INDOT contract B-43545-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on March 12, 2025, Rush, Greenfield. 6 bids received; low bid $4,254,565 by His Constructors Inc.

Owner
Indiana DOT
Letting
12 MAR 2025
Pay items
98
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1His Constructors Inc$4,254,565Low
2Force Construction Co Inc$4,368,713+3.0%
3Milestone Contractors LP$4,393,129+3.0%
4Duncan Robertson Inc$4,838,017+14%
5Beaty Construction Inc$4,943,554+16%
6Paul H Rohe Company Inc$5,511,257+30%
INDOT contract B-43545-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. His Constructors Inc2. Force Construction Co Inc3. Milestone Contractors LP4. Duncan Robertson Inc5. Beaty Construction Inc6. Paul H Rohe Company Inc
0001Construction engineering (105-06845)LS1$26,738$27,440$35,000$45,000$50,000$26,418
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$154,079$218,000$219,000$240,000$260,000$540,200
0010Clearing right-of-way (201-52370)LS1$32,688$34,320$55,500$45,000$100,000$28,500
0011Pavement removal (202-02240)SYS164$165.50$38.00$45.00$35.00$50.00$50.00
0012Present structure, remove, structure no. 1 (202-51330)LS1$212,263$177,380$350,747$275,000$302,000$327,440
0013Excavation, common (203-02000)CYS1,640$24.54$42.00$45.00$30.00$65.00$80.00
0014Excavation, waterway (203-51223)CYS4,840$28.47$36.00$26.00$30.00$30.00$84.00
0015Pump around (205-11626)EACH1$66,978$12,150$31,000$15,000$25,000$40,785
0016Stormwater management budget (205-12108)DOL40,920$1.00$1.00$1.00$1.00$1.00$1.00
0017Stormwater management implementation (205-12616)LS1$117,700$13,130$12,500$45,000$72,000$15,000
0018SWQCP preparation (205-12618)LS1$16,370$3,635.00$4,100.00$3,500.00$3,000.00$1,900.00
0019Excavation, dry (206-51225)CYS110$138.34$95.00$68.00$20.00$58.00$90.00
0020Subgrade treatment, type IC (207-09935)SYS2,200$30.76$42.00$43.00$65.00$35.00$66.00
0021Aggregate for end bent backfill (211-06467)CYS42$117.16$130.00$182.00$125.00$200.00$180.00
0022Geotextile for pavement, type 2B (214-12239)SYS2,200$5.74$5.70$6.50$6.00$6.00$4.50
0023Compacted aggregate, no. 53 (301-12234)CYS314$87.22$109.00$45.00$125.00$165.00$130.00
0024Subbase for PCCP (302-06464)CYS68$132.84$134.00$116.00$150.00$220.00$160.00
0025Compacted aggregate, no. 53 (303-01180)TON378$47.25$50.00$55.00$75.00$65.00$70.00
0026HMA patching, partial depth, type B (304-12624)TON100$229.18$297.00$365.00$230.00$210.00$230.00
0027Milling, transition (306-08043)SYS660$37.23$9.70$9.00$10.00$11.50$11.00
0028QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON197$141.88$135.00$176.00$143.00$130.00$190.00
0029QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON237$127.69$122.00$165.00$128.00$117.00$155.00
0030QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON1,050$125.51$119.00$137.00$126.00$115.00$135.00
0031Joint adhesive, surface (401-10258)LFT1,663$0.65$0.60$2.00$0.66$0.60$0.60
0032Joint adhesive, intermediate (401-10259)LFT1,123$0.65$0.60$2.00$0.66$0.60$0.85
0033Asphalt for tack coat (406-05520)TON2$3,132.19$2,981.00$1,200.00$3,155.00$2,870.00$1,100.00
0034Cracks and joints in asphalt pavement, rout and seal (408-07478)TON1$6,220.71$5,920.00$1,200.00$6,200.00$5,700.00$6,000.00
0035Terminal joint, type HMA (503-12477)LFT79$647.42$419.00$325.00$250.00$627.88$415.00
0036Guardrail, remove (601-02241)LFT512$4.37$7.30$7.10$7.70$10.00$7.00
0037Guardrail transition, MGS without curb (601-12292)EACH4$3,819.74$3,531.00$3,450.00$3,740.00$3,050.00$3,400.00
0038Guardrail end treatment, type OS (601-94689)EACH4$3,274.06$3,427.00$3,325.00$3,630.00$3,000.00$3,300.00
0039Barrier delineator (602-06729)EACH16$24.89$24.00$35.00$25.00$25.00$50.00
0040Milled HMA corrugations, sinusoidal (606-12400)LFT1,564$12.74$1.50$3.00$3.00$5.00$4.61
0041Reinforced concrete bridge approach, 12 in. (609-06259)SYS270$253.39$187.00$185.00$235.00$263.00$235.00
0042Right-of-way marker (615-06490)EACH10$174.62$192.00$188.00$203.00$200.00$185.00
0043Monument, type B (615-06505)EACH4$1,200.49$1,091.00$1,070.00$1,155.00$1,350.00$1,050.00
0044Monument, type C (615-06510)EACH1$709.38$1,007.00$990.00$1,065.00$2,000.00$970.00
0045Monument, type D (615-06515)EACH1$141.88$258.00$250.00$270.00$160.00$248.00
0046Riprap, class 1 (616-05688)TON1,044$70.10$80.00$65.00$75.00$48.00$96.00
0047Riprap, revetment (616-06405)TON29$230.76$72.00$75.00$75.00$112.00$99.00
0048Geotextile for riprap, type 1A (616-12246)SYS106$14.95$10.00$5.50$5.00$5.00$5.50
0049Geotextile for riprap, type 3 (616-12251)SYS1,108$8.89$4.90$6.50$6.00$5.00$3.50
0050Mobilization and demobilization for seeding (621-01004)EACH1$873.09$1,558.00$810.00$1,650.00$802.36$1,500.00
0051Erosion control blanket (621-02770)SYS7,066$1.79$2.10$1.35$2.20$1.33$2.00
0052Mulched seeding, type R (621-06559)SYS2,656$1.77$2.80$0.90$3.00$0.87$2.70
0053Mulching material (621-06565)TON3$862.79$701.00$460.00$740.00$458.35$675.00
0054Sodding (621-06574)SYS1,541$8.87$11.00$8.25$12.00$8.15$11.00
0055Seed mixture, floodplain (621-12612)LBS80$62.21$218.00$58.00$230.00$57.17$210.00
0056Sign, "DO not spray" (621-52448)EACH4$84.04$114.00$78.00$120.00$77.23$110.00
0057Field office, type C (628-09403)MOS12$3,356.95$2,908.00$3,000.00$2,500.00$3,900.00$3,800.00
0058Computer system equipment (628-11976)EACH1$726.31$831.00$500.00$1,000.00$1,200.00$1,100.00
0059Computer system (628-11977)EACH1$2,553.77$1,039.00$500.00$1,000.00$2,000.00$790.00
0060Plant growth layer (629-12029)SYS11,245$3.96$9.30$3.70$4.50$3.64$10.20
0061Dynamic pile load test (701-06011)EACH2$7,914.49$5,512.00$8,400.00$1,500.00$3,700.00$2,250.00
0062Test pile, dynamic, production (701-09557)LFT112$63.20$106.00$145.00$100.00$46.00$245.00
0063Test pile, dynamic, restrike (701-09559)EACH2$7,368.81$2,067.00$6,000.00$1,500.00$1,900.00$3,500.00
0064Pile shoe, HP 12 X 74 (701-09683)EACH12$208.48$152.00$175.00$350.00$1,500.00$400.00
0065Pile, steel H, HP 12 X 74 (701-95780)LFT460$147.59$131.00$210.00$125.00$70.00$115.00
0066Concrete, C, substructure (702-92857)CYS163$995.86$1,459.00$1,500.00$1,250.00$3,000.00$2,995.00
0067Reinforcing bars (703-06028)LBS23,769$1.58$1.60$1.60$2.00$1.25$0.98
0068Reinforcing bars, epoxy coated (703-06029)LBS162,171$1.33$1.40$1.55$2.00$1.25$1.08
0069Threaded tie bar assembly, epoxy coated (703-97936)EACH42$122.42$60.00$75.00$65.00$50.00$90.00
0070Concrete, C, superstructure (704-51002)CYS402$1,064.51$1,070.00$1,100.00$1,250.00$1,200.00$1,095.00
0071Railing, concrete type FC (706-11600)CYS51$763.95$727.00$700.00$770.00$745.00$700.00
0072Concrete bridge railing transition, type TFC (706-11620)EACH4$2,728.39$2,596.00$2,700.00$2,750.00$2,000.00$2,500.00
0073Structural member, concrete, bulb-T beam, 42 in. X 49 in. (707-08158)LFT1,303$669.45$582.00$540.00$850.00$650.00$720.00
0074Surface seal (709-51821)LS1$6,142.14$1.00$200.00$5,000.00$1.00$5,628.00
0075Pipe, type 3, circular, diameter 15 in. (715-05169)LFT65$153.70$64.00$110.00$65.00$65.00$140.00
0076Pipe, end bent drain, diameter 6 in. (715-05407)LFT114$16.87$30.00$33.00$25.00$18.00$85.00
0077Pipe end section, diameter 15 in. (715-46005)EACH2$3,266.97$1,255.00$560.00$1,000.00$880.00$900.00
0078Longitudinal grooving (722-12732)SYS1,416$3.81$6.00$3.50$5.00$3.40$3.50
0079Bearing assembly, elastomeric (726-92406)EACH20$4,081.46$3,515.00$3,900.00$3,500.00$1,250.00$3,210.00
0080Drilled shaft exploratory core (728-11672)LFT498$110.76$99.00$210.00$100.00$72.00$77.40
0081Drilled shaft permanent casing (728-11673)LFT366$502.12$498.00$490.00$600.00$380.00$295.00
0082Drilled shaft, diameter 42 in. (728-11789)LFT366$693.15$568.00$990.00$675.00$1,200.00$1,080.00
0083Road closure sign assembly (801-04308)EACH7$272.84$364.00$356.00$275.00$350.00$350.00
0084Detour route marker assembly (801-06625)EACH41$92.76$99.00$96.00$93.00$95.00$95.00
0085Construction sign, type A (801-06640)EACH18$272.84$192.00$188.00$275.00$185.00$185.00
0086Maintaining traffic (801-06775)LS1$5,456.77$324,200$3,550.00$80,000$140,000$55,285
0087Barricade, type III-A (801-07118)LFT144$21.83$13.00$12.55$22.00$12.50$12.50
0088Barricade, type III-B (801-07119)LFT96$21.83$13.00$12.55$22.00$12.50$12.50
0089Sign post, square, type 1, reinforced anchor base (802-05701)LFT86$24.01$44.00$42.50$46.00$27.00$42.00
0090Sign, sheet, and supports, remove (802-07059)EACH6$54.57$113.00$110.00$120.00$58.00$109.00
0091Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT24$43.65$86.00$84.00$91.00$53.00$83.00
0092Sign, ground mounted, reset (802-91122)EACH5$136.42$225.00$220.00$240.00$325.00$217.00
0093Transverse marking, paint, stop line, white, 24 in. (808-06726)LFT40$5.46$21.00$20.50$5.50$20.00$20.00
0094Line, paint, solid, white, 6 in. (808-75007)LFT1,650$1.09$1.30$1.25$1.10$1.25$1.25
0095Line, paint, solid, yellow, 6 in. (808-75047)LFT1,760$1.09$1.30$1.25$1.10$1.25$1.25
0096Snowplowable raised pavement marker, remove (808-75996)EACH10$163.70$78.00$75.00$20.00$75.00$75.00
0097Snowplowable raised pavement marker (808-75998)EACH10$163.70$379.00$365.00$165.00$365.00$365.00
0098Drilled shaft, diameter 36 in. (728-11713)LFT42$1,483.33$1,091.00$1,100.00$1,250.00$2,000.00$795.00
INDOT contract B-43545-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of March 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way