ASPHALT RESURFACE AND REPLACE SUBSTRUCTURE. Let by Indiana DOT on February 12, 2025, Boone, Hendricks, Crawfordsville. 4 bids received; low bid $4,550,000 by Calumet Civil Contractors Inc.
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 208
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Calumet Civil Contractors Inc | $4,550,000 | Low |
| 2 | Milestone Contractors LP | $4,596,000 | +1.0% |
| 3 | Rieth-Riley Construction Co., Inc. | $5,140,000 | +13% |
| 4 | E & B Paving LLC | $5,246,389 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Calumet Civil Contractors Inc | 2. Milestone Contractors LP | 3. Rieth-Riley Construction Co., Inc. | 4. E & B Paving LLC |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $100,000 | $69,000 | $58,000 | $118,830 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 3 | $320.00 | $700.00 | $1,000.00 | $400.00 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 4 | $300.00 | $400.00 | $700.00 | $700.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0014 | Mobilization and demobilization (110-01001) | LS | 1 | $225,000 | $202,533 | $369,875 | $262,000 |
| 0015 | Tree, 30 in., remove (201-02260) | EACH | 3 | $2,300.00 | $3,500.00 | $5,000.00 | $3,500.00 |
| 0016 | Clearing right-of-way (201-52370) | LS | 1 | $50,000 | $75,000 | $70,000 | $105,000 |
| 0017 | Pavement removal (202-02240) | SYS | 206 | $47.00 | $35.00 | $47.00 | $49.00 |
| 0018 | Headwall, remove (202-02271) | EACH | 3 | $2,000.00 | $600.00 | $1,250.00 | $1,700.00 |
| 0019 | Curb, concrete, remove (202-02278) | LFT | 958 | $10.00 | $17.00 | $26.00 | $18.00 |
| 0020 | Curb and gutter, remove (202-02279) | LFT | 764 | $15.00 | $17.00 | $26.00 | $23.00 |
| 0021 | Pipe abandon and grout fill (202-02637) | LFT | 45 | $50.00 | $35.00 | $70.00 | $95.00 |
| 0022 | Catch basin, remove (202-02928) | EACH | 9 | $550.00 | $700.00 | $850.00 | $950.00 |
| 0023 | Concrete steps, remove (202-03875) | EACH | 1 | $1,000.00 | $500.00 | $1,000.00 | $1,050.00 |
| 0024 | Contaminated soil, remove (202-06580) | CYS | 20 | $200.00 | $350.00 | $325.00 | $325.00 |
| 0025 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $75,000 | $145,000 | $75,000 | $75,000 |
| 0026 | Present structure, remove, structure no. 2 (202-51330) | LS | 1 | $55,000 | $38,000 | $33,300 | $72,000 |
| 0027 | Sidewalk concrete, remove (202-52710) | SYS | 415 | $20.00 | $38.00 | $45.00 | $28.00 |
| 0028 | Inlet, remove (202-91385) | EACH | 2 | $700.00 | $1,000.00 | $1,200.00 | $930.00 |
| 0029 | Pipe, remove (202-96133) | LFT | 276 | $10.00 | $65.00 | $50.00 | $16.00 |
| 0030 | Fire hydrant assembly, remove (202-97009) | EACH | 1 | $2,500.00 | $500.00 | $2,000.00 | $1,700.00 |
| 0031 | Excavation, common (203-02000) | CYS | 254 | $75.00 | $60.00 | $180.00 | $190.00 |
| 0032 | Borrow (203-02070) | CYS | 94 | $15.00 | $50.00 | $180.00 | $0.01 |
| 0033 | Linear grading (203-08607) | LFT | 302 | $5.50 | $14.00 | $5.00 | $5.00 |
| 0034 | Pump around (205-11626) | EACH | 2 | $5,000.00 | $29,000 | $12,500 | $11,500 |
| 0035 | Stormwater management budget (205-12108) | DOL | 44,999 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0036 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $16,000 | $22,000 | $85,000 |
| 0037 | Excavation, foundation, unclassified (206-51230) | CYS | 24 | $100.00 | $180.00 | $100.00 | $100.00 |
