 6145-01- 72 (650.8501) | EACH | 1 | $17,000 | $25,000 | $25,000 |
| 284 | Construction staking electrical installations (project) 03. 6145-01- 73 (650.8501) | EACH | 1 | $17,000 | $25,000 | $25,000 |
| 285 | Construction staking electrical installations (project) 04. 6145-01- 74 (650.8501) | EACH | 1 | $17,000 | $25,000 | $25,000 |
| 286 | Construction staking curb ramps (650.9000) | EACH | 79 | $198.20 | $500.00 | $500.00 |
| 287 | Construction staking sidewalk (project) 01. 6145-01-72 (650.9500) | EACH | 1 | $17,000 | $20,000 | $20,000 |
| 288 | Construction staking sidewalk (project) 02. 6145-01-73 (650.9500) | EACH | 1 | $18,000 | $20,000 | $20,000 |
| 289 | Construction staking sidewalk (project) 03. 6145-01-74 (650.9500) | EACH | 1 | $17,000 | $20,000 | $20,000 |
| 290 | Construction staking supplemental control (project) 01. 6130-01-72 (650.9911) | EACH | 1 | $3,500.00 | $250,000 | $250,000 |
| 291 | Construction staking supplemental control (project) 02. 6145-01-72 (650.9911) | EACH | 1 | $3,500.00 | $250,000 | $250,000 |
| 292 | Construction staking supplemental control (project) 03. 6145-01-73 (650.9911) | EACH | 1 | $3,500.00 | $250,000 | $250,000 |
| 293 | Construction staking supplemental control (project) 04. 6145-01-74 (650.9911) | EACH | 1 | $3,500.00 | $250,000 | $250,000 |
| 294 | Construction staking slope stakes (650.9920) | LF | 13,931 | $0.75 | $5.00 | $5.00 |
| 295 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 31,613 | $16.00 | $16.00 | $16.00 |
| 296 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 5,871 | $16.55 | $16.55 | $16.55 |
| 297 | Conduit rigid nonmetallic schedule 40 4-inch (652.0240) | LF | 1,165 | $23.53 | $23.53 | $23.53 |
| 298 | Conduit loop detector (652.0800) | LF | 978 | $15.98 | $15.98 | $15.98 |
| 299 | Pull boxes steel 24X36-inch (653.0135) | EACH | 60 | $1,976.00 | $1,976.00 | $1,976.00 |
| 300 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 63 | $2,718.00 | $2,718.00 | $2,718.00 |
| 301 | Removing pull boxes (653.0905) | EACH | 65 | $433.00 | $433.00 | $433.00 |
| 302 | Concrete bases type 1 (654.0101) | EACH | 28 | $1,405.00 | $1,405.00 | $1,405.00 |
| 303 | Concrete bases type 2 (654.0102) | EACH | 110 | $2,027.00 | $2,027.00 | $2,027.00 |
| 304 | Concrete bases type 5 (654.0105) | EACH | 4 | $1,668.00 | $1,668.00 | $1,668.00 |
| 305 | Concrete bases type 10 (654.0110) | EACH | 13 | $13,318 | $13,318 | $13,318 |
| 306 | Concrete bases type 13 (654.0113) | EACH | 5 | $25,043 | $25,043 | $25,043 |
| 307 | Concrete bases type 10-special (654.0120) | EACH | 7 | $17,047 | $17,047 | $17,047 |
| 308 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 8 | $3,695.00 | $3,695.00 | $3,695.00 |
| 309 | Concrete control cabinet bases type L30 (654.0230) | EACH | 4 | $2,936.00 | $2,936.00 | $2,936.00 |
| 310 | Cable traffic signal 3-14 AWG (655.0210) | LF | 630 | $2.85 | $2.85 | $2.85 |
| 311 | Cable traffic signal 5-14 AWG (655.0230) | LF | 6,812 | $3.30 | $3.30 | $3.30 |
| 312 | Cable traffic signal 7-14 AWG (655.0240) | LF | 3,083 | $3.91 | $3.91 | $3.91 |
| 313 | Cable traffic signal 9-14 AWG (655.0250) | LF | 176 | $4.80 | $4.80 | $4.80 |
| 314 | Cable traffic signal 12-14 AWG (655.0260) | LF | 3,271 | $5.70 | $5.70 | $5.70 |
| 315 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 3,727 | $4.30 | $4.30 | $4.30 |
| 316 | Electrical wire traffic signals 12 AWG (655.0510) | LF | 12,412 | $1.60 | $1.60 | $1.60 |
| 317 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 7,079 | $1.65 | $1.65 | $1.65 |
| 318 | Electrical wire lighting 12 AWG (655.0610) | LF | 26,904 | $1.56 | $1.56 | $1.56 |
| 319 | Electrical wire lighting 6 AWG (655.0625) | LF | 2,055 | $2.95 | $2.95 | $2.95 |
| 320 | Electrical wire lighting 4 AWG (655.0630) | LF | 163,569 | $3.60 | $3.60 | $3.60 |
| 321 | Loop detector lead in cable (655.0700) | LF | 13,518 | $2.35 | $2.35 | $2.35 |
| 322 | Loop detector wire (655.0800) | LF | 3,094 | $1.80 | $1.80 | $1.80 |
| 323 | Electrical service meter breaker pedestal (location) 01. ush 12 & STH 13/16/23 (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 324 | Electrical service meter breaker pedestal (location) 02. ush 12 & dellshire DR (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 325 | Electrical service meter breaker pedestal (location) 03. ush 12 & CTH A (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 326 | Electrical service meter breaker pedestal (location) 04. ush 12 at bonanza PHB (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 327 | Electrical service meter breaker pedestal (location) 05. ush 12 & olympus DR (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 328 | Electrical service meter breaker pedestal (location) 06. ush 12 & lake ave (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 329 | Electrical service meter breaker pedestal (location) 07. ush 12 at hiawatha PHB (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 330 | Electrical service meter breaker pedestal (location) 08. ush 12 at newsom PHB (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 331 | Electrical service meter breaker pedestal (location) 09. village lighting (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 332 | Electrical service meter breaker pedestal (location) 10. village lighting (656.0201) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 333 | Electrical service meter breaker pedestal (location) 11. city lighting (656.0201) | EACH | 2 | $3,500.00 | $3,500.00 | $3,500.00 |
| 334 | Pedestal bases (657.0100) | EACH | 28 | $446.00 | $446.00 | $446.00 |
| 335 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 110 | $846.00 | $846.00 | $846.00 |
| 336 | Poles type 4 (657.0315) | EACH | 7 | $3,482.00 | $3,482.00 | $3,482.00 |
| 337 | Poles type 9 (657.0345) | EACH | 1 | $10,626 | $10,626 | $10,626 |
| 338 | Poles type 10 (657.0350) | EACH | 12 | $12,376 | $12,376 | $12,376 |
| 339 | Poles type 10-special (657.0352) | EACH | 7 | $16,370 | $16,370 | $16,370 |
| 340 | Poles type 13 (657.0360) | EACH | 5 | $19,838 | $19,838 | $19,838 |
| 341 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 7 | $1,025.00 | $1,025.00 | $1,025.00 |
| 342 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 6 | $1,072.00 | $1,072.00 | $1,072.00 |
| 343 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 15 | $943.00 | $943.00 | $943.00 |
| 344 | Monotube arms 15-FT (657.0515) | EACH | 1 | $4,789.00 | $4,789.00 | $4,789.00 |
| 345 | Monotube arms 20-FT (657.0520) | EACH | 1 | $4,848.00 | $4,848.00 | $4,848.00 |
| 346 | Monotube arms 25-FT (657.0525) | EACH | 6 | $5,500.00 | $5,500.00 | $5,500.00 |
| 347 | Monotube arms 30-FT (657.0530) | EACH | 5 | $6,925.00 | $6,925.00 | $6,925.00 |
| 348 | Monotube arms 35-FT-special (657.0536) | EACH | 1 | $7,260.00 | $7,260.00 | $7,260.00 |
| 349 | Monotube arms 40-FT-special (657.0541) | EACH | 4 | $7,800.00 | $7,800.00 | $7,800.00 |
| 350 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $8,220.00 | $8,220.00 | $8,220.00 |
| 351 | Monotube arms 50-FT (657.0550) | EACH | 2 | $15,481 | $15,481 | $15,481 |
| 352 | Monotube arms 55-FT (657.0555) | EACH | 3 | $19,220 | $19,220 | $19,220 |
| 353 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 7 | $559.00 | $559.00 | $559.00 |
| 354 | Luminaire arms single member 6- inch clamp 10-FT (657.0635) | EACH | 103 | $700.00 | $700.00 | $700.00 |
| 355 | Luminaire arms truss type 4-inch clamp 12-FT (657.0709) | EACH | 3 | $1,057.00 | $1,057.00 | $1,057.00 |
| 356 | Luminaire arms steel 15-FT (657.0815) | EACH | 26 | $1,492.00 | $1,492.00 | $1,492.00 |
| 357 | Traffic signal face 3S 12-inch (658.0173) | EACH | 69 | $825.00 | $825.00 | $825.00 |
| 358 | Traffic signal face 4S 12-inch (658.0174) | EACH | 20 | $1,258.00 | $1,258.00 | $1,258.00 |
| 359 | Pedestrian signal face 16-inch (658.0416) | EACH | 42 | $581.00 | $581.00 | $581.00 |
| 360 | Signal mounting hardware (location) 01. ush 12 & STH 13/16/23 (658.5070) | EACH | 1 | $5,654.00 | $5,654.00 | $5,654.00 |
| 361 | Signal mounting hardware (location) 02. ush 12 & dellshire DR (658.5070) | EACH | 1 | $4,837.00 | $4,837.00 | $4,837.00 |
| 362 | Signal mounting hardware (location) 03. ush 12 & CTH A (658.5070) | EACH | 1 | $4,954.00 | $4,954.00 | $4,954.00 |
| 363 | Signal mounting hardware (location) 04. ush 12 at bonanza PHB (658.5070) | EACH | 1 | $3,321.00 | $3,321.00 | $3,321.00 |
| 364 | Signal mounting hardware (location) 05. ush 12 & olympus DR (658.5070) | EACH | 1 | $3,846.00 | $3,846.00 | $3,846.00 |
| 365 | Signal mounting hardware (location) 06. ush 12 & lake avenue (658.5070) | EACH | 1 | $4,837.00 | $4,837.00 | $4,837.00 |
| 366 | Signal mounting hardware (location) 07. ush 12 at hiawatha PHB (658.5070) | EACH | 1 | $3,321.00 | $3,321.00 | $3,321.00 |
| 367 | Signal mounting hardware (location) 08. ush 12 at newsom PHB (658.5070) | EACH | 1 | $3,321.00 | $3,321.00 | $3,321.00 |
| 368 | Luminaires utility LED C (659.1125) | EACH | 36 | $521.00 | $521.00 | $521.00 |
| 369 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 4 | $11,690 | $11,690 | $11,690 |
| 370 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 95 | $80.00 | $80.00 | $80.00 |
| 371 | Temporary traffic signals for intersections (location) 01. ush 12 & STH 13/16/23 (661.0201) | EACH | 1 | $198,700 | $198,700 | $400,000 |
| 372 | Temporary traffic signals for intersections (location) 02. ush 12 & dellshire DR (661.0201) | EACH | 1 | $180,364 | $180,364 | $180,365 |
| 373 | Temporary traffic signals for intersections (location) 03. ush 12 & CTH A (661.0201) | EACH | 1 | $185,707 | $185,707 | $385,000 |
| 374 | Temporary traffic signals for intersections (location) 05. ush 12 & olympus DR (661.0201) | EACH | 1 | $144,966 | $144,966 | $345,000 |
| 375 | Temporary traffic signals for intersections (location) 06. ush 12 & lake ave (661.0201) | EACH | 1 | $187,142 | $187,142 | $387,000 |
| 376 | Field system integrator (670.0101) | EACH | 2 | $27,730 | $27,730 | $27,730 |
| 377 | ITS documentation (670.0201) | EACH | 2 | $9,298.00 | $9,298.00 | $9,298.00 |
| 378 | Conduit HDPE 2-duct 2-inch (671.0122) | LF | 11,824 | $18.71 | $18.71 | $18.71 |
| 379 | Communication vault type round (673.0110) | EACH | 10 | $5,195.00 | $5,195.00 | $5,195.00 |
| 380 | Remove cable (674.0300) | LF | 1,349 | $2.15 | $2.15 | $2.15 |
| 381 | Install fiber optic cable outdoor plant 6-CT (678.0006) | LF | 2,142 | $2.40 | $2.40 | $2.40 |
| 382 | Install fiber optic cable outdoor plant 24-CT (678.0024) | LF | 13,172 | $3.40 | $3.40 | $3.40 |
| 383 | Fiber optic splice enclosure (678.0200) | EACH | 8 | $1,450.00 | $1,450.00 | $1,450.00 |
| 384 | Fiber optic splice (678.0300) | EACH | 32 | $422.00 | $422.00 | $422.00 |
| 385 | Fiber optic termination (678.0400) | EACH | 12 | $451.00 | $451.00 | $451.00 |
| 386 | Communication system testing (678.0501) | EACH | 2 | $6,875.00 | $6,875.00 | $6,875.00 |
| 387 | Install ethernet switches (678.0600) | EACH | 8 | $1,571.00 | $1,571.00 | $1,571.00 |
| 388 | Public land survey monument verify and reset (680.0100) | EACH | 85 | $50.00 | $100.00 | $100.00 |
| 389 | Sawing asphalt (690.0150) | LF | 9,637 | $1.75 | $1.14 | $1.75 |
| 390 | Sawing concrete (690.0250) | LF | 13,940 | $2.35 | $2.23 | $2.35 |
| 391 | Incentive strength concrete structures (715.0502) | DOL | 4,598 | $1.00 | $1.00 | $1.00 |
| 392 | Incentive flexural strength concrete pavement (715.0715) | DOL | 26,006 | $1.00 | $1.00 | $1.00 |
| 393 | Incentive iri ride (740.0440) | DOL | 24,525 | $1.00 | $1.00 | $1.00 |
| 394 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 |
| 395 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 6,480 | $5.00 | $5.00 | $5.00 |
| 396 | Special 001. concrete masonry parapet and anchor slab (SPV.0035) | CY | 415 | $1,000.00 | $1,000.00 | $1,500.00 |
| 397 | Special 002. concrete anchor slab (SPV.0035) | CY | 131 | $1,000.00 | $1,000.00 | $961.52 |
| 398 | Special 003. lightweight foamed concrete fill (SPV.0035) | CY | 140 | $461.00 | $1,050.00 | $425.00 |
| 399 | Special 004. VLD rock excavation (SPV.0035) | CY | 790 | $110.83 | $110.83 | $300.00 |
| 400 | Special 005. VLD abandon EX. sanitary sewer and laterals (SPV.0035) | CY | 20 | $899.08 | $899.08 | $894.00 |
| 401 | Special 007. CWD rock excavation sanitary sewer (SPV.0035) | CY | 2,190 | $108.74 | $108.74 | $300.00 |
| 402 | Special 008. CWD abandon existing sanitary sewer, CLSM (SPV.0035) | CY | 28 | $896.27 | $896.27 | $1,476.00 |
| 403 | Special 009. CWD rock excavation water main (SPV.0035) | CY | 599 | $98.36 | $98.36 | $300.00 |
| 404 | Special 010. concrete retaining stair and footing (SPV.0035) | CY | 22 | $3,350.00 | $1,142.24 | $3,350.00 |
| 405 | Special 001. storm sewer pipe class III 60-inch diameter 45 degree elbow (SPV.0060) | EACH | 1 | $16,778 | $20,000 | $30,000 |
| 406 | Special 002. storm sewer pipe class III-A 24-inch diameter 45 degree elbow (SPV.0060) | EACH | 2 | $2,885.71 | $2,200.00 | $2,500.00 |
| 407 | Special 003. double inlets (SPV.0060) | EACH | 67 | $4,171.89 | $3,200.00 | $12,000 |
| 408 | Special 004. inlet covers type SP (SPV.0060) | EACH | 67 | $1,092.08 | $1,200.00 | $5,000.00 |
| 409 | Special 005. storm sewer manhole 15-FT X 4-FT (SPV.0060) | EACH | 2 | $15,465 | $24,500 | $75,000 |
| 410 | Special 006. storm sewer manhole 7-FT X 3-FT (SPV.0060) | EACH | 1 | $7,580.30 | $9,200.00 | $45,000 |
| 411 | Special 007. temporary pipe connection 12-inch (SPV.0060) | EACH | 11 | $2,070.57 | $1,000.00 | $4,040.00 |
| 412 | Special 008. temporary pipe connection 18-inch (SPV.0060) | EACH | 3 | $2,070.39 | $1,200.00 | $4,130.00 |
| 413 | Special 009. temporary pipe connection 24-inch (SPV.0060) | EACH | 1 | $2,074.57 | $1,200.00 | $4,166.00 |
| 414 | Special 010. temporary pipe connection 30-inch (SPV.0060) | EACH | 3 | $2,070.39 | $1,600.00 | $4,340.00 |
| 415 | Special 011. temporary rectangular rapid flashing beacon (ush 12 at olympus DR) (SPV.0060) | EACH | 1 | $20,462 | $20,462 | $20,462 |
| 416 | Special 012. accessible pedestrian signals (SPV.0060) | EACH | 42 | $2,267.00 | $2,267.00 | $2,267.00 |
| 417 | Special 013. luminaire utility LED D (type 4) (SPV.0060) | EACH | 103 | $622.00 | $622.00 | $622.00 |
| 418 | Special 014. luminaire utility LED A (type 2) (SPV.0060) | EACH | 96 | $476.00 | $476.00 | $476.00 |
| 419 | Special 015. 30-FT decorative light pole (type 5) (SPV.0060) | EACH | 103 | $4,793.00 | $4,793.00 | $4,793.00 |
| 420 | Special 016. relocate lighting unit (SPV.0060) | EACH | 4 | $6,248.00 | $6,248.00 | $6,248.00 |
| 421 | Special 017. luminaire arm member 6-inch long (SPV.0060) | EACH | 96 | $577.00 | $577.00 | $577.00 |
| 422 | Special 018. utility line opening (SPV.0060) | EACH | 60 | $1,382.41 | $1,382.41 | $1,372.00 |
| 423 | Special 019. VLD remove existing water manhole and valve (SPV.0060) | EACH | 1 | $1,266.07 | $1,266.07 | $1,909.00 |
| 424 | Special 020. VLD remove EX. sanitary sewer manhole (SPV.0060) | EACH | 39 | $1,261.88 | $1,261.88 | $1,804.00 |
| 425 | Special 021. VLD 48-inch sanitary manhole (SPV.0060) | EACH | 39 | $4,358.28 | $4,358.28 | $6,588.00 |
| 426 | Special 022. VLD 48-inch sanitary manhole W/external drop, complete (SPV.0060) | EACH | 5 | $10,255 | $10,255 | $10,786 |
| 427 | Special 023. VLD connect to EX. sanitary sewer pipe (SPV.0060) | EACH | 48 | $1,336.96 | $1,336.96 | $7,174.00 |
| 428 | Special 024. VLD connect to EX. sanitary sewer manhole (SPV.0060) | EACH | 4 | $2,275.87 | $2,275.87 | $14,630 |
| 429 | Special 025. VLD adjust manhole casting < 6-inches (SPV.0060) | EACH | 12 | $576.08 | $576.08 | $1,361.00 |
| 430 | Special 026. VLD adjust manhole casting - 6-inches to 1-foot (SPV.0060) | EACH | 4 | $755.13 | $755.13 | $1,632.00 |
| 431 | Special 027. VLD adjust manhole casting > 1-foot (SPV.0060) | EACH | 1 | $752.52 | $752.52 | $1,897.00 |
| 432 | Special 028. VLD adjust and waterproof manhole casting (SPV.0060) | EACH | 2 | $1,274.26 | $1,274.26 | $2,881.00 |
| 433 | Special 029. VLD adjust manhole casting via MR. manhole (SPV.0060) | EACH | 3 | $1,241.06 | $1,241.06 | $10,235 |
| 434 | Special 030. VLD remove existing service (SPV.0060) | EACH | 3 | $1,261.89 | $1,261.89 | $5,441.00 |
| 435 | Special 031. VLD hydrant, complete (SPV.0060) | EACH | 29 | $8,005.34 | $8,005.34 | $7,972.00 |
| 436 | Special 032. VLD remove & salvage existing hydrant (SPV.0060) | EACH | 28 | $1,262.03 | $1,262.03 | $2,658.00 |
| 437 | Special 033. VLD remove & salvage existing valve and box (SPV.0060) | EACH | 18 | $1,261.88 | $1,261.88 | $1,776.00 |
| 438 | Special 034. VLD remove & salvage existing curb stop box (SPV.0060) | EACH | 5 | $1,262.30 | $1,262.30 | $2,660.00 |
| 439 | Special 035. VLD adjust EX. hydrant (SPV.0060) | EACH | 1 | $2,814.16 | $2,814.16 | $1,670.00 |
| 440 | Special 036. VLD adjust EX. water valve < 6-inches (SPV.0060) | EACH | 81 | $528.96 | $528.96 | $918.00 |
| 441 | Special 037. VLD adjust EX. water valve - 6-inches to 1-foot (SPV.0060) | EACH | 7 | $528.88 | $528.88 | $908.00 |
| 442 | Special 038. VLD adjust EX. water valve > 1-foot (SPV.0060) | EACH | 2 | $532.34 | $532.34 | $890.00 |
| 443 | Special 039. VLD adjust EX. curb stop < 6-inches (SPV.0060) | EACH | 5 | $529.89 | $529.89 | $828.00 |
| 444 | Special 040. VLD adjust EX. curb stop - 6-inches to 1-foot (SPV.0060) | EACH | 3 | $530.34 | $530.34 | $848.00 |
| 445 | Special 041. VLD adjust EX. curb stop > 1-foot (SPV.0060) | EACH | 3 | $530.34 | $530.34 | $870.00 |
| 446 | Special 042. VLD 4- inch valve and box, ductile iron (SPV.0060) | EACH | 1 | $3,142.95 | $3,142.95 | $1,653.00 |
| 447 | Special 043. VLD 6-inch valve and box, ductile iron (SPV.0060) | EACH | 14 | $2,648.96 | $2,648.96 | $1,969.00 |
| 448 | Special 044. VLD 8-inch valve and box, ductile iron (SPV.0060) | EACH | 3 | $3,532.44 | $3,532.44 | $2,758.00 |
| 449 | Special 045. VLD 12-inch valve and box, ductile iron (SPV.0060) | EACH | 1 | $6,904.78 | $6,904.78 | $4,987.00 |
| 450 | Special 046. VLD 45-degree, 4-inch bend, ductile iron (SPV.0060) | EACH | 1 | $655.16 | $665.16 | $202.00 |
| 451 | Special 047. VLD 22.5 degree, 6- inch bend, ductile iron (SPV.0060) | EACH | 1 | $750.63 | $750.63 | $270.00 |
| 452 | Special 047. VLD 22.5-degree, 6- inch bend, ductile iron (SPV.0060) | EACH | 2 | $1,089.33 | $1,089.33 | $270.00 |
| 453 | Special 048. VLD 45-degree, 6-inch bend, ductile iron (SPV.0060) | EACH | 22 | $778.75 | $778.75 | $290.00 |
| 454 | Special 049. VLD 90-degree, 6-inch bend, ductile iron (SPV.0060) | EACH | 6 | $803.28 | $803.28 | $312.00 |
| 455 | Special 050. VLD 22.5-degree, 8- inch bend, ductile iron (SPV.0060) | EACH | 1 | $890.39 | $890.39 | $385.00 |
| 456 | Special 051. VLD 45-degree, 8-inch bend, ductile iron (SPV.0060) | EACH | 8 | $896.45 | $896.45 | $386.00 |
| 457 | Special 052. VLD 45-degree, 12- inch bend, ductile iron (SPV.0060) | EACH | 5 | $1,478.40 | $1,478.40 | $858.00 |
| 458 | Special 053. VLD connect to EX. watermain (SPV.0060) | EACH | 31 | $1,634.02 | $1,634.02 | $18,350 |
| 459 | Special 054. VLD abandon EX. water service at main & plug (SPV.0060) | EACH | 2 | $1,320.68 | $1,320.68 | $42.00 |
| 460 | Special 055. VLD exploratory excavation (SPV.0060) | EACH | 5 | $1,382.87 | $1,382.87 | $2,500.00 |
| 461 | Special 056. VLD abandon EX. hydrant lead at tee & plug (SPV.0060) | EACH | 9 | $1,440.91 | $1,440.91 | $104.00 |
| 462 | Special 057. VLD abandon EX. corp. valve at main, and curb stop & box (SPV.0060) | EACH | 6 | $2,523.76 | $2,523.76 | $150.00 |
| 463 | Special 058. VLD 12-inch X 6-inch tapping sleeve, live tap (SPV.0060) | EACH | 3 | $4,832.72 | $4,832.72 | $20,400 |
| 464 | Special 059. VLD 2-inch corporation valve (SPV.0060) | EACH | 1 | $1,945.21 | $1,945.21 | $359.00 |
| 465 | Special 060. VLD 1-inch curb stop and box (SPV.0060) | EACH | 1 | $1,549.05 | $1,549.05 | $268.00 |
| 466 | Special 061. VLD 2-inch curb stop and box (SPV.0060) | EACH | 3 | $1,987.23 | $1,987.23 | $622.00 |
| 467 | Special 062. VLD connect to EX. water service (SPV.0060) | EACH | 2 | $1,339.16 | $1,339.16 | $180.50 |
| 468 | Special 063. VLD 8-inch X 6-inch tee (SPV.0060) | EACH | 3 | $1,165.84 | $1,165.84 | $606.00 |
| 469 | Special 064. VLD 6-inch X 6-inch tee (SPV.0060) | EACH | 1 | $1,025.52 | $1,025.52 | $494.00 |
| 470 | Special 065. VLD 12-inch X 6-inch reducer (SPV.0060) | EACH | 2 | $1,166.71 | $1,166.71 | $603.00 |
| 471 | Special 066. VLD 8-inch plug (SPV.0060) | EACH | 1 | $713.67 | $713.67 | $158.00 |
| 472 | Special 067. VLD 4-foot bollard, 6- inch diameter with concrete base (SPV.0060) | EACH | 2 | $1,500.00 | $1,000.16 | $5,965.00 |
| 473 | Special 068. VLD 12-inch X 6-inch tee (SPV.0060) | EACH | 1 | $2,493.84 | $2,493.84 | $996.00 |
| 474 | Special 069. VLD 12-inch X 4-inch tee (SPV.0060) | EACH | 1 | $2,396.82 | $2,396.82 | $917.00 |
| 475 | Special 070. VLD 12-inch X 8-inch tee (SPV.0060) | EACH | 1 | $2,556.21 | $2,556.21 | $1,047.00 |
| 476 | Special 071. CWD construction staking sanitary sewer (SPV.0060) | EACH | 1 | $31,000 | $100,000 | $100,000 |
| 477 | Special 072. CWD construction staking water main (SPV.0060) | EACH | 1 | $35,000 | $100,000 | $100,000 |
| 478 | Special 073. CWD abandon existing sanitary manhole (SPV.0060) | EACH | 6 | $1,325.41 | $1,325.41 | $4,116.00 |
| 479 | Special 074. CWD abandon existing sanitary sewer (SPV.0060) | EACH | 9 | $1,319.63 | $1,319.63 | $6,042.00 |
| 480 | Special 075. CWD saniary sewer manhole (SPV.0060) | EACH | 23 | $6,804.56 | $6,804.56 | $8,269.00 |
| 481 | Special 076. CWD sanitary sewer manhole, outside drop (SPV.0060) | EACH | 2 | $13,178 | $13,178 | $13,080 |
| 482 | Special 077. CWD adjust existing sanitary manhole (SPV.0060) | EACH | 14 | $2,020.40 | $2,020.40 | $1,160.00 |
| 483 | Special 078. CWD connect to existing sanitary sewer manhole (SPV.0060) | EACH | 4 | $2,347.89 | $2,347.89 | $10,600 |
| 484 | Special 079. CWD connect to existing sanitary sewer (SPV.0060) | EACH | 11 | $1,342.92 | $1,342.92 | $7,082.00 |
| 485 | Special 080. CWD sanitary sewer wye 8-inch X 6-inch W/tracer wire & terminal (SPV.0060) | EACH | 2 | $1,533.20 | $1,533.20 | $161.00 |
| 486 | Special 081. CWD remove existing hydrant assembly (SPV.0060) | EACH | 5 | $1,262.30 | $1,262.30 | $2,640.00 |
| 487 | Special 082. CWD remove existing valve box (SPV.0060) | EACH | 7 | $420.55 | $420.55 | $1,222.00 |
| 488 | Special 083. CWD abandon existing water main (SPV.0060) | EACH | 7 | $1,441.51 | $1,441.51 | $3,242.00 |
| 489 | Special 084. CWD hydrant (SPV.0060) | EACH | 8 | $7,325.89 | $7,325.89 | $8,000.00 |
| 490 | Special 085. CWD valve & box 12- inch (SPV.0060) | EACH | 25 | $6,059.32 | $6,059.32 | $4,987.00 |
| 491 | Special 086. CWD valve & box 8- inch (SPV.0060) | EACH | 5 | $3,531.99 | $3,531.99 | $2,758.00 |
| 492 | Special 087. CWD valve & box 6- inch (SPV.0060) | EACH | 8 | $2,649.74 | $2,649.74 | $1,969.00 |
| 493 | Special 088. CWD cross 12-inch X 6-inch X 12-inch X 12-inch (SPV.0060) | EACH | 2 | $7,878.77 | $7,878.77 | $2,227.00 |
| 494 | Special 089. CWD tee 12-inch X 12-inch X 12-inch (SPV.0060) | EACH | 8 | $2,916.10 | $2,916.10 | $1,342.00 |
| 495 | Special 090. CWD tee 12-inch X 6- inch X 12-inch (SPV.0060) | EACH | 3 | $2,489.65 | $2,489.65 | $999.00 |
| 496 | Special 091. CWD tee 8-inch X 12- inch X 8-inch (SPV.0060) | EACH | 2 | $2,807.17 | $2,807.17 | $1,257.00 |
| 497 | Special 092. CWD tee 8-inch X 8- inch X 8-inch (SPV.0060) | EACH | 1 | $1,269.23 | $1,269.23 | $693.00 |
| 498 | Special 093. CWD tee 8-inch X 6- inch X 8-inch (SPV.0060) | EACH | 1 | $1,161.81 | $1,161.81 | $606.00 |
| 499 | Special 094. CWD bend 12-inch (SPV.0060) | EACH | 14 | $1,459.31 | $1,459.31 | $837.00 |
| 500 | Special 095. CWD bend 8-inch (SPV.0060) | EACH | 12 | $1,070.86 | $1,070.86 | $382.00 |
| 501 | Special 096. CWD bend 6-inch (SPV.0060) | EACH | 2 | $782.10 | $782.10 | $290.00 |
| 502 | Special 097. CWD reducer 12-inch X 8-inch (SPV.0060) | EACH | 2 | $1,200.21 | $1,200.21 | $631.00 |
| 503 | Special 098. CWD reducer 12-inch X 6-inch (SPV.0060) | EACH | 3 | $1,164.69 | $1,164.69 | $603.00 |
| 504 | Special 099. CWD plug, 12-inch (SPV.0060) | EACH | 1 | $953.91 | $953.91 | $418.00 |
| 505 | Special 100. CWD corporation, curb stop, box & reconnect 1-inch (SPV.0060) | EACH | 3 | $2,970.75 | $2,970.75 | $378.00 |
