Research record, not reviewed
Clearwater Effluent Outfall Tunnel
- Location
- Carson / San Pedro, CA, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of June 30, 2026 (Los Angeles County Sanitation Districts).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Los Angeles County Sanitation Districts | |
| Category | Water | |
| Amount | US$900 million (US dollars), as of May 9, 2022 | U.S. Environmental Protection Agency |
| What the amount covers | Cost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. | |
| Threshold evidence | Only a financed-scope figure meets the threshold; to reconcile |
Water projects are counted apart and left out of totals while their place in the atlas is decided.
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$900 M | Cost of the WIFIA-financed scope | Scope financed by WIFIA | 9 May 2022 | U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| FlatironDragados USA | prime contractor (bid-build) | Los Angeles Effluent Outfall Tunnel (7-mile, 18-foot-diameter tunnel from the A.K. Warren plant to Royal Palms Beach) | FlatironDragados |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| May 9, 2022 | Financing closed | Scope financed by WIFIA | U.S. Environmental Protection Agency |
About the project
EPA's financed scope concerns the effluent tunnel replacement. The authority separately documents tunnel recovery and re-entry activity.
Scope notes
- EPA's financed scope concerns the effluent tunnel replacement. The authority separately documents tunnel recovery and re-entry activity. U.S. Environmental Protection Agency
- Owner reports construction activity for this scope. Los Angeles County Sanitation Districts
Sources
- Clearwater Effluent Outfall Tunnel – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
- WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
- Clearwater Effluent Outfall Tunnel – delivery update, Los Angeles County Sanitation Districts. Owner construction update.. Consulted 9 Nov 2026.
- Los Angeles Effluent Outfall Tunnel (project page), FlatironDragados. 'Client: Los Angeles County Sanitation District ... Delivery Method: Bid-Build ... Company: FlatironDragados USA ... Role: Prime Contractor ... FlatironDragados is constructing ... a 7-mile, 18-foot-diameter tunnel, at a depth of 400 feet'. Consulted 18 Nov 2026.