INDOT contract B-43622-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on February 12, 2025, Hancock, Greenfield. 5 bids received; low bid $1,037,090 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 74
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $1,037,090 | Low |
| 2 | Force Construction Co Inc | $1,052,467 | +1.0% |
| 3 | Milestone Contractors LP | $1,077,344 | +4.0% |
| 4 | His Constructors Inc | $1,079,628 | +4.0% |
| 5 | Pontem Contractors Inc | $1,230,000 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Force Construction Co Inc | 3. Milestone Contractors LP | 4. His Constructors Inc | 5. Pontem Contractors Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $20,000 | $14,950 | $16,000 | $14,590 | $17,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $50,000 | $50,000 | $53,000 | $115,525 | $61,400 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $20,000 | $14,200 | $21,000 | $20,822 | $24,560 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $80,000 | $21,930 | $77,471 | $31,621 | $193,331 |
| 0012 | Excavation, common (203-02000) | CYS | 125 | $60.00 | $56.00 | $150.00 | $46.70 | $126.00 |
| 0013 | Excavation, waterway (203-51223) | CYS | 95 | $85.00 | $79.00 | $150.00 | $101.53 | $135.00 |
| 0014 | Pump around (205-11626) | EACH | 1 | $5,000.00 | $9,555.00 | $40,500 | $21,026 | $50,000 |
| 0015 | Stormwater management budget (205-12108) | DOL | 14,185 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $20,000 | $3,793.00 | $5,000.00 | $56,012 | $15,000 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 185 | $85.00 | $69.00 | $150.00 | $67.71 | $80.00 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 492 | $75.00 | $45.00 | $62.00 | $44.77 | $50.00 |
| 0019 | Flowable backfill, removable (213-09270) | CYS | 46 | $350.00 | $220.00 | $350.00 | $253.51 | $190.00 |
| 0020 | Geotextile for pavement, type 2B (214-12239) | SYS | 232 | $6.00 | $9.50 | $9.00 | $12.40 | $8.00 |
| 0021 | Subbase for PCCP (302-06464) | CYS | 58 | $185.00 | $173.00 | $180.00 | $167.28 | $225.00 |
| 0022 | Compacted aggregate, no. 53 (303-01180) | TON | 481 | $82.00 | $57.00 | $80.00 | $61.97 | $65.00 |
| 0023 | Milling, transition (306-08043) | SYS | 386 | $18.00 | $14.00 | $13.00 | $24.28 | $14.00 |
| 0024 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 55 | $252.00 | $232.00 | $338.00 | $436.42 | $246.10 |
| 0025 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 57 | $252.00 | $232.00 | $318.00 | $410.59 | $246.10 |
| 0026 | QC/QA-HMA, 2, 58S, base, 19.0 MM (401-000052) | TON | 71 | $252.00 | $232.00 | $272.00 | $351.20 | $246.10 |
| 0027 | Joint adhesive, surface (401-10258) | LFT | 696 | $0.55 | $0.50 | $2.50 | $3.23 | $0.54 |
| 0028 | Joint adhesive, intermediate (401-10259) | LFT | 332 | $0.55 | $0.50 | $2.50 | $3.23 | $0.54 |
| 0029 | Liquid asphalt sealant (401-11785) | LFT | 696 | $0.06 | $0.05 | $2.00 | $2.58 | $0.05 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 1,340 | $0.55 | $0.50 | $0.50 | $0.65 | $0.54 |
| 0031 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 1 | $2,750.00 | $2,525.00 | $1,250.00 | $1,613.97 | $2,675.00 |
| 0032 | Guardrail, remove (601-02241) | LFT | 155 | $11.00 | $10.00 | $10.50 | $3.87 | $10.70 |
| 0033 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 56 | $22.00 | $19.00 | $20.00 | $23.24 | $20.33 |
| 0034 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $2,750.00 | $2,525.00 | $2,650.00 | $3,847.69 | $2,675.00 |
| 0035 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,190.00 | $2,929.00 | $3,100.00 | $3,615.28 | $3,103.00 |
| 0036 | Barrier delineator (602-06729) | EACH | 2 | $40.00 | $47.00 | $37.00 | $29.45 | $135.00 |
| 0037 | Curb and gutter, concrete , modified (605-06140) | LFT | 200 | $40.00 | $65.00 | $85.00 | $62.98 | $80.00 |
| 0038 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 232 | $250.00 | $172.00 | $185.00 | $289.15 | $235.00 |
| 0039 | Right-of-way marker (615-06490) | EACH | 4 | $187.00 | $172.00 | $180.00 | $187.22 | $185.00 |
| 0040 | Monument, type B (615-06505) | EACH | 2 | $1,568.00 | $1,439.00 | $1,500.00 | $1,129.78 | $1,524.75 |
| 0041 | Benchmark post (615-06530) | EACH | 1 | $1,250.00 | $757.00 | $1,300.00 | $1,155.60 | $1,337.50 |
| 0042 | Riprap, revetment (616-06405) | TON | 197 | $80.00 | $86.00 | $82.00 | $94.75 | $90.00 |
| 0043 | Geotextile for riprap, type 2A (616-12248) | SYS | 343 | $5.00 | $6.60 | $6.00 | $12.55 | $5.00 |
| 0044 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $577.00 | $202.00 | $580.00 | $677.86 | $214.00 |
| 0045 | Erosion control blanket (621-02770) | SYS | 66 | $15.50 | $8.10 | $15.00 | $18.01 | $8.56 |
| 0046 | Mulched seeding, type U (621-06560) | SYS | 892 | $3.70 | $4.50 | $3.75 | $5.20 | $4.82 |
| 0047 | Water (621-06567) | KGAL | 1 | $11.00 | $1.00 | $10.00 | $12.91 | $1.07 |
| 0048 | Field office, type C (628-09403) | MOS | 6 | $3,000.00 | $2,828.00 | $3,200.00 | $1,803.12 | $3,820.00 |
| 0049 | Computer system equipment (628-11976) | EACH | 2 | $1,000.00 | $808.00 | $500.00 | $929.64 | $980.00 |
| 0050 | Dynamic pile load test (701-06011) | EACH | 2 | $10,000 | $3,641.00 | $8,000.00 | $8,913.28 | $5,000.00 |
| 0051 | Test pile, dynamic, production (701-09557) | LFT | 120 | $55.00 | $96.00 | $46.00 | $42.31 | $105.00 |
| 0052 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $10,000 | $2,913.00 | $6,000.00 | $8,267.70 | $5,335.00 |
| 0053 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 10 | $300.00 | $147.00 | $140.00 | $189.80 | $125.00 |
| 0054 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 400 | $65.00 | $90.00 | $130.00 | $186.46 | $75.00 |
| 0055 | Reinforcing bars, epoxy coated (703-06029) | LBS | 58,655 | $1.50 | $1.30 | $1.50 | $1.54 | $1.50 |
| 0056 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 40 | $75.00 | $50.00 | $42.00 | $73.99 | $50.00 |
| 0057 | Concrete, C, superstructure (704-51002) | CYS | 200.20 | $1,250.00 | $1,426.00 | $1,300.00 | $920.83 | $1,300.00 |
| 0058 | Railing, concrete type FT (706-09959) | LFT | 42 | $200.00 | $265.00 | $210.00 | $338.29 | $255.00 |
| 0059 | Railing, concrete type FC (706-09960) | LFT | 42 | $200.00 | $207.00 | $200.00 | $264.69 | $205.00 |
| 0060 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 2 | $2,250.00 | $1,217.00 | $3,900.00 | $1,555.87 | $3,700.00 |
| 0061 | Concrete bridge railing transition, type TFT (706-11621) | EACH | 2 | $2,250.00 | $1,409.00 | $3,700.00 | $1,801.19 | $4,600.00 |
| 0062 | Surface seal (709-51821) | LS | 1 | $1,500.00 | $1.00 | $200.00 | $3,331.22 | $5,350.00 |
| 0063 | Pipe, drain tile terminal (719-05439) | LFT | 15 | $80.00 | $63.00 | $35.00 | $113.05 | $112.00 |
| 0064 | Longitudinal grooving (722-12732) | SYS | 310 | $25.00 | $11.00 | $8.50 | $11.62 | $22.00 |
| 0065 | Road closure sign assembly (801-04308) | EACH | 4 | $220.00 | $289.00 | $250.00 | $369.27 | $256.80 |
| 0066 | Detour route marker assembly (801-06625) | EACH | 22 | $110.00 | $189.00 | $160.00 | $241.45 | $163.71 |
| 0067 | Construction sign, type A (801-06640) | EACH | 10 | $220.00 | $234.00 | $185.00 | $299.55 | $186.18 |
| 0068 | Maintaining traffic (801-06775) | LS | 1 | $30,000 | $180,000 | $6,000.00 | $2,995.52 | $50,000 |
| 0069 | Barricade, type III-A (801-07118) | LFT | 48 | $20.00 | $16.00 | $13.00 | $20.54 | $12.84 |
| 0070 | Barricade, type III-B (801-07119) | LFT | 48 | $20.00 | $16.00 | $15.00 | $20.54 | $14.98 |
| 0071 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 12 | $19.00 | $17.00 | $18.00 | $36.15 | $18.19 |
| 0072 | Sign, sheet assembly, relocate (802-07058) | EACH | 1 | $358.00 | $328.00 | $350.00 | $25.82 | $347.75 |
| 0073 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 662 | $2.20 | $2.70 | $2.50 | $3.40 | $2.14 |
| 0074 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 662 | $2.20 | $2.70 | $2.50 | $3.40 | $2.14 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.