WisDOT contract 20261110014 bid tabulation
C Milwaukee, W National Ave; 27th St to 1st St (STH 059, Milwaukee County C Milwaukee, W National Ave). Let by Wisconsin DOT on November 10, 2026, Milwaukee. 3 bids received; low bid $26,868,079 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 372
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $26,868,079 | Low |
| 2 | Zignego Company, Inc. | $27,657,152 | +3.0% |
| 3 | Hoffman Construction Company | $29,589,437 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Zignego Company, Inc. | 3. Hoffman Construction Company |
|---|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $19,360 | $1,000.00 | $1,000.00 |
| 2 | Clearing (201.0105) | STA | 20 | $1,402.70 | $1,618.50 | $1,618.50 |
| 3 | Clearing (201.0120) | ID | 25 | $53.95 | $43.16 | $43.16 |
| 4 | Grubbing (201.0205) | STA | 21 | $161.85 | $453.18 | $453.18 |
| 5 | Grubbing (201.0220) | ID | 27 | $9.71 | $5.40 | $5.40 |
| 6 | Removing concrete pavement (204.0100) | SY | 2,550 | $9.46 | $10.45 | $2.50 |
| 7 | Removing asphaltic surface (204.0110) | SY | 79 | $19.62 | $10.45 | $15.00 |
| 8 | Removing curb (204.0130) | LF | 116 | $6.83 | $20.00 | $10.00 |
| 9 | Removing curb & gutter (204.0150) | LF | 19,825 | $6.84 | $3.00 | $10.00 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 16,291 | $10.91 | $8.73 | $20.00 |
| 11 | Removing fence (204.0170) | LF | 320 | $2.10 | $4.50 | $4.50 |
| 12 | Removing delineators and markers (204.0180) | EACH | 2 | $1.00 | $50.00 | $50.00 |
| 13 | Removing concrete bases (204.0195) | EACH | 51 | $375.00 | $500.00 | $392.37 |
| 14 | Removing manholes (204.0210) | EACH | 8 | $400.00 | $500.00 | $500.00 |
| 15 | Removing catch basins (204.0215) | EACH | 27 | $400.00 | $600.00 | $500.00 |
| 16 | Removing storm sewer (size) 012. 12-inch (204.0245) | LF | 819 | $20.00 | $35.00 | $12.50 |
| 17 | Abandoning manholes (204.0250) | EACH | 32 | $400.00 | $400.00 | $750.00 |
| 18 | Abandoning catch basins (204.0255) | EACH | 73 | $400.00 | $400.00 | $750.00 |
| 19 | Abandoning sewer (204.0291.S) | CY | 82 | $200.00 | $300.00 | $550.00 |
| 20 | Removing (item description) 201. traffic signals W national ave & S 21ST ST (204.9060.S) | EACH | 1 | $4,000.00 | $3,152.83 | $3,152.83 |
| 21 | Removing (item description) 202. traffic signals W national ave & S 19TH ST (204.9060.S) | EACH | 1 | $6,000.00 | $3,152.83 | $3,152.83 |
| 22 | Removing (item description) 203. traffic signals W national ave & S 16TH ST (204.9060.S) | EACH | 1 | $6,500.00 | $5,629.49 | $5,629.49 |
| 23 | Removing (item description) 204. traffic signals W national ave & S 11TH ST (204.9060.S) | EACH | 1 | $5,000.00 | $3,152.83 | $3,152.83 |
| 24 | Removing (item description) 205. traffic signals W national ave & S 9TH ST (204.9060.S) | EACH | 1 | $4,000.00 | $3,152.83 | $3,152.83 |
| 25 | Removing (item description) 206. traffic signals W national ave & S 6TH ST (204.9060.S) | EACH | 1 | $6,000.00 | $5,629.49 | $5,629.49 |
| 26 | Removing (item description) 207. traffic signals W national ave & S 5TH ST (204.9060.S) | EACH | 1 | $5,500.00 | $5,629.49 | $5,629.49 |
| 27 | Removing (item description) 208. traffic signals W national ave & S 2ND ST (204.9060.S) | EACH | 1 | $7,000.00 | $5,629.49 | $5,629.49 |
| 28 | Removing (item description) 209. traffic signals W national ave & S 1ST ST (204.9060.S) | EACH | 1 | $5,500.00 | $5,629.49 | $5,629.49 |
| 29 | Removing (item description) 310. poles (204.9060.S) | EACH | 193 | $500.00 | $456.68 | $456.68 |
| 30 | Removing (item description) 314. aerial cable (204.9090.S) | LF | 6,980 | $3.00 | $3.20 | $3.20 |
| 31 | Removing (item description) traffic channelizing curb systems (204.9090.S) | LF | 75 | $21.05 | $100.00 | $15.00 |
| 32 | Excavation common (205.0100) | CY | 44,570 | $0.01 | $0.01 | $20.00 |
| 33 | Finishing roadway (project) 001. 2410-10-71 (213.0100) | EACH | 1 | $5,984.00 | $1,000.00 | $1,000.00 |
| 34 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 63,725 | $22.27 | $23.30 | $35.00 |
| 35 | Base aggregate open-graded (310.0115) | CY | 96 | $95.82 | $100.00 | $100.00 |
| 36 | Select crushed material (312.0110) | TON | 40,351 | $11.73 | $23.00 | $30.00 |
| 37 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 70 | $775.00 | $100.00 | $775.00 |
| 38 | Coloring concrete wisdot red (405.0100) | CY | 3 | $170.81 | $200.00 | $246.11 |
| 39 | Coloring concrete custom (405.0200) | CY | 1,362 | $157.25 | $100.00 | $110.76 |
| 40 | Concrete pavement 7 1/2-inch (415.0075) | SY | 1,326 | $89.83 | $110.49 | $103.17 |
| 41 | Concrete pavement 8-inch (415.0080) | SY | 1,653 | $92.46 | $110.97 | $101.87 |
| 42 | Concrete alley (415.0310) | SY | 420 | $79.02 | $110.97 | $109.86 |
| 43 | Concrete pavement joint filling (415.4100) | SY | 3,692 | $3.79 | $3.00 | $3.85 |
| 44 | Drilled tie bars (416.0610) | EACH | 184 | $23.69 | $30.00 | $14.30 |
| 45 | Drilled dowel bars (416.0620) | EACH | 156 | $28.33 | $30.00 | $18.50 |
| 46 | HMA cold weather paving (450.4000) | TON | 273 | $4.50 | $4.50 | $10.00 |
| 47 | Tack coat (455.0605) | GAL | 5,805 | $1.10 | $1.10 | $2.00 |
