IDOT contract 61K86 bid tabulation

Brookfield, section 21-00134-00-RS. Let by Illinois DOT on January 17, 2025, Cook, District 01. 4 bids received; low bid $4,534,006 by Schroeder Asphalt Services, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
145
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Schroeder Asphalt Services, Inc.$4,534,006Low
2K-Five Construction Corporation$4,673,430+3.0%
3R. W. Dunteman Company$4,784,000+6.0%
4Alliance Contractors, Inc.$5,000,846+10%
IDOT contract 61K86: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Schroeder Asphalt Services, Inc.2. K-Five Construction Corporation3. R. W. Dunteman Company4. Alliance Contractors, Inc.
1Explor excavation (XX000541)CY100$56.00$50.00$50.00$135.00
2San sew service 6 (XX003803)LF36$205.00$185.00$185.00$131.00
3Brick paver sidewalk (XX004688)SF3,500$25.00$15.00$24.27$14.85
4Brick paver crosswalk (XX005283)SF200$30.00$28.00$39.48$74.95
512" X 6" PVC sew con (XX005634)EACH5$2,600.00$2,385.00$2,385.00$2,079.00
6PVC CS pipe repl 12" (XX006449)LF38$900.00$825.00$825.00$527.00
7PVC CS pipe repl 15" (XX006450)LF64$935.00$850.00$850.00$593.00
815" X 6" PVC sew con (XX006452)EACH2$3,300.00$2,950.00$2,950.00$2,264.00
9E con to EX LT sys (XX006834)EACH3$2,600.00$2,100.00$2,100.00$2,300.00
108X4 CB trap & restr (XX006994)EACH9$1,550.00$1,385.00$1,385.00$2,008.00
11Concrete ribbon (XX007079)LF600$79.10$70.00$44.83$86.45
1224" X 6" PVC sew con (XX007203)EACH2$3,600.00$3,285.00$3,285.00$6,706.00
13Detectable wrning SPL (XX007729)SF50$79.10$70.00$56.84$65.00
14Masonry wall (XX007899)LF30$1,750.00$5,312.00$7,322.81$3,173.50
15PCC band paver bricks (XX008159)LF65$79.10$70.00$62.34$176.95
16Orn LP A contemp arm (XX008284)EACH4$20,000$17,550$17,550$17,800
17Structural soil (XX008356)CY1,150$450.00$345.73$106.73$400.00
18Preparation of bse SP (XX008536)SY12,250$1.39$1.70$1.30$11.55
19Comb sewer CL B T3 24 (XX008994)LF132$1,000.00$880.00$880.00$588.00
2010X6 CB trap & restr (XX009601)EACH4$1,650.00$1,450.00$1,450.00$2,241.00
21Storm sew CL B 2 6 (XX009689)LF30$125.00$115.00$115.00$133.00
22Check valve 8 (XX009690)EACH2$4,650.00$4,175.00$4,175.00$7,328.00
23Drainage restrictor (X0323868)EACH6$1,650.00$1,450.00$1,450.00$2,022.00
24Bollard, LED (X0324050)EACH4$4,100.00$3,670.00$3,670.00$3,680.00
25Rem & rein bric paver (X0327611)SF3,350$12.30$15.50$25.11$20.00
26Storm sew CL B 2 8 (X1200046)LF55$140.00$120.00$120.00$119.00
27Conn EX DRG structure (X1200160)EACH2$1,525.00$1,350.00$1,350.00$3,034.00
28LT P special 12' (X1400210)EACH50$9,000.00$7,225.00$7,225.00$8,100.00
29Tree grates (X2530008)EACH23$1,000.00$2,391.30$4,540.20$2,460.00
30Tree grate removal (X2530009)EACH9$200.00$766.12$1,340.58$100.00
31Temp access- priv ent (X4021000)EACH25$113.00$1,041.05$407.64$1.00
32PC conc sidewalk 5 SP (X4240430)SF750$33.90$30.00$22.85$25.75
33Detectable warn SPL (X4240800)SF50$56.50$50.00$48.38$65.00
34PCC surf rem var DP (X4400100)SY250$30.00$4.56$21.21$35.00
35HMA surf rem var DP (X4401198)SY21,500$3.85$4.56$6.34$4.10
36Temporary patching (X4420210)SY250$28.00$65.00$29.58$70.00
37Storm sew connection (X5510010)EACH2$2,550.00$2,250.00$2,250.00$4,064.00
38Cleanouts (X5610001)EACH6$1,600.00$1,385.00$1,385.00$50.00
39Connect EX manhole (X6020399)EACH5$1,585.00$1,350.00$1,350.00$4,064.00
40FR & lids adjust SPL (X6030310)EACH45$1,300.00$1,150.00$1,150.00$1,008.00
41Fence removal (X6640104)LF250$15.00$35.00$25.41$10.00
42Traf cont & prot SPL (X7010216)LS1$150,000$356,591$419,683$31,500
43Rem RE-erect EX sign (X7240600)EACH45$625.00$575.00$140.00$140.00
44HMA drivwy pavt rem (Z0004544)SY50$28.00$58.42$68.08$30.00
45Drainage STR removed (Z0018700)EACH1$400.00$325.00$325.00$1,891.00
46Dust control watering (Z0019600)UNIT50$100.00$100.00$1.00$1.00
47Temp info signing (Z0030850)SF175$30.00$25.00$16.00$16.00
48Maint lighting sys (Z0033028)CAL MO9$1,300.00$850.00$850.00$1,000.00
49RR prot liability ins (Z0048665)LS1$3,500.00$4,000.00$5,000.00$500.00
50Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80
51Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00
52Tree trunk protection (20101100)EACH40$200.00$100.00$100.00$100.00
53Tree root pruning (20101200)EACH8$210.00$75.00$75.00$75.00
54Earth excavation (20200100)CY1,050$70.00$100.40$68.00$40.00
55Rem & disp uns matl (20201200)CY60$60.00$77.69$68.00$70.00
56Trench backfill (20800150)CY325$26.00$23.00$23.00$50.00
57Topsoil F & P 4 (21101615)SY2,500$8.00$6.00$6.00$6.00
58Nitrogen fert nutr (25000400)LB50$4.00$4.00$4.00$4.00
59Phosphorus fert nutr (25000500)LB50$4.00$4.00$4.00$4.00
60Potassium fert nutr (25000600)LB50$4.00$4.00$4.00$4.00
61Sodding salt tolerant (25200110)SY2,500$18.25$12.00$12.00$12.00
62Supple watering (25200200)UNIT25$35.00$0.01$0.01$0.01
63Inlet filters (28000510)EACH82$220.00$115.00$115.00$25.00
64Agg subgrade improve (30300001)CY60$80.00$108.91$72.91$65.25
65PCC base course 4" (35300060)SY750$62.15$55.00$89.01$75.55
66Agg base repair (35800200)TON950$35.00$1.00$57.00$30.10
67Aggregate-temp access (40201000)TON35$33.90$77.97$57.00$50.00
68Bit matls tack CT (40600290)LB14,500$0.01$0.01$0.01$0.01
69Long joint sealant (40600370)LF10,250$3.55$3.87$3.52$3.75
70Mix CR JTS flangewys (40600400)TON25$300.00$50.00$100.00$340.00
71HMA surf rem butt JT (40600982)SY400$9.00$1.00$1.00$11.00
72PCC surf rem butt JT (40600985)SY25$80.00$1.00$1.00$80.00
73HMA BC IL-9.5 N50 (40602978)TON2,400$95.00$104.00$104.21$96.50
74HMA SC IL-9.5 D N50 (40604060)TON2,750$95.00$95.00$97.82$97.00
75Incidental HMA surf (40800050)TON15$180.00$300.00$149.64$200.00
76PCC PVT 8 (42000300)SY100$124.30$110.00$117.18$143.45
77Protective coat (42001300)SY3,000$1.98$1.75$1.25$0.01
78PCC driveway pavt 7 (42300300)SY175$101.70$90.00$102.23$135.00
79PC conc sidewalk 5 (42400200)SF26,000$10.17$9.00$9.38$13.30
80Detectable warnings (42400800)SF335$39.55$35.00$41.03$40.00
81Pavement rem (44000100)SY100$22.55$19.95$48.56$60.00
82Drive pavement rem (44000200)SY175$20.91$18.50$24.28$40.00
83Comb curb gutter rem (44000500)LF2,250$12.43$11.00$14.42$30.00
84Sidewalk rem (44000600)SF29,250$2.26$2.00$2.46$3.00
85CL B patch T1 8 (44200929)SY125$231.65$185.00$130.00$250.00
86CL B patch T2 8 (44200934)SY225$160.46$130.36$125.00$250.00
87CL B patch T3 8 (44200942)SY325$129.95$106.87$125.00$250.00
88CL B patch T4 8 (44200944)SY425$118.65$98.17$125.00$250.00
89CL D patch T1 6 (44201713)SY150$68.00$20.00$88.00$73.00
90CL D patch T2 6 (44201717)SY275$68.00$20.00$88.00$73.00
91CL D patch T3 6 (44201721)SY400$63.00$20.00$88.00$70.00
92CL D patch T4 6 (44201723)SY525$63.00$20.00$88.00$70.00
93Saw cuts (44213200)LF4,750$5.65$4.47$2.62$3.30
94Tie bars 1 (44213202)EACH1,300$19.61$16.03$17.42$3.35
95Storm sew CL B 2 10 (550B0330)LF10$145.00$125.00$125.00$200.00
