Southeast Treatment Plant Biosolids Digester Facilities
- Location
- San Francisco, CA, United States. Location shown at city level. See it on the map
- Stage
- Under construction. Date of this stage: not collected yet (San Francisco Public Utilities Commission).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | San Francisco Public Utilities Commission | |
| Category | Water | |
| Amount | US$1.427 billion (US dollars), as of July 27, 2018 | U.S. Environmental Protection Agency |
| What the amount covers | Cost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. | |
| Threshold evidence | Only a financed-scope figure meets the threshold; to reconcile |
Water projects are counted apart and left out of totals while their place in the atlas is decided.
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$1.43 bn | Cost of the WIFIA-financed scope | Scope financed by WIFIA | 27 Jul 2018 | U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| July 27, 2018 | Financing closed | Scope financed by WIFIA | U.S. Environmental Protection Agency |
About the project
Biosolids facilities are a different project from the New Headworks. The utility's construction page confirms ongoing work in 2026.
Scope notes
- Biosolids facilities are a different project from the New Headworks. The utility's construction page confirms ongoing work in 2026. U.S. Environmental Protection Agency
- Owner reports construction activity for this scope. San Francisco Public Utilities Commission
Sources
- Southeast Treatment Plant Biosolids Digester Facilities – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
- WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
- Southeast Treatment Plant Biosolids Digester Facilities – delivery update, San Francisco Public Utilities Commission. Owner construction update.. Consulted 9 Nov 2026.