| 48 | Incentive density HMA pavement (460.2000) | DOL | 10,850 | $1.00 | $1.00 | $1.00 |
| 49 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 11,535 | $92.90 | $92.90 | $91.80 |
| 50 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 5,418 | $106.45 | $106.45 | $98.80 |
| 51 | Asphaltic surface driveways and field entrances (465.0120) | TON | 91 | $287.20 | $287.20 | $330.00 |
| 52 | Asphaltic surface temporary (465.0125) | TON | 200 | $186.00 | $186.00 | $200.00 |
| 53 | Concrete curb type A (601.0105) | LF | 10 | $61.94 | $46.11 | $65.80 |
| 54 | Concrete curb type D (601.0110) | LF | 70 | $61.44 | $46.11 | $83.17 |
| 55 | Concrete curb & gutter 19-inch (601.0319) | LF | 6,462 | $46.77 | $31.11 | $28.23 |
| 56 | Concrete curb & gutter 31-inch (601.0331) | LF | 18,100 | $35.30 | $40.77 | $32.07 |
| 57 | Concrete curb pedestrian (601.0600) | LF | 141 | $52.18 | $36.14 | $52.06 |
| 58 | Concrete sidewalk 5-inch (602.0410) | SF | 254,236 | $9.24 | $11.79 | $8.71 |
| 59 | Curb ramp detectable warning field natural patina (602.0515) | SF | 4,402 | $48.28 | $40.00 | $53.95 |
| 60 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 351 | $66.07 | $75.00 | $71.93 |
| 61 | Concrete driveway 6-inch (602.0810) | SY | 566 | $81.96 | $129.04 | $85.68 |
| 62 | Concrete driveway 8-inch (602.0820) | SY | 2,078 | $91.25 | $148.96 | $109.85 |
| 63 | Concrete driveway hes 6-inch (602.0860) | SY | 271 | $83.46 | $134.16 | $83.81 |
| 64 | Concrete driveway hes 8-inch (602.0870) | SY | 582 | $93.26 | $155.80 | $114.37 |
| 65 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 5,721 | $70.00 | $94.23 | $80.00 |
| 66 | Storm sewer pipe composite 12- inch (608.6012) | LF | 390 | $70.00 | $88.12 | $60.00 |
| 67 | Reconstructing manholes (611.0420) | EACH | 6 | $2,500.00 | $1,000.00 | $1,500.00 |
| 68 | Manholes 4-FT diameter (611.2004) | EACH | 20 | $10,000 | $4,669.04 | $3,600.00 |
| 69 | Manholes 5-FT diameter (611.2005) | EACH | 2 | $12,000 | $9,121.20 | $6,800.00 |
| 70 | Manholes 6-FT diameter (611.2006) | EACH | 4 | $15,000 | $10,916 | $9,100.00 |
| 71 | Adjusting manhole covers (611.8110) | EACH | 12 | $800.00 | $850.00 | $3,000.00 |
| 72 | Pipe underdrain 6-inch (612.0106) | LF | 1,903 | $30.00 | $18.17 | $9.00 |
| 73 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 177 | $30.00 | $18.35 | $9.50 |
| 74 | Mobilization (619.1000) | EACH | 1 | $2,055,986 | $2,581,000 | $2,532,834 |
| 75 | Concrete median sloped nose (620.0300) | SF | 945 | $20.22 | $17.13 | $22.75 |
| 76 | Water (624.0100) | MGAL | 2,003.50 | $0.01 | $0.01 | $0.01 |
| 77 | Topsoil (625.0100) | SY | 10,033 | $5.80 | $6.40 | $6.40 |
| 78 | Mulching (627.0200) | SY | 2,390 | $0.60 | $0.74 | $0.74 |
| 79 | Mobilizations erosion control (628.1905) | EACH | 40 | $40.00 | $325.00 | $325.00 |
| 80 | Mobilizations emergency erosion control (628.1910) | EACH | 20 | $1.00 | $275.00 | $275.00 |
| 81 | Inlet protection type A (628.7005) | EACH | 210 | $1.00 | $88.00 | $88.00 |
| 82 | Inlet protection type B (628.7010) | EACH | 143 | $65.00 | $31.00 | $31.00 |
| 83 | Inlet protection type D (628.7020) | EACH | 185 | $120.00 | $86.00 | $86.00 |
| 84 | Tracking pads (628.7560) | EACH | 16 | $0.01 | $0.01 | $100.00 |
| 85 | Fertilizer type B (629.0210) | CWT | 6.47 | $80.00 | $92.00 | $92.00 |
| 86 | Seeding temporary (630.0200) | LB | 905 | $1.00 | $1.85 | $1.85 |
| 87 | Seed water (630.0500) | MGAL | 755 | $1.00 | $3.00 | $3.00 |
| 88 | Sod water (631.0300) | MGAL | 241 | $30.00 | $12.00 | $12.00 |
| 89 | Sod lawn (631.1000) | SY | 10,033 | $7.15 | $6.95 | $6.95 |
| 90 | Trees (species, root, size) 001. autumn blaze maple, B&B, 3" cal. (632.0101) | EACH | 15 | $780.00 | $512.40 | $512.40 |
| 91 | Trees (species, root, size) 002. pacific sunset maple, B&B, 2.5" cal. (632.0101) | EACH | 8 | $680.00 | $553.35 | $553.35 |
| 92 | Trees (species, root, size) 003. red pointe maple, B&B, 3" cal. (632.0101) | EACH | 5 | $680.00 | $553.35 | $553.35 |
| 93 | Trees (species, root, size) 004. tulip tree, B&B, 3" cal. (632.0101) | EACH | 8 | $700.00 | $512.40 | $512.40 |
| 94 | Trees (species, root, size) 005. sunburst honeylocust, B&B, 3" cal. (632.0101) | EACH | 20 | $675.00 | $531.30 | $531.30 |
| 95 | Trees (species, root, size) 006. kentucky coffee tree, B&B, 3" cal. (632.0101) | EACH | 9 | $700.00 | $498.75 | $498.75 |
| 96 | Trees (species, root, size) 007. frontier elm, B&B, 3" cal. (632.0101) | EACH | 13 | $700.00 | $498.75 | $498.75 |
| 97 | Trees (species, root, size) 008. upright english oak, B&B, 3" cal. (632.0101) | EACH | 3 | $700.00 | $553.35 | $553.35 |
| 98 | Trees (species, root, size) 009. japanese tree lilac, B&B, 2.5" cal. (632.0101) | EACH | 13 | $680.00 | $468.30 | $468.30 |
| 99 | Trees (species, root, size) 010. fort mcnair red horse chestnut, B&B, 3" cal. (632.0101) | EACH | 9 | $700.00 | $766.50 | $766.50 |
| 100 | Trees (species, root, size) 011. dawn redwood, B&B, 3" cal. (632.0101) | EACH | 8 | $700.00 | $553.35 | $553.35 |
| 101 | Trees (species, root, size) 012. hot wing tatarian maple, B&B, 2.5" cal. (632.0101) | EACH | 11 | $680.00 | $425.25 | $425.25 |
