INDOT contract B-44246-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on September 10, 2025, Hendricks, Crawfordsville. 7 bids received; low bid $1,021,485 by Beaty Construction Inc.

Owner
Indiana DOT
Letting
10 SEP 2025
Pay items
75
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Beaty Construction Inc$1,021,485Low
2Force Construction Co Inc$1,059,736+4.0%
3Duncan Robertson Inc$1,064,879+4.0%
4William Charles Construction Company$1,102,282+8.0%
5Milestone Contractors LP$1,127,000+10%
6Pontem Contractors Inc$1,206,946+18%
7Superior Construction Co Inc$1,242,842+22%
INDOT contract B-44246-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Beaty Construction Inc2. Force Construction Co Inc3. Duncan Robertson Inc4. William Charles Construction Company5. Milestone Contractors LP6. Pontem Contractors Inc
0001Construction engineering (105-06845)LS1$12,940$17,510$12,000$29,951$25,500$26,775
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$50,000$50,000$50,000$53,000$56,565$59,200
0010Clearing right-of-way (201-52370)LS1$30,000$23,520$30,000$30,000$34,000$35,500
0011Present structure, remove, structure no. , 32-00109 (202-51330)LS1$65,700$33,180$85,000$45,000$76,000$214,000
0012Pipe, remove (202-96133)LFT44$4.25$42.00$25.00$8.00$45.19$34.63
0013Excavation, common (203-02000)CYS690$30.00$32.00$30.00$40.00$48.33$76.51
0014Borrow (203-02070)CYS215$1.00$56.00$0.01$25.00$80.00$59.90
0015Excavation, waterway (203-51223)CYS50$55.00$71.00$40.00$40.00$90.77$96.34
0016Stormwater management budget (205-12108)DOL22,000$1.00$1.00$1.00$1.00$1.00$1.00
0017Stormwater management implementation (205-12616)LS1$7,500.00$5,456.00$25,000$10,000$1,700.00$14,010
0018Excavation, foundation, unclassified (206-51230)CYS35$34.00$55.00$55.00$40.00$100.00$68.09
0019Cofferdam (206-51235)LS1$35,000$18,200$10,000$25,000$20,000$32,872
0020Subgrade treatment, type II (207-08264)SYS48$30.00$41.00$20.00$20.00$42.90$32.56
0021Subgrade treatment, type IC (207-09935)SYS1,720$31.00$35.00$50.00$32.00$43.45$38.13
0022Structure backfill, type 2 (211-09265)CYS20$75.00$120.00$120.00$80.00$48.68$111.30
0023Structure backfill, type 4 (211-09267)CYS10$425.00$467.00$300.00$250.00$347.82$260.06
0024Geotextile for pavement, type 2A (214-12238)SYS1,020$4.50$5.00$5.00$3.50$5.32$3.72
0025Geotextile for pavement, type 2B (214-12239)SYS1,850$5.25$4.60$6.00$4.29$3.72$5.13
0026Compacted aggregate, no. 8 (301-12233)CYS85$94.00$93.00$115.00$80.00$158.41$66.38
0027Compacted aggregate, no. 53 (301-12234)CYS8$110.00$139.00$115.00$70.00$153.90$232.88
0028Subbase for PCCP (302-06464)CYS34$160.00$121.00$160.00$125.00$200.00$225.59
0029Compacted aggregate, no. 53 (303-01180)TON88$82.00$52.00$70.00$70.00$95.28$59.93
0030QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON83$150.00$154.00$297.00$150.00$261.00$157.50
0031QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON249$110.00$113.00$170.00$110.00$175.00$115.50
0032QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON332$105.00$108.00$137.00$105.00$179.00$110.25
0033Joint adhesive (401-11526)LFT1,018$0.50$0.50$0.55$0.50$1.80$0.53
0034Asphalt for tack coat (406-05521)SYS3,109$1.20$1.20$0.01$1.20$0.19$1.26
0035Guardrail terminal system, W-beam curved, type 3 (601-01846)EACH1$2,670.00$2,873.00$3,069.00$2,790.00$2,525.00$2,651.25
0036Guardrail transition, type TGS-1 , modified (601-06374)EACH4$1,440.00$1,302.00$1,390.00$1,264.00$890.00$934.50
0037Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT232$23.00$25.00$26.00$24.00$17.00$17.85
0038Guardrail height transition, MGS (601-12289)EACH1$800.00$1,310.00$1,400.00$1,272.00$725.00$761.25
0039Guardrail end treatment, type OS (601-94689)EACH3$2,950.00$3,368.00$3,598.00$3,271.00$2,675.00$2,808.75
0040Reinforced concrete bridge approach, 10 in. (609-06257)SYS130$175.00$220.00$235.00$225.00$229.88$225.52
0041HMA for approaches, type B (610-07487)TON11$160.00$165.00$495.00$160.00$423.00$168.00
0042Mailbox assembly, single (611-06497)EACH1$184.00$307.00$328.00$298.00$280.00$294.00
0043Right-of-way marker (615-06490)EACH17$175.00$179.00$191.00$174.00$150.00$157.50
0044Monument, type B (615-06505)EACH2$1,400.00$1,012.00$1,081.00$983.00$950.00$997.50
0045Riprap, revetment (616-06405)TON379$65.00$72.00$60.00$85.00$119.24$61.37
0046Geotextile for riprap, type 1A (616-12246)SYS563$3.25$4.80$4.00$4.00$4.35$3.05
0047Mobilization and demobilization for seeding (621-01004)EACH1$575.00$592.00$632.00$575.00$575.00$603.75
0048Mulched seeding, type R (621-06559)SYS1,329$2.25$2.30$2.45$2.22$2.22$2.33
0049Sodding (621-06574)SYS530$9.50$9.70$10.40$9.45$9.45$25.18
0050Field office, type C (628-09403)MOS12$3,375.00$3,295.00$2,250.00$2,500.00$4,635.79$3,468.96
0051Test pile, indicator, production (701-09558)LFT162$110.00$99.00$75.00$135.00$95.00$76.89
0052Test pile, indicator, restrike (701-09560)EACH4$5,050.00$2,698.00$2,000.00$3,000.00$2,500.00$1,420.37
0053Pile, steel pipe, 0.312 in., diameter 14 in. (701-09663)LFT480$110.00$76.00$75.00$130.00$95.00$77.04
0054Pile, steel pipe, epoxy coated, 0.312 in., diameter 14 in. (701-09675)LFT100$300.00$158.00$350.00$315.00$250.00$239.01
0055Conical pile tip, 14 in. (701-09679)EACH20$420.00$391.00$800.00$400.00$350.00$415.03
0056Reinforcing bars, epoxy coated (703-06029)LBS36,758$1.65$1.50$1.50$2.55$1.79$1.46
0057Threaded tie bar assembly, epoxy coated (703-97936)EACH30$45.00$49.00$65.00$50.00$52.69$48.97
0058Concrete, C, superstructure (704-51002)CYS133.30$1,400.00$1,390.00$1,500.00$2,000.00$1,408.68$1,491.35
0059Railing, steel type TS-1 (706-06344)LFT136$93.75$106.00$113.00$116.00$69.00$72.45
0060Surface seal (709-51821)LS1$0.01$1.00$800.00$800.00$2,500.00$3,444.00
0061Safety metal end section, 6:1, diameter 15 in. (715-02628)EACH1$2,100.00$1,310.00$1,400.00$1,800.00$3,095.79$1,867.10
0062Pipe, type 1, circular, diameter 15 in. (715-05119)LFT45$82.00$62.00$85.00$60.00$61.07$60.85
0063Pipe, type 3, circular, diameter 12 in. (715-05168)LFT38$85.00$65.00$80.00$58.00$56.45$61.17
0064Video inspection for pipe (715-09064)LFT38$70.00$93.00$100.00$85.55$70.00$89.83
0065Pipe end section, diameter 12 in. (715-46000)EACH1$1,050.00$1,545.00$1,150.00$1,500.00$2,252.90$1,744.25
0066Catch basin, type E7 (720-45235)EACH1$2,650.00$1,900.00$4,000.00$3,000.00$2,931.63$2,159.62
0067Manhole, type C4 (720-45410)EACH1$4,775.00$3,252.00$4,000.00$4,500.00$5,928.46$3,484.90
0068Longitudinal grooving (722-12732)SYS351$10.35$8.80$14.00$9.71$15.83$20.07
0069Road closure sign assembly (801-04308)EACH5$325.00$285.00$305.00$277.00$277.00$290.85
0070Detour route marker assembly (801-06625)EACH12$130.00$167.00$178.00$162.00$162.00$170.10
0071Construction sign, type A (801-06640)EACH8$190.00$217.00$232.00$211.00$211.00$221.55
0072Maintaining traffic (801-06775)LS1$45,700$155,200$15,000$3,073.66$3,999.39$11,388
0073Barricade, type III-A (801-07118)LFT116$16.00$13.00$14.00$13.00$13.00$13.65
0074Barricade, type III-B (801-07119)LFT50$16.00$15.00$16.50$15.00$15.00$15.75
0075Line, paint, solid, yellow, 4 in. (808-06714)LFT1,128$1.00$1.50$1.60$1.47$1.47$1.54
INDOT contract B-44246-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy