Tacoma Dome Link Extension
- Location
- Federal Way–Tacoma, WA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Not collected yet | |
| Category | Urban transit | |
| Route length | 8.5 mi | Sound Transit |
| Stations | 4 | Sound Transit |
| Amount | US$5.4 billion to US$6.1 billion (US dollars), as of September 2025 | Sound Transit |
| What the amount covers | Capital estimate range: Sound Transit updated estimate in constant 2025 dollars: 'Project Cost (2025$) $5.4B - $6.1B'; the same memo gives $6,800 - $7,600 million in year-of-expenditure dollars. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$5.4 bn to 6.1 bn | Capital estimate range | Whole project | Sep 2025 | Sound TransitSound Transit updated estimate in constant 2025 dollars: 'Project Cost (2025$) $5.4B - $6.1B'; the same memo gives $6,800 - $7,600 million in year-of-expenditure dollars. |
Contracts and teams
Contracts and teams: No construction contract awarded yet Sound Transit.
About the project
Sound Transit's September 2025 cost memo describes an 8.5-mile light rail extension with four elevated stations.
Sources
- Capital Investment Grants Dashboard – September 2026, Federal Transit Administration, 11 Sep 2026. Page 1 project phase, scope and Project Cost column. The PDF indicates a 10 September update.. Consulted 9 Nov 2026.
- Tacoma Dome Link Extension: Timeline and milestones, Sound Transit. 'Planning (2018-2027) [...] Final Environmental Impact Statement (2027), board selection of project (2027). Design (2027-2029) [...] Construction (2029-2035) [...] Start of service (2035)'. Consulted 18 Nov 2026.
- Memo: Updated ST3 Capital Project Cost Estimates, Sound Transit, 11 Sep 2025. 'Tacoma Dome Link Extension Guideway: 8.5 miles Stations: 4 elevated Project Cost (2025$) $5.4B - $6.1B'; table: 'Tacoma Dome Link Extension $4,626 $5,400 - $6,100 $5,825 $6,800 - $7,600 Advanced conceptual engineering'. Consulted 19 Nov 2026.
Research leads not yet reviewed: www.transit.dot.gov.