| 102 | Trees (species, root, size) 013. american sycamore, B&B, 3" cal. (632.0101) | EACH | 8 | $700.00 | $512.40 | $512.40 |
| 103 | Trees (species, root, size) 014. columnar armstrong maple, B&B, 3" cal. (632.0101) | EACH | 3 | $700.00 | $512.40 | $512.40 |
| 104 | Trees (species, root, size) 015. crimson king maple, B&B, 3" cal. (632.0101) | EACH | 3 | $700.00 | $630.00 | $630.00 |
| 105 | Trees (species, root, size) 016. pink spire crabapple, B&B, 2.5" cal. (632.0101) | EACH | 7 | $650.00 | $425.25 | $425.25 |
| 106 | Trees (species, root, size) 017. purple prince crabapple, B&B, 2.5" cal. (632.0101) | EACH | 2 | $650.00 | $425.25 | $425.25 |
| 107 | Trees (species, root, size) 018. adams crabapple, B&B, 2.5" cal. (632.0101) | EACH | 2 | $650.00 | $425.25 | $425.25 |
| 108 | Trees (species, root, size) 019. eastern redbud, B&B, 2.5" cal. (632.0101) | EACH | 2 | $670.00 | $516.60 | $516.60 |
| 109 | Trees (species, root, size) 020. autumn brilliance serviceberry, B&B, 2.5" cal. (632.0101) | EACH | 10 | $670.00 | $540.75 | $540.75 |
| 110 | Landscape planting surveillance and care cycles (632.9101) | EACH | 10 | $500.00 | $500.00 | $500.00 |
| 111 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 3 | $150.00 | $92.00 | $92.00 |
| 112 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $160.00 | $92.00 | $92.00 |
| 113 | Signs type II reflective H (637.2210) | SF | 1,386.43 | $22.10 | $27.15 | $27.15 |
| 114 | Signs type II reflective SH (637.2220) | SF | 658.12 | $24.89 | $45.00 | $45.00 |
| 115 | Signs type II reflective F (637.2230) | SF | 545.14 | $23.10 | $28.40 | $28.40 |
| 116 | Removing signs type II (638.2602) | EACH | 20 | $10.00 | $26.00 | $26.00 |
| 117 | Removing small sign supports (638.3000) | EACH | 1 | $10.00 | $90.00 | $90.00 |
| 118 | Traffic control drums (643.0300) | DAY | 54,787 | $0.10 | $0.10 | $0.10 |
| 119 | Traffic control barricades type III (643.0420) | DAY | 69,031 | $0.30 | $0.30 | $0.30 |
| 120 | Traffic control flexible tubular marker posts (643.0500) | EACH | 24 | $35.00 | $35.00 | $35.00 |
| 121 | Traffic control flexible tubular marker bases (643.0600) | EACH | 24 | $1.00 | $1.00 | $1.00 |
| 122 | Traffic control channelizing curb system (643.0650) | LF | 75 | $70.00 | $70.00 | $70.00 |
| 123 | Traffic control warning lights type A (643.0705) | DAY | 138,062 | $0.06 | $0.06 | $0.06 |
| 124 | Traffic control warning lights type C (643.0715) | DAY | 4,590 | $0.06 | $0.06 | $0.06 |
| 125 | Traffic control connected arrow boards (643.0810) | DAY | 288 | $6.00 | $6.00 | $6.00 |
| 126 | Traffic control signs (643.0900) | DAY | 156,741 | $0.25 | $0.25 | $0.25 |
| 127 | Traffic control covering signs type II (643.0920) | EACH | 7 | $45.00 | $45.00 | $45.00 |
| 128 | Traffic control signs fixed message (643.1000) | SF | 428 | $16.00 | $16.00 | $16.00 |
| 129 | Traffic control signs PCMS (643.1050) | DAY | 259 | $30.00 | $30.00 | $30.00 |
| 130 | Traffic control connected work zone end location marker (643.1222) | DAY | 288 | $6.00 | $6.00 | $6.00 |
| 131 | Traffic control speed feedback trailer (643.1500) | DAY | 832 | $6.00 | $25.00 | $6.00 |
| 132 | Temporary marking line removable tape 6-inch (643.3180) | LF | 44,655 | $1.60 | $1.60 | $1.60 |
| 133 | Temporary marking line removable tape 10-inch (643.3280) | LF | 70 | $2.65 | $2.65 | $2.65 |
| 134 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 50 | $6.00 | $6.00 | $6.00 |
| 135 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 526 | $1.85 | $1.85 | $1.85 |
| 136 | Traffic control (643.5000) | EACH | 1 | $414,700 | $414,700 | $414,700 |
| 137 | Temporary pedestrian surface plate (644.1430) | SF | 2,110 | $13.00 | $13.00 | $13.00 |
| 138 | Temporary pedestrian surface matting (644.1440) | SF | 18,999 | $0.40 | $0.40 | $0.40 |
| 139 | Temporary pedestrian curb ramp (644.1601) | DAY | 9,500 | $1.50 | $1.50 | $1.50 |
| 140 | Temporary pedestrian detectable warning field (644.1605) | SF | 9,930 | $0.50 | $0.50 | $0.50 |
| 141 | Temporary pedestrian barricade (644.1810) | LF | 39,919 | $1.00 | $1.00 | $1.00 |
| 142 | Temporary audible message devices (644.1900.S) | DAY | 25,179 | $1.00 | $1.00 | $1.00 |
| 143 | Geotextile type DF schedule A (645.0111) | SY | 987 | $8.00 | $10.00 | $5.00 |
| 144 | Geotextile type sas (645.0140) | SY | 178 | $2.86 | $10.00 | $10.00 |
| 145 | Geogrid type SR (645.0220) | SY | 57,598 | $1.95 | $2.00 | $2.00 |
| 146 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 25,991 | $1.28 | $1.28 | $1.28 |
| 147 | Marking line mma 4-inch (646.1060.S) | LF | 2,416 | $62.22 | $62.22 | $62.22 |
| 148 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 764 | $1.56 | $1.56 | $1.56 |
| 149 | Marking line grooved wet ref epoxy 8-inch (646.3040) | LF | 3,743 | $2.02 | $2.02 | $2.02 |
| 150 | Marking arrow epoxy (646.5020) | EACH | 58 | $490.61 | $490.61 | $490.61 |
| 151 | Marking arrow mma (646.5060.S) | EACH | 107 | $660.09 | $660.09 | $660.09 |
| 152 | Marking symbol mma (646.5260.S) | EACH | 109 | $663.83 | $663.83 | $663.83 |
