IDOT contract 74597 bid tabulation
Section (18-1VB,18-20HB)B. Let by Illinois DOT on September 19, 2025, Cumberland, District 07. 4 bids received; low bid $54,599,804 by William Charles Construction Company, LLC.
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 188
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | William Charles Construction Company, LLC | $54,599,804 | Low |
| 2 | Sangamo Construction Company | $54,945,530 | +1.0% |
| 3 | Plocher Construction Company, Inc. | $57,679,000 | +6.0% |
| 4 | Samron Midwest Contracting, Inc. | $58,430,539 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. William Charles Construction Company, LLC | 2. Sangamo Construction Company | 3. Plocher Construction Company, Inc. | 4. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Recoverable delineatr (X2600002) | EACH | 1,036 | $103.41 | $115.29 | $90.00 | $100.00 |
| 2 | Temp shoulders (X4810100) | SY | 377 | $32.69 | $29.04 | $17.50 | $18.00 |
| 3 | BR deck grooving long (X5030250) | SY | 3,744 | $10.10 | $13.04 | $14.00 | $13.00 |
| 4 | FD prec bridge app slab (X5040101) | SF | 5,998 | $157.79 | $151.36 | $132.00 | $135.00 |
| 5 | Bar terminators (X5080530) | EACH | 3,228 | $48.61 | $25.32 | $25.00 | $32.00 |
| 6 | Remov EX flar end sec (X5427602) | EACH | 1 | $426.70 | $1,060.94 | $425.00 | $350.00 |
| 7 | Class SI conc out SPL (X6060097) | CY | 19 | $821.91 | $1,007.78 | $825.00 | $1,650.00 |
| 8 | Conc med TSB doweled (X6061800) | SF | 200 | $75.12 | $41.42 | $30.50 | $18.00 |
| 9 | Rel mod glar SCRN sys (X6380200) | LF | 7,075 | $3.11 | $5.12 | $5.00 | $5.00 |
| 10 | Fill EX rumble strip (X6420002) | LF | 10,690 | $5.27 | $11.31 | $7.50 | $10.00 |
| 11 | Median closure (X7010112) | EACH | 2 | $56.98 | $11,785 | $30,000 | $15,000 |
| 12 | Real-time TR cont sys (X7011850) | LS | 1 | $156,952 | $172,496 | $150,000 | $150,000 |
| 13 | Detour signing (X7200203) | LS | 1 | $73,594 | $135,590 | $50,000 | $250,000 |
| 14 | Smart traf monit sys (X8570000) | LS | 1 | $57,856 | $63,586 | $300,000 | $350,000 |
| 15 | Diamond grind BR sec (Z0029090) | SY | 7,264 | $19.65 | $14.15 | $13.50 | $12.00 |
| 16 | RR prot liability ins (Z0048665) | LS | 1 | $40,000 | $15,286 | $15,000 | $150,000 |
| 17 | Prot reset survey MRK (Z0049799) | EACH | 3 | $2,510.03 | $1,581.26 | $1,000.00 | $450.00 |
| 18 | Temp pavement (Z0062456) | SY | 4,800 | $117.83 | $131.15 | $130.00 | $100.00 |
| 19 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 | $0.80 | $0.80 |
| 20 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 21 | Tree remov acres (20100500) | ACRE | 2.30 | $12,048 | $19,784 | $13,000 | $15,000 |
| 22 | Temporary fence (20101000) | LF | 3,945 | $4.51 | $5.32 | $10.00 | $6.00 |
| 23 | Tree trunk protection (20101100) | EACH | 4 | $100.40 | $292.11 | $110.00 | $115.00 |
| 24 | Earth excavation (20200100) | CY | 24,241 | $33.43 | $16.92 | $33.50 | $25.00 |
| 25 | Rem & disp uns matl (20201200) | CY | 79,124 | $1.00 | $17.46 | $1.00 | $15.00 |
| 26 | Furnished excavation (20400800) | CY | 227,326 | $28.31 | $33.13 | $28.20 | $20.00 |
| 27 | Trench backfill (20800150) | CY | 498 | $120.48 | $75.74 | $125.00 | $95.00 |
| 28 | Topsoil F & P 6 (21101625) | SY | 28,920 | $10.75 | $4.34 | $7.50 | $7.00 |
| 29 | Seeding CL 2A (25000210) | ACRE | 36 | $1,882.52 | $2,167.38 | $1,875.00 | $2,000.00 |
| 30 | Nitrogen fert nutr (25000400) | LB | 3,227 | $1.66 | $1.08 | $1.65 | $2.00 |
| 31 | Phosphorus fert nutr (25000500) | LB | 3,227 | $1.66 | $1.08 | $1.65 | $2.00 |
| 32 | Potassium fert nutr (25000600) | LB | 3,227 | $1.66 | $1.08 | $1.65 | $2.00 |
| 33 | Mulch method 2 (25100115) | ACRE | 7 | $1,531.12 | $2,167.38 | $1,525.00 | $1,800.00 |
| 34 | Erosion contr blanket (25100630) | SY | 67,767 | $1.86 | $1.90 | $1.85 | $2.00 |
| 35 | Temp eros contr seed (28000250) | LB | 15,234 | $3.51 | $3.11 | $9.00 | $2.00 |
| 36 | Temp ditch checks (28000305) | LF | 944 | $28.11 | $19.78 | $6.00 | $15.00 |
| 37 | Perimeter eros bar (28000400) | LF | 3,945 | $4.02 | $3.95 | $3.25 | $5.00 |
| 38 | Inlet & pipe protect (28000500) | EACH | 19 | $251.00 | $182.34 | $150.00 | $160.00 |
| 39 | Stone riprap CL A4 (28100107) | SY | 310 | $72.34 | $73.67 | $100.00 | $100.00 |
| 40 | Filter fabric (28200200) | SY | 310 | $1.11 | $5.08 | $2.00 | $3.00 |
| 41 | Agg subgrade impr 12 (30300112) | SY | 86,729 | $28.16 | $29.83 | $24.30 | $26.00 |
| 42 | PCC bse cse 10 (35300500) | SY | 189 | $117.80 | $97.26 | $145.00 | $125.00 |
| 43 | Bit matls PR CT (40600275) | LB | 168,066 | $1.29 | $1.35 | $1.28 | $1.28 |
| 44 | Bit matls tack CT (40600290) | LB | 33,613 | $1.84 | $1.93 | $1.83 | $1.83 |
| 45 | Long joint sealant (40600370) | LF | 58,308 | $4.56 | $4.79 | $4.54 | $4.54 |
| 46 | HMA BC IL-19.0 N70 (40603085) | TON | 5,973 | $184.92 | $194.30 | $184.20 | $184.18 |
| 47 | HMA BC IL-19.0 N90 (40603090) | TON | 25,412 | $153.99 | $161.80 | $153.40 | $153.37 |
| 48 | P HMA BC IL19.0 N90 (40603240) | TON | 8,409 | $173.64 | $182.45 | $173.00 | $172.95 |
| 49 | HMA SC IL-9.5 C N70 (40604052) | TON | 1,214 | $273.36 | $287.23 | $272.30 | $272.27 |
| 50 | P HMA SC IL-9.5 D N90 (40604164) | TON | 3,876 | $185.23 | $194.63 | $184.50 | $184.49 |
| 51 | P SC SMA 12.5 E N80 (40605034) | TON | 3,684 | $227.04 | $238.56 | $226.20 | $226.13 |
| 52 | HMA pavt FD 11 1/2 (40701911) | SY | 10,550 | $102.57 | $107.77 | $133.50 | $105.00 |
| 53 | PVT con HMA BR app SL (42000070) | SY | 1,082 | $281.33 | $295.61 | $280.22 | $280.21 |
| 54 | Pavement rem (44000100) | SY | 43,495 | $14.06 | $17.32 | $14.00 | $11.00 |
| 55 | HMA surf rem 2 (44000157) | SY | 2,792 | $1.71 | $16.26 | $15.50 | $10.00 |
| 56 | Curb rem (44000300) | LF | 1,540 | $9.54 | $12.00 | $10.00 | $10.00 |
| 57 | Comb curb gutter rem (44000500) | LF | 631 | $9.04 | $17.26 | $10.00 | $10.00 |
| 58 | Median removal (44003100) | SF | 256 | $4.77 | $9.02 | $4.75 | $5.00 |
| 59 | Paved ditch removal (44004000) | LF | 542 | $12.05 | $10.65 | $12.00 | $12.00 |
| 60 | Paved SHLD removal (44004250) | SY | 33,649 | $10.54 | $9.89 | $10.50 | $10.00 |
| 61 | Aggregate SHLDS B 6 (48101500) | SY | 6,829 | $16.38 | $20.49 | $16.00 | $10.00 |
| 62 | Rem exist struct N1 (50100300) | EACH | 1 | $325,000 | $389,909 | $750,000 | $1,250,000 |
| 63 | Rem exist struct N2 (50100400) | EACH | 1 | $328,000 | $378,284 | $750,000 | $1,250,000 |
| 64 | Rem exist struct N3 (50100500) | EACH | 1 | $250,000 | $162,301 | $350,000 | $650,000 |
| 65 | Rem exist struct N4 (50100600) | EACH | 1 | $250,000 | $160,368 | $350,000 | $650,000 |
| 66 | Conc headwall removal (50104400) | EACH | 9 | $426.70 | $432.50 | $425.00 | $150.00 |
| 67 | Pipe culvert remov (50105220) | LF | 447 | $16.06 | $28.36 | $16.00 | $22.00 |
| 68 | Protective shield (50157300) | SY | 1,419 | $66.11 | $114.70 | $94.00 | $150.00 |
| 69 | Structure excavation (50200100) | CY | 3,308 | $96.42 | $38.40 | $42.00 | $50.00 |
| 70 | Floor drains (50300100) | EACH | 32 | $785.12 | $846.11 | $700.00 | $750.00 |
| 71 | Conc struct (50300225) | CY | 1,875 | $1,340.37 | $1,347.21 | $1,000.00 | $1,250.00 |
| 72 | Conc sup-STR (50300255) | CY | 2,039 | $1,536.08 | $1,603.37 | $2,000.00 | $1,650.00 |
| 73 | Protective coat (50300300) | SY | 8,269 | $2.64 | $3.48 | $3.75 | $2.50 |
| 74 | Conc supstr app slab (50301350) | CY | 256 | $692.51 | $701.22 | $428.00 | $650.00 |
| 75 | F & E struct steel (50500105) | LS | 1 | $8,164,000 | $7,670,679 | $10,087,000 | $9,000,000 |
| 76 | Stud shear connectors (50500505) | EACH | 29,934 | $5.79 | $5.01 | $4.10 | $4.50 |
| 77 | Reinf bars, epoxy CTD (50800205) | LB | 894,800 | $1.97 | $1.72 | $1.80 | $1.50 |
| 78 | Slope wall 4 (51100100) | SY | 5,705 | $277.50 | $174.79 | $205.00 | $100.00 |
| 79 | Fur M S pile 14X0.312 (51200959) | LF | 11,457 | $68.22 | $95.97 | $53.00 | $115.00 |
| 80 | Driving piles (51202305) | LF | 11,457 | $59.51 | $0.03 | $0.10 | $0.01 |
| 81 | Test pile met shells (51203200) | EACH | 16 | $13,645 | $6,291.04 | $30,000 | $15,000 |
| 82 | Pile shoes (51204650) | EACH | 236 | $391.02 | $469.37 | $150.00 | $175.00 |
| 83 | Name plates (51500100) | EACH | 4 | $1,412.78 | $1,157.57 | $1,000.00 | $1,500.00 |
| 84 | Pref JT strip seal (52000110) | LF | 278 | $351.08 | $257.14 | $185.00 | $250.00 |
| 85 | Elast bearing assy T1 (52100010) | EACH | 60 | $4,746.30 | $4,552.75 | $4,200.00 | $4,200.00 |
| 86 | Anchor bolts 1 (52100520) | EACH | 120 | $165.00 | $103.53 | $84.00 | $85.00 |
| 87 | Anchor bolts 1 1/4 (52100530) | EACH | 56 | $279.61 | $143.35 | $112.00 | $115.00 |
| 88 | Anchor bolts 1 1/2 (52100540) | EACH | 64 | $264.65 | $127.42 | $136.00 | $140.00 |
| 89 | Temp soil reten systm (52200020) | SF | 5,629 | $130.51 | $1.00 | $60.00 | $200.00 |
| 90 | P cul CL A 1 24 (542A0229) | LF | 166 | $121.49 | $123.38 | $121.00 | $105.00 |
| 91 | P cul CL A 2 24 (542A1069) | LF | 245 | $139.56 | $123.38 | $139.00 | $125.00 |
| 92 | P cul CL A 2 36 (542A1081) | LF | 119 | $158.63 | $183.85 | $158.00 | $195.00 |
| 93 | P cul CL C 1 15 temp (5421C015) | LF | 446 | $60.24 | $59.29 | $60.00 | $75.00 |
| 94 | End sections 15 (54213450) | EACH | 2 | $386.54 | $1,706.80 | $385.00 | $2,000.00 |
| 95 | Cip RC end sec 24 (54215424) | EACH | 4 | $9,988.84 | $3,791.47 | $16,000 | $15,000 |
| 96 | Cip RC end sec 36 (54215436) | EACH | 2 | $17,062 | $6,861.22 | $28,000 | $27,000 |
| 97 | Inlet box 542501 (54244805) | EACH | 1 | $9,136.50 | $10,485 | $9,100.00 | $7,000.00 |
| 98 | TRVRS pipe GRT con ES (54260315) | LF | 84 | $105.42 | $124.76 | $105.00 | $100.00 |
| 99 | Conc ES 542001 24 1:3 (54261324) | EACH | 5 | $13,052 | $5,648.26 | $13,000 | $11,000 |
| 100 | Conc ES 542001 36 1:3 (54261336) | EACH | 2 | $16,064 | $9,330.30 | $16,000 | $16,000 |
| 101 | Storm sewer rem 12 (55100500) | LF | 307 | $14.06 | $28.37 | $14.00 | $35.00 |
| 102 | Granular backfill STR (58600101) | CY | 1,129 | $137.98 | $100.17 | $108.00 | $95.00 |
| 103 | Geocomposite wall DR (59100100) | SY | 571 | $52.07 | $25.36 | $21.25 | $35.00 |
| 104 | Conc HDWL for P drain (60100060) | EACH | 8 | $536.58 | $291.00 | $795.00 | $275.00 |
| 105 | P undr for struct 4 (60146304) | LF | 799 | $32.73 | $26.37 | $25.00 | $30.00 |
| 106 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $7,028.08 | $6,225.26 | $7,000.00 | $6,500.00 |
| 107 | Remov inlets (60500060) | EACH | 8 | $853.41 | $878.34 | $850.00 | $650.00 |
| 108 | Comb CC&G TY B-6.24 (60605000) | LF | 675 | $95.17 | $70.75 | $70.00 | $65.00 |
| 109 | Paved ditch TA-22 (60615910) | LF | 390 | $188.69 | $164.94 | $93.00 | $100.00 |
| 110 | Paved ditch TB-37 (60617520) | LF | 134 | $476.05 | $215.54 | $195.00 | $185.00 |
| 111 | SPBGR TY A 6FT posts (63000001) | LF | 10,013 | $28.11 | $29.52 | $28.00 | $33.00 |
| 112 | Traf bar term T2 (63100045) | EACH | 9 | $1,606.42 | $1,686.68 | $1,600.00 | $1,800.00 |
| 113 | Traf bar term T6 (63100085) | EACH | 12 | $4,919.65 | $5,575.88 | $4,900.00 | $5,750.00 |
| 114 | TR bar TRM T1 SPL tan (63100167) | EACH | 13 | $4,317.25 | $4,532.94 | $4,300.00 | $4,900.00 |
| 115 | Guardrail remov (63200310) | LF | 7,717 | $5.02 | $5.27 | $6.00 | $5.50 |
| 116 | Mod glar SCR sys temp (63800920) | LF | 7,200 | $18.22 | $18.13 | $7.00 | $8.00 |
| 117 | Shoulder rum strip 8 (64200108) | LF | 19,674 | $1.69 | $0.77 | $1.25 | $1.00 |
| 118 | Non SPL waste disposl (66900200) | CY | 1,135 | $165.66 | $123.17 | $200.00 | $160.00 |
| 119 | Soil disposal analy (66900530) | EACH | 2 | $1,200.00 | $1,265.01 | $1,450.00 | $1,400.00 |
| 120 | Reg sub P-const plan (66901001) | LS | 1 | $4,500.00 | $3,584.19 | $2,200.00 | $4,000.00 |
| 121 | Reg sub F con report (66901003) | LS | 1 | $2,000.00 | $1,054.17 | $2,200.00 | $1,100.00 |
| 122 | Reg sub mon (66901006) | CAL DAY | 31 | $1,100.00 | $1,159.59 | $1,150.00 | $1,250.00 |
| 123 | Mobilization (67100100) | LS | 1 | $3,347,000 | $3,241,786 | $4,424,079 | $3,500,000 |
| 124 | Traf cont-prot 701416 (70100410) | EACH | 2 | $125,476 | $215,088 | $350,000 | $1,540,000 |
