Research record, not reviewed
Ship Canal Water Quality Project
- Location
- Seattle, WA, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of July 2026 (King County Wastewater Treatment Division).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Seattle Public Utilities with King County Wastewater Treatment Division | |
| Category | Water | |
| Tunnel length | 2.7 mi | The Lane Construction Corporation |
| Amount | US$710 million (US dollars), as of June 2024 | Seattle Public Utilities (At Your Service |
| What the amount covers | Capital estimate, approx. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$710 M | Capital estimate, approx. | Whole project | Jun 2024 | Seattle Public Utilities (At Your Service, SPU Media) |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| The Lane Construction Corporation | contractor | Storage tunnel: 2.7-mile, 18'10" diameter tunnel holding 29.6 million gallons | The Lane Construction Corporation |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| 2027 | planned completion | Whole project | King County Wastewater Treatment Division |
About the project
A 2.7-mile storage tunnel, 18 feet 10 inches in internal diameter, holding more than 29.6 million gallons of stormwater and sewage during heavy rains, a joint project of Seattle Public Utilities and King County to prevent, on average, up to 75 million gallons a year of polluted stormwater and sewage from entering the Lake Washington Ship Canal, Salmon Bay and Lake Union. King County reports it under construction and on track for completion in 2027; SPU raised the project budget from $570 million to $710 million in 2024.
Sources
- Ensuring a Future With Clean Water and Healthy Communities, Seattle Public Utilities (At Your Service, SPU Media), 21 Jun 2024. Body: 'the project budget has been modified from $570 million to $710 million at an 80% confidence'. Consulted 13 Nov 2026.
- Ship Canal Water Quality Project, The Lane Construction Corporation. 'Lane's new 2.7-mile tunnel will capture and temporarily hold more than 29.6 million gallons of stormwater and sewage during heavy rains. ... Client: City of Seattle and King County'. Consulted 18 Nov 2026.
- King County Wastewater Treatment 2025 CSO Annual Snapshot, King County Wastewater Treatment Division, Jul 2026. 'The Ship Canal Water Quality Project is a joint effort between King County and Seattle Public Utilities. The project will capture and store 29 million gallons of polluted water during heavy rains. This project is currently under construction, on track for completion in 2027.'. Consulted 19 Nov 2026.