| 153 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $4,820.33 | $4,820.33 | $4,820.33 |
| 154 | Marking diagonal epoxy 12-inch (646.7120) | LF | 781 | $20.01 | $20.01 | $20.01 |
| 155 | Marking bike lane mma (646.7760.S) | SF | 644 | $12.09 | $12.09 | $12.09 |
| 156 | Marking curb epoxy (646.8120) | LF | 333 | $9.84 | $9.84 | $9.84 |
| 157 | Marking island nose epoxy (646.8220) | EACH | 21 | $366.69 | $366.69 | $366.69 |
| 158 | Marking removal line 4-inch (646.9000) | LF | 40 | $3.00 | $3.00 | $3.00 |
| 159 | Marking removal line 6-inch (646.9002) | LF | 202 | $1.50 | $1.50 | $1.50 |
| 160 | Marking removal line wide (646.9200) | LF | 12 | $7.00 | $7.00 | $7.00 |
| 161 | Construction staking storm sewer (650.4000) | EACH | 267 | $130.00 | $130.00 | $130.00 |
| 162 | Construction staking subgrade (650.4500) | LF | 10,360 | $0.01 | $0.01 | $0.01 |
| 163 | Construction staking base (650.5000) | LF | 10,307 | $1.50 | $0.01 | $0.01 |
| 164 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 25,884 | $1.25 | $1.25 | $1.25 |
| 165 | Construction staking concrete pavement (650.7000) | LF | 1,079 | $2.25 | $2.25 | $2.25 |
| 166 | Construction staking electrical installations (project) 001. 2410-10- 71 (650.8501) | EACH | 1 | $10,000 | $10,000 | $10,000 |
| 167 | Construction staking curb ramps (650.9000) | EACH | 198 | $155.00 | $155.00 | $155.00 |
| 168 | Construction staking sidewalk (project) 001. 2410-10-71 (650.9500) | EACH | 1 | $12,500 | $12,500 | $12,500 |
| 169 | Construction staking supplemental control (project) 001. 2410-10-71 (650.9911) | EACH | 1 | $5,500.00 | $5,500.00 | $5,500.00 |
| 170 | Construction staking slope stakes (650.9920) | LF | 10,407 | $0.75 | $0.75 | $0.75 |
| 171 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 642 | $11.18 | $10.47 | $10.47 |
| 172 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 3,204 | $14.25 | $11.64 | $11.64 |
| 173 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 4,898 | $15.35 | $12.66 | $12.66 |
| 174 | Removing pull boxes (653.0905) | EACH | 65 | $265.00 | $111.97 | $111.97 |
| 175 | Concrete bases type 1 (654.0101) | EACH | 39 | $1,180.00 | $983.88 | $983.88 |
| 176 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,725.00 | $1,226.36 | $1,226.36 |
| 177 | Concrete bases type 10 (654.0110) | EACH | 11 | $7,500.00 | $6,884.64 | $6,884.64 |
| 178 | Concrete bases type 10-special (654.0120) | EACH | 15 | $8,500.00 | $9,607.97 | $9,607.97 |
| 179 | Cable traffic signal 5-14 AWG (655.0230) | LF | 5,337 | $2.50 | $2.03 | $2.03 |
| 180 | Cable traffic signal 7-14 AWG (655.0240) | LF | 498 | $2.90 | $2.56 | $2.56 |
| 181 | Cable traffic signal 12-14 AWG (655.0260) | LF | 5,528 | $4.05 | $4.70 | $4.70 |
| 182 | Cable traffic signal 15-14 AWG (655.0270) | LF | 3,110 | $5.00 | $5.76 | $5.76 |
| 183 | Cable traffic signal 19-14 AWG (655.0280) | LF | 4,467 | $5.85 | $7.64 | $7.64 |
| 184 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 5,351 | $2.25 | $2.33 | $2.33 |
| 185 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 8,866 | $2.10 | $2.16 | $2.16 |
| 186 | Traffic signal evp detector cable (655.0900) | LF | 4,961 | $1.90 | $1.29 | $1.29 |
| 187 | Electrical service meter breaker pedestal (location) 001. W national ave & S 24TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 188 | Electrical service meter breaker pedestal (location) 002. W national ave & S 21ST ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 189 | Electrical service meter breaker pedestal (location) 003. W national ave & S 19TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 190 | Electrical service meter breaker pedestal (location) 004. W national ave & S 16TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 191 | Electrical service meter breaker pedestal (location) 005. W national ave & S 11TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 192 | Electrical service meter breaker pedestal (location) 006. W national ave & S 9TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 193 | Electrical service meter breaker pedestal (location) 007. W national ave & S 6TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 194 | Electrical service meter breaker pedestal (location) 008. W national ave & S 5TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 195 | Electrical service meter breaker pedestal (location) 009. W national ave & S 4TH ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 196 | Electrical service meter breaker pedestal (location) 010. W national ave & S 2ND ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 197 | Electrical service meter breaker pedestal (location) 011. W national ave & S 1ST ST (656.0201) | EACH | 1 | $1,880.00 | $1,389.45 | $1,389.45 |
| 198 | Pedestal bases (657.0100) | EACH | 31 | $525.00 | $434.15 | $434.15 |
| 199 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 6 | $985.00 | $745.06 | $745.06 |
| 200 | Poles type 3 (657.0310) | EACH | 2 | $5,460.00 | $4,498.25 | $4,498.25 |
| 201 | Poles type 5-aluminum (657.0322) | EACH | 6 | $3,250.00 | $2,837.54 | $2,837.54 |
| 202 | Poles type 9 (657.0345) | EACH | 1 | $9,460.00 | $8,466.21 | $8,466.21 |
| 203 | Poles type 9-special (657.0347) | EACH | 1 | $11,470 | $10,752 | $10,752 |
| 204 | Poles type 10 (657.0350) | EACH | 10 | $11,085 | $10,315 | $10,315 |
| 205 | Poles type 10-special (657.0352) | EACH | 14 | $13,110 | $12,616 | $12,616 |
| 206 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 4 | $560.00 | $563.58 | $563.58 |
| 207 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 26 | $1,080.00 | $1,126.68 | $1,126.68 |
| 208 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 1 | $1,175.00 | $1,234.81 | $1,234.81 |
| 209 | Monotube arms 20-FT (657.0520) | EACH | 1 | $4,660.00 | $4,415.65 | $4,415.65 |
| 210 | Monotube arms 25-FT (657.0525) | EACH | 2 | $4,860.00 | $4,645.57 | $4,645.57 |
| 211 | Monotube arms 30-FT (657.0530) | EACH | 8 | $6,075.00 | $6,024.00 | $6,024.00 |
| 212 | Monotube arms 35-FT-special (657.0536) | EACH | 6 | $6,680.00 | $7,066.45 | $7,066.45 |
| 213 | Monotube arms 40-FT-special (657.0541) | EACH | 7 | $6,795.00 | $7,197.35 | $7,197.35 |
| 214 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $6,895.00 | $7,313.45 | $7,313.45 |
| 215 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 2 | $525.00 | $454.97 | $454.97 |
| 216 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 6 | $525.00 | $448.14 | $448.14 |
| 217 | Traffic signal face 3S 12-inch (658.0173) | EACH | 133 | $825.00 | $727.58 | $727.58 |
| 218 | Traffic signal face 4S 12-inch (658.0174) | EACH | 12 | $1,025.00 | $886.94 | $886.94 |
| 219 | Pedestrian signal face 12-inch (658.0412) | EACH | 144 | $710.00 | $415.94 | $415.94 |
| 220 | Signal mounting hardware (location) 001. W national ave & S 21ST ST (658.5070) | EACH | 1 | $3,945.00 | $3,705.96 | $3,705.96 |
| 221 | Signal mounting hardware (location) 002. W national ave & S 19TH ST (658.5070) | EACH | 1 | $4,530.00 | $4,371.83 | $4,371.83 |
| 222 | Signal mounting hardware (location) 003. W national ave & S 16TH ST (658.5070) | EACH | 1 | $5,750.00 | $5,760.50 | $5,760.50 |
| 223 | Signal mounting hardware (location) 004. W national ave & S 11TH ST (658.5070) | EACH | 1 | $4,530.00 | $4,371.83 | $4,371.83 |
| 224 | Signal mounting hardware (location) 005. W national ave & S 9TH ST (658.5070) | EACH | 1 | $3,955.00 | $3,717.34 | $3,717.34 |
| 225 | Signal mounting hardware (location) 006. W national ave & S 6TH ST (658.5070) | EACH | 1 | $4,910.00 | $4,804.37 | $4,804.37 |
| 226 | Signal mounting hardware (location) 007. W national ave & S 5TH ST (658.5070) | EACH | 1 | $4,530.00 | $4,371.83 | $4,371.83 |
| 227 | Signal mounting hardware (location) 008. W national ave & S 2ND ST (658.5070) | EACH | 1 | $5,350.00 | $5,305.20 | $5,305.20 |
| 228 | Signal mounting hardware (location) 009. W national ave & S 1ST ST (658.5070) | EACH | 1 | $5,250.00 | $5,191.38 | $5,191.38 |
| 229 | Luminaires utility LED B (659.1120) | EACH | 5 | $510.00 | $532.85 | $532.85 |
| 230 | Luminaires utility LED C (659.1125) | EACH | 9 | $535.00 | $559.03 | $559.03 |
| 231 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 369 | $3.00 | $3.54 | $3.54 |
| 232 | Temporary traffic signals for intersections (location) 001. W national ave & S 19TH ST (661.0201) | EACH | 1 | $61,750 | $62,457 | $62,457 |
| 233 | Temporary traffic signals for intersections (location) 002. W national ave & S 16TH ST (661.0201) | EACH | 1 | $63,500 | $69,050 | $69,050 |
| 234 | Temporary traffic signals for intersections (location) 003. W national ave & S 11TH ST (661.0201) | EACH | 1 | $69,300 | $70,892 | $70,892 |
| 235 | Temporary traffic signals for intersections (location) 004. W national ave & S 9TH ST (661.0201) | EACH | 1 | $63,250 | $62,998 | $62,998 |
| 236 | Temporary traffic signals for intersections (location) 005. W national ave & S 6TH ST (661.0201) | EACH | 1 | $61,700 | $64,147 | $64,147 |
| 237 | Temporary traffic signals for intersections (location) 006. W national ave & S 1ST ST (661.0201) | EACH | 1 | $62,500 | $66,612 | $66,612 |
| 238 | Generators (661.0300) | DAY | 6 | $500.00 | $379.08 | $379.08 |
| 239 | Remove cable (674.0300) | LF | 650 | $8.00 | $1.60 | $1.60 |
| 240 | Sawing asphalt (690.0150) | LF | 2,719 | $2.05 | $2.05 | $1.89 |
| 241 | Sawing concrete (690.0250) | LF | 7,393 | $2.75 | $2.75 | $2.85 |
| 242 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,020 | $1.00 | $1.00 | $1.00 |
| 243 | Incentive iri ride (740.0440) | DOL | 4,430 | $1.00 | $1.00 | $1.00 |
| 244 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 12,000 | $5.00 | $5.00 | $5.00 |
| 245 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 15,000 | $5.00 | $5.00 | $5.00 |
| 246 | Special 001. removing concrete pavement modified (SPV.0035) | CY | 16,760 | $27.75 | $31.35 | $40.00 |
| 247 | Special 002. removing asphaltic surface modified (SPV.0035) | CY | 13,580 | $27.76 | $31.35 | $40.00 |
| 248 | Special 001. utility line opening (ulo) (SPV.0060) | EACH | 200 | $100.00 | $1.00 | $500.00 |
| 249 | Special 002. salvaging and reinstalling brick pavers (SPV.0060) | EACH | 3 | $2,000.00 | $200.00 | $200.00 |
| 250 | Special 003. adjusting water valve boxes (SPV.0060) | EACH | 430 | $300.00 | $450.00 | $450.00 |
| 251 | Special 004. water main protection (SPV.0060) | EACH | 7 | $200.00 | $250.00 | $500.00 |
| 252 | Special 005. removing city-owned signs and posts (SPV.0060) | EACH | 273 | $20.00 | $52.00 | $52.00 |
| 253 | Special 006. moving city-owned signs (SPV.0060) | EACH | 36 | $70.00 | $115.00 | $115.00 |
| 254 | Special 007. round aluminum sign post system in soft surface 7-FT (SPV.0060) | EACH | 22 | $270.00 | $220.00 | $220.00 |
| 255 | Special 008. round aluminum sign post system in soft surface 10-FT (SPV.0060) | EACH | 135 | $275.00 | $240.00 | $240.00 |
| 256 | Special 009. round aluminum sign post system in soft surface 11-FT (SPV.0060) | EACH | 18 | $275.00 | $250.00 | $250.00 |
| 257 | Special 010. round aluminum sign post system in soft surface 12-FT (SPV.0060) | EACH | 8 | $275.00 | $260.00 | $260.00 |
| 258 | Special 011. round aluminum sign post system in concrete surface 7- FT (SPV.0060) | EACH | 16 | $295.00 | $185.00 | $185.00 |
| 259 | Special 012. round aluminum sign post system in concrete surface 10-FT (SPV.0060) | EACH | 76 | $295.00 | $205.00 | $205.00 |
| 260 | Special 013. round aluminum sign post system in concrete surface 11-FT (SPV.0060) | EACH | 11 | $295.00 | $215.00 | $215.00 |
| 261 | Special 014. round aluminum sign post system in concrete surface 12-FT (SPV.0060) | EACH | 20 | $295.00 | $225.00 | $225.00 |
| 262 | Special 015. pipe bollards (SPV.0060) | EACH | 1 | $500.00 | $2,000.00 | $5,000.00 |
| 263 | Special 016. marking speed table chevron contrast epoxy (SPV.0060) | EACH | 40 | $959.34 | $959.34 | $959.34 |
| 264 | Special 017. marking bike lane two-stage turning queue box mma (SPV.0060) | EACH | 6 | $2,269.16 | $2,269.16 | $2,269.16 |
| 265 | Special 018. marking yield line mma 18-inch (SPV.0060) | EACH | 41 | $640.03 | $640.03 | $640.03 |
| 266 | Special 102. inlet covers type MS 57 (SPV.0060) | EACH | 184 | $950.00 | $1,079.00 | $1,100.00 |
| 267 | Special 103. manhole covers type MS 58-A (SPV.0060) | EACH | 154 | $1,100.00 | $1,201.00 | $1,200.00 |
| 268 | Special 110. catch basins type 44A (SPV.0060) | EACH | 193 | $6,250.00 | $4,435.16 | $4,400.00 |
| 269 | Special 112. storm inlet type 45A (SPV.0060) | EACH | 17 | $4,500.00 | $2,641.47 | $2,500.00 |
| 270 | Special 115. pipe connection to existing structure (SPV.0060) | EACH | 139 | $400.00 | $1,110.00 | $1,200.00 |
| 271 | Special 120. curb inlet type 70A (SPV.0060) | EACH | 32 | $3,750.00 | $2,500.00 | $3,700.00 |
| 272 | Special 201. traffic signal cabinet & controller W national ave & S 21ST ST (SPV.0060) | EACH | 1 | $32,340 | $21,228 | $21,228 |
| 273 | Special 202. traffic signal cabinet & controller W national ave & S 19TH ST (SPV.0060) | EACH | 1 | $32,340 | $20,874 | $20,874 |
| 274 | Special 203. traffic signal cabinet & controller W national ave & S 16TH ST (SPV.0060) | EACH | 1 | $32,340 | $20,874 | $20,874 |
| 275 | Special 204. traffic signal cabinet & controller W national ave & S 11TH ST (SPV.0060) | EACH | 1 | $32,340 | $20,874 | $20,874 |
| 276 | Special 205. traffic signal cabinet & controller W national ave & S 9TH ST (SPV.0060) | EACH | 1 | $32,340 | $21,051 | $21,051 |
| 277 | Special 206. traffic signal cabinet & controller W national ave & S 6TH ST (SPV.0060) | EACH | 1 | $32,340 | $21,051 | $21,051 |
| 278 | Special 207. traffic signal cabinet & controller W national ave & S 5TH ST (SPV.0060) | EACH | 1 | $32,340 | $20,874 | $20,874 |
| 279 | Special 208. traffic signal cabinet & controller W national ave & S 2ND ST (SPV.0060) | EACH | 1 | $32,340 | $21,228 | $21,228 |
| 280 | Special 209. traffic signal cabinet & controller W national ave & S 1ST ST (SPV.0060) | EACH | 1 | $32,340 | $21,051 | $21,051 |
| 281 | Special 210. emergency vehicle preemption system W national ave & S 21ST ST (SPV.0060) | EACH | 1 | $11,870 | $11,966 | $11,966 |
| 282 | Special 211. emergency vehicle preemption system W national ave & S 19TH ST (SPV.0060) | EACH | 1 | $11,870 | $12,068 | $12,068 |
| 283 | Special 212. emergency vehicle preemption system W national ave & S 16TH ST (SPV.0060) | EACH | 1 | $11,870 | $16,698 | $16,698 |
| 284 | Special 213. emergency vehicle preemption system W national ave & S 11TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,966 | $11,966 |
| 285 | Special 214. emergency vehicle preemption system W national ave & S 9TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,966 | $11,966 |
| 286 | Special 215. emergency vehicle preemption system W national ave & S 6TH ST (SPV.0060) | EACH | 1 | $11,870 | $16,698 | $16,698 |
| 287 | Special 216. emergency vehicle preemption system W national ave & S 5TH ST (SPV.0060) | EACH | 1 | $11,870 | $15,283 | $15,283 |
| 288 | Special 217. emergency vehicle preemption system W national ave & S 2ND ST (SPV.0060) | EACH | 1 | $11,870 | $16,698 | $16,698 |
| 289 | Special 218. emergency vehicle preemption system W national ave & S 1ST ST (SPV.0060) | EACH | 1 | $11,870 | $16,698 | $16,698 |
| 290 | Special 219. video detection system W national ave & S 21ST ST (SPV.0060) | EACH | 1 | $28,500 | $23,517 | $23,517 |
| 291 | Special 220. video detection system W national ave & S 19TH ST (SPV.0060) | EACH | 1 | $28,500 | $23,517 | $23,517 |
| 292 | Special 221. video detection system W national ave & S 16TH ST (SPV.0060) | EACH | 1 | $49,300 | $31,148 | $31,148 |
| 293 | Special 222. video detection system W national ave & S 11TH ST (SPV.0060) | EACH | 1 | $28,500 | $23,517 | $23,517 |
| 294 | Special 223. video detection system W national ave & S 9TH ST (SPV.0060) | EACH | 1 | $19,900 | $18,996 | $18,996 |
| 295 | Special 224. video detection system W national ave & S 6TH ST (SPV.0060) | EACH | 1 | $49,300 | $31,148 | $31,148 |
| 296 | Special 225. video detection system W national ave & S 5TH ST (SPV.0060) | EACH | 1 | $28,500 | $23,517 | $23,517 |
| 297 | Special 226. video detection system W national ave & S 2ND ST (SPV.0060) | EACH | 1 | $49,300 | $31,148 | $31,148 |
| 298 | Special 227. video detection system W national ave & S 1ST ST (SPV.0060) | EACH | 1 | $49,300 | $31,148 | $31,148 |
| 299 | Special 228. accessible pedestrian push button system W national ave & S 21ST ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 300 | Special 229. accessible pedestrian push button system W national ave & S 19TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 301 | Special 230.accessible pedestrian push button system W national ave & S 16TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 302 | Special 231. accessible pedestrian push button system W national ave & S 11TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 303 | Special 232. accessible pedestrian push button system W national ave & S 9TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 304 | Special 233. accessible pedestrian push button system W national ave & S 6TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 305 | Special 234. accessible pedestrian push button system W national ave & S 5TH ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 306 | Special 235. accessible pedestrian push button system W national ave & S 2ND ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 307 | Special 236. accessible pedestrian push button system W national ave & S 1ST ST (SPV.0060) | EACH | 1 | $11,870 | $11,790 | $11,790 |
| 308 | Special 237. rectangular rapid flashing beacon system W national ave & S 24TH ST (SPV.0060) | EACH | 1 | $32,500 | $32,943 | $32,943 |
| 309 | Special 238. rectangular rapid flashing beacon system W national ave & S 4TH ST (SPV.0060) | EACH | 1 | $32,500 | $30,328 | $30,328 |
| 310 | Special 239. installing precast controller base (SPV.0060) | EACH | 9 | $750.00 | $815.07 | $815.07 |
| 311 | Special 240. traffic signal LED no left turn blank out signs (SPV.0060) | EACH | 2 | $7,065.00 | $6,242.88 | $6,242.88 |
| 312 | Special 241. temporary infrared evp system W national ave & S 19TH ST (SPV.0060) | EACH | 1 | $6,080.00 | $1,735.18 | $1,735.18 |
| 313 | Special 242. temporary infrared evp system W national ave & S 16TH ST (SPV.0060) | EACH | 1 | $6,850.00 | $3,434.97 | $3,434.97 |
| 314 | Special 243. temporary infrared evp system W national ave & S 11TH ST (SPV.0060) | EACH | 1 | $6,080.00 | $1,735.18 | $1,735.18 |
| 315 | Special 244. temporary infrared evp system W national ave & S 9TH ST (SPV.0060) | EACH | 1 | $6,080.00 | $1,735.18 | $1,735.18 |
| 316 | Special 245. temporary infrared evp system W national ave & S 6TH ST (SPV.0060) | EACH | 1 | $6,850.00 | $3,434.97 | $3,434.97 |
| 317 | Special 246. temporary infrared evp system W national ave & S 1ST ST (SPV.0060) | EACH | 1 | $6,850.00 | $3,434.97 | $3,434.97 |
| 318 | Special 302. pull boxes 13-inch X 24-inch X 24-inch (fiberglass polymer concrete) (SPV.0060) | EACH | 208 | $1,180.00 | $1,024.51 | $1,024.51 |
| 319 | Special 303. pull boxes 17-inch X 30-inch X 24-inch (fiberglass polymer concrete) (SPV.0060) | EACH | 122 | $1,275.00 | $1,154.33 | $1,154.33 |
| 320 | Special 321. poles mke 30 black (30-FT aluminum, black, bolt-down) (SPV.0060) | EACH | 71 | $2,730.00 | $2,690.50 | $2,690.50 |
| 321 | Special 324. 40-FT wood pole (SPV.0060) | EACH | 16 | $1,095.00 | $1,609.02 | $1,609.02 |
| 322 | Special 342. submersible multitap 3-port pre-insulated connector (SPV.0060) | EACH | 593 | $93.00 | $89.63 | $89.63 |
| 323 | Special 343. submersible multitap 4-port pre-insulated connector (SPV.0060) | EACH | 165 | $99.00 | $95.03 | $95.03 |
| 324 | Special 346. luminaire arms single member 6-FT WP mount (SPV.0060) | EACH | 8 | $425.00 | $329.19 | $329.19 |
| 325 | Special 348. luminaire arms truss member 12-FT WP mount (SPV.0060) | EACH | 3 | $985.00 | $1,182.55 | $1,182.55 |
| 326 | Special 353. installing equipment grounding electrode (SPV.0060) | EACH | 29 | $300.00 | $250.89 | $250.89 |
| 327 | Special 374. luminaire utility 1LED2 (SPV.0060) | EACH | 2 | $650.00 | $695.62 | $695.62 |
| 328 | Special 375. luminaire utility 2LED2 (SPV.0060) | EACH | 4 | $1,425.00 | $1,402.47 | $1,402.47 |
