San Mateo Wastewater Treatment Plant Upgrade and Expansion
- Location
- San Mateo / Foster City, CA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owners or sponsors | City of San Mateo, Estero Municipal Improvement District | |
| Category | Water | |
| Amount | US$566 million (US dollars), as of November 5, 2020 | U.S. Environmental Protection Agency |
| What the amount covers | Cost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. | |
| Threshold evidence | Only a financed-scope figure meets the threshold; to reconcile |
Water projects are counted apart and left out of totals while their place in the atlas is decided.
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$566 M | Cost of the WIFIA-financed scope | Scope financed by WIFIA | 5 Nov 2020 | U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Sundt | contractor | Wastewater treatment plant expansion: new 78 MGD treatment plant (membrane bioreactor) and administration building | Sundt |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| November 5, 2020 | Financing closed | Scope financed by WIFIA | U.S. Environmental Protection Agency |
About the project
EPA amended-loan factsheet describes the treatment capacity, effluent and resiliency upgrades.
Scope notes
- EPA amended-loan factsheet describes the treatment capacity, effluent and resiliency upgrades. U.S. Environmental Protection Agency
Sources
- San Mateo Wastewater Treatment Plant Upgrade and Expansion – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
- WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
- Partnering Key to Progress at $435 Million San Mateo Water Project, Sundt, Oct 2022. 'Now wrapping up their third summer of a five-year, $435 million wastewater treatment plant (WWTP) expansion, our Industrial team in San Mateo, California has been busy forming connections and hitting milestones. ... vertical construction of the new 78 MGD treatment plant (including the membrane bioreactor pictured here) and admin building is approaching 80% complete.'. Consulted 18 Nov 2026.