| 125 | Traf cont-prot 701411 (70100420) | EACH | 4 | $4,518.05 | $3,773.83 | $10,000 | $2,500.00 |
| 126 | Traf cont-prot 701201 (70100450) | LS | 1 | $6,199.77 | $129,337 | $50,000 | $1,500.00 |
| 127 | Traf cont-prot 701406 (70100700) | LS | 1 | $30,120 | $14,545 | $65,000 | $0.01 |
| 128 | Traf cont-prot 701401 (70100800) | LS | 1 | $51,958 | $81,580 | $250,000 | $150,000 |
| 129 | Traf cont-prot 701451 (70100820) | LS | 1 | $11,822 | $1,024.81 | $20,000 | $1,000.00 |
| 130 | Traf cont-prot 701456 (70100825) | LS | 1 | $5,747.96 | $768.60 | $20,000 | $1,000.00 |
| 131 | TR cont surveillance (70103815) | CAL DAY | 525 | $251.00 | $1.21 | $250.00 | $0.01 |
| 132 | Temp rumble strips (70106700) | EACH | 6 | $1,330.31 | $6,276.91 | $2,000.00 | $5,800.00 |
| 133 | Pavt MK blkout tape 7 (70107007) | LF | 43,210 | $2.26 | $3.86 | $2.25 | $3.25 |
| 134 | Changeable message SN (70107025) | CAL DAY | 84 | $130.52 | $160.13 | $150.00 | $125.00 |
| 135 | Short term pavt mking (70300100) | LF | 8,581 | $2.01 | $1.84 | $2.00 | $2.00 |
| 136 | SHRT TRM pavt MK rem (70300150) | SF | 29,496 | $1.26 | $1.83 | $1.00 | $0.25 |
| 137 | Temp PVT MK line 4 - paint (70300221) | LF | 4,137 | $0.50 | $0.89 | $0.50 | $0.75 |
| 138 | Temp PVT MK line 6 - paint (70300241) | LF | 17,818 | $0.75 | $1.07 | $0.75 | $1.00 |
| 139 | Temp PVT MK line 8 - paint (70300251) | LF | 52 | $12.55 | $1.31 | $12.50 | $1.20 |
| 140 | Temp PVT MK line 24 - paint (70300281) | LF | 32 | $25.10 | $2.37 | $25.00 | $2.10 |
| 141 | Temp PVT MK L4 T4 tape (70307120) | LF | 9,153 | $2.51 | $2.08 | $1.10 | $1.60 |
| 142 | Temp PVT MK L6 T4 tape (70307130) | LF | 76,658 | $3.01 | $2.92 | $1.65 | $2.50 |
| 143 | Temp conc barrier (70400100) | LF | 12,850 | $51.71 | $66.40 | $80.00 | $50.00 |
| 144 | Pin temp conc barrier (70400125) | EACH | 9,339 | $21.59 | $25.48 | $20.00 | $20.00 |
| 145 | Rel temp conc barrier (70400200) | LF | 11,925 | $18.57 | $25.42 | $1.00 | $15.00 |
| 146 | Temp SPBGR TY A (70500100) | LF | 1,375 | $27.11 | $28.46 | $27.00 | $31.00 |
| 147 | Temp TR bar term T1 (70500615) | EACH | 2 | $3,714.84 | $3,900.44 | $3,700.00 | $4,250.00 |
| 148 | Temp TR bar term T2 (70500625) | EACH | 2 | $1,506.02 | $1,581.26 | $1,500.00 | $1,650.00 |
| 149 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $7,504.98 | $9,223.22 | $7,500.00 | $7,000.00 |
| 150 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $502.01 | $640.50 | $5,000.00 | $500.00 |
| 151 | Sign panel T1 (72000100) | SF | 106 | $33.89 | $28.46 | $37.50 | $35.00 |
| 152 | Sign panel T2 (72000200) | SF | 313 | $29.12 | $30.57 | $38.00 | $30.00 |
| 153 | Remov sin pan assy TA (72400100) | EACH | 7 | $202.31 | $274.08 | $350.00 | $215.00 |
| 154 | Remov sin pan assy TB (72400200) | EACH | 19 | $255.52 | $368.96 | $375.00 | $250.00 |
| 155 | Rem & rel sign panel asmbly TB (72400210) | EACH | 8 | $1,270.07 | $1,317.72 | $960.00 | $300.00 |
| 156 | Rem & rel sign panel T3 (72400745) | SF | 496 | $43.17 | $33.73 | $50.00 | $45.00 |
| 157 | Terminal marker - DA (72501000) | EACH | 15 | $50.20 | $52.71 | $50.00 | $52.00 |
| 158 | STR STL sin sup BA (72700100) | LB | 2,475 | $5.52 | $9.49 | $12.50 | $6.00 |
| 159 | Tub STL SN support BA (72700200) | LB | 2,259 | $13.30 | $15.81 | $25.00 | $14.50 |
| 160 | Wood sin support (73000100) | LF | 84 | $40.16 | $84.33 | $75.00 | $45.00 |
| 161 | Conc foundation (73400100) | CY | 11 | $4,016.04 | $4,585.65 | $3,500.00 | $4,500.00 |
| 162 | Rem GR MT sin support (73700100) | EACH | 16 | $314.76 | $316.25 | $500.00 | $375.00 |
| 163 | Rem conc FDN-GR MT (73700200) | EACH | 16 | $1,330.31 | $727.38 | $750.00 | $1,650.00 |
| 164 | Pref PL PM TD STD L4 (78004620) | LF | 120 | $5.52 | $7.12 | $5.50 | $7.00 |
| 165 | Pref PL PM TD STD L 6 (78004630) | LF | 67,274 | $5.52 | $7.42 | $5.50 | $7.20 |
| 166 | Pref PL PM TD STD L 8 (78004640) | LF | 4,233 | $8.79 | $9.50 | $8.75 | $9.00 |
| 167 | Pref PL PM TD STD L12 (78004660) | LF | 526 | $15.06 | $17.80 | $15.00 | $17.00 |
| 168 | Pref PL PM TD STD L24 (78004720) | LF | 87 | $30.12 | $29.67 | $30.00 | $28.00 |
| 169 | GRV RCSD PVT MRKG 5 (78011025) | LF | 120 | $1.51 | $1.19 | $1.50 | $1.00 |
| 170 | GRV RCSD PVT MRKG 7 (78011035) | LF | 67,274 | $1.51 | $0.89 | $1.50 | $0.80 |
| 171 | GRV RCSD PVT MRKG 9 (78011045) | LF | 4,233 | $2.01 | $1.48 | $2.00 | $1.25 |
| 172 | GRV RCSD PVT MRKG 13 (78011065) | LF | 526 | $12.05 | $4.15 | $12.00 | $3.75 |
| 173 | GRV RCSD PVT MRKG 25 (78011125) | LF | 87 | $24.10 | $5.34 | $24.00 | $4.75 |
| 174 | Raised refl pavt MKR (78100100) | EACH | 804 | $45.18 | $39.16 | $45.00 | $40.00 |
| 175 | Temp rais ref PVT MKR (78100200) | EACH | 336 | $69.53 | $26.35 | $25.00 | $120.00 |
| 176 | Barr wall ref type C (78200011) | EACH | 165 | $11.70 | $18.39 | $20.00 | $11.00 |
| 177 | Undrgrd C CNC 3 (81028770) | LF | 345 | $34.91 | $26.35 | $62.00 | $73.00 |
| 178 | UD 2#6 #6G xlpuse 1 (81603035) | LF | 4,633 | $19.48 | $11.07 | $38.50 | $44.00 |
| 179 | Lum LED rdwy H (82110008) | EACH | 10 | $2,439.75 | $1,064.71 | $1,215.00 | $1,400.00 |
| 180 | LT cont pedm 240V 60 (82500330) | EACH | 1 | $23,087 | $18,553 | $18,750 | $22,000 |
| 181 | LT P GS 45MH ten MT (83060830) | EACH | 6 | $9,262.00 | $7,300.14 | $7,900.00 | $9,200.00 |
| 182 | LT P GS 45MH TN MT-TW (83060835) | EACH | 2 | $13,944 | $7,300.14 | $8,585.00 | $9,800.00 |
| 183 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 8 | $6,676.67 | $1,328.26 | $1,765.00 | $1,800.00 |
| 184 | Bkwy dev cou SS SCRN (83800650) | EACH | 32 | $478.91 | $316.25 | $227.00 | $275.00 |
| 185 | Rem LT U no salv (84200600) | EACH | 8 | $2,479.91 | $1,159.59 | $965.00 | $1,100.00 |
| 186 | Remov lighting contr (84500110) | EACH | 1 | $1,265.05 | $1,001.46 | $995.00 | $1,175.00 |
| 187 | Remov LTG contr FDN (84500130) | EACH | 1 | $1,782.12 | $1,265.01 | $3,495.00 | $4,200.00 |
| 188 | Rem elcbl FR con (89502300) | LF | 13,878 | $0.50 | $1.92 | $0.55 | $0.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.