IDOT contract 74164 bid tabulation

Section (16BR-1,BR-2)B-1. Let by Illinois DOT on September 19, 2025, Lawrence, District 07. 3 bids received; low bid $21,455,785 by Sangamo Construction Company.

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
122
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sangamo Construction Company$21,455,785Low
2William Charles Construction Company, LLC$22,211,111+4.0%
3Samron Midwest Contracting, Inc.$22,670,202+6.0%
IDOT contract 74164: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sangamo Construction Company2. William Charles Construction Company, LLC3. Samron Midwest Contracting, Inc.
1T-acer rubrm 2 (A2001016)EACH10$575.59$545.00$550.00
2T-acer sacr 2 (A2001716)EACH5$575.59$545.00$600.00
3T-ginkgo biloba 2 (A2004416)EACH5$575.59$545.00$700.00
4T-quercus alba 2 (A2006416)EACH45$575.59$545.00$525.00
5T-quercus bicol 2 (A2006516)EACH45$575.59$545.00$525.00
6T-quercus macr 2 (A2006716)EACH45$575.59$545.00$525.00
7T-quercus meuh 2 (A2006816)EACH44$575.59$545.00$525.00
8T-aesculus pavia 6' (A2022166)EACH21$575.59$545.00$70.00
9T-cercis can TF 2 (B2001116)EACH15$575.59$545.00$345.00
10T-cornus kousa 8' (B2010168)EACH15$575.59$545.00$450.00
11Cold mix asphalt mixt (X4060205)TON4$348.00$400.00$320.00
12HMA surf rem var DP (X4401198)SY3,095$9.76$9.00$11.00
13BR deck grooving long (X5030250)SY3,640$12.46$10.00$11.00
14Bar terminators (X5080530)EACH788$32.31$27.84$26.00
15Drainage scuppr DS-11 (X5230174)EACH16$2,150.43$2,662.81$2,500.00
16Approach slab rem (Z0004552)SY363$63.90$41.62$120.00
17Deck slab rep (FD-T1) (Z0016001)SY100$677.00$1,800.00$1,800.00
18Deck slab rep (FD-T2) (Z0016002)SY100$377.00$1,485.00$1,800.00
19Diamond grind BR sec (Z0029090)SY5,700$12.37$15.00$12.00
20Modular expan JT 6 (Z0034390)LF86$2,669.96$3,000.00$2,200.00
21Permnt bench marks (Z0038700)EACH2$115.65$899.00$550.00
22Prot reset survey MRK (Z0049799)EACH1$2,341.23$1,000.00$550.00
23Trainees (Z0076600)HR1,000$0.80$0.80$0.80
24Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00
25Tree remov acres (20100500)ACRE1$39,590$24,000$20,000
26Earth excavation (20200100)CY272$63.76$200.00$45.00
27Channel excavation (20300100)CY2,376$32.62$45.00$35.00
28Furnished excavation (20400800)CY2,766$49.17$30.00$45.00
29Seeding CL 2 (25000200)ACRE1.75$2,719.51$2,575.00$2,900.00
30Seeding CL 4B (25000314)ACRE3.25$6,933.45$6,565.00$7,500.00
31Seeding CL 7 (25000350)ACRE5$607.27$575.00$600.00
32Nitrogen fert nutr (25000400)LB416$1.74$1.65$1.75
33Phosphorus fert nutr (25000500)LB416$1.74$1.65$1.75
34Potassium fert nutr (25000600)LB416$1.74$1.65$1.75
35Agr ground limestone (25000700)TON20$369.64$350.00$350.00
36Mulch method 2 (25100115)ACRE3.25$1,980.23$1,875.00$2,100.00
37Erosion contr blanket (25100630)SY7,712$2.06$1.95$2.00
38Temp eros contr seed (28000250)LB15,000$3.09$4.50$0.01
39Perimeter eros bar (28000400)LF4,588$3.98$4.00$4.00
40Stone riprap CL A4 (28100107)SY2,605$63.57$90.00$45.00
41Filter fabric (28200200)SY2,605$3.76$2.51$3.00
42Sub gran mat B (31101000)TON49$90.95$140.00$105.00
43HMA BC wid 10 (35600716)SY848$205.90$194.96$194.96
44Agg surf course TY B (40200800)TON188$57.80$115.19$56.00
45Bit matls tack CT (40600290)LB1,892$0.53$0.50$0.50
46Temporary ramp (40600990)SY175$67.46$66.00$18.00
47HMA BC IL-19.0 N90 (40603090)TON153$437.37$414.13$414.13
48P HMA BC IL-9.5FG N90 (40603219)TON182$412.00$390.11$390.11
49HMA SC IL-9.5 C N70 (40604052)TON244$267.15$252.95$252.95
50P HMA SC IL-9.5 D N90 (40604164)TON365$358.25$339.21$339.21
51Welded wire reinf (42000060)SY134$18.93$42.34$14.00
52PVT con HMA BR app SL (42000070)SY89$267.70$602.00$602.00
53PVT con PCC BR app SL (42000080)SY134$247.91$265.00$256.00
54Pavement rem (44000100)SY307$40.53$40.00$24.00
55HMA surf rem 2 (44000157)SY2,168$11.38$8.27$8.00
56Paved SHLD removal (44004250)SY139$21.00$31.81$13.00
57Aggregate SHLDS B 6 (48101500)SY679$35.96$57.91$45.00
58Agg wedge SHLD type B (48102100)TON5$84.87$175.00$40.00
59HMA shoulders 2 (48203005)SY848$53.47$50.63$50.63
60Rem exist struct N1 (50100300)EACH1$419,138$400,000$1,000,000
61Rem exist struct N2 (50100400)EACH1$767,665$800,000$1,500,000
62Structure excavation (50200100)CY1,625$54.69$100.00$50.00
63Cofferdam excavation (50200300)CY260$77.24$133.82$50.00
64Cofferdam typ 1 loc 1 (50201101)EACH1$56,176$95,000$0.01
65Cofferdam typ 1 loc 2 (50201102)EACH1$56,176$95,000$0.01
66Cofferdam typ 1 loc 3 (50201103)EACH1$56,176$95,000$0.01
67Cofferdam typ 1 loc 4 (50201104)EACH1$56,176$95,000$0.01
68Floor drains (50300100)EACH16$598.47$1,019.09$650.00
69Conc struct (50300225)CY1,277.40$1,544.20$1,305.00$1,500.00
70Conc sup-STR (50300255)CY1,808.40$1,970.35$1,655.00$2,000.00
71Protective coat (50300300)SY7,267$2.08$9.18$2.00
72Conc supstr app slab (50301350)CY237.40$679.59$618.67$650.00
73F & E struct steel (50500105)LS1$6,706,061$6,062,951$5,000,000
74Stud shear connectors (50500505)EACH41,322$4.82$3.46$5.00
75Reinf bars, epoxy CTD (50800205)LB752,760$1.54$2.13$1.50
76Bar splicers (50800515)EACH5,654$42.64$39.16$35.00
77Mechanical splicers (50800530)EACH476$188.52$188.75$156.00
78Fur STL pile HP14X102 (51202000)LF14,932$58.00$106.00$125.00
79Fur STL pile HP14X117 (51202100)LF8,779$68.00$103.00$135.00
80Driving piles (51202305)LF23,711$0.02$1.00$0.01
81Test pile ST HP14X102 (51204000)EACH7$18,161$15,000$15,000
82Test pile ST HP14X117 (51204100)EACH2$17,650$14,000$20,000
83Pile shoes (51204650)EACH140$164.69$173.53$170.00
84Name plates (51500100)EACH2$804.08$1,452.68$1,000.00
85Elast bearing assy T1 (52100010)EACH60$2,479.30$2,500.00$2,400.00
86Anchor bolts 1 (52100520)EACH216$119.19$161.69$125.00
87Temp SHT piling (52200010)SF566$27.77$70.00$135.00
88Temp soil reten systm (52200020)SF952$37.77$140.00$155.00
89Granular backfill STR (58600101)CY230$131.10$129.62$100.00
90Concrete sealer (58700300)SF910$2.47$7.95$2.00
91Geocomposite wall DR (59100100)SY127$24.53$70.10$40.00
92Conc HDWL for P drain (60100060)EACH8$306.07$812.79$275.00
93P undr for struct 4 (60146304)LF254$31.84$25.10$35.00
94SPBGR TY A 6FT posts (63000001)LF300$33.80$32.00$35.00
95Traf bar term T6 (63100085)EACH8$5,479.84$5,200.00$5,400.00
96TR bar TRM T1 SPL tan (63100167)EACH8$3,802.04$3,600.00$3,800.00
97Guardrail remov (63200310)LF1,087.50$5.28$5.00$4.25
98Fur erect row markers (66600105)EACH10$287.90$50.00$250.00
99Perm surv MKRS T1 (66700205)EACH3$201.76$1,500.00$375.00
100Engr field office A (67000400)CAL MO18$2,513.71$2,200.00$2,300.00
101Mobilization (67100100)LS1$1,265,891$1,367,580$1,360,000
102Traf cont-prot 701321 (70100405)EACH2$35,290$34,203$45,000
103Traf cont-prot 701201 (70100450)LS1$46,632$1,200.00$0.01
104Traf cont-prot 701306 (70100460)LS1$11,192$1,200.00$5,000.00
105Traf cont-prot 701326 (70100500)LS1$3,730.57$1,600.00$0.01
106TR cont surveillance (70103815)CAL DAY10$1.17$650.00$0.01
107Temp BR traf signals (70106500)EACH2$51,486$65,000$100,000
108Pavt MK blkout tape 5 (70107005)LF3,519$4.75$2.45$3.25
109Changeable message SN (70107025)CAL DAY28$152.83$130.00$150.00
110Short term pavt mking (70300100)LF676$2.67$1.48$3.60
111SHRT TRM pavt MK rem (70300150)SF777$2.34$0.50$4.00
112Temp PVT MK line 4 - paint (70300221)LF5,577$0.94$1.25$0.97
113Temp conc barrier (70400100)LF2,369$47.00$44.50$45.00
114Pin temp conc barrier (70400125)EACH357$26.40$25.00$23.00
115Rel temp conc barrier (70400200)LF2,242$9.77$9.25$10.00
116Imp attn temp NRD TL3 (70600250)EACH3$6,104.90$8,500.00$8,000.00
117Imp attn temp FRN TL3 (70600260)EACH3$12,933$19,900$11,000
118Imp attn rel FRN TL3 (70600332)EACH1$3,278.68$2,800.00$3,500.00
119Imp attn rel NRD TL3 (70600350)EACH3$1,433.68$2,800.00$700.00
120Terminal marker - DA (72501000)EACH8$52.81$800.00$40.00
121Paint PVT MK line 4 (78001110)LF7,142$0.94$0.65$0.75
122Grdrail ref type A (78200005)EACH32$10.56$32.50$10.00
IDOT contract 74164: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy