ARDOT contract A00097 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO REPLACE CONCRETE PAVEMENT ON APPROXIMATELY 0.500 MILE OF HIGHWAY 67 IN CLAY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT, EARTHWORK, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BASE, BINDER, AND SURFACE COURSES, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PIPE UNDERDRAINS, EROSION CONTROL, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on March 4, 2026, Clay. 2 bids received; low bid $1,303,576 by Delta Asphalt of Arkansas, Inc..

Owner
Arkansas DOT
Letting
04 MAR 2026
Pay items
30
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Delta Asphalt of Arkansas, Inc.$1,303,576Low
2Atlas Asphalt, Inc.$1,412,435+8.0%
ARDOT contract A00097: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Delta Asphalt of Arkansas, Inc.2. Atlas Asphalt, Inc.
0001Removal and disposal of concrete pavement (202042)SY7,040$7.53$10.07
0002Unclassified excavation (210213)CY2,053$13.87$41.79
0003Soil stabilization (210702)TON642$320.56$409.25
0004Trenching and shoulder preparation (215011)STA27$215.37$505.38
0005Aggregate base course (class 7) (303117)TON2,878$21.74$33.90
0006Tack coat (401011)GAL1,500$4.09$3.50
0007Mineral aggregate in achm base course (1 1/2") (405161)TON2,175$83.93$75.42
0008Asphalt binder (PG 70-22) in achm base course (1 1/2") (minimum bid $120.00) (405412)TON84$120.00$120.00
0009Mineral aggregate in achm binder course (1") (406161)TON1,731$91.69$78.75
0010Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412)TON76$120.00$120.00
0011Mineral aggregate in achm surface course (1/2") (407162)TON2,807$106.25$88.81
0012Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON170$120.00$120.00
0013Asphalt concrete patching for maintenance of traffic (414011)TON10$356.59$100.00
0014Achm patching of existing roadway (415011)TON10$356.59$100.00
0015Maintenance of traffic (603009)LS1$50,000$15,883
0016Signs (604003)SF429$6.00$6.00
0017Traffic drums (604023)EACH90$25.00$20.00
0018Construction pavement markings (604041)LF13,200$0.35$0.56
0019Removable construction pavement markings (604051)LF672$10.00$2.95
0020Portable changeable message sign (604078)WEEK15$150.00$150.00
00214" pipe underdrains (611008)LF5,940$7.38$16.85
0022Underdrain outlet protectors (611013)EACH22$1,177.38$1,644.92
0023Sand bag ditch checks (621031)BAG130$11.35$11.35
0024Filter sock (18") (621169)LF2,500$3.98$3.98
0025Roadway construction control (635011)LS1$34,500$28,611
0026Portable traffic signal system - actuated (701603)WEEK15$875.00$1,212.58
0027Thermoplastic pavement marking white (6") (719002)LF5,280$0.85$1.18
0028Thermoplastic pavement marking yellow (6") (719102)LF670$0.85$1.18
0029Raised pavement markers (type II) (721002)EACH34$8.00$5.80
0030Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$53,000$51,703
ARDOT contract A00097: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of March 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy