Research record, not reviewed

C Line (Green) Extension to Torrance

Location
Torrance, CA, United States. Location shown at city level. See it on the map
Stage
Planning, as of September 2025 (LA Metro).
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorLA Metro
CategoryUrban transit
Route length4.5 miLA Metro
New stations2LA Metro
AmountUS$2.23 billion (US dollars), as of September 2025LA Metro
What the amount coversCapital estimate.
Threshold evidenceA cited project-scope figure meets the threshold
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$2.23 bnCapital estimateWhole projectSep 2025LA Metro
Financial records, each with its kind and scope

Contracts and teams

Contracts and teams: No construction contract awarded yet LA Metro.

Milestones

DateMilestoneScopeSource
September 11, 2025environmentalWhole projectLA Metro
2036planned openingWhole projectLA Metro
Dated milestones, at the precision of their source

About the project

An approximately 4.5-mile light rail extension from the Redondo Beach (Marine) Station to a new Torrance Transit Center station along Metro's Harbor Subdivision right-of-way, with elevated, at-grade and trench sections and two new stations. Metro released the Final EIR on September 11, 2025; the locally preferred alternative's projected cost is $2.23 billion as estimated in 2022. Construction could start as early as 2027 with an estimated opening in 2036.