Research record, not reviewed

Southeast Gateway Line

Location
Los Angeles County, CA, United States. Location shown at city level. See it on the map
Stage
Development, as of November 2026 (Los Angeles County Metropolitan Transportation Authority).
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorLos Angeles County Metropolitan Transportation Authority
CategoryUrban transit
Route length14.5 miLos Angeles County Metropolitan Transportation Authority
Stations9Los Angeles County Metropolitan Transportation Authority
AmountNot collected yet
Threshold evidenceA cited project-scope figure meets the threshold
Sourced facts in the research record

Contracts and teams

Contracts and teams: Not found in the sources consulted.

About the project

LA Metro describes a 14.5-mile light rail line with nine stations from the Slauson/A Line station to Pioneer Station in southeast Los Angeles County.

Sources

  • FY 2027 CIG and EPD Project Profiles, Federal Transit Administration, Apr 2026. PDF page 50 · Profile summary, description and status. Consulted 9 Nov 2026.
  • Capital Investment Grants Dashboard – September 2026, Federal Transit Administration, 11 Sep 2026. Page 1 project phase, scope and Project Cost column. The PDF indicates a 10 September update.. Consulted 9 Nov 2026.
  • Southeast Gateway Line Project Facts (June 2026), Los Angeles County Metropolitan Transportation Authority, Jun 2026. 'Segment: Slauson/A Line to Pioneer Station (SGL/14.5 miles) ... This segment will include: Nine (9) stations; A new C Line infill station at I-105 Freeway; ... 30 at-grade crossings and 15 elevated crossings; A Maintenance and Storage Facility (MSF) in Bellflower'; 'SGL is forecasted to be completion by 2035.'. Consulted 19 Nov 2026.
  • Southeast Gateway Line (project page), Los Angeles County Metropolitan Transportation Authority. 'Current Phase: Design'; 'Estimated Project Completion: 2035'. Consulted 19 Nov 2026.

Research leads not yet reviewed: www.transit.dot.gov.

See it on the map. How the atlas qualifies a record.