| 506 | Special 101. CWD connect to existing water main (SPV.0060) | EACH | 14 | $1,907.18 | $1,907.18 | $11,150 |
| 507 | Special 102. CWD manhole adjustment via MR. manhole (SPV.0060) | EACH | 5 | $1,270.14 | $1,270.14 | $10,400 |
| 508 | Special 103. removing billboard sign and sign structure (SPV.0060) | EACH | 2 | $10,000 | $5,300.00 | $6,000.00 |
| 509 | Special 104. remove, salvage and reinstall guardrail and single post (SPV.0060) | EACH | 1 | $500.00 | $500.00 | $560.00 |
| 510 | Special 106. galvanizing steel soldier piles (SPV.0060) | EACH | 62 | $1,200.00 | $1,200.00 | $1.00 |
| 511 | Special 107. VLD construction staking sanitary sewer (SPV.0060) | EACH | 2 | $15,000 | $25,000 | $25,000 |
| 512 | Special 108. VLD construction staking water main (SPV.0060) | EACH | 2 | $15,000 | $25,000 | $25,000 |
| 513 | Special 001. cipp lining 15-inch (SPV.0090) | LF | 32 | $310.00 | $310.00 | $310.00 |
| 514 | Special 002. cipp lining 18-inch (SPV.0090) | LF | 1,032 | $105.00 | $105.00 | $105.00 |
| 515 | Special 003. concrete curb pedestrian special (SPV.0090) | LF | 88 | $200.00 | $146.94 | $146.94 |
| 516 | Special 004. concrete curb & gutter 18-inch, type G (SPV.0090) | LF | 89 | $200.00 | $59.77 | $59.77 |
| 517 | Special 005. concrete curb & gutter 6-inch sloped 18-inch, type G (SPV.0090) | LF | 290 | $60.00 | $59.77 | $59.77 |
| 518 | Special 006. concrete curb & gutter integral 66-inch, type A (SPV.0090) | LF | 4,693 | $75.00 | $49.44 | $49.44 |
| 519 | Special 007. concrete curb & gutter 24-inch type A (SPV.0090) | LF | 116 | $100.00 | $61.32 | $61.32 |
| 520 | Special 008. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 31 | $100.00 | $61.32 | $61.32 |
| 521 | Special 009. remove, salvage and reinstall railing (SPV.0090) | LF | 24 | $200.00 | $70.00 | $100.00 |
| 522 | Special 010. remove, salvage and reinstall brick edging (SPV.0090) | LF | 80 | $80.00 | $80.00 | $65.00 |
| 523 | Special 011. install state-supplied non-intrusive detection cable (SPV.0090) | LF | 4,533 | $2.60 | $2.60 | $2.60 |
| 524 | Special 015. VLD 4-inch PVC sanitary sewer (SPV.0090) | LF | 68 | $46.28 | $46.28 | $200.00 |
| 525 | Special 016. VLD 6-inch PVC sanitary sewer (SPV.0090) | LF | 179 | $49.27 | $49.27 | $350.00 |
| 526 | Special 017. VLD 8-inch PVC sanitary sewer (SPV.0090) | LF | 3,684 | $96.95 | $96.95 | $250.00 |
| 527 | Special 018. VLD 10-inch PVC sanitary sewer (SPV.0090) | LF | 270 | $175.62 | $175.62 | $300.00 |
| 528 | Special 019. VLD 4-inch DI watermain (SPV.0090) | LF | 108 | $123.41 | $123.41 | $250.00 |
| 529 | Special 020. VLD 6-inch DI watermain (SPV.0090) | LF | 415 | $149.71 | $149.71 | $550.00 |
| 530 | Special 021. VLD 8-inch DI watermain (SPV.0090) | LF | 127 | $127.69 | $127.69 | $300.00 |
| 531 | Special 022. VLD 12-inch DI watermain (SPV.0090) | LF | 390 | $158.97 | $158.97 | $400.00 |
| 532 | Special 023. VLD 1-inch service line (SPV.0090) | LF | 8 | $280.05 | $280.05 | $700.00 |
| 533 | Special 024. VLD 2-inch copper service (SPV.0090) | LF | 92 | $102.19 | $102.19 | $700.00 |
| 534 | Special 025. VLD existing sanitary sewer televising (SPV.0090) | LF | 2,282 | $1.58 | $1.58 | $4.75 |
| 535 | Special 026. VLD remove existing watermain (SPV.0090) | LF | 438 | $14.52 | $14.52 | $47.00 |
| 536 | Special 027. VLD remove EX. sanitary sewer and laterals (SPV.0090) | LF | 2,571 | $14.44 | $14.44 | $75.00 |
| 537 | Special 029. CWD sanitary sewer C900 restrained joint 12-inch (SPV.0090) | LF | 115 | $140.62 | $140.62 | $350.00 |
| 538 | Special 030. CWD sanitary sewer PVC 10-inch (SPV.0090) | LF | 1,359 | $119.29 | $119.29 | $300.00 |
| 539 | Special 031. CWD sanitary sewer PVC 8-inch (SPV.0090) | LF | 2,417 | $97.17 | $97.17 | $250.00 |
| 540 | Special 032. CWD sanitary sewer C900 restrained joint 8-inch (SPV.0090) | LF | 104 | $102.30 | $102.30 | $350.00 |
| 541 | Special 033. CWD casing pipe RCP 24-inch (SPV.0090) | LF | 80 | $205.49 | $205.49 | $328.00 |
| 542 | Special 034. CWD sanitary lateral PVC 6-inch (SPV.0090) | LF | 35 | $92.00 | $92.00 | $178.00 |
