Bull Run Treatment Program
- Location
- Portland area, OR, United States. Location shown at city level. See it on the map
- Stage
- Under construction. Date of this stage: not collected yet (City of Portland).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | City of Portland | |
| Category | Water | |
| Amount | US$651 million (US dollars), as of October 31, 2024 | U.S. Environmental Protection Agency |
| What the amount covers | Cost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Water projects are counted apart and left out of totals while their place in the atlas is decided.
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$651 M | Cost of the WIFIA-financed scope | Scope financed by WIFIA | 31 Oct 2024 | U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. |
| US$2.58 bn | Budget | Whole project | Undated | City of PortlandBull Run Treatment Program funding after Council adopted the FY 2026-27 budget: 'the Bull Run Treatment Program funding is now $2.58 billion'. It includes program financing ($101 million) and the completed Improved Corrosion Control Treatment Project ($20 million); the Bull Run Filtration Project is $2.46 billion. Separate from the WIFIA tranche. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| MWH-Kiewit (a joint venture with MWH Constructors and Kiewit) | construction manager/general contractor (CM/GC) | Bull Run filtration facility | City of Portland |
| Bull Run Conveyance Partners (a joint venture with James W. Fowler Co. and MWH Constructors) | construction manager/general contractor (CM/GC) | Bull Run filtration pipelines | City of Portland |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| October 31, 2024 | Financing closed | Scope financed by WIFIA | U.S. Environmental Protection Agency |
About the project
The second loan's scope is one financed slice of the wider programme.
Scope notes
- The second loan's scope is one financed slice of the wider programme. U.S. Environmental Protection Agency
- Owner reports construction activity for this scope. City of Portland
- City programme budget US$2.58bn. City of Portland
Sources
- Bull Run Treatment Program – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
- WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
- Bull Run Treatment Program – delivery update, City of Portland. Owner construction update.. Consulted 9 Nov 2026.
- Bull Run costs and funding, City of Portland. City programme budget US$2.58bn.. Consulted 9 Nov 2026.