Southeast Connector
- Location
- Fort Worth, TX, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of November 2026 (Texas Department of Transportation).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Texas Department of Transportation | |
| Category | Highways | |
| Route length | 16 mi | Texas Department of Transportation |
| Amount | US$2.3 billion (US dollars), as of November 2026 | Texas Department of Transportation |
| What the amount covers | Project value. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$2.3 bn | Project value | Whole project | Nov 2026 | Texas Department of Transportation |
| US$2.2 bn | Capital estimate | Whole project | Nov 2026 | Texas Department of Transportation |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| South-Point Constructors (Kiewit Infrastructure South Co. and Austin Bridge & Road, LP) | design-builder (design-build contract and capital maintenance contract) | Southeast Connector design-build contract and capital maintenance contract | Texas Department of Transportation |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| 2023 | construction start | Whole project | Texas Department of Transportation |
About the project
Reconstruction and widening of about 16 miles of I-20 and I-820, with the I-20, I-820 and US 287 interchanges, in southeast Fort Worth, which TxDOT calls the largest transportation investment in its Fort Worth district's history at $2.3 billion, estimated for completion in 2028. The Texas Clear Lanes Fort Worth list carries it at $2.2 billion as a current project with a 2023 to 2030 timeline. TxDOT's design-build site reports work under construction by South-Point Constructors, the design-build contractor.
Sources
- Southeast Connector, Texas Department of Transportation. 'The $2.3 billion project will widen I-20 to 10 mainlanes from I-820 to US 287'; 'rebuild and widen approximately 16 miles of I-20 and I-820'; 'estimated for completion in 2028'; 'the largest investment in transportation infrastructure in the history of TxDOT's Fort Worth district'. Consulted 12 Nov 2026.
- Texas Clear Lanes: Fort Worth projects, Texas Department of Transportation. Current projects card 'Southeast Connector': Timeline 2023-2030, Cost $2,200,000,000 (the card carries no 'under construction' label). Consulted 12 Nov 2026.
- Southeast Connector - executed agreements, Texas Department of Transportation, 14 Mar 2022. 'the proposal submitted by South-Point Constructors provides the apparent best value to TxDOT (Texas Transportation Commission Minute Order 116157, Nov. 30, 2021) [...] On February 24, 2022, TxDOT executed: Design-Build Contract (DBC); Capital Maintenance Contract (CMC). Members per TxDOT's RFQ page: South-Point Constructors: Kiewit Infrastructure South Co.; Austin Bridge & Road, LP'. Consulted 18 Nov 2026.
- Southeast Connector (design-build project site), Texas Department of Transportation. 'DWC #1: I-820 from Ramey Ave. to Brentwood Stairs Rd., which is currently under construction'; 'South-Point Constructors, the Design-Build Contractor. South-Point Constructors is a joint venture between Kiewit Infrastructures South Co. (Westlake), and Austin Road & Bridge, LP (Austin)'. Consulted 19 Nov 2026.