| 543 | Special 035. CWD water main ductile iron 12-inch (SPV.0090) | LF | 2,658 | $156.84 | $156.84 | $194.00 |
| 544 | Special 036. CWD water main ductile iron 8-inch (SPV.0090) | LF | 1,230 | $122.81 | $122.81 | $148.00 |
| 545 | Special 037. CWD water main ductile iron 6-inch (SPV.0090) | LF | 78 | $202.85 | $202.85 | $752.00 |
| 546 | Special 038. CWD water main ductile iron restrained joint 12-inch (SPV.0090) | LF | 401 | $218.76 | $218.76 | $197.00 |
| 547 | Special 039. CWD casing pipe RCP 30-inch (SPV.0090) | LF | 328 | $161.45 | $161.45 | $700.00 |
| 548 | Special 040. CWD water service copper 1-inch (SPV.0090) | LF | 27 | $194.25 | $194.25 | $477.00 |
| 549 | Special 041. CWD casing pipe RCP 30-inch (sanitary) (SPV.0090) | LF | 80 | $161.61 | $161.61 | $700.00 |
| 550 | Special 001. VLD rigid insulation, 4-FT X 8-FT X 2-inch (for water main) (SPV.0165) | SF | 448 | $11.50 | $11.50 | $2.00 |
| 551 | Special 002. VLD rigid insultation, 4-FT X 8-FT X 2-inch (for sanitary sewer) (SPV.0165) | SF | 148 | $11.49 | $11.49 | $2.16 |
| 552 | Special 003. CWD rigid insulation, 4-FT X 8-FT X 2-inch (SPV.0165) | SF | 64 | $11.59 | $11.59 | $2.00 |
| 553 | Special 005. remove, salvage and reinstall landscaping rock (SPV.0165) | SF | 3,403 | $10.00 | $5.00 | $22.00 |
| 554 | Special 010. anti-graffiti coating (SPV.0165) | SF | 25,126 | $1.89 | $3.00 | $1.89 |
| 555 | Special 011. wall modular block gravity landscape (L01 - sta. 617+06) (SPV.0165) | SF | 213 | $86.00 | $101.40 | $96.16 |
| 556 | Special 012. wall modular block gravity landscape (L02 - sta. 618+16) (SPV.0165) | SF | 495 | $86.00 | $101.50 | $96.16 |
| 557 | Special 013. wal modular block gravity landscape (L03 - sta. 623+00) (SPV.0165) | SF | 494 | $86.00 | $101.80 | $96.16 |
| 558 | Special 014. wall modular block gravity landscape (L04 - sta. 633+90) (SPV.0165) | SF | 202 | $86.00 | $102.30 | $96.16 |
| 559 | Special 015. wall modular block gravity landscape (L05 - sta. 659+68) (SPV.0165) | SF | 493 | $86.00 | $102.20 | $96.16 |
| 560 | Special 016. wall modular block gravity (R-56-0038) (SPV.0165) | SF | 1,276 | $86.00 | $109.80 | $96.16 |
| 561 | Special 017. wall modular block gravity (R-56-0039) (SPV.0165) | SF | 791 | $86.00 | $115.30 | $96.16 |
| 562 | Special 018. wall modular block gravity (R-56-0041) (SPV.0165) | SF | 682 | $86.00 | $111.30 | $96.16 |
| 563 | Special 019. wall modular block gravity (R-56-0043) (SPV.0165) | SF | 1,231 | $86.00 | $114.50 | $96.16 |
| 564 | Special 022. wall modular block gravity (R-56-0046) (SPV.0165) | SF | 902 | $86.00 | $111.70 | $96.16 |
| 565 | Special 023. wall modular block gravity (R-56-0047) (SPV.0165) | SF | 2,746 | $86.00 | $118.50 | $96.16 |
| 566 | Special 024. wall modular block gravity (R-56-0048) (SPV.0165) | SF | 753 | $166.00 | $190.50 | $96.16 |
| 567 | Special 025. wall modular block mechanically stabilized earth (R-56- 0044) (SPV.0165) | SF | 2,294 | $134.00 | $167.67 | $82.11 |
| 568 | Special 026. wall modular block mechanically stabilized earth (R-56- 0045) (SPV.0165) | SF | 4,468 | $84.00 | $116.21 | $82.11 |
| 569 | Special 027. parapet architectural surface treatment (SPV.0165) | SF | 3,032 | $16.00 | $5.00 | $16.00 |
| 570 | Special 001. concrete pavement 8- inch special (SPV.0180) | SY | 86,233 | $70.00 | $55.13 | $55.13 |
| 571 | Special 002. concrete pavement hes 8-inch special (SPV.0180) | SY | 4,101 | $93.50 | $110.07 | $110.07 |
| 572 | Special 001. VLD imported granular backfill (for sanitary sewer) (SPV.0195) | TON | 250 | $15.82 | $15.82 | $50.00 |
| 573 | Special 002. VLD imported granular backfill (for water main) (SPV.0195) | TON | 100 | $16.22 | $16.22 | $50.00 |
| 574 | Special 004. CWD imported granular backfill (for sanitary sewer) (SPV.0195) | TON | 200 | $16.22 | $16.22 | $50.00 |
| 575 | Special 005. CWD imported granular backfill (for water main) (SPV.0195) | TON | 300 | $15.56 | $15.56 | $50.00 |
| 576 | Special 006. cold patch (SPV.0195) | TON | 198 | $1.00 | $135.00 | $280.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.