INDOT contract B-44244-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on July 8, 2026, Boone, Crawfordsville. 7 bids received; low bid $1,745,859 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 80
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $1,745,859 | Low |
| 2 | Hoosier Pride Excavating Inc | $2,021,219 | +16% |
| 3 | Pontem Contractors Inc | $2,161,075 | +24% |
| 4 | Beaty Construction Inc | $2,261,925 | +30% |
| 5 | Milestone Contractors LP | $2,263,000 | +30% |
| 6 | Icc Group Inc | $2,834,200 | +62% |
| 7 | Rieth-Riley Construction Co., Inc. | $3,051,659 | +75% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Hoosier Pride Excavating Inc | 3. Pontem Contractors Inc | 4. Beaty Construction Inc | 5. Milestone Contractors LP | 6. Icc Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $17,500 | $27,066 | $35,000 | $18,286 | $47,700 | $25,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $87,500 | $100,000 | $108,700 | $112,000 | $123,000 | $140,730 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $35,000 | $25,000 | $40,000 | $44,000 | $32,412 | $56,000 |
| 0011 | Debris, remove, structure no. 61 (201-90788) | LS | 1 | $35,000 | $30,000 | $10,000 | $5,000.00 | $4,919.22 | $15,000 |
| 0012 | Present structure, remove, structure no. 61 (202-51330) | LS | 1 | $110,000 | $75,000 | $213,323 | $125,000 | $100,000 | $167,000 |
| 0013 | Sign, remove (202-74035) | EACH | 4 | $15.00 | $200.00 | $87.39 | $53.54 | $65.00 | $100.00 |
| 0014 | Pipe, remove (202-96133) | LFT | 35 | $20.00 | $100.00 | $28.74 | $21.00 | $35.00 | $35.00 |
| 0015 | Fence and posts, remove (202-96430) | LS | 1 | $1,000.00 | $500.00 | $3,079.96 | $2,750.00 | $3,000.00 | $5,500.00 |
| 0016 | Pipe end section, remove (202-98488) | EACH | 2 | $50.00 | $100.00 | $243.86 | $200.00 | $1,200.00 | $800.00 |
| 0017 | Excavation, common (203-02000) | CYS | 771 | $18.00 | $55.00 | $76.13 | $40.00 | $82.37 | $55.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 26,600 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $30,000 | $35,400 | $4,537.43 | $15,000 | $18,194 | $19,025 |
| 0020 | Excavation, foundation, unclassified (206-51230) | CYS | 861 | $60.00 | $55.00 | $62.90 | $40.00 | $81.64 | $55.00 |
| 0021 | Cofferdam (206-51235) | LS | 1 | $30,000 | $45,000 | $100,000 | $245,000 | $10,171 | $328,500 |
| 0022 | Subgrade treatment, type II (207-08264) | SYS | 151 | $25.00 | $37.00 | $28.33 | $38.25 | $48.52 | $16.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 1,578 | $45.00 | $49.00 | $45.00 | $41.50 | $58.04 | $35.00 |
| 0024 | Structure backfill, type 2 (211-09265) | CYS | 13 | $150.00 | $250.00 | $120.83 | $81.00 | $306.72 | $120.00 |
| 0025 | Structure backfill, type 4 (211-09267) | CYS | 36 | $325.00 | $270.00 | $188.68 | $300.00 | $426.56 | $200.00 |
| 0026 | Geotextile for pavement, type 2A (214-12238) | SYS | 1,489 | $3.50 | $6.17 | $4.03 | $4.50 | $4.99 | $4.00 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 194 | $4.00 | $21.85 | $9.86 | $6.00 | $13.96 | $8.00 |
| 0028 | Compacted aggregate, no. 5 (301-12232) | CYS | 240 | $130.00 | $125.00 | $103.52 | $105.00 | $107.21 | $100.00 |
| 0029 | Compacted aggregate, no. 8 (301-12233) | CYS | 10 | $100.00 | $180.00 | $102.87 | $152.00 | $215.02 | $115.00 |
| 0030 | Compacted aggregate, no. 53 (301-12234) | CYS | 280 | $110.00 | $110.00 | $90.55 | $115.00 | $161.80 | $100.00 |
| 0031 | Subbase for PCCP (302-06464) | CYS | 50 | $175.00 | $110.00 | $198.43 | $215.00 | $319.03 | $100.00 |
| 0032 | Compacted aggregate, no. 53 (303-01180) | TON | 113 | $80.00 | $57.00 | $63.60 | $67.00 | $81.96 | $65.00 |
| 0033 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 113 | $142.00 | $193.90 | $135.48 | $130.00 | $250.00 | $129.03 |
| 0034 | QC/QA-HMA, 2, 58S, intermediate, 12.5 MM (401-000028) | TON | 151 | $127.00 | $128.36 | $122.54 | $118.00 | $230.00 | $116.70 |
| 0035 | QC/QA-HMA, 2, 58S, base, 19.0 MM (401-000052) | TON | 231 | $123.00 | $123.28 | $117.67 | $112.00 | $210.00 | $112.07 |
| 0036 | Joint adhesive (401-11526) | LFT | 2,130 | $0.55 | $0.55 | $0.53 | $0.50 | $3.00 | $0.50 |
| 0037 | Asphalt for tack coat (406-05521) | SYS | 2,892 | $0.60 | $0.59 | $0.57 | $0.55 | $0.50 | $0.54 |
| 0038 | Guardrail transition, type TGS-1 (601-06374) | EACH | 4 | $880.00 | $1,251.25 | $840.00 | $1,500.00 | $800.00 | $800.00 |
| 0039 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,915.00 | $2,915.00 | $2,782.50 | $2,900.00 | $2,650.00 | $2,650.00 |
| 0040 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 50 | $24.00 | $24.20 | $23.10 | $23.00 | $22.00 | $22.00 |
| 0041 | Temporary fence (603-97461) | LFT | 75 | $20.00 | $6.25 | $49.79 | $15.00 | $100.00 | $5.00 |
| 0042 | Curb, concrete , modified (605-06120) | LFT | 69 | $45.00 | $45.29 | $130.88 | $225.00 | $306.43 | $230.00 |
| 0043 | Curb and gutter, concrete, type C , modified (605-06150) | LFT | 216 | $55.00 | $54.99 | $71.93 | $80.00 | $91.68 | $68.50 |
| 0044 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 194 | $240.00 | $240.00 | $222.12 | $190.00 | $200.00 | $225.00 |
| 0045 | HMA for approaches, type B (610-07487) | TON | 30 | $193.00 | $208.68 | $185.69 | $178.00 | $300.00 | $176.85 |
| 0046 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $247.00 | $295.00 | $236.25 | $375.00 | $225.00 | $500.00 |
| 0047 | Right-of-way marker (615-06490) | EACH | 13 | $154.00 | $165.20 | $147.00 | $210.00 | $140.00 | $140.00 |
| 0048 | Riprap, class 1 (616-05688) | TON | 933 | $60.00 | $230.00 | $108.80 | $105.00 | $110.00 | $125.00 |
| 0049 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,112 | $2.50 | $6.00 | $4.21 | $3.75 | $4.15 | $5.50 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $275.00 | $750.00 | $446.25 | $425.00 | $425.00 | $425.00 |
| 0051 | Fertilizer for permanent seeding (621-06545) | TON | 1 | $880.00 | $900.00 | $1,459.50 | $1,400.00 | $1,390.00 | $1,390.00 |
| 0052 | Seed mixture, type R (621-06553) | LBS | 80 | $5.75 | $6.00 | $10.55 | $10.25 | $10.05 | $10.05 |
| 0053 | Mulched seeding, type R (621-06559) | SYS | 119 | $13.75 | $15.00 | $4.83 | $4.75 | $4.60 | $4.60 |
| 0054 | Water (621-06567) | KGAL | 1 | $632.00 | $1,000.00 | $10.50 | $10.00 | $10.00 | $10.00 |
| 0055 | Field office, type A (628-09401) | MOS | 12 | $2,500.00 | $2,800.00 | $2,849.93 | $3,000.00 | $4,547.24 | $3,000.00 |
| 0056 | Dynamic pile load test (701-06011) | EACH | 4 | $4,750.00 | $2,750.00 | $5,395.14 | $7,500.00 | $5,253.79 | $8,500.00 |
| 0057 | Test pile, dynamic, production (701-09557) | LFT | 222 | $70.00 | $100.00 | $107.18 | $80.00 | $99.50 | $250.00 |
| 0058 | Test pile, dynamic, restrike (701-09559) | EACH | 4 | $4,125.00 | $1,500.00 | $4,870.14 | $5,400.00 | $3,502.20 | $7,500.00 |
| 0059 | Pile shoe, HP 12 X 74 (701-09683) | EACH | 40 | $350.00 | $150.00 | $120.00 | $125.00 | $235.00 | $225.00 |
| 0060 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 14 | $350.00 | $150.00 | $120.00 | $125.00 | $235.00 | $225.00 |
| 0061 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 588 | $60.00 | $80.00 | $95.19 | $92.00 | $120.00 | $83.00 |
| 0062 | Pile, steel H, HP 12 X 74 (701-95780) | LFT | 1,596 | $80.00 | $100.00 | $117.33 | $110.00 | $130.00 | $99.00 |
| 0063 | Concrete, A, substructure (702-51005) | CYS | 97 | $900.00 | $950.00 | $1,191.25 | $1,200.00 | $1,100.00 | $1,300.00 |
| 0064 | Concrete, B, footings (702-51015) | CYS | 54 | $600.00 | $900.00 | $666.98 | $860.00 | $912.00 | $1,200.00 |
| 0065 | Reinforcing bars (703-06028) | LBS | 35,445 | $1.50 | $1.75 | $1.41 | $1.50 | $1.65 | $1.50 |
| 0066 | Reinforcing bars, epoxy coated (703-06029) | LBS | 84,992 | $1.70 | $1.80 | $1.52 | $1.55 | $1.75 | $1.50 |
| 0067 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 30 | $60.00 | $65.00 | $54.02 | $52.00 | $54.52 | $75.00 |
| 0068 | Concrete, C, superstructure (704-51002) | CYS | 281.70 | $950.00 | $1,050.00 | $1,210.90 | $1,400.00 | $1,250.00 | $2,500.00 |
| 0069 | Railing, steel type TS-1 (706-06344) | LFT | 250 | $75.00 | $80.24 | $71.40 | $87.00 | $68.00 | $75.00 |
| 0070 | Pipe end section, diameter 48 in. (715-02246) | EACH | 2 | $4,850.00 | $500.00 | $3,631.51 | $5,500.00 | $4,485.92 | $4,500.00 |
| 0071 | Pipe, type 3, circular, diameter 48 in. (715-05186) | LFT | 35 | $330.00 | $90.00 | $303.80 | $360.00 | $262.58 | $550.00 |
| 0072 | Road closure sign assembly (801-04308) | EACH | 4 | $270.00 | $962.50 | $257.25 | $325.00 | $325.00 | $325.00 |
| 0073 | Detour route marker assembly (801-06625) | EACH | 16 | $156.00 | $93.50 | $149.10 | $125.00 | $125.00 | $125.00 |
| 0074 | Construction sign, type A (801-06640) | EACH | 9 | $215.00 | $223.00 | $205.80 | $185.00 | $185.00 | $185.00 |
| 0075 | Maintaining traffic (801-06775) | LS | 1 | $15,000 | $8,850.00 | $10,009 | $28,030 | $25,000 | $25,000 |
| 0076 | Barricade, type III-A (801-07118) | LFT | 48 | $17.00 | $28.60 | $16.52 | $18.00 | $18.00 | $18.00 |
| 0077 | Barricade, type III-B (801-07119) | LFT | 72 | $17.00 | $28.60 | $16.52 | $18.00 | $18.00 | $18.00 |
| 0078 | Sign, ground mounted, reset (802-91122) | EACH | 1 | $990.00 | $280.50 | $267.75 | $400.00 | $255.00 | $255.00 |
| 0080 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 1,350 | $0.66 | $2.20 | $0.62 | $1.00 | $1.00 | $1.00 |
| 0081 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 1,350 | $0.66 | $2.20 | $0.62 | $1.00 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.