96Dom wat ser box adj (56500600)EACH10$170.00$150.00$150.00$397.00
97Pipe underdr T 1 6 (60108106)LF1,450$71.00$65.00$65.00$20.00
98CB TA 4 dia T1F OL (60200105)EACH1$10,000$8,950.00$8,950.00$4,549.00
99CB TC T1F OL (60206905)EACH1$5,200.00$4,750.00$4,750.00$3,154.00
100Man TA 4 dia T1F CL (60218400)EACH1$20,300$18,550$18,550$6,477.00
101Inlets TA T1F OL (60234200)EACH1$3,000.00$2,650.00$2,650.00$2,351.00
102VV TA 5 dia T1F CL (60248900)EACH1$9,000.00$8,150.00$8,150.00$5,276.00
103CB adj new T1F OL (60250400)EACH2$1,000.00$900.00$900.00$917.00
104Man adj new T1F CL (60255800)EACH2$1,100.00$1,000.00$1,000.00$991.00
105Man reconst (60257900)EACH3$1,850.00$1,650.00$1,650.00$2,878.00
106VV adj new T1F CL (60265900)EACH1$1,100.00$1,000.00$1,000.00$1,204.00
107FR & lids adjust (60300305)EACH37$500.00$450.00$450.00$612.00
108Conc curb TB (60600605)LF200$58.76$52.00$61.16$53.80
109Comb CC&G TB6.12 (60603800)LF125$53.11$47.00$66.34$80.15
110Comb CC&G TB6.12 mod (60604100)LF2,000$55.37$49.00$39.18$83.35
111Non SPL waste disposl (66900200)CY350$105.00$128.21$110.50$66.00
112Soil disposal analy (66900530)EACH1$1,850.00$1,450.00$1,585.00$2,100.00
113Reg sub P-const plan (66901001)LS1$3,900.00$3,100.00$3,400.00$2,500.00
114Reg sub F con report (66901003)LS1$600.00$1,200.00$500.00$2,300.00
115Reg sub mon (66901006)CAL DAY5$900.00$680.00$700.00$1,000.00
116Mobilization (67100100)LS1$74,000$266,261$287,000$558,397
117Changeable message SN (70107025)CAL DAY60$50.00$40.00$30.00$30.00
118Short term pavt mking (70300100)LF4,250$1.25$1.00$1.00$1.00
119SHRT TRM pavt MK rem (70300150)SF1,500$3.00$2.00$1.00$1.00
120Sign panel T1 (72000100)SF625$29.00$25.00$38.00$38.00
121Teles STL sin support (72800100)LF350$17.00$15.00$14.00$14.00
122Metal post TY A (72900100)LF550$15.50$13.00$11.00$11.00
123Metal post TY B (72900200)LF600$17.00$15.00$12.00$12.00
124Base tel STL sin supp (73100100)EACH35$220.00$200.00$235.00$235.00
125THPL PVT MK LTR & sym (78000100)SF150$8.00$8.00$5.70$7.10
126THPL PVT MK line 4 (78000200)LF20,750$1.05$0.81$0.72$0.90
127THPL PVT MK line 6 (78000400)LF1,300$2.85$1.22$1.45$2.35
128THPL PVT MK line 12 (78000600)LF575$6.15$4.00$2.85$5.50
129THPL PVT MK line 24 (78000650)LF350$8.00$8.00$5.70$7.10
130PVT MKG rem grinding (78300201)SF300$4.00$3.00$1.50$1.50
131Elect serv install (80400100)EACH2$1,650.00$6,900.00$6,900.00$1,500.00
132Elect util serv conn (80400200)LS1$10,000$10,000$10,000$10,000
133Undrgrd C galvs 2 (81028200)LF250$27.00$65.00$65.00$24.00
134Undrgrd C galvs 5 (81028250)LF250$83.00$125.00$125.00$75.00
135Handhole (81400100)EACH2$5,600.00$4,550.00$4,550.00$5,100.00
136DBL handhole (81400300)EACH3$7,200.00$7,325.00$7,325.00$6,500.00
137UD 3#6#8G xlpuse 1.25 (81603051)LF5,150$21.00$24.00$24.00$19.00
138UD 6#6 #8G xlpuse 1.5 (81603598)LF1,500$24.50$28.00$28.00$22.00
139EC C XLP use 3-1C 2 (81702400)LF50$50.00$18.00$18.00$45.00
140LT cont basem 240V100 (82500350)EACH1$16,200$17,250$17,250$14,400
141LT cont basem 240V200 (82500370)EACH1$20,400$22,000$22,000$18,400
142Light pole FDN 24D (83600200)LF285$345.00$300.00$300.00$310.00
143Rem LT U no salv (84200600)EACH37$245.00$560.00$560.00$220.00
144Rem pole FDN (84200804)EACH37$355.00$686.00$686.00$320.00
145Remov EX handhole (89502380)EACH5$390.00$878.00$878.00$350.00
IDOT contract 61K86: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy