INDOT contract B-44248-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on September 10, 2025, Hendricks, Crawfordsville. 8 bids received; low bid $1,218,822 by Force Construction Co Inc.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 73
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Force Construction Co Inc | $1,218,822 | Low |
| 2 | Beaty Construction Inc | $1,250,225 | +3.0% |
| 3 | Duncan Robertson Inc | $1,286,702 | +6.0% |
| 4 | Superior Construction Co Inc | $1,461,142 | +20% |
| 5 | William Charles Construction Company | $1,465,598 | +20% |
| 6 | Milestone Contractors LP | $1,477,000 | +21% |
| 7 | Pontem Contractors Inc | $1,499,334 | +23% |
| 8 | CLR Inc | $1,526,185 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Force Construction Co Inc | 2. Beaty Construction Inc | 3. Duncan Robertson Inc | 4. Superior Construction Co Inc | 5. William Charles Construction Company | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $16,920 | $10,702 | $15,000 | $25,000 | $30,000 | $29,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $60,000 | $62,500 | $60,000 | $72,000 | $73,280 | $77,883 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $9,282.00 | $25,000 | $24,000 | $29,000 | $29,312 | $29,560 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $41,650 | $54,800 | $115,000 | $297,107 | $91,460 | $71,463 |
| 0012 | Fence, farm field, remove (202-99187) | LFT | 176 | $4.10 | $3.00 | $8.00 | $4.00 | $4.00 | $4.00 |
| 0013 | Excavation, common (203-02000) | CYS | 955 | $38.00 | $30.00 | $50.00 | $0.01 | $42.00 | $70.00 |
| 0014 | Excavation, waterway (203-51223) | CYS | 475 | $51.00 | $39.00 | $30.00 | $25.00 | $42.00 | $54.72 |
| 0015 | Pump around (205-11626) | EACH | 2 | $7,319.00 | $15,000 | $20,000 | $12,000 | $20,000 | $9,500.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 8,815 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $5,339.00 | $10,100 | $15,000 | $10,000 | $7,500.00 | $3,240.00 |
| 0018 | Excavation, foundation, unclassified (206-51230) | CYS | 145 | $62.00 | $50.00 | $80.00 | $75.00 | $59.00 | $70.00 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 1,029 | $32.00 | $35.00 | $55.00 | $30.00 | $35.00 | $55.00 |
| 0020 | Flowable backfill, removable (213-09270) | CYS | 24 | $341.00 | $450.00 | $325.00 | $194.00 | $256.00 | $320.00 |
| 0021 | Geotextile for pavement, type 2A (214-12238) | SYS | 904 | $5.30 | $4.00 | $5.00 | $6.00 | $3.00 | $5.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 198 | $6.60 | $5.00 | $6.00 | $6.00 | $8.00 | $5.00 |
| 0023 | Compacted aggregate, no. 5 (301-12232) | CYS | 30 | $73.00 | $140.00 | $115.00 | $85.00 | $76.00 | $120.00 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 50 | $103.00 | $140.00 | $140.00 | $168.00 | $97.00 | $280.00 |
| 0025 | Compacted aggregate, no. 53 (303-01180) | TON | 377 | $41.00 | $48.50 | $70.00 | $20.00 | $32.00 | $52.00 |
| 0026 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 208 | $22.00 | $29.50 | $25.00 | $18.00 | $17.00 | $28.45 |
| 0027 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 92 | $170.00 | $165.00 | $188.00 | $171.00 | $165.00 | $240.00 |
| 0028 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 125 | $139.00 | $135.00 | $161.00 | $147.00 | $135.00 | $220.00 |
| 0029 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 299 | $108.00 | $105.00 | $149.00 | $136.00 | $105.00 | $184.00 |
| 0030 | Joint adhesive (401-11526) | LFT | 1,427 | $0.50 | $0.50 | $0.60 | $0.55 | $0.50 | $1.80 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 2,920 | $1.00 | $1.00 | $0.01 | $0.01 | $1.00 | $0.20 |
| 0032 | Guardrail, remove (601-02241) | LFT | 761 | $3.10 | $4.50 | $3.30 | $3.00 | $3.00 | $3.00 |
| 0033 | Guardrail, reset (601-06035) | LFT | 81 | $10.00 | $12.00 | $11.00 | $10.00 | $10.00 | $10.00 |
| 0034 | Guardrail transition, type TGS-1 , modified (601-06374) | EACH | 4 | $927.00 | $1,400.00 | $990.00 | $900.00 | $900.00 | $900.00 |
| 0035 | Hand dig guardrail post holes (601-09238) | EACH | 11 | $154.00 | $290.00 | $165.00 | $150.00 | $150.00 | $150.00 |
| 0036 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 225 | $19.00 | $19.00 | $20.00 | $18.00 | $18.00 | $18.00 |
| 0037 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $2,780.00 | $2,875.00 | $2,970.00 | $2,700.00 | $2,700.00 | $2,700.00 |
