INDOT contract B-44247-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Hendricks, Crawfordsville. 7 bids received; low bid $1,436,400 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 66
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $1,436,400 | Low |
| 2 | Pontem Contractors Inc | $1,481,940 | +3.0% |
| 3 | Force Construction Co Inc | $1,588,843 | +11% |
| 4 | His Constructors Inc | $1,616,855 | +13% |
| 5 | CLR Inc | $1,704,753 | +19% |
| 6 | Milestone Contractors LP | $1,816,000 | +26% |
| 7 | Beaty Construction Inc | $1,910,469 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Pontem Contractors Inc | 3. Force Construction Co Inc | 4. His Constructors Inc | 5. CLR Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $10,000 | $25,000 | $17,460 | $35,000 | $52,000 | $18,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $70,000 | $74,000 | $78,000 | $80,843 | $86,000 | $98,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $28,000 | $14,850 | $30,070 | $16,169 | $17,000 | $34,086 |
| 0011 | Present structure, remove, structure no. 32-00136 (202-51330) | LS | 1 | $100,000 | $175,371 | $77,580 | $100,000 | $118,000 | $75,000 |
| 0012 | Excavation, common (203-02000) | CYS | 240 | $30.00 | $127.56 | $78.00 | $83.00 | $115.00 | $64.78 |
| 0013 | Excavation, waterway (203-51223) | CYS | 815 | $75.00 | $50.78 | $43.00 | $35.00 | $27.00 | $80.27 |
| 0014 | Stormwater management budget (205-12108) | DOL | 11,963 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $12,000 | $4,010.56 | $5,016.00 | $2,500.00 | $5,000.00 | $3,200.00 |
| 0016 | Excavation, wet (206-51220) | CYS | 535 | $85.00 | $51.23 | $51.00 | $37.00 | $67.00 | $112.00 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 140 | $60.00 | $50.18 | $77.00 | $68.00 | $58.00 | $81.00 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $15,000 | $53,036 | $58,100 | $90,000 | $45,000 | $66,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 369 | $60.00 | $31.69 | $44.00 | $55.00 | $32.00 | $62.00 |
| 0020 | Flowable backfill, removable (213-09270) | CYS | 22 | $350.00 | $198.05 | $309.00 | $192.00 | $290.00 | $391.11 |
| 0021 | Geotextile for pavement, type 2A (214-12238) | SYS | 369 | $4.50 | $3.85 | $5.90 | $5.00 | $3.00 | $6.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 164 | $5.50 | $8.89 | $6.10 | $10.00 | $5.50 | $6.00 |
| 0023 | Compacted aggregate, no. 5 (301-12232) | CYS | 1,197 | $85.00 | $65.19 | $55.00 | $48.00 | $53.00 | $95.75 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 42 | $140.00 | $184.43 | $114.00 | $200.00 | $170.00 | $288.00 |
| 0025 | Compacted aggregate, no. 53 (303-01180) | TON | 191 | $60.00 | $47.52 | $40.00 | $40.00 | $59.00 | $62.00 |
| 0026 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 213 | $25.00 | $19.04 | $24.00 | $25.00 | $15.00 | $26.77 |
| 0027 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 41 | $300.00 | $303.24 | $300.00 | $288.80 | $449.00 | $450.00 |
| 0028 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 40 | $209.00 | $296.68 | $294.00 | $282.55 | $403.00 | $400.00 |
| 0029 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 103 | $158.00 | $252.00 | $249.00 | $240.00 | $190.00 | $380.00 |
| 0030 | Joint adhesive (401-11526) | LFT | 856 | $0.90 | $0.53 | $0.50 | $0.50 | $1.50 | $2.22 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 1,049 | $0.90 | $0.26 | $0.25 | $0.25 | $0.01 | $0.28 |
| 0032 | Guardrail transition, type TGS-1 (601-06374) | EACH | 4 | $1,177.00 | $1,123.50 | $1,112.00 | $1,070.00 | $1,200.00 | $1,070.00 |
| 0033 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 157 | $24.00 | $23.10 | $23.00 | $22.00 | $25.00 | $22.00 |
| 0034 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,245.00 | $3,097.50 | $3,066.00 | $2,950.00 | $3,275.00 | $2,950.00 |
| 0035 | Fence, farm field, reset (603-06060) | LFT | 27 | $64.00 | $60.90 | $60.00 | $58.00 | $65.00 | $58.00 |
| 0036 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 164 | $250.00 | $193.85 | $183.00 | $275.00 | $225.00 | $223.93 |
| 0037 | Right-of-way marker (615-06490) | EACH | 12 | $203.00 | $194.25 | $192.00 | $185.00 | $110.00 | $185.00 |
| 0038 | Monument, type B (615-06505) | EACH | 2 | $1,243.00 | $1,186.50 | $1,175.00 | $1,130.00 | $500.00 | $1,130.00 |
| 0039 | Benchmark post (615-06530) | EACH | 1 | $1,100.00 | $1,050.00 | $624.00 | $600.00 | $250.00 | $465.00 |
| 0040 | Riprap, class 2 (616-05689) | TON | 1,647 | $65.00 | $80.16 | $80.00 | $52.00 | $76.00 | $109.00 |
| 0041 | Riprap, revetment (616-06405) | TON | 454 | $50.00 | $43.70 | $71.00 | $41.00 | $59.00 | $90.00 |
| 0042 | Geotextile for riprap, type 2A (616-12248) | SYS | 2,360 | $4.00 | $3.64 | $3.20 | $5.00 | $5.00 | $3.91 |
| 0043 | Slope protection , hybrid turf instant armoring mat (616-12496) | SYS | 235 | $52.00 | $49.93 | $61.00 | $47.55 | $52.00 | $125.00 |
| 0044 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $632.00 | $603.75 | $208.00 | $575.00 | $250.00 | $200.00 |
| 0045 | Mulched seeding, type R (621-06559) | SYS | 488 | $7.20 | $6.87 | $12.00 | $6.54 | $4.00 | $12.00 |
| 0046 | Water (621-06567) | KGAL | 1 | $11.00 | $10.50 | $0.01 | $10.00 | $250.00 | $0.01 |
| 0047 | Field office, type A (628-09401) | MOS | 6 | $2,750.00 | $2,673.68 | $2,859.00 | $3,700.00 | $1,100.00 | $3,500.00 |
| 0048 | Computer system equipment (628-11976) | EACH | 2 | $1,000.00 | $611.44 | $884.00 | $1,150.00 | $100.00 | $1,013.42 |
| 0049 | Dynamic pile load test (701-06011) | EACH | 4 | $3,850.00 | $4,874.04 | $9,700.00 | $5,750.00 | $2,000.00 | $4,600.00 |
| 0050 | Test pile, dynamic, production (701-09557) | LFT | 302 | $85.00 | $89.15 | $102.00 | $120.00 | $180.00 | $64.00 |
| 0051 | Test pile, dynamic, restrike (701-09559) | EACH | 4 | $5,000.00 | $4,349.04 | $2,943.00 | $5,250.00 | $2,000.00 | $6,800.00 |
| 0052 | Reinforced concrete encasement for H piles (701-12709) | LFT | 205 | $350.00 | $230.41 | $179.00 | $225.00 | $265.00 | $200.00 |
| 0053 | Pile, steel H, HP, 12 X 84 (701-95782) | LFT | 1,048 | $85.00 | $91.43 | $82.00 | $91.00 | $180.00 | $96.00 |
| 0054 | Reinforcing bars, epoxy coated (703-06029) | LBS | 80,779 | $1.75 | $1.39 | $1.30 | $1.75 | $1.55 | $1.75 |
| 0055 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 28 | $65.00 | $41.50 | $46.00 | $75.00 | $35.00 | $60.00 |
| 0056 | Concrete, C, superstructure (704-51002) | CYS | 234.30 | $900.00 | $985.65 | $1,335.00 | $1,750.00 | $1,607.00 | $1,500.00 |
| 0057 | Railing, steel type TS-1 (706-06344) | LFT | 225 | $91.00 | $71.40 | $71.00 | $84.11 | $83.00 | $68.00 |
| 0058 | Railing, steel type TS-1 modified (706-06344) | LFT | 25 | $146.00 | $142.80 | $141.00 | $136.00 | $168.00 | $136.00 |
| 0059 | Pipe, drain tile terminal (719-05438) | LFT | 15 | $25.00 | $27.11 | $60.00 | $62.34 | $56.00 | $76.38 |
| 0060 | Longitudinal grooving (722-12732) | SYS | 526 | $10.00 | $14.89 | $6.50 | $4.76 | $15.00 | $12.00 |
| 0061 | Road closure sign assembly (801-04308) | EACH | 4 | $192.00 | $315.00 | $338.00 | $325.00 | $360.00 | $325.00 |
| 0062 | Detour route marker assembly (801-06625) | EACH | 17 | $82.00 | $131.25 | $140.00 | $135.00 | $150.00 | $135.00 |
| 0063 | Construction sign, type A (801-06640) | EACH | 12 | $192.00 | $152.25 | $187.00 | $180.00 | $200.00 | $180.00 |
| 0064 | Maintaining traffic (801-06775) | LS | 1 | $15,000 | $8,264.73 | $136,000 | $11,596 | $11,388 | $17,283 |
| 0065 | Barricade, type III-A (801-07118) | LFT | 48 | $17.50 | $21.00 | $17.00 | $16.00 | $17.00 | $16.00 |
| 0066 | Barricade, type III-B (801-07119) | LFT | 48 | $17.50 | $21.00 | $17.00 | $16.00 | $17.00 | $16.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.