INDOT contract R-42194-A bid tabulation
INTERSECTION IMPROVEMENT, MEDIAN U-TURN. Let by Indiana DOT on July 9, 2025, Lawrence, Vincennes. 3 bids received; low bid $4,224,325 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 144
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $4,224,325 | Low |
| 2 | E & B Paving LLC | $4,883,705 | +16% |
| 3 | Crider & Crider Inc | $5,217,586 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. E & B Paving LLC | 3. Crider & Crider Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $22,000 | $47,633 | $161,510 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $211,000 | $242,000 | $435,637 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $32,441 | $95,000 | $40,449 |
| 0014 | Pavement removal (202-02240) | SYS | 3,248 | $14.00 | $19.00 | $15.89 |
| 0015 | Inlet, remove (202-91385) | EACH | 1 | $800.00 | $1,050.00 | $1,161.30 |
| 0016 | Pipe, remove (202-96133) | LFT | 10 | $38.00 | $100.00 | $175.66 |
| 0017 | Transportation of salvageable items (202-96151) | LS | 1 | $1,263.12 | $2,900.00 | $1,291.61 |
| 0018 | Excavation, unclassified (203-02020) | CYS | 3,340 | $47.00 | $62.00 | $74.61 |
| 0019 | Borrow (203-02070) | CYS | 3,020 | $17.00 | $15.00 | $40.72 |
| 0020 | Stormwater management budget (205-12108) | DOL | 54,810 | $1.00 | $1.00 | $1.00 |
| 0021 | Stormwater management implementation (205-12616) | LS | 1 | $20,000 | $28,000 | $17,873 |
| 0022 | SWQCP preparation (205-12618) | LS | 1 | $2,250.00 | $4,100.00 | $2,690.86 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 12,347 | $28.00 | $35.00 | $29.76 |
| 0024 | Structure backfill, type 1 (211-09264) | CYS | 175 | $54.00 | $75.00 | $66.98 |
| 0025 | Geogrid, type IB (214-11796) | SYS | 12,347 | $2.00 | $2.50 | $4.61 |
| 0026 | Geotextile for pavement, type 2B (214-12239) | SYS | 6,281 | $3.30 | $3.40 | $2.88 |
| 0027 | Cellular concrete fill, class IV (216-06394) | CYS | 11 | $1,120.00 | $1,460.00 | $1,085.28 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 95 | $63.00 | $120.00 | $103.64 |
| 0029 | Dense graded subbase (302-07455) | CYS | 885 | $63.00 | $70.00 | $87.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 2,213 | $42.00 | $42.50 | $34.97 |
| 0031 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 20,629 | $1.20 | $1.80 | $2.37 |
| 0032 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 2,094 | $106.00 | $113.00 | $106.63 |
| 0033 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 721 | $115.00 | $127.00 | $115.68 |
| 0034 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 2,307 | $90.00 | $101.00 | $90.53 |
| 0035 | Joint adhesive, surface (401-10258) | LFT | 14,950 | $1.00 | $0.40 | $1.01 |
| 0036 | Joint adhesive, intermediate (401-10259) | LFT | 2,299 | $1.00 | $1.10 | $1.01 |
| 0037 | Asphalt for tack coat (406-05520) | TON | 14 | $670.00 | $685.00 | $673.95 |
| 0038 | PCCP, 10 in. (502-06327) | SYS | 5,309 | $83.00 | $94.00 | $93.55 |
| 0039 | PCCP, 8 in. (502-06999) | SYS | 115 | $170.00 | $120.00 | $88.52 |
| 0040 | PCCP, 7 in. (502-11564) | SYS | 111 | $145.00 | $115.00 | $82.48 |
| 0041 | Retrofitted tie bars (503-03489) | EACH | 156 | $80.00 | $40.00 | $22.13 |
| 0042 | D-1 contraction joint (503-05240) | LFT | 2,152 | $19.00 | $20.00 | $12.22 |
| 0043 | Curb and gutter, concrete, type B (605-06145) | LFT | 400 | $58.00 | $80.00 | $38.22 |
| 0044 | Center curb, concrete, type B (605-06245) | SYS | 279 | $145.00 | $180.00 | $112.66 |
| 0045 | Milled PCCP corrugations, conventional (606-11064) | LFT | 674 | $2.01 | $16.50 | $2.02 |
| 0046 | Milled HMA corrugations, conventional (606-12399) | LFT | 200 | $1.68 | $41.00 | $1.69 |
| 0047 | HMA for approaches, type B (610-07487) | TON | 42 | $190.00 | $235.00 | $191.12 |
| 0048 | Monument, type B (615-06505) | EACH | 1 | $2,200.00 | $1,900.00 | $1,911.21 |
| 0049 | Monument, type C (615-06510) | EACH | 4 | $1,000.00 | $950.00 | $955.60 |
| 0050 | Monument, type D (615-06515) | EACH | 1 | $275.00 | $400.00 | $402.36 |
| 0051 | Riprap, revetment (616-06405) | TON | 9 | $150.00 | $225.00 | $205.91 |
| 0052 | Riprap, uniform (616-06451) | TON | 155 | $115.00 | $120.00 | $76.62 |
| 0053 | Geotextile for riprap, type 1A (616-12246) | SYS | 277 | $4.60 | $3.00 | $3.79 |
| 0054 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $300.00 | $1,050.00 | $1,056.19 |
| 0055 | Mulched seeding, type R (621-06559) | SYS | 4,126 | $3.00 | $2.78 | $2.80 |
| 0056 | Water (621-06567) | KGAL | 19 | $0.01 | $2.00 | $2.01 |
| 0057 | Sodding (621-06574) | SYS | 4,050 | $12.00 | $6.10 | $6.14 |
| 0058 | Computer system equipment (628-11976) | EACH | 1 | $1,000.00 | $575.00 | $2,011.80 |
| 0059 | Field office, type D (628-12683) | MOS | 12 | $3,000.00 | $3,400.00 | $5,029.50 |
| 0060 | Safety metal end section, 6:1, diameter 24 in. (715-02630) | EACH | 1 | $3,000.00 | $4,300.00 | $3,394.40 |
| 0061 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 280 | $40.00 | $55.00 | $47.07 |
| 0062 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 88 | $105.00 | $125.00 | $87.40 |
| 0063 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 345 | $125.00 | $125.00 | $109.11 |
| 0064 | Video inspection for pipe (715-09064) | LFT | 625 | $5.50 | $5.20 | $5.38 |
| 0065 | Pipe end section, diameter 18 in. (715-46010) | EACH | 2 | $2,000.00 | $1,850.00 | $1,724.26 |
| 0066 | Grated box end section, type II, 6:1, diameter 18 in. (715-99044) | EACH | 1 | $8,900.00 | $8,300.00 | $12,063 |
| 0067 | Pipe installation, trenchless, 18 in. (716-07632) | LFT | 176 | $560.00 | $545.00 | $765.17 |
| 0068 | Pipe installation, trenchless, 24 in. (716-07633) | LFT | 77 | $680.00 | $655.00 | $994.30 |
| 0069 | Outlet protector, type 1 (718-06528) | EACH | 9 | $1,900.00 | $2,000.00 | $2,301.48 |
| 0070 | Inlet, type P12, modified (720-000104) | EACH | 3 | $8,800.00 | $5,200.00 | $7,275.02 |
| 0071 | Inlet, type N12 (720-45065) | EACH | 5 | $7,300.00 | $5,400.00 | $6,785.11 |
| 0072 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 8,940 | $1.48 | $1.31 | $1.49 |
| 0073 | Temporary pavement marking, removable, 5 in. (801-06208) | LFT | 1,440 | $2.01 | $2.09 | $2.02 |
| 0074 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 2 | $219.00 | $204.00 | $220.29 |
| 0075 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 24 | $11.78 | $3.69 | $11.83 |
| 0076 | Construction sign, type A (801-06640) | EACH | 108 | $241.00 | $269.00 | $242.42 |
| 0077 | Construction sign, type B (801-06645) | EACH | 12 | $121.00 | $89.00 | $121.71 |
| 0078 | Temporary raised pavement marker, grade 2 (801-06650) | EACH | 12 | $25.33 | $20.00 | $25.48 |
