East Link Extension – Seattle to Redmond Technology
- Location
- Seattle / Bellevue / Redmond, WA, United States. Location shown at city level. See it on the map
- Stage
- Opened, as of March 28, 2026 (Sound Transit).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Sound Transit | |
| Category | Urban transit | |
| Amount | US$3.817 billion (US dollars), as of January 22, 2026 | Sound Transit |
| What the amount covers | Authorized project cost: Authorized project allocation after the amendment. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$3.68 bn | Budget | Whole project | 2024 | Sound TransitHistorical project baseline. |
| US$3.82 bn | Authorized project cost | Whole project | 22 Jan 2026 | Sound TransitAuthorized project allocation after the amendment. |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| March 28, 2026 | Opened | One phase | Sound Transit |
About the project
The Crosslake Connection, the last East Link segment, opened on March 28, 2026, carrying light rail across Lake Washington. Downtown Redmond is a separate extension with its own budget.
Scope notes
- System expansion report records the remaining Crosslake Connection opening on March 28, 2026. Downtown Redmond is a separately financed extension. Sound Transit
- Crosslake Connection is the last East Link segment; Downtown Redmond is a separate extension. Sound Transit
- East Link project baseline budget at the time of the motion. Sound Transit
- Final Board resolution describes the change in authorized allocation. Sound Transit
Sources
- East Link Extension – Seattle to Redmond Technology, Sound Transit, Mar 2026. System expansion report records the remaining Crosslake Connection opening on March 28, 2026. Downtown Redmond is a separately financed extension.. Consulted 9 Nov 2026.
- East Link baseline budget in M2024-42, Sound Transit, 2024. East Link project baseline budget at the time of the motion.. Consulted 9 Nov 2026.
- East Link budget amendment R2026-01, Sound Transit, 22 Jan 2026. Final Board resolution describes the change in authorized allocation.. Consulted 9 Nov 2026.
- Link light rail opens across Lake Washington, Sound Transit, 28 Mar 2026. 'Today the Crosslake Connection opens, with light rail vehicles carrying passengers across a floating bridge for the first time.'. Consulted 19 Nov 2026.