WisDOT contract 20260609001 bid tabulation
Waukesha - Slinger; Swan Road to Silver Spring Dr (STH 164, Waukesha County Waukesha - Slinger). Let by Wisconsin DOT on June 9, 2026, Waukesha. 2 bids received; low bid $9,143,680 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 09 JUN 2026
- Pay items
- 229
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $9,143,680 | Low |
| 2 | Stark Pavement Corporation | $9,565,970 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Stark Pavement Corporation |
|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $9,686.87 | $5,550.00 |
| 2 | Clearing (201.0105) | STA | 1 | $3,535.35 | $4,000.00 |
| 3 | Grubbing (201.0205) | STA | 1 | $1,515.15 | $2,000.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 1,330 | $16.00 | $20.00 |
| 5 | Removing concrete surface partial depth (204.0109.S) | SF | 29,800 | $1.54 | $1.25 |
| 6 | Removing asphaltic surface (204.0110) | SY | 500 | $48.00 | $17.50 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 270 | $5.00 | $17.50 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 324,500 | $1.35 | $1.22 |
| 9 | Removing curb & gutter (204.0150) | LF | 2,070 | $10.00 | $8.50 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 2,320 | $10.00 | $6.50 |
| 11 | Removing guardrail (204.0165) | LF | 570 | $4.00 | $4.00 |
| 12 | Removing concrete bases (204.0195) | EACH | 56 | $250.00 | $200.00 |
| 13 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 6 | $60.00 | $60.00 |
| 14 | Removing (item description) 01. removing traffic signals STH 164 & swan road (204.9060.S) | EACH | 1 | $8,971.56 | $8,971.56 |
| 15 | Removing (item description) 02. removing traffic signals STH 164 & costco dwy (204.9060.S) | EACH | 1 | $1,647.73 | $1,647.73 |
| 16 | Removing (item description) 03. removing traffic signals STH 164 & CTH K (lisbon road) (204.9060.S) | EACH | 1 | $8,971.56 | $8,971.56 |
| 17 | Removing (item description) 04. removing traffic signals STH 164 & CTH VV (main ST) (204.9060.S) | EACH | 1 | $8,971.56 | $8,971.56 |
| 18 | Removing (item description) 05. removing loop detector wire and lead-in cable STH 164 & swan road (204.9060.S) | EACH | 1 | $1,420.29 | $1,420.29 |
| 19 | Removing (item description) 06. removing loop detector wire and lead-in cable STH 164 & costco dwy (204.9060.S) | EACH | 1 | $374.03 | $374.03 |
| 20 | Removing (item description) 07. removing loop detector wire and lead-in cable STH 164 & CTH K (lisbon road) (204.9060.S) | EACH | 1 | $1,420.29 | $1,420.29 |
| 21 | Removing (item description) 08. removing loop detector wire and lead-in cable STH 164 & CTH VV (main ST) (204.9060.S) | EACH | 1 | $1,420.29 | $1,420.29 |
| 22 | Excavation common (205.0100) | CY | 78 | $50.00 | $35.00 |
| 23 | Finishing roadway (project) 01. 2370-00-75 (213.0100) | EACH | 1 | $4,000.00 | $7,325.00 |
| 24 | Base aggregate dense 3/4-inch (305.0110) | TON | 130 | $65.00 | $33.25 |
| 25 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 46 | $100.00 | $37.20 |
| 26 | Base aggregate open-graded (310.0110) | TON | 43 | $75.00 | $50.00 |
| 27 | Breaker run (311.0110) | TON | 54 | $70.00 | $48.40 |
| 28 | Base patching concrete shes (390.0405) | CY | 93 | $560.00 | $615.00 |
| 29 | Drilled tie bars (416.0610) | EACH | 1,029 | $8.00 | $20.50 |
| 30 | Drilled dowel bars (416.0620) | EACH | 2,044 | $8.00 | $26.50 |
| 31 | Concrete pavement replacement shes (416.1725) | SY | 1,380 | $135.00 | $205.00 |
| 32 | Tack coat (455.0605) | GAL | 16,620 | $8.00 | $8.55 |
| 33 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 4 | $1,660.00 | $3,233.00 |
