IDOT contract 93839 bid tabulation
Springfield, section 22-00496-00-SP. Let by Illinois DOT on January 16, 2026, Sangamon, District 06. 3 bids received; low bid $2,799,987 by Kinney Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 138
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kinney Contractors, Inc. | $2,799,987 | Low |
| 2 | P. H. Broughton & Sons, Inc. | $2,998,814 | +7.0% |
| 3 | Sangamo Construction Company | $3,203,894 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kinney Contractors, Inc. | 2. P. H. Broughton & Sons, Inc. | 3. Sangamo Construction Company |
|---|---|---|---|---|---|---|
| 1 | CB 1P 20A/120V EX cab (X0324603) | EACH | 2 | $712.00 | $763.25 | $698.27 |
| 2 | Rem & rein bric paver (X0327611) | SF | 95 | $31.25 | $112.06 | $22.31 |
| 3 | Term fiber in cabinet (X1400217) | EACH | 8 | $300.00 | $318.02 | $290.95 |
| 4 | Roadway lum SPL IO (X1400227) | EACH | 3 | $300.00 | $318.02 | $290.95 |
| 5 | Select gran back spec (X2090215) | CY | 300 | $80.00 | $224.48 | $192.48 |
| 6 | HMA base cse var DP (X3550015) | TON | 1,716 | $135.00 | $127.50 | $142.35 |
| 7 | HMA surf rem var DP (X4401198) | SY | 3,016 | $9.50 | $6.30 | $7.38 |
| 8 | Storm sewer removal (X5510100) | LF | 47 | $53.00 | $26.53 | $98.51 |
| 9 | Inlets SPL (X6024240) | EACH | 27 | $3,000.00 | $3,540.75 | $5,010.89 |
| 10 | Sanitary manhole adj (X6026050) | EACH | 3 | $800.00 | $952.20 | $4,617.68 |
| 11 | Comb CC&G TB mod (X6061610) | LF | 50 | $175.00 | $728.11 | $68.35 |
| 12 | Traf cont & prot SPL (X7010216) | LS | 1 | $79,500 | $66,007 | $103,064 |
| 13 | Conduit splice (X8100105) | EACH | 4 | $445.00 | $477.03 | $436.42 |
| 14 | Intercept EX conduit (X8100863) | EACH | 4 | $371.00 | $397.53 | $363.68 |
| 15 | Fib opt fusion splice (X8710071) | EACH | 52 | $43.00 | $46.12 | $42.19 |
| 16 | Accessible ped signal (X8760200) | EACH | 16 | $1,960.00 | $2,098.95 | $1,920.25 |
| 17 | W A vid veh det sys com (X8891202) | EACH | 2 | $26,100 | $27,986 | $25,603 |
| 18 | Rel EX TS cont/cab CM (X8950103) | EACH | 2 | $2,375.00 | $2,544.18 | $2,327.58 |
| 19 | Mod EX contr & cab (X8950114) | EACH | 2 | $1,600.00 | $1,717.32 | $1,571.12 |
| 20 | Rem EX TR signal post (X8950301) | EACH | 14 | $300.00 | $318.02 | $290.95 |
| 21 | Remov EX sig head (X8950305) | EACH | 18 | $300.00 | $318.02 | $290.95 |
| 22 | Rem EX ped sig head (X8950307) | EACH | 16 | $300.00 | $318.02 | $290.95 |
| 23 | Rem & rein FO CBL con (X8950512) | LF | 1,948 | $4.50 | $4.78 | $4.37 |
| 24 | Construction layout (Z0013798) | LS | 1 | $30,000 | $56,612 | $36,522 |
| 25 | Drill-grout #6 T-bar (Z0018911) | EACH | 1,042 | $9.50 | $29.47 | $38.85 |
| 26 | Rem EX sign post (Z0051398) | EACH | 12 | $62.00 | $115.65 | $81.93 |
| 27 | Storm sew WM req 10 (Z0056606) | LF | 62 | $176.00 | $121.39 | $150.09 |
| 28 | Storm sew WM req 12 (Z0056608) | LF | 224 | $159.00 | $121.40 | $189.65 |
| 29 | Saw cutting (FD) (Z0062002) | LF | 2,626 | $4.75 | $7.69 | $7.91 |
| 30 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 | $0.80 |
| 31 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 | $15.00 |
| 32 | Tree remov 6-15 (20100110) | UNIT | 12 | $55.00 | $578.22 | $76.66 |
| 33 | Earth excavation (20200100) | CY | 1,510 | $43.00 | $30.85 | $52.74 |
| 34 | Seeding CL 2A (25000210) | ACRE | 0.25 | $9,000.00 | $11,586 | $7,674.48 |
| 35 | Nitrogen fert nutr (25000400) | LB | 6 | $20.00 | $49.99 | $9.02 |
| 36 | Phosphorus fert nutr (25000500) | LB | 6 | $20.00 | $51.28 | $9.02 |
| 37 | Potassium fert nutr (25000600) | LB | 6 | $20.00 | $51.66 | $9.02 |
| 38 | Sodding salt tolerant (25200110) | SY | 1,787 | $22.00 | $21.11 | $34.32 |
| 39 | Supple watering (25200200) | UNIT | 54 | $200.00 | $289.11 | $439.89 |
| 40 | Temp eros contr seed (28000250) | LB | 43 | $3.00 | $4.39 | $4.31 |
| 41 | Perimeter eros bar (28000400) | LF | 2,275 | $0.05 | $4.95 | $7.14 |
| 42 | Inlet & pipe protect (28000500) | EACH | 44 | $200.00 | $176.12 | $175.55 |
| 43 | Agg subgrade improve (30300001) | CY | 180 | $79.00 | $180.08 | $281.53 |
| 44 | Sub gran mat C 8 (31102500) | SY | 2,703 | $25.50 | $38.47 | $34.37 |
| 45 | Agg base cse B 4 (35101600) | SY | 3,564 | $14.85 | $25.51 | $19.08 |
| 46 | PCC bse cse 8 (35300300) | SY | 1,863 | $80.00 | $92.67 | $88.79 |
| 47 | Aggregate-temp access (40201000) | TON | 100 | $59.00 | $105.56 | $45.54 |
| 48 | Bit matls tack CT (40600290) | LB | 6,331 | $1.00 | $3.95 | $4.81 |
| 49 | Long joint sealant (40600370) | LF | 6,725 | $4.00 | $3.35 | $4.16 |
| 50 | Temporary ramp (40600990) | SY | 390 | $21.50 | $21.69 | $27.27 |
| 51 | HMA BC IL-19.0 N70 (40603085) | TON | 942 | $162.00 | $125.11 | $138.86 |
| 52 | HMA SC IL-9.5FG D N70 (40604012) | TON | 628 | $210.00 | $146.33 | $164.90 |
| 53 | PCC driveway pavt 6 (42300200) | SY | 103 | $145.00 | $178.67 | $114.43 |
| 54 | PC conc sidewalk 4 (42400100) | SF | 4,451 | $15.50 | $13.92 | $15.06 |
| 55 | Detectable warnings (42400800) | SF | 232 | $44.00 | $48.35 | $26.42 |
| 56 | Pavement rem (44000100) | SY | 551 | $29.00 | $28.78 | $61.68 |
| 57 | HMA surf rem 1 1/2 (44000155) | SY | 3,282 | $7.50 | $3.03 | $4.12 |
| 58 | Drive pavement rem (44000200) | SY | 174 | $23.50 | $11.60 | $31.83 |
| 59 | Comb curb gutter rem (44000500) | LF | 2,506 | $12.50 | $8.88 | $19.63 |
| 60 | Sidewalk rem (44000600) | SF | 4,729 | $3.00 | $1.60 | $4.74 |
| 61 | CL B patch T2 14 (44201019) | SY | 50 | $250.00 | $292.96 | $282.48 |
| 62 | Saw cuts (44213200) | LF | 205 | $5.00 | $8.16 | $7.93 |
| 63 | Tie bars 3/4 (44213204) | EACH | 1,042 | $5.50 | $34.23 | $5.69 |
| 64 | Pipe elbow 12 (54210182) | EACH | 32 | $1,300.00 | $2,222.48 | $2,229.41 |
| 65 | Concrete collar (54248510) | CY | 6 | $1,185.00 | $597.26 | $681.72 |
| 66 | Storm sew CL A 1 12 (550A0050) | LF | 222 | $142.00 | $165.69 | $97.06 |
| 67 | Storm sew CL A 2 12 (550A0340) | LF | 184 | $157.00 | $167.34 | $108.82 |
| 68 | SS RG CL A 2 12 (550A2520) | LF | 18 | $185.00 | $173.75 | $161.01 |
| 69 | Inlets TA T1F OL (60234200) | EACH | 7 | $2,600.00 | $3,165.90 | $3,937.77 |
| 70 | Inlets TA T11F&G (60236800) | EACH | 4 | $2,875.00 | $3,512.66 | $3,912.02 |
| 71 | Inlets TA T11V F&G (60236825) | EACH | 11 | $2,875.00 | $3,368.61 | $4,069.12 |
| 72 | Valve box adj (60266600) | EACH | 11 | $400.00 | $861.51 | $1,110.56 |
| 73 | FR & grates T11 (60404800) | EACH | 9 | $1,055.00 | $1,848.20 | $854.10 |
| 74 | FR & grates T11V (60404805) | EACH | 15 | $1,055.00 | $1,848.20 | $1,011.20 |
| 75 | FR & lids T1 CL (60406100) | EACH | 6 | $815.00 | $691.15 | $929.61 |
| 76 | Remov inlets (60500060) | EACH | 16 | $495.00 | $368.33 | $743.85 |
| 77 | Comb CC&G TB6.12 (60603800) | LF | 2,439 | $48.00 | $72.39 | $60.94 |
| 78 | Non SPL waste disposl (66900200) | CY | 490 | $140.00 | $105.06 | $112.10 |
| 79 | Reg sub P-const plan (66901001) | LS | 1 | $2,675.00 | $2,544.18 | $2,383.70 |
| 80 | Reg sub F con report (66901003) | LS | 1 | $2,675.00 | $2,544.18 | $2,383.70 |
| 81 | Reg sub mon (66901006) | CAL DAY | 5 | $1,100.00 | $231.29 | $1,083.50 |
| 82 | Mobilization (67100100) | LS | 1 | $165,000 | $48,723 | $189,030 |
| 83 | Short term pavt mking (70300100) | LF | 1,193 | $1.50 | $4.21 | $1.92 |
| 84 | SHRT TRM pavt MK rem (70300150) | SF | 189 | $3.50 | $2.98 | $3.15 |
| 85 | Temp PVT MK LTR & sym paint (70300211) | SF | 88 | $3.05 | $3.47 | $3.17 |
| 86 | Temp PVT MK line 4 - paint (70300221) | LF | 8,339 | $1.05 | $1.10 | $1.01 |
| 87 | Temp PVT MK line 6 - paint (70300241) | LF | 1,634 | $1.50 | $1.65 | $1.51 |
| 88 | Temp PVT MK line 12 - paint (70300261) | LF | 314 | $3.00 | $3.32 | $3.04 |
| 89 | Sign panel T1 (72000100) | SF | 162 | $42.00 | $34.40 | $31.48 |
| 90 | Sign panel T2 (72000200) | SF | 20 | $67.00 | $44.81 | $41.00 |
| 91 | Remov sign panel T1 (72400310) | SF | 111 | $18.50 | $9.25 | $8.21 |
| 92 | Rem & rel sign panel T1 (72400735) | SF | 97 | $31.00 | $9.25 | $72.23 |
| 93 | Metal post TY A (72900100) | LF | 168 | $41.00 | $16.77 | $15.34 |
| 94 | THPL PVT MK LTR & sym (78000100) | SF | 102 | $9.00 | $9.25 | $8.46 |
| 95 | THPL PVT MK line 4 (78000200) | LF | 2,884 | $2.75 | $2.86 | $2.61 |
| 96 | THPL PVT MK line 6 (78000400) | LF | 1,346 | $4.00 | $4.29 | $3.93 |
| 97 | THPL PVT MK line 12 (78000600) | LF | 518 | $8.00 | $8.58 | $7.85 |
| 98 | PVT MKG rem WTR blast (78300202) | SF | 158 | $34.00 | $36.20 | $33.12 |
| 99 | Serv install TY A (80500100) | EACH | 2 | $4,400.00 | $4,770.33 | $4,364.20 |
| 100 | Undrgrd C galvs 2 (81028200) | LF | 50 | $43.00 | $46.12 | $42.19 |
| 101 | Undrgrd C PVC 1 1/2 (81028340) | LF | 80 | $33.00 | $35.31 | $32.30 |
| 102 | Undrgrd C PVC 2 (81028350) | LF | 178 | $33.25 | $35.62 | $32.59 |
| 103 | Undrgrd C PVC 3 (81028370) | LF | 530 | $38.00 | $41.03 | $37.54 |
