ALDOT contract 20251107039 bid tabulation

RESURFACING, GUARDRAIL INSTALLATION , AND TRAFFIC STRIPE ON THE SR-225 SERVICE ROADS FROM A POINT 0.587 MILE NORTH OF SR-2 (US-72) TO A POINT 0.580 NORTH OF SR-53 IN HUNTSVILLE. Let by Alabama DOT on November 7, 2025, Madison, 0102. 4 bids received; low bid $1,619,720 by Rogers Group, Inc..

Owner
Alabama DOT
Letting
07 NOV 2025
Pay items
35
Data through
28 AUG 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$1,619,720Low
2Apac-Alabama, Inc.$1,684,180+4.0%
3Grayson Carter & Son Contracting, Inc.$1,685,683+4.0%
4Wiregrass Construction Company, Inc.$1,864,609+15%
ALDOT contract 20251107039: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.2. Apac-Alabama, Inc.3. Grayson Carter & Son Contracting, Inc.4. Wiregrass Construction Company, Inc.
0010Removing guardrail (206D001)LF813$4.25$4.22$4.34$4.32
0020Removing guardrail end anchor (all type) (206E008)EACH46$155.00$158.29$161.60$161.85
0030Tack coat (405A000)GAL12,918$3.00$4.31$3.54$3.47
0040Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001)SY129,154$0.90$1.49$0.48$1.10
0050Material remixing device (410H000)EACH1$42,000$36,363$35,810$30,000
0060Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360)TON10,952$79.00$80.10$92.49$92.81
0070Superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range C/D (424A369)TON407$108.75$139.99$139.92$147.42
0080Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655)TON1,000$126.00$103.53$117.45$145.98
0090Mobilization (600A000)LS1$64,150$21,952$15,039$74,315
0100Steel beam guardrail, class A, type 2 (630A001)LF813$25.50$25.33$25.81$25.90
0110Guardrail end anchor, type 8 (MASH) (630C077)EACH24$1,280.00$1,266.36$1,289.77$1,294.84
0120Guardrail end anchor, type 20 series (MASH) (630C080)EACH22$3,400.00$3,376.95$3,439.05$3,452.90
0130Guardrail reset (631C010)LF2,538$7.45$7.39$7.52$7.55
0140Sand bags (665G000)EACH400$5.90$9.28$13.45$8.28
0150Wattle (665Q002)LF1,000$7.00$8.08$7.04$11.80
0160Construction fuel (maximum bid limited to $ 106,500.00) (698A000)LS1$0.00$0.01$0.01$0.00
0170Solid white, class 2, type A traffic stripe (5" wide) (701A227)MI8$3,400.00$3,588.01$3,653.19$3,668.70
0180Solid yellow, class 2, type A traffic stripe (5" wide) (701A230)MI7$3,400.00$3,588.01$3,653.19$3,668.70
0190Broken white, class 2, type A traffic stripe (5" wide) (701A239)MI13$1,200.00$1,266.36$1,289.37$1,294.84
0200Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063)LF2,141$0.60$0.63$0.65$0.65
0210Dotted, class 2, type A traffic stripe (5" wide) (701B207)LF1,607$0.35$0.37$0.37$0.38
0220Broken temporary traffic stripe (701C000)MI24$525.00$554.03$564.10$566.49
0230Solid temporary traffic stripe (701C001)MI26$1,050.00$1,108.06$1,128.19$1,132.98
0240Traffic control markings, class 2, type A (703A002)SF923$5.50$5.80$5.91$5.93
0250Traffic control legends, class 2, type A (703B002)SF113$7.50$7.91$8.06$8.09
0260Temporary traffic control markings (703D001)SF1,440$1.25$1.32$1.34$1.35
0270Pavement markers, class A-H, type 2-C (705A030)EACH1,034$4.50$4.75$4.84$4.86
0280Pavement markers, class A-H, type 1-A (705A031)EACH393$4.50$4.75$4.84$4.86
0290Pavement markers, class A-H, type 1-B (705A032)EACH322$4.50$4.75$4.84$4.86
0300Loop wire (730H001)LF5,000$2.75$2.90$2.78$2.97
0310Construction signs (740B000)SF2,313$5.80$5.80$6.45$6.51
0320Special construction signs (740C000)SF163$5.50$5.80$6.72$6.78
0330Channelizing drums (740D000)EACH200$10.00$47.42$14.14$27.11
0340Portable sequential arrow and chevron sign unit (741C010)EACH2$500.00$575.14$701.95$1,247.19
0350Portable changeable message sign, type 2 (742A001)EACH2$1,500.00$1,582.95$1,186.75$2,478.10
ALDOT contract 20251107039: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

Every contract let that day: ALDOT letting of November 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy