Southeast Gateway Line
- Location
- Los Angeles County, CA, United States. Location shown at city level. See it on the map
- Stage
- Development, as of November 2026 (Los Angeles County Metropolitan Transportation Authority).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Los Angeles County Metropolitan Transportation Authority | |
| Category | Urban transit | |
| Route length | 14.5 mi | Los Angeles County Metropolitan Transportation Authority |
| Stations | 9 | Los Angeles County Metropolitan Transportation Authority |
| Amount | Not collected yet | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
About the project
LA Metro describes a 14.5-mile light rail line with nine stations from the Slauson/A Line station to Pioneer Station in southeast Los Angeles County.
Sources
- FY 2027 CIG and EPD Project Profiles, Federal Transit Administration, Apr 2026. PDF page 50 · Profile summary, description and status. Consulted 9 Nov 2026.
- Capital Investment Grants Dashboard – September 2026, Federal Transit Administration, 11 Sep 2026. Page 1 project phase, scope and Project Cost column. The PDF indicates a 10 September update.. Consulted 9 Nov 2026.
- Southeast Gateway Line Project Facts (June 2026), Los Angeles County Metropolitan Transportation Authority, Jun 2026. 'Segment: Slauson/A Line to Pioneer Station (SGL/14.5 miles) ... This segment will include: Nine (9) stations; A new C Line infill station at I-105 Freeway; ... 30 at-grade crossings and 15 elevated crossings; A Maintenance and Storage Facility (MSF) in Bellflower'; 'SGL is forecasted to be completion by 2035.'. Consulted 19 Nov 2026.
- Southeast Gateway Line (project page), Los Angeles County Metropolitan Transportation Authority. 'Current Phase: Design'; 'Estimated Project Completion: 2035'. Consulted 19 Nov 2026.
Research leads not yet reviewed: www.transit.dot.gov.