| 104 | Undrgrd C PVC 4 (81028390) | LF | 182 | $39.00 | $42.30 | $38.70 |
| 105 | Handhole C conc (81400730) | EACH | 6 | $2,125.00 | $2,289.76 | $2,094.82 |
| 106 | DBL handhole C conc (81400740) | EACH | 2 | $3,564.00 | $3,816.27 | $3,491.36 |
| 107 | Gulfbox junction CC (81500120) | EACH | 3 | $1,900.00 | $2,035.34 | $1,862.06 |
| 108 | EC C XLP use 1C 10 (81702110) | LF | 1,560 | $3.50 | $3.82 | $3.49 |
| 109 | Elcbl C signal 14 5C (87301245) | LF | 2,831 | $4.15 | $4.45 | $4.07 |
| 110 | Elcbl C signal 14 7C (87301255) | LF | 2,024 | $4.50 | $4.96 | $4.54 |
| 111 | Elcbl C signal 14 9C (87301265) | LF | 652 | $5.25 | $5.47 | $5.00 |
| 112 | Elcbl C signal 14 12C (87301275) | LF | 724 | $6.00 | $6.05 | $5.53 |
| 113 | Elcbl C serv 6 2C (87301805) | LF | 156 | $6.00 | $6.05 | $5.53 |
| 114 | Elcbl C egrdc 6 1C (87301900) | LF | 945 | $4.50 | $4.78 | $4.37 |
| 115 | TS post A 8 (87502620) | EACH | 3 | $2,275.00 | $2,385.17 | $2,182.10 |
| 116 | TS post A 15 (87502690) | EACH | 7 | $2,800.00 | $2,989.41 | $2,734.90 |
| 117 | Ped P-B post galvs T1 (87601100) | EACH | 1 | $2,700.00 | $2,925.80 | $2,676.71 |
| 118 | S maa & P 30 (87700190) | EACH | 1 | $16,500 | $17,809 | $16,293 |
| 119 | S maa & P 34 (87700210) | EACH | 2 | $18,000 | $19,081 | $17,457 |
| 120 | STL comb maa&P 30 (87702880) | EACH | 1 | $24,500 | $26,396 | $24,149 |
| 121 | STL comb maa&P 40 (87702930) | EACH | 1 | $29,500 | $31,484 | $28,804 |
| 122 | STL comb maa&P 44 (87702950) | EACH | 1 | $28,500 | $42,413 | $28,222 |
| 123 | Conc FDN TY A (87800100) | LF | 33 | $475.00 | $492.93 | $450.97 |
| 124 | Conc FDN TY C (87800150) | LF | 7 | $510.00 | $540.64 | $494.61 |
| 125 | Conc FDN TY E 30D (87800400) | LF | 54 | $550.00 | $601.06 | $549.89 |
| 126 | Conc FDN TY E 36D (87800415) | LF | 26 | $675.00 | $706.01 | $645.90 |
| 127 | SH P LED 1F 3S BM (88040070) | EACH | 4 | $1,450.00 | $1,507.43 | $1,379.09 |
| 128 | SH P LED 1F 3S mam (88040090) | EACH | 15 | $1,475.00 | $1,596.47 | $1,460.55 |
| 129 | SH P LED 1F 4S mam (88040120) | EACH | 2 | $1,615.00 | $1,749.13 | $1,600.21 |
| 130 | SH P LED 2F 3S BM (88040230) | EACH | 2 | $2,250.00 | $2,416.97 | $2,211.20 |
| 131 | SH P LED 2F 1-3 1-4BM (88040250) | EACH | 2 | $2,550.00 | $2,734.99 | $2,502.15 |
| 132 | Ped SH P LED 1F BM CT (88102825) | EACH | 16 | $1,315.00 | $1,412.02 | $1,291.80 |
| 133 | TS backplate (88200100) | EACH | 16 | $340.00 | $362.55 | $331.68 |
| 134 | Temp TR sig install (89000100) | EACH | 2 | $30,000 | $31,802 | $29,095 |
| 135 | Rem EX serv install (89500120) | EACH | 2 | $1,200.00 | $1,272.09 | $1,163.79 |
| 136 | Rem elcbl FR con (89502300) | LF | 1,805 | $1.50 | $1.60 | $1.46 |
| 137 | Remov EX handhole (89502380) | EACH | 10 | $895.00 | $954.07 | $872.84 |
| 138 | Remov EX conc FDN (89502385) | EACH | 16 | $895.00 | $954.07 | $872.84 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.