| 0038 | Guardrail height transition, VH, 6 FT 3 in. spacing (601-99132) | EACH | 1 | $175.00 | $350.00 | $187.00 | $170.00 | $170.00 | $170.00 |
| 0039 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 204 | $171.00 | $182.00 | $225.00 | $160.00 | $205.00 | $190.00 |
| 0040 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $283.00 | $375.00 | $302.00 | $275.00 | $275.00 | $275.00 |
| 0041 | Right-of-way marker (615-06490) | EACH | 4 | $154.00 | $175.00 | $165.00 | $150.00 | $150.00 | $150.00 |
| 0042 | Monument, type B (615-06505) | EACH | 2 | $978.00 | $1,550.00 | $1,045.00 | $950.00 | $950.00 | $950.00 |
| 0043 | Riprap, revetment (616-06405) | TON | 1,103 | $48.00 | $66.75 | $55.00 | $65.00 | $107.00 | $87.20 |
| 0044 | Geotextile for riprap, type 2A (616-12248) | SYS | 1,815 | $3.80 | $3.00 | $4.50 | $3.00 | $3.00 | $5.00 |
| 0045 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $592.00 | $575.00 | $632.00 | $575.00 | $575.00 | $575.00 |
| 0046 | Mulched seeding, type R (621-06559) | SYS | 100 | $16.00 | $16.00 | $17.50 | $15.98 | $15.98 | $15.96 |
| 0047 | Water (621-06567) | KGAL | 1 | $15.00 | $15.00 | $16.50 | $15.00 | $15.00 | $15.00 |
| 0048 | Field office, type A (628-09401) | MOS | 9 | $3,015.00 | $2,900.00 | $2,250.00 | $2,800.00 | $2,500.00 | $3,500.00 |
| 0049 | Cored hole in rock, diameter 24 in. (701-02938) | LFT | 144 | $414.00 | $575.00 | $700.00 | $560.00 | $259.00 | $610.00 |
| 0050 | Test pile, indicator, production (701-09558) | LFT | 162 | $147.00 | $85.00 | $65.00 | $65.00 | $102.00 | $85.00 |
| 0051 | Test pile, indicator, restrike (701-09560) | EACH | 4 | $2,856.00 | $5,775.00 | $2,000.00 | $1,500.00 | $3,500.00 | $2,100.00 |
| 0052 | Prebored hole, diameter 24 in. (701-12361) | LFT | 458 | $91.00 | $120.00 | $35.00 | $43.00 | $146.00 | $85.20 |
| 0053 | Reinforced concrete encasement for H piles (701-12709) | LFT | 140 | $92.00 | $260.00 | $200.00 | $152.00 | $225.00 | $576.84 |
| 0054 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 612 | $88.00 | $85.00 | $70.00 | $65.00 | $100.00 | $83.00 |
| 0055 | Reinforcing bars, epoxy coated (703-06029) | LBS | 56,532 | $1.40 | $1.50 | $1.50 | $1.20 | $2.25 | $1.69 |
| 0056 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 44 | $43.00 | $42.50 | $65.00 | $32.00 | $75.00 | $27.00 |
| 0057 | Concrete, C, superstructure (704-51002) | CYS | 207 | $1,089.00 | $1,300.00 | $1,100.00 | $1,650.00 | $1,750.00 | $1,367.00 |
| 0058 | Railing, steel type TS-1 (706-06344) | LFT | 125 | $77.00 | $90.00 | $82.50 | $75.00 | $88.32 | $75.00 |
| 0059 | Railing, steel type TS-1 , modified (706-06344) | LFT | 25 | $113.00 | $145.00 | $121.00 | $110.00 | $118.33 | $110.00 |
| 0060 | Stud shear connectors (711-96800) | EACH | 576 | $5.20 | $11.00 | $9.00 | $11.00 | $20.00 | $5.00 |
| 0061 | Longitudinal grooving (722-12732) | SYS | 542 | $5.80 | $8.25 | $10.00 | $4.61 | $7.50 | $5.07 |
| 0062 | Road closure sign assembly (801-04308) | EACH | 5 | $335.00 | $325.00 | $357.00 | $325.00 | $325.00 | $325.00 |
| 0063 | Detour route marker assembly (801-06625) | EACH | 20 | $134.00 | $130.00 | $143.00 | $130.00 | $130.00 | $130.00 |
| 0064 | Construction sign, type A (801-06640) | EACH | 9 | $196.00 | $190.00 | $209.00 | $190.00 | $190.00 | $190.00 |
| 0065 | Maintaining traffic (801-06775) | LS | 1 | $160,000 | $8,000.00 | $17,500 | $50,000 | $5,000.00 | $23,000 |
| 0066 | Barricade, type III-A (801-07118) | LFT | 48 | $16.00 | $16.00 | $17.50 | $16.00 | $16.00 | $16.00 |
| 0067 | Barricade, type III-B (801-07119) | LFT | 72 | $16.00 | $16.00 | $17.50 | $16.00 | $16.00 | $16.00 |
| 0068 | Sign, sheet, remove (802-04089) | EACH | 2 | $51.00 | $55.00 | $55.00 | $50.00 | $50.00 | $50.00 |
| 0069 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 11 | $33.00 | $18.00 | $35.00 | $32.00 | $32.00 | $32.00 |
| 0070 | Sign, sheet, relocate (802-07060) | EACH | 1 | $283.00 | $500.00 | $302.00 | $275.00 | $275.00 | $275.00 |
| 0071 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 18 | $19.00 | $20.00 | $20.00 | $18.00 | $18.00 | $18.00 |
| 0072 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 750 | $1.40 | $1.35 | $1.50 | $1.35 | $1.35 | $1.35 |
| 0073 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 750 | $1.40 | $1.35 | $1.50 | $1.35 | $1.35 | $1.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.