| 329 | Special 388. concrete base type 2 (milwaukee) (SPV.0060) | EACH | 77 | $1,375.00 | $1,270.59 | $1,270.59 |
| 330 | Special 389. concrete base type 5 (milwaukee) (SPV.0060) | EACH | 47 | $1,275.00 | $1,179.78 | $1,179.78 |
| 331 | Special 399. transformer bases breakaway 11 1/2-inch bolt circle black (SPV.0060) | EACH | 75 | $890.00 | $796.28 | $796.28 |
| 332 | Special 401. 4' diameter manhole type cuc (SPV.0060) | EACH | 27 | $10,575 | $8,780.36 | $14,479 |
| 333 | Special 410. 4' diameter doghouse manhole type cuc (SPV.0060) | EACH | 5 | $12,575 | $10,754 | $16,819 |
| 334 | Special 420. removing cuc manhole (SPV.0060) | EACH | 1 | $4,500.00 | $2,000.00 | $9,425.04 |
| 335 | Special 426. sawing concrete- encased duct package (SPV.0060) | EACH | 6 | $1,175.00 | $500.00 | $2,015.59 |
| 336 | Special 821. poles type 15'-6" black aluminum harp pole and shroud (SPV.0060) | EACH | 47 | $6,980.00 | $6,451.22 | $6,451.22 |
| 337 | Special 865. luminaire historic black milwaukee harp LED screw- in lamp (SPV.0060) | EACH | 47 | $4,060.00 | $4,170.56 | $4,170.56 |
| 338 | Special 867. luminaire historic black milwaukee lantern LED 3 screw-in lamp (SPV.0060) | EACH | 93 | $3,840.00 | $3,876.22 | $3,876.22 |
| 339 | Special 881. fuse system on the lighting riser cable in the pole (SPV.0060) | EACH | 146 | $100.00 | $91.78 | $91.78 |
| 340 | Special 001. concrete curb & gutter hes 19-inch (SPV.0090) | LF | 105 | $54.04 | $45.65 | $58.61 |
| 341 | Special 002. concrete curb & gutter hes 31-inch (SPV.0090) | LF | 740 | $58.01 | $56.14 | $62.36 |
| 342 | Special 004. concrete curb & gutter 31-inch type MCTS (SPV.0090) | LF | 225 | $59.11 | $53.77 | $69.64 |
| 343 | Special 005. concrete curb type D special (SPV.0090) | LF | 111 | $51.50 | $46.11 | $85.04 |
| 344 | Special 006. marking stop line epoxy 24-inch (SPV.0090) | LF | 906 | $20.99 | $20.99 | $20.99 |
| 345 | Special 007. marking crosswalk mma block style 12-inch (SPV.0090) | LF | 3,056 | $22.21 | $22.21 | $22.21 |
| 346 | Special 008. marking bike lane crosswalk mma block style 24-inch (SPV.0090) | LF | 2,325 | $23.15 | $23.15 | $23.15 |
| 347 | Special 009. marking crosswalk epoxy transverse line 12-inch (SPV.0090) | LF | 490 | $16.84 | $16.84 | $16.84 |
| 348 | Special 010. marking crosswalk epoxy block style 12-inch (SPV.0090) | LF | 8,017 | $20.01 | $20.01 | $20.01 |
| 349 | Special 011. temporary marking wet reflective epoxy 6-inch (SPV.0090) | LF | 9,026 | $0.75 | $0.93 | $0.93 |
| 350 | Special 012. temporary marking wet reflective epoxy 10-inch (SPV.0090) | LF | 90 | $2.50 | $1.33 | $1.33 |
| 351 | Special 300. city furnished electrical cable 1#8 AWG 5KV concentric (SPV.0090) | LF | 4,810 | $2.10 | $1.79 | $1.79 |
| 352 | Special 304. electrical cable type 2#2/1#4 AL (SPV.0090) | LF | 4,550 | $4.75 | $6.67 | $6.67 |
| 353 | Special 309. cable type UF 3-12 AWG grounded (SPV.0090) | LF | 275 | $5.00 | $4.29 | $4.29 |
| 354 | Special 319. liquidtight flexible nonmetallic conduit 1 1/2-inch (SPV.0090) | LF | 205 | $25.00 | $45.77 | $45.77 |
| 355 | Special 324. electrical cable type 4#2/1#8 XLP (SPV.0090) | LF | 27,418 | $16.65 | $22.15 | $22.15 |
| 356 | Special 325. conduit 3-inch HDPE schedule 40 (SPV.0090) | LF | 24,897 | $11.25 | $11.07 | $11.07 |
| 357 | Special 326. conduit 3-inch HDPE schedule 80 (SPV.0090) | LF | 3,575 | $14.00 | $14.31 | $14.31 |
| 358 | Special 451. 1-duct sand encased conduit, HDPE, 4-inch (SPV.0090) | LF | 21 | $90.00 | $88.22 | $88.22 |
| 359 | Special 452. 2-duct sand encased conduit, HDPE, 4-inch (SPV.0090) | LF | 9,905 | $81.00 | $91.87 | $91.87 |
| 360 | Special 453. 3-duct sand encased conduit, HDPE, 4-inch (SPV.0090) | LF | 142 | $105.00 | $119.48 | $119.48 |
| 361 | Special 454. 4-duct sand encased conduit, HDPE, 4-inch (SPV.0090) | LF | 1,199 | $88.00 | $140.64 | $140.64 |
| 362 | Special 456. 6-duct sand encased conduit, HDPE, 4-inch (SPV.0090) | LF | 150 | $120.00 | $156.53 | $156.53 |
| 363 | Special 458. 8-duct sand encased conduit, HDPE, 4-inch (SPV.0090) | LF | 8 | $150.00 | $161.26 | $161.26 |
| 364 | Special 601. fiber optic cable outdoor plant 72-count (SPV.0090) | LF | 14,948 | $3.33 | $3.26 | $3.26 |
| 365 | Special 602. fiber optic cable outdoor plant 12-count (SPV.0090) | LF | 4,746 | $2.85 | $2.69 | $2.69 |
| 366 | Special 001. detectable edge tiles (SPV.0165) | SF | 15,720 | $57.97 | $50.00 | $44.00 |
| 367 | Special 002. concrete raised median (SPV.0165) | SF | 1,164 | $25.34 | $17.13 | $22.96 |
| 368 | Special 001. track zone removal (SPV.0180) | SY | 18,622 | $27.16 | $8.51 | $30.00 |
| 369 | Special 001. excavation, hauling, and disposal of metals contaminated soil (SPV.0195) | TON | 2,535 | $56.00 | $50.00 | $49.00 |
| 370 | Special 002. excavation, hauling, and disposal of pah contaminated soil (SPV.0195) | TON | 915 | $56.00 | $50.00 | $49.00 |
| 371 | Special 003. excavation, hauling, and disposal of voc contaminated soil (SPV.0195) | TON | 27,676 | $56.00 | $50.00 | $49.00 |
| 372 | Special 004. possible management of solid waste (SPV.0195) | TON | 426 | $56.00 | $50.00 | $49.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.