| 0079 | Flashing arrow sign (801-06710) | DAY | 190 | $18.00 | $18.00 | $18.11 |
| 0080 | Maintaining traffic (801-06775) | LS | 1 | $64,215 | $180,717 | $206,147 |
| 0082 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 10 | $8,050.00 | $10,400 | $12,276 |
| 0083 | Barricade, type III-A (801-07118) | LFT | 180 | $16.09 | $18.00 | $16.09 |
| 0084 | Temporary traffic barrier, type 2 (801-08401) | LFT | 6,181 | $41.00 | $47.73 | $55.77 |
| 0085 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 16 | $923.00 | $2,527.00 | $928.45 |
| 0086 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 817 | $30.00 | $30.00 | $30.18 |
| 0087 | Sign post, square, type 2, unreinforced anchor base (802-05705) | LFT | 124 | $30.00 | $30.00 | $30.18 |
| 0088 | Sign, sheet, and supports, remove (802-07059) | EACH | 17 | $100.00 | $100.00 | $100.59 |
| 0089 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 79 | $35.00 | $35.00 | $35.21 |
| 0090 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 829 | $26.00 | $26.00 | $26.15 |
| 0091 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 132 | $32.00 | $32.00 | $32.19 |
| 0092 | Delineator post, flexible, type I (804-11920) | EACH | 8 | $25.34 | $125.00 | $125.74 |
| 0093 | Delineator post, flexible, type II (804-11921) | EACH | 6 | $25.43 | $250.00 | $251.47 |
| 0094 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $8,000.00 | $8,000.00 | $8,047.19 |
| 0095 | Signal pole foundation, 36 in. X 144 in. , modified signal pole foundation (805-01815) | EACH | 1 | $8,250.00 | $8,250.00 | $8,298.67 |
| 0096 | Signal pole foundation, 36 in. X 144 in. , permanent signal installation (805-01815) | EACH | 3 | $8,250.00 | $8,250.00 | $8,298.67 |
| 0097 | Handhole, signal, type 1 , permanent signal installation (805-01842) | EACH | 7 | $2,200.00 | $2,200.00 | $2,212.98 |
| 0098 | Transportation of salvageable signal equipment (805-02087) | LS | 1 | $1,800.00 | $1,800.00 | $1,810.62 |
| 0099 | Loop detector delay amplifier, counting, no. 2 channel (805-09539) | EACH | 5 | $600.00 | $600.00 | $603.54 |
| 0100 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 490 | $65.00 | $65.00 | $65.38 |
| 0101 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 491 | $65.00 | $65.00 | $65.38 |
| 0102 | Traffic signal head, no. 3 (805-78205) | EACH | 10 | $1,100.00 | $1,100.00 | $1,106.49 |
| 0103 | Span, catenary, and tether (805-78415) | EACH | 4 | $6,800.00 | $6,800.00 | $6,840.12 |
| 0104 | Disconnect hanger (805-78420) | EACH | 4 | $550.00 | $550.00 | $553.24 |
| 0105 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 3,490 | $0.80 | $0.80 | $0.80 |
| 0106 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 650 | $3.00 | $3.00 | $3.02 |
| 0107 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 1,160 | $3.50 | $3.50 | $3.52 |
| 0108 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 3,062 | $4.20 | $4.20 | $4.22 |
| 0109 | Signal detector housing (805-78785) | EACH | 7 | $2,050.00 | $2,050.00 | $2,062.09 |
| 0110 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 760 | $11.00 | $11.00 | $11.06 |
| 0111 | Signal pole, steel strain, 36 FT (805-81060) | EACH | 4 | $12,000 | $12,000 | $12,071 |
| 0112 | Handhole, lighting (807-02191) | EACH | 15 | $2,250.00 | $2,250.00 | $2,263.27 |
| 0113 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 810 | $65.00 | $65.00 | $65.38 |
| 0114 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 6,962 | $23.00 | $23.00 | $23.14 |
| 0115 | Light pole, 40 FT E.M.H. 25 FT mast arm, breakaway base (807-09787) | EACH | 2 | $5,500.00 | $5,500.00 | $5,532.45 |
| 0116 | Luminaire, high lumen roadway (807-12199) | EACH | 16 | $650.00 | $650.00 | $653.83 |
| 0117 | Luminaire, low lumen roadway (807-12202) | EACH | 22 | $650.00 | $650.00 | $653.83 |
| 0118 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 38 | $2,500.00 | $2,500.00 | $2,514.75 |
| 0119 | Light pole, 40 FT E.M.H., 15 FT mast arm, breakaway base (807-85762) | EACH | 36 | $4,100.00 | $4,100.00 | $4,124.19 |
| 0120 | Service point, type II (807-86810) | EACH | 2 | $10,200 | $10,200 | $10,260 |
| 0121 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 3,850 | $1.00 | $1.00 | $1.01 |
| 0122 | Sign, underpass, and roadway lighting, location identification (807-86950) | EACH | 38 | $65.00 | $65.00 | $65.38 |
| 0123 | Wire, no. 10 copper, 1/C (807-95889) | LFT | 2,450 | $1.00 | $1.00 | $1.01 |
| 0124 | Line, remove (808-06716) | LFT | 2,870 | $0.89 | $1.13 | $0.90 |
| 0125 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,000.00 | $8,426.00 | $3,017.70 |
| 0126 | Transverse marking, multi-component, crosshatch line, white, 24 in. (808-10038) | LFT | 432 | $16.01 | $15.00 | $16.10 |
| 0127 | Transverse marking, multi-component, crosshatch line, yellow, 12 in. (808-10042) | LFT | 180 | $9.01 | $10.00 | $9.06 |
| 0128 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 16,188 | $1.09 | $1.25 | $1.26 |
| 0129 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 144 | $16.01 | $15.00 | $16.10 |
| 0130 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 11,835 | $1.09 | $1.25 | $1.26 |
| 0131 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 2,930 | $1.49 | $1.30 | $1.31 |
| 0132 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 18 | $249.00 | $200.00 | $250.47 |
| 0133 | Transverse marking, multi-component, yield line, white, 27 in. (808-10097) | LFT | 64 | $27.06 | $20.00 | $27.22 |
| 0134 | Transverse marking, thermoplastic, yield line, white, 27 in. (808-11698) | LFT | 72 | $21.09 | $21.98 | $21.21 |
| 0135 | Grooving for pavement markings (808-12032) | LFT | 32,506 | $0.78 | $1.17 | $0.78 |
| 0136 | Line, multi-component, solid, white, 10 in. (808-12781) | LFT | 4,498 | $1.87 | $3.00 | $3.02 |
| 0137 | Line, multi-component, dotted, white, 10 in. (808-12851) | LFT | 630 | $2.48 | $6.00 | $6.04 |
| 0138 | Line, multi-component, broken, black, 6 in. (808-12949) | LFT | 1,440 | $2.01 | $9.00 | $9.05 |
| 0139 | Line, multi-component, dotted, black, 10 in. (808-12952) | LFT | 400 | $2.17 | $13.00 | $13.08 |
| 0140 | Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272) | LFT | 138 | $13.54 | $10.02 | $13.62 |
| 0141 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 388 | $7.01 | $5.01 | $7.05 |
| 0142 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 28 | $13.54 | $10.02 | $13.62 |
| 0143 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 18 | $223.00 | $211.00 | $224.32 |
| 0144 | Snowplowable raised pavement marker (808-75998) | EACH | 38 | $53.61 | $90.00 | $53.93 |
| 0145 | Truck mounted attenuator (801-12042) | DAY | 12 | $635.00 | $603.23 | $603.54 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.