Annacis Island Wastewater Treatment Plant Expansion
- Location
- Delta, BC, Canada. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Metro Vancouver | |
| Category | Water | |
| Amount | Not collected yet | |
| Threshold evidence | A comparable project-wide cost is still needed |
Water projects are counted apart and left out of totals while their place in the atlas is decided.
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| C$1 bn | Capital estimate | One component | 19 Jul 2023 | Metro VancouverAgenda table reports this forecast separately for Stage 5 Expansion. The broader workbook project also needs outfall and programme-boundary reconciliation. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Pomerleau Bessac General Partnership | contractor | RFP No. 18-001: Construction Services for the Annacis Island Wastewater Treatment Plant Outfall Project | Metro Vancouver (Board in Brief, reproduced in City of Richmond council agenda) |
| Graham | contractor (stipulated price, in a joint venture) | Stage 5 Expansion Phase 1: ground improvements, new primary treatment facilities, secondary treatment extensions, odour control, utility tunnel | Graham |
About the project
Hold the workbook value pending a programme-level appropriation.
Scope notes
- Hold the workbook value pending a programme-level appropriation. Metro Vancouver
- Agenda table reports this forecast separately for Stage 5 Expansion. The broader workbook project also needs outfall and programme-boundary reconciliation. Metro Vancouver
Sources
- Annacis Island Wastewater Treatment Plant Expansion – official project evidence, Metro Vancouver. Consulted 9 Nov 2026.
- Annacis Island Wastewater Treatment Plant Expansion – official project evidence, Metro Vancouver, 19 Jul 2023. Agenda table reports this forecast separately for Stage 5 Expansion. The broader workbook project also needs outfall and programme-boundary reconciliation.. Consulted 9 Nov 2026.
- For Metro Vancouver meetings on Friday, May 24, 2019 (Board in Brief), Metro Vancouver (Board in Brief, reproduced in City of Richmond council agenda), 24 May 2019. 'The Board approved the award of a contract for an amount of up to $184,124,380.27 (exclusive of taxes) to Pomerleau Bessac General Partnership, resulting from Request for Proposal No. 18-001: Construction Services for the Annacis Island Wastewater Treatment Plant Outfall Project.'. Consulted 18 Nov 2026.
- Annacis Island Wastewater Treatment Plant – Phase 1 Stage 5 Expansion, Graham. 'Graham and its joint venture partner were contracted perform the construction scope ... Stipulated Price'. Consulted 18 Nov 2026.
Research leads not yet reviewed: www.renewcanada.net.