Pure Water Southern California

Location
Carson, CA, United States. Location shown at city level. See it on the map
Stage
Planning, as of September 2025 (Metropolitan Water District of Southern California).
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorMetropolitan Water District of Southern California with the Los Angeles County Sanitation Districts
CategoryWater
Capacity mgd115 mgdMetropolitan Water District of Southern California
AmountUS$8.311 billion (US dollars), as of September 2025Metropolitan Water District of Southern California
What the amount coversCapital estimate.
Threshold evidenceA cited project-scope figure meets the threshold
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$8.31 bnCapital estimateProgrammeSep 2025Metropolitan Water District of Southern California
US$9.4 bnCapital estimateProgrammeSep 2025Metropolitan Water District of Southern California
US$6.39 bnCapital estimateProgrammeNov 2023Metropolitan Water District of Southern California
Financial records, each with its kind and scope

Contracts and teams

Contracts and teams: No construction contract awarded yet Metropolitan Water District of Southern California.

About the project

Advanced water purification program at the Los Angeles County Sanitation Districts' Joint Water Pollution Control Plant with a backbone pipeline to recharge basins and treatment plants across Southern California; Phase 1 provides 115 million gallons a day of treatment capacity. Metropolitan's September 2025 cost update put its own Phase 1 costs at $8.3 billion in 2025 dollars, excluding the Sanitation Districts' facilities, and the Phase 1 grand total including them at $9.4 billion; the November 2023 update had put Phase 1 at $6.4 billion in 2023 dollars, the Sanitation Districts' pretreatment facilities included. Commissioning could begin as early as August 2035, and staging options were presented to the Board.

Sources

  • Pure Water Southern California Program Cost Update, Board of Directors Workshop on Engineering, Operations and Technology, Item 5a, Metropolitan Water District of Southern California, 23 Sep 2025. Cover: 'Item 5a', 'September 23, 2025'; slides: 'Metropolitan Grand Total: 8,311', 'LACSD Grand Total: 1,085', 'Program Phase 1 Grand Total = $9.4 Billion'; 'Phase 1- 115 MGD Program Cost Comparison (2023/2025): 2023 Cost estimate: $6.4B ... 2025 Cost Estimate: $8.3B'; 'All costs in 2025 dollars; not escalated'; 'Significant O&M costs start with facilities commissioning as early as 08/2035 & likely starting in 2037'; staging table: 115 MGD online year 2036. The researcher cited the November 28, 2023 deck (pwscrc-3b-presentation.pdf, Item 3b) under this date; corrected (PDF read locally with pymupdf from the file WebFetch downloaded from this URL on 2026-11-13; WebFetch's summariser could not read it). Consulted 13 Nov 2026.
  • Pure Water Southern California Program Cost Update, Subcommittee on Pure Water Southern California and Regional Conveyance, Item 3b, Metropolitan Water District of Southern California, 28 Nov 2023. Cover: 'Item 3b', 'November 28, 2023'; slide '2023 PWSC Facility Costs (Phase 1)': 'Total $6,390', 'Costs are in 2023 dollars and include a 35% contingency and no escalation'; 'Phase 1: 115 mgd of treatment capacity'; 'Advanced treatment at LACSD's JWPCP' (PDF read locally with pymupdf from the file WebFetch downloaded from this URL on 2026-11-13; WebFetch's summariser could not read it). Consulted 13 Nov 2026.

See it on the map. How the atlas qualifies a record.