| 34 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 27,650 | $68.54 | $66.15 |
| 35 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 21,500 | $80.13 | $79.20 |
| 36 | Asphaltic surface patching (465.0110) | TON | 2,580 | $110.00 | $163.25 |
| 37 | Asphaltic flumes (465.0315) | SY | 5 | $180.99 | $200.00 |
| 38 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $2,500.00 | $2,500.00 |
| 39 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 7 | $150.00 | $265.00 |
| 40 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 92 | $85.00 | $75.00 |
| 41 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 2,058 | $72.00 | $48.50 |
| 42 | Concrete curb pedestrian (601.0600) | LF | 90 | $40.00 | $48.50 |
| 43 | Concrete sidewalk 5-inch (602.0410) | SF | 20,680 | $10.30 | $15.00 |
| 44 | Curb ramp detectable warning field yellow (602.0505) | SF | 272 | $50.00 | $60.00 |
| 45 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 346 | $70.00 | $65.00 |
| 46 | Reconstructing catch basins (611.0410) | EACH | 24 | $1,800.00 | $1,800.00 |
| 47 | Inlet covers type F (611.0615) | EACH | 53 | $2,000.00 | $2,000.00 |
| 48 | Adjusting catch basin covers (611.8105) | EACH | 29 | $1,134.00 | $1,134.00 |
| 49 | Adjusting manhole covers (611.8110) | EACH | 22 | $984.00 | $984.00 |
| 50 | Cover plates temporary (611.8120.S) | EACH | 49 | $300.00 | $300.00 |
| 51 | Steel thrie beam structure approach (614.0200) | LF | 82.40 | $95.00 | $95.00 |
| 52 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $13,000 | $13,000 |
| 53 | MGS guardrail 3 (614.2300) | LF | 78.10 | $46.00 | $46.00 |
| 54 | MGS guardrail 3 K (614.2330) | LF | 12.50 | $46.00 | $46.00 |
| 55 | MGS guardrail short radius (614.2350) | LF | 13 | $46.00 | $46.00 |
| 56 | MGS thrie beam transition (614.2500) | LF | 78.80 | $95.00 | $95.00 |
| 57 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,850.00 | $3,850.00 |
| 58 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $3,500.00 | $3,500.00 |
| 59 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,500.00 | $2,500.00 |
| 60 | Mobilization (619.1000) | EACH | 1 | $252,000 | $570,000 |
| 61 | Topsoil (625.0100) | SY | 190 | $25.00 | $12.00 |
| 62 | Salvaged topsoil (625.0500) | SY | 670 | $25.00 | $12.00 |
| 63 | Mulching (627.0200) | SY | 36 | $6.00 | $6.00 |
| 64 | Erosion bales (628.1104) | EACH | 35 | $11.00 | $11.00 |
| 65 | Silt fence (628.1504) | LF | 984 | $2.10 | $2.10 |
| 66 | Silt fence maintenance (628.1520) | LF | 984 | $0.25 | $0.25 |
| 67 | Mobilizations erosion control (628.1905) | EACH | 4 | $350.00 | $350.00 |
| 68 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $150.00 | $150.00 |
| 69 | Erosion mat urban class I type B (628.2008) | SY | 898 | $2.50 | $2.50 |
| 70 | Inlet protection type A (628.7005) | EACH | 1 | $100.00 | $100.00 |
| 71 | Inlet protection type C (628.7015) | EACH | 182 | $31.00 | $31.00 |
| 72 | Inlet protection type D (628.7020) | EACH | 85 | $85.00 | $85.00 |
| 73 | Fertilizer type B (629.0210) | CWT | 0.50 | $300.00 | $300.00 |
| 74 | Seeding mixture no. 30 (630.0130) | LB | 42 | $11.00 | $11.00 |
| 75 | Seeding temporary (630.0200) | LB | 17 | $10.00 | $10.00 |
| 76 | Seed water (630.0500) | MGAL | 17 | $10.00 | $10.00 |
| 77 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 257 | $85.00 | $85.00 |
| 78 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 5 | $210.00 | $210.00 |
| 79 | Signs type II reflective H (637.2210) | SF | 3,442.07 | $22.00 | $22.00 |
| 80 | Signs type II reflective H folding (637.2215) | SF | 216.34 | $30.00 | $30.00 |
| 81 | Signs type II reflective F (637.2230) | SF | 173 | $24.00 | $24.00 |
| 82 | Moving signs type II (638.2102) | EACH | 4 | $100.00 | $100.00 |
| 83 | Removing signs type II (638.2602) | EACH | 300 | $18.00 | $18.00 |
| 84 | Removing small sign supports (638.3000) | EACH | 254 | $18.00 | $18.00 |
| 85 | Traffic control drums (643.0300) | DAY | 326,670 | $0.10 | $0.12 |
| 86 | Traffic control barricades type III (643.0420) | DAY | 15,901 | $0.45 | $0.55 |
| 87 | Traffic control warning lights type A (643.0705) | DAY | 30,182 | $0.06 | $0.15 |
| 88 | Traffic control warning lights type C (643.0715) | DAY | 15,951 | $0.06 | $0.15 |
| 89 | Traffic control connected arrow boards (643.0810) | DAY | 602 | $7.58 | $15.65 |
| 90 | Traffic control signs (643.0900) | DAY | 44,549 | $0.35 | $0.35 |
| 91 | Traffic control covering signs type II (643.0920) | EACH | 2 | $151.52 | $55.00 |
| 92 | Traffic control signs fixed message (643.1000) | SF | 4 | $25.25 | $30.00 |
| 93 | Traffic control signs PCMS (643.1050) | DAY | 465 | $25.25 | $45.86 |
| 94 | Traffic control cones 42-inch (643.1070) | DAY | 30,695 | $0.15 | $0.26 |
| 95 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 718 | $4.04 | $9.83 |
| 96 | Temporary marking line paint 6- inch (643.3165) | LF | 243,149 | $0.35 | $0.38 |
| 97 | Temporary marking line removable tape 6-inch (643.3180) | LF | 127,136 | $1.52 | $1.54 |
| 98 | Temporary marking line paint 10- inch (643.3265) | LF | 28,029 | $0.66 | $1.00 |
| 99 | Temporary marking line removable tape 10-inch (643.3280) | LF | 22,402 | $2.32 | $3.17 |
| 100 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 1,846 | $0.71 | $3.35 |
| 101 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 2,543 | $1.52 | $2.15 |
| 102 | Temporary marking arrow paint (643.3505) | EACH | 54 | $50.51 | $105.00 |
| 103 | Temporary marking arrow removable tape (643.3550) | EACH | 56 | $75.76 | $95.00 |
| 104 | Temporary marking word paint (643.3605) | EACH | 32 | $50.51 | $135.00 |
| 105 | Temporary marking word removable tape (643.3650) | EACH | 11 | $75.76 | $100.00 |
| 106 | Temporary marking stop line paint 18-inch (643.3805) | LF | 1,806 | $1.16 | $5.54 |
| 107 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 910 | $4.04 | $6.35 |
| 108 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 9,733 | $1.77 | $2.55 |
| 109 | Traffic control (643.5000) | EACH | 1 | $325,044 | $207,000 |
| 110 | Temporary pedestrian surface asphalt (644.1410) | SF | 980 | $15.00 | $9.50 |
| 111 | Temporary pedestrian surface plate (644.1430) | SF | 1,300 | $12.12 | $10.95 |
| 112 | Temporary pedestrian curb ramp (644.1601) | DAY | 5,386 | $2.02 | $10.00 |
| 113 | Temporary pedestrian detectable warning field (644.1605) | SF | 812 | $5.05 | $8.75 |
| 114 | Temporary pedestrian barricade (644.1810) | LF | 5,468 | $5.05 | $5.25 |
| 115 | Temporary audible message devices (644.1900.S) | DAY | 2,977 | $10.10 | $3.35 |
| 116 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 1,084 | $1.00 | $0.95 |
| 117 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 102,558 | $1.29 | $1.35 |
| 118 | Marking line grooved wet ref epoxy 8-inch (646.3040) | LF | 87 | $2.55 | $3.00 |
| 119 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 21,755 | $2.90 | $3.10 |
| 120 | Marking arrow epoxy (646.5020) | EACH | 51 | $204.00 | $195.00 |
| 121 | Marking word epoxy (646.5120) | EACH | 24 | $272.25 | $275.00 |
| 122 | Marking stop line epoxy 18-inch (646.6120) | LF | 896 | $14.00 | $18.50 |
| 123 | Marking yield line epoxy 18-inch (646.6220) | EACH | 31 | $40.00 | $37.50 |
| 124 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 2,921 | $13.25 | $13.40 |
| 125 | Marking curb epoxy (646.8120) | LF | 684 | $8.00 | $7.75 |
| 126 | Marking island nose epoxy (646.8220) | EACH | 32 | $298.00 | $295.00 |
| 127 | Marking removal line 4-inch (646.9000) | LF | 30,999 | $0.71 | $0.75 |
| 128 | Marking removal line 8-inch (646.9100) | LF | 68 | $5.05 | $3.00 |
| 129 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,038 | $0.01 | $0.01 |
| 130 | Construction staking resurfacing reference (650.8000) | LF | 20,975 | $0.25 | $0.25 |
| 131 | Construction staking electrical installations (project) 01. 2370-00- 75 (650.8501) | EACH | 1 | $7,000.00 | $9,000.00 |
| 132 | Construction staking curb ramps (650.9000) | EACH | 50 | $200.00 | $200.00 |
| 133 | Construction staking sidewalk (project) 01. 2370-00-75 (650.9500) | EACH | 1 | $1.00 | $1.00 |
| 134 | Construction staking supplemental control (project) 01. 2370-00-75 (650.9911) | EACH | 1 | $5,000.00 | $5,000.00 |
| 135 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 7,550 | $8.72 | $8.72 |
| 136 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,694 | $9.98 | $9.98 |
| 137 | Conduit special 2-inch (652.0605) | LF | 148 | $25.35 | $25.35 |
| 138 | Conduit special 3-inch (652.0615) | LF | 3,564 | $29.22 | $29.22 |
| 139 | Conduit loop detector (652.0800) | LF | 7,156 | $11.17 | $11.17 |
| 140 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 26 | $2,352.40 | $2,352.40 |
| 141 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 43 | $2,501.17 | $2,501.17 |
| 142 | Removing pull boxes (653.0905) | EACH | 73 | $111.00 | $111.00 |
| 143 | Concrete bases type 1 (654.0101) | EACH | 22 | $983.94 | $983.94 |
| 144 | Concrete bases type 5 (654.0105) | EACH | 39 | $1,181.45 | $1,181.45 |
| 145 | Concrete bases type 10 (654.0110) | EACH | 3 | $6,192.75 | $6,192.75 |
| 146 | Concrete bases type 10-special (654.0120) | EACH | 11 | $9,844.63 | $9,844.63 |
| 147 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 3 | $2,486.67 | $2,486.67 |
| 148 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,823 | $2.27 | $2.27 |
| 149 | Cable traffic signal 7-14 AWG (655.0240) | LF | 4,312 | $2.92 | $2.92 |
| 150 | Cable traffic signal 12-14 AWG (655.0260) | LF | 7,212 | $4.54 | $4.54 |
| 151 | Cable traffic signal 15-14 AWG (655.0270) | LF | 1,212 | $5.67 | $5.67 |
| 152 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 6,585 | $2.52 | $2.52 |
| 153 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 5,642 | $2.00 | $2.00 |
| 154 | Electrical wire lighting 10 AWG (655.0615) | LF | 5,994 | $1.22 | $1.22 |
| 155 | Loop detector lead in cable (655.0700) | LF | 26,482 | $1.68 | $1.68 |
| 156 | Loop detector wire (655.0800) | LF | 24,388 | $1.03 | $1.03 |
| 157 | Traffic signal evp detector cable (655.0900) | LF | 4,623 | $1.60 | $1.60 |
| 158 | Electrical service meter breaker pedestal (location) 01. STH 164 & swan road (656.0201) | EACH | 1 | $1,393.25 | $1,393.25 |
| 159 | Electrical service meter breaker pedestal (location) 02. STH 164 & CTH K (lisbon road) (656.0201) | EACH | 1 | $1,393.25 | $1,393.25 |
| 160 | Electrical service meter breaker pedestal (location) 03. STH 164 & CTH VV (main ST) (656.0201) | EACH | 1 | $1,393.25 | $1,393.25 |
| 161 | Pedestal bases (657.0100) | EACH | 22 | $385.89 | $385.89 |
| 162 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 39 | $723.97 | $723.97 |
| 163 | Poles type 5-steel (657.0321) | EACH | 39 | $1,989.70 | $1,989.70 |
| 164 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 16 | $989.14 | $989.14 |
| 165 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 6 | $852.41 | $852.41 |
| 166 | Luminaire arms truss type 4-inch clamp 15-FT (657.0714) | EACH | 50 | $1,220.06 | $1,220.06 |
| 167 | Traffic signal face 3S 12-inch (658.0173) | EACH | 36 | $927.47 | $927.47 |
| 168 | Traffic signal face 4S 12-inch (658.0174) | EACH | 34 | $1,172.87 | $1,172.87 |
| 169 | Pedestrian signal face 16-inch (658.0416) | EACH | 22 | $536.64 | $536.64 |
| 170 | Pedestrian push buttons (658.0500) | EACH | 22 | $448.99 | $448.99 |
| 171 | Signal mounting hardware (location) 01. STH 164 & swan road (658.5070) | EACH | 1 | $5,443.75 | $5,443.75 |
| 172 | Signal mounting hardware (location) 02. STH 164 & costco dwy (658.5070) | EACH | 1 | $640.90 | $640.90 |
| 173 | Signal mounting hardware (location) 03. STH 164 & CTH K (lisbon road) (658.5070) | EACH | 1 | $6,004.67 | $6,004.67 |
| 174 | Signal mounting hardware (location) 04. STH 164 & CTH VV (main ST) (658.5070) | EACH | 1 | $6,004.67 | $6,004.67 |
| 175 | Luminaires utility LED C (659.1125) | EACH | 51 | $532.67 | $532.67 |
| 176 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 97 | $26.16 | $26.16 |
| 177 | Temporary traffic signals for intersections (location) 01. STH 164 & swan road (661.0201) | EACH | 1 | $56,911 | $56,911 |
| 178 | Temporary traffic signals for intersections (location) 02. STH 164 & CTH K (lisbon road) (661.0201) | EACH | 1 | $59,073 | $59,073 |
| 179 | Temporary traffic signals for intersections (location) 03. STH 164 & CTH VV (main ST) (661.0201) | EACH | 1 | $65,715 | $65,715 |
| 180 | Generators (661.0300) | DAY | 6 | $376.55 | $376.55 |
| 181 | Install camera assembly (677.0200) | EACH | 3 | $1,628.73 | $1,628.73 |
| 182 | Sawing asphalt (690.0150) | LF | 6,220 | $2.10 | $1.25 |
| 183 | Sawing concrete (690.0250) | LF | 2,130 | $3.25 | $2.25 |
| 184 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 3,200 | $5.00 | $5.00 |
| 185 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 9,600 | $5.00 | $5.00 |
| 186 | Special 01. incentive density PWL HMA pavement core only (SPV.0055) | DOL | 24,237 | $1.00 | $1.00 |
| 187 | Special 02. PWL incentive air voids HMA pavement core only (SPV.0055) | DOL | 49,141 | $1.00 | $1.00 |
| 188 | Special 03. HMA pavement longitudinal joint density, core only project (SPV.0055) | DOL | 7,574 | $1.00 | $1.00 |
| 189 | Special 01. field facilities office space (SPV.0060) | EACH | 1 | $85,000 | $21,350 |
| 190 | Special 02. drainage clean storm sewer structures (SPV.0060) | EACH | 16 | $300.00 | $300.00 |
| 191 | Special 03. curb ramps grading, shaping and finishing (SPV.0060) | EACH | 36 | $1,750.00 | $1,223.00 |
| 192 | Special 04. adjusting water valve boxes (SPV.0060) | EACH | 1 | $700.00 | $700.00 |
| 193 | Special 05. cleaning endwalls (SPV.0060) | EACH | 15 | $300.00 | $300.00 |
| 194 | Special 06. section corner monuments (SPV.0060) | EACH | 2 | $1,500.00 | $300.00 |
| 195 | Special 07. utility line opening (ulo) (SPV.0060) | EACH | 10 | $1,000.00 | $700.00 |
| 196 | Special 10. remove sanitary sewer structures (SPV.0060) | EACH | 1 | $950.00 | $950.00 |
| 197 | Special 11. salvage sanitary sewer structures (SPV.0060) | EACH | 10 | $1,700.00 | $1,700.00 |
| 198 | Special 16. watermain - remove and replace valve box top section and lid, 6-inch (SPV.0060) | EACH | 5 | $800.00 | $800.00 |
| 199 | Special 17. watermain - remove and replace valve box top section and lid, 8-inch (SPV.0060) | EACH | 1 | $900.00 | $900.00 |
| 200 | Special 18. watermain - remove and replace valve box top section and lid, 12-inch (SPV.0060) | EACH | 7 | $900.00 | $900.00 |
| 201 | Special 19. watermain - remove vault and replace with entire valve box and lid, 12-inch (SPV.0060) | EACH | 3 | $2,500.00 | $2,500.00 |
| 202 | Special 20. install poles type 9 (SPV.0060) | EACH | 2 | $1,180.52 | $1,180.52 |
| 203 | Special 21. install poles type 10 (SPV.0060) | EACH | 1 | $1,442.08 | $1,442.08 |
| 204 | Special 22. install poles type 9 special (SPV.0060) | EACH | 5 | $1,180.52 | $1,180.52 |
| 205 | Special 23. install poles type 9 special over-height (SPV.0060) | EACH | 6 | $1,180.52 | $1,180.52 |
| 206 | Special 24. install monotube arms 15-FT (SPV.0060) | EACH | 2 | $1,546.06 | $1,546.06 |
| 207 | Special 25. install monotube arms 30-FT (SPV.0060) | EACH | 1 | $1,546.06 | $1,546.06 |
| 208 | Special 26. install monotube arms 40-FT special (SPV.0060) | EACH | 4 | $1,720.44 | $1,720.44 |
| 209 | Special 27. install monotube arms 45-FT special (SPV.0060) | EACH | 7 | $1,720.44 | $1,720.44 |
| 210 | Special 28. install luminaire arms steel 15-FT (SPV.0060) | EACH | 1 | $339.02 | $339.02 |
| 211 | Special 29. transport & install state furnished traffic signal cabinet STH 164 & swan RD (SPV.0060) | EACH | 1 | $7,068.16 | $7,068.16 |
| 212 | Special 30. transport & install state furnished traffic signal cabinet STH 164 & CTH K. (SPV.0060) | EACH | 1 | $7,897.77 | $7,897.77 |
| 213 | Special 31. transport & install state furnished traffic signal cabinet STH 164 & CTH VV (SPV.0060) | EACH | 1 | $8,683.33 | $8,683.33 |
| 214 | Special 32. transport & install state furnished radar detection system STH 164 & swan RD (SPV.0060) | EACH | 1 | $2,127.90 | $2,127.90 |
| 215 | Special 33. transport & install state furnished radar detection system STH 164 & costco (SPV.0060) | EACH | 1 | $2,127.90 | $2,127.90 |
| 216 | Special 34. transport & install state furnished radar detection system STH 164 & CTH K (SPV.0060) | EACH | 1 | $4,220.43 | $4,220.43 |
| 217 | Special 35. transport & install state furnished radar detection system STH 164 & CTH VV (SPV.0060) | EACH | 1 | $2,127.90 | $2,127.90 |
| 218 | Special 36. transport traffic signal & intersection lighting materials STH 164 & swan RD (SPV.0060) | EACH | 1 | $697.51 | $697.51 |
| 219 | Special 37. transport traffic signal & intersection lighting materials STH 164 & CTH K (SPV.0060) | EACH | 1 | $697.51 | $697.51 |
| 220 | Special 38. transport traffic signal & intersection lighting materials STH 164 & CTH VV (SPV.0060) | EACH | 1 | $697.51 | $697.51 |
| 221 | Special 39. transport & install state furnished evp heads STH 164 & swan RD (SPV.0060) | EACH | 4 | $762.10 | $762.10 |
| 222 | Special 40. transport & install state furnished evp heads STH 164 & CTH K (SPV.0060) | EACH | 4 | $762.10 | $762.10 |
| 223 | Special 41. transport & install state furnished evp heads STH 164 & CTH VV (SPV.0060) | EACH | 4 | $762.10 | $762.10 |
| 224 | Special 42. temporary emergency vehicle preemption system STH 164 & swan RD (SPV.0060) | EACH | 4 | $1,053.79 | $1,053.79 |
| 225 | Special 43. temporary emergency vehicle preemption system STH 164 & CTH K (SPV.0060) | EACH | 4 | $1,053.79 | $1,053.79 |
| 226 | Special 44. temporary emergency vehicle preemption system STH 164 & CTH VV (SPV.0060) | EACH | 4 | $1,053.79 | $1,053.79 |
| 227 | Special 45. remove, salvage, & reinstall fiber optic interconnect STH 164 & swan road (SPV.0060) | EACH | 1 | $6,295.76 | $6,295.76 |
| 228 | Special 46. remove, salvage, & reinstall fiber optic interconnect STH 164 & costco DR (SPV.0060) | EACH | 1 | $6,295.76 | $6,295.76 |
| 229 | Special 47. install conduit into existing item (SPV.0060) | EACH | 8 | $377.97 | $377.97 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of June 9, 2026. Compiled by Mirage Metrics.