Pure Water Southern California
- Location
- Carson, CA, United States. Location shown at city level. See it on the map
- Stage
- Planning, as of September 2025 (Metropolitan Water District of Southern California).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Metropolitan Water District of Southern California with the Los Angeles County Sanitation Districts | |
| Category | Water | |
| Capacity mgd | 115 mgd | Metropolitan Water District of Southern California |
| Amount | US$8.311 billion (US dollars), as of September 2025 | Metropolitan Water District of Southern California |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$8.31 bn | Capital estimate | Programme | Sep 2025 | Metropolitan Water District of Southern California |
| US$9.4 bn | Capital estimate | Programme | Sep 2025 | Metropolitan Water District of Southern California |
| US$6.39 bn | Capital estimate | Programme | Nov 2023 | Metropolitan Water District of Southern California |
Contracts and teams
Contracts and teams: No construction contract awarded yet Metropolitan Water District of Southern California.
About the project
Advanced water purification program at the Los Angeles County Sanitation Districts' Joint Water Pollution Control Plant with a backbone pipeline to recharge basins and treatment plants across Southern California; Phase 1 provides 115 million gallons a day of treatment capacity. Metropolitan's September 2025 cost update put its own Phase 1 costs at $8.3 billion in 2025 dollars, excluding the Sanitation Districts' facilities, and the Phase 1 grand total including them at $9.4 billion; the November 2023 update had put Phase 1 at $6.4 billion in 2023 dollars, the Sanitation Districts' pretreatment facilities included. Commissioning could begin as early as August 2035, and staging options were presented to the Board.
Sources
- Pure Water Southern California Program Cost Update, Board of Directors Workshop on Engineering, Operations and Technology, Item 5a, Metropolitan Water District of Southern California, 23 Sep 2025. Cover: 'Item 5a', 'September 23, 2025'; slides: 'Metropolitan Grand Total: 8,311', 'LACSD Grand Total: 1,085', 'Program Phase 1 Grand Total = $9.4 Billion'; 'Phase 1- 115 MGD Program Cost Comparison (2023/2025): 2023 Cost estimate: $6.4B ... 2025 Cost Estimate: $8.3B'; 'All costs in 2025 dollars; not escalated'; 'Significant O&M costs start with facilities commissioning as early as 08/2035 & likely starting in 2037'; staging table: 115 MGD online year 2036. The researcher cited the November 28, 2023 deck (pwscrc-3b-presentation.pdf, Item 3b) under this date; corrected (PDF read locally with pymupdf from the file WebFetch downloaded from this URL on 2026-11-13; WebFetch's summariser could not read it). Consulted 13 Nov 2026.
- Pure Water Southern California Program Cost Update, Subcommittee on Pure Water Southern California and Regional Conveyance, Item 3b, Metropolitan Water District of Southern California, 28 Nov 2023. Cover: 'Item 3b', 'November 28, 2023'; slide '2023 PWSC Facility Costs (Phase 1)': 'Total $6,390', 'Costs are in 2023 dollars and include a 35% contingency and no escalation'; 'Phase 1: 115 mgd of treatment capacity'; 'Advanced treatment at LACSD's JWPCP' (PDF read locally with pymupdf from the file WebFetch downloaded from this URL on 2026-11-13; WebFetch's summariser could not read it). Consulted 13 Nov 2026.