| 0038 | Cofferdam (206-51235) | LS | 1 | $50,000 | $15,000 | $40,586 | $40,586 |
| 0039 | Subgrade treatment, type II (207-08264) | SYS | 4,178 | $26.00 | $35.00 | $15.00 | $24.50 |
| 0040 | Subgrade treatment, type IC (207-09935) | SYS | 688 | $30.00 | $45.00 | $37.00 | $38.00 |
| 0041 | Structure backfill, type 2 (211-09265) | CYS | 78 | $68.00 | $110.00 | $135.00 | $80.00 |
| 0042 | Structure backfill, type 4 (211-09267) | CYS | 13 | $335.00 | $380.00 | $335.00 | $350.00 |
| 0043 | Structure backfill, type 5 (211-09268) | CYS | 1,538 | $180.00 | $178.00 | $210.00 | $159.00 |
| 0044 | Geogrid, type IB (214-11796) | SYS | 4,437 | $3.00 | $1.50 | $4.00 | $2.50 |
| 0045 | Geotextile for pavement, type 2B (214-12239) | SYS | 766 | $4.50 | $1.80 | $2.00 | $4.50 |
| 0046 | Compacted aggregate, no. 5 (301-12232) | CYS | 6 | $200.00 | $85.00 | $158.00 | $215.00 |
| 0047 | Compacted aggregate, no. 8 (301-12233) | CYS | 59 | $110.00 | $90.00 | $173.00 | $105.00 |
| 0048 | Compacted aggregate, no. 53 (301-12234) | CYS | 30 | $110.00 | $175.00 | $150.00 | $96.00 |
| 0049 | Subbase for PCCP (302-06464) | CYS | 38 | $220.00 | $390.00 | $215.00 | $223.60 |
| 0050 | Dense graded subbase (302-07455) | CYS | 41 | $120.00 | $250.00 | $150.00 | $100.00 |
| 0051 | Compacted aggregate, no. 53 (303-01180) | TON | 101 | $65.00 | $95.00 | $100.00 | $73.00 |
| 0052 | Compacted aggregate, no. 73 (303-07449) | TON | 51 | $80.00 | $100.00 | $100.00 | $81.00 |
| 0053 | HMA patching, full depth, type B (304-12623) | TON | 1,581 | $150.00 | $120.00 | $265.00 | $185.00 |
| 0054 | HMA patching, partial depth, type B (304-12624) | TON | 299 | $135.00 | $160.00 | $230.00 | $185.00 |
| 0055 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 167 | $15.00 | $35.00 | $6.00 | $25.00 |
| 0056 | Milling, asphalt, 2 in. (306-08036) | SYS | 23,228 | $3.00 | $2.70 | $3.00 | $2.50 |
| 0057 | Milling, asphalt, 4 in. (306-08038) | SYS | 10,546 | $5.00 | $4.00 | $6.00 | $3.00 |
| 0058 | Milling, transition (306-08043) | SYS | 928 | $3.00 | $8.00 | $6.00 | $9.00 |
| 0059 | Milling, approach (306-08432) | SYS | 2,269 | $8.00 | $9.00 | $8.00 | $10.00 |
| 0060 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 3,584 | $100.00 | $118.00 | $120.00 | $105.00 |
| 0061 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 1,460 | $87.00 | $108.00 | $96.00 | $97.00 |
| 0062 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 87 | $125.00 | $113.00 | $140.00 | $150.00 |
| 0063 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 24 | $170.00 | $133.00 | $180.00 | $337.00 |
| 0064 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 208 | $95.00 | $137.00 | $140.00 | $110.00 |
| 0065 | Joint adhesive, surface (401-10258) | LFT | 19,093 | $0.55 | $0.70 | $0.70 | $0.60 |
| 0066 | Joint adhesive, intermediate (401-10259) | LFT | 6,939 | $0.50 | $0.90 | $0.90 | $0.60 |
| 0067 | Liquid asphalt sealant (401-11785) | LFT | 1,445 | $0.30 | $0.60 | $0.01 | $0.01 |
| 0068 | Liquid asphalt sealant , rpe (401-11785) | LFT | 17,648 | $0.67 | $0.30 | $0.01 | $0.01 |
| 0069 | Liquid asphalt sealant rpe (401-11785) | LFT | 617 | $0.67 | $0.30 | $0.01 | $0.01 |
| 0070 | HMA wedge and level, type B (402-07451) | TON | 450 | $95.00 | $111.00 | $110.00 | $90.00 |
| 0071 | Asphalt for tack coat (406-05520) | TON | 17.50 | $500.00 | $550.00 | $0.01 | $1.00 |
| 0072 | Asphalt for tack coat (406-05521) | SYS | 381 | $1.75 | $0.20 | $0.01 | $1.00 |
| 0073 | Cracks in asphalt pavement, fill (408-12028) | TON | 1.50 | $4,000.00 | $2,700.00 | $6,000.00 | $3,000.00 |
| 0074 | Guardrail transition, type TGB (601-01522) | EACH | 3 | $3,145.15 | $2,925.00 | $2,925.00 | $2,925.00 |
| 0075 | Guardrail terminal system, W-beam curved, type 5 (601-01848) | EACH | 1 | $3,145.15 | $2,925.00 | $2,925.00 | $2,925.00 |
| 0076 | Guardrail terminal system, W-beam curved, type 5 , modified (601-01848) | EACH | 1 | $3,145.15 | $2,925.00 | $2,925.00 | $2,925.00 |
| 0077 | Guardrail, remove (601-02241) | LFT | 471 | $6.45 | $6.00 | $6.00 | $6.00 |
| 0078 | Guardrail, reset (601-06035) | LFT | 13 | $40.86 | $38.00 | $38.00 | $38.00 |
| 0079 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $887.09 | $825.00 | $825.00 | $825.00 |
| 0080 | Guardrail transition, MGS without curb (601-12292) | EACH | 1 | $3,279.56 | $3,050.00 | $3,050.00 | $3,050.00 |
| 0081 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,010.75 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0082 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 88 | $21.51 | $20.00 | $20.00 | $20.00 |
| 0083 | Guardrail height transition, VH, 6 FT 3 in. spacing (601-99132) | EACH | 1 | $177.42 | $165.00 | $165.00 | $165.00 |
| 0084 | Barrier delineator (602-06729) | EACH | 10 | $135.00 | $88.00 | $135.00 | $135.00 |
| 0085 | Sidewalk, concrete (604-06070) | SYS | 512 | $100.00 | $90.00 | $70.00 | $93.00 |
| 0086 | Bed course material (604-07092) | TON | 12 | $100.00 | $66.00 | $150.00 | $95.00 |
| 0087 | Curb ramp, concrete (604-08086) | SYS | 368 | $280.00 | $260.00 | $230.00 | $152.00 |
| 0088 | Detectable warning surfaces (604-12083) | SYS | 68 | $400.00 | $350.00 | $360.00 | $165.00 |
| 0089 | Detectable warning surfaces, retrofit (604-12084) | SYS | 2 | $650.00 | $450.00 | $1,500.00 | $370.00 |
| 0090 | Steps, concrete (604-44251) | CYS | 2 | $1,200.00 | $3,500.00 | $3,500.00 | $1,700.00 |
| 0091 | Handrail, pedestrian (604-95344) | LFT | 22 | $188.17 | $180.00 | $175.00 | $175.00 |
| 0092 | Curb, concrete (605-06120) | LFT | 288 | $45.00 | $65.00 | $65.00 | $79.00 |
| 0093 | Curb, concrete , modified (605-06120) | LFT | 213 | $45.00 | $68.00 | $65.00 | $79.00 |
| 0094 | Curb and gutter, concrete (605-06140) | LFT | 1,549 | $45.00 | $39.00 | $40.00 | $36.00 |
| 0095 | Curb and gutter, concrete , modified (605-06140) | LFT | 935 | $50.00 | $59.00 | $65.00 | $50.00 |
| 0096 | Curb and gutter, concrete, type B (605-06145) | LFT | 108 | $50.00 | $65.00 | $65.00 | $50.00 |
| 0097 | Center curb, concrete, type D (605-06255) | SYS | 22 | $160.00 | $350.00 | $250.00 | $170.00 |
| 0098 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 617 | $10.00 | $13.00 | $15.00 | $25.00 |
| 0099 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 154 | $235.00 | $205.00 | $235.00 | $235.00 |
| 0100 | HMA for approaches, type B (610-07487) | TON | 278 | $180.00 | $170.00 | $250.00 | $215.00 |
| 0101 | PCCP for approaches, 6 in. (610-08446) | SYS | 184 | $100.00 | $98.00 | $110.00 | $110.00 |
| 0102 | PCCP for approaches, 9 in. (610-09108) | SYS | 60 | $165.00 | $157.00 | $125.00 | $111.00 |
| 0103 | Mailbox assembly, single (611-06497) | EACH | 1 | $295.70 | $275.00 | $275.00 | $275.00 |
| 0104 | Mailbox assembly, reset, single (611-08232) | EACH | 3 | $295.70 | $275.00 | $275.00 | $275.00 |
| 0105 | Right-of-way marker (615-06490) | EACH | 4 | $241.94 | $225.00 | $225.00 | $225.00 |
| 0106 | Monument, type A , rpe (615-06500) | EACH | 1 | $1,155.91 | $1,080.00 | $1,075.00 | $1,075.00 |
| 0107 | Monument, type B (615-06505) | EACH | 16 | $967.74 | $900.00 | $900.00 | $900.00 |
| 0108 | Monument, type C (615-06510) | EACH | 1 | $672.04 | $630.00 | $625.00 | $625.00 |
| 0109 | Benchmark post (615-06530) | EACH | 1 | $700.00 | $900.00 | $1,000.00 | $750.00 |
| 0110 | Riprap, class 1 (616-05688) | TON | 115 | $185.00 | $140.00 | $185.00 | $185.00 |
| 0111 | Riprap, revetment (616-06405) | TON | 132 | $65.00 | $130.00 | $130.00 | $55.00 |
| 0112 | Riprap, uniform (616-06451) | TON | 17 | $75.00 | $180.00 | $160.00 | $85.00 |
| 0113 | Geotextile for riprap, type 1A (616-12246) | SYS | 46 | $3.20 | $2.50 | $4.00 | $5.00 |
| 0114 | Geotextile for riprap, type 2A (616-12248) | SYS | 750 | $4.00 | $2.50 | $4.00 | $8.50 |
| 0115 | Fabric formed concrete revetment (616-12903) | SYS | 134 | $155.00 | $145.00 | $155.00 | $155.00 |
| 0116 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $525.00 | $650.00 | $650.00 | $650.00 |
| 0117 | Mulched seeding, type R (621-06559) | SYS | 901 | $2.35 | $2.80 | $2.79 | $2.79 |
| 0118 | Water (621-06567) | KGAL | 6 | $10.00 | $20.00 | $19.00 | $19.00 |
| 0119 | Sodding (621-06574) | SYS | 19 | $110.00 | $7.00 | $6.97 | $6.97 |
| 0120 | Sodding, nursery (621-06575) | SYS | 2,413 | $7.85 | $7.00 | $6.97 | $6.97 |
| 0121 | Seed mixture, floodplain (621-12612) | LBS | 5 | $280.00 | $240.00 | $237.00 | $237.00 |
| 0122 | Field office, type C (628-09403) | MOS | 13 | $3,500.00 | $2,950.00 | $3,500.00 | $3,450.00 |
| 0123 | Computer system equipment (628-11976) | EACH | 4 | $600.00 | $900.00 | $1,000.00 | $650.00 |
| 0124 | Concrete, A, substructure (702-51005) | CYS | 1 | $3,324.48 | $2,450.00 | $5,000.00 | $2,303.09 |
| 0125 | Reinforcing bars, epoxy coated (703-06029) | LBS | 70,026 | $1.50 | $1.65 | $1.50 | $1.50 |
| 0126 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 34 | $50.00 | $45.00 | $50.00 | $50.00 |
| 0127 | Concrete, C, superstructure (704-51002) | CYS | 185.20 | $1,350.00 | $1,340.00 | $1,350.00 | $1,350.00 |
| 0128 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 4 | $5,500.00 | $3,300.00 | $5,500.00 | $5,500.00 |
| 0129 | Railing, concrete type PF-1 (706-09962) | LFT | 183 | $105.00 | $135.00 | $105.00 | $105.00 |
| 0130 | Railing, steel type PF-1 (706-11404) | LFT | 201 | $77.42 | $79.00 | $72.00 | $72.00 |
| 0131 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $5,250.00 | $5,000.00 | $5,250.00 | $5,250.00 |
| 0132 | Patching concrete structures (710-09158) | SFT | 50 | $175.00 | $220.00 | $175.00 | $175.00 |
| 0133 | Waterproofing membrane type 3 (714-000087) | SFT | 3,875 | $2.80 | $4.50 | $6.00 | $3.50 |
| 0134 | Structure, coated reinforced concrete, box sections, 10 FT X 5 FT (714-11767) | LFT | 155 | $1,400.00 | $1,550.00 | $1,672.00 | $2,130.00 |
| 0135 | Valve , remove existing (715-04926) | EACH | 1 | $1,800.00 | $500.00 | $2,000.00 | $2,000.00 |
| 0136 | Line stop , 6-inch (715-04995) | EACH | 2 | $7,000.00 | $6,000.00 | $10,000 | $11,500 |
| 0137 | Pipe, type 2, circular, diameter 10 in. (715-05148) | LFT | 58 | $65.00 | $130.00 | $80.00 | $75.00 |
| 0138 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 37 | $80.00 | $145.00 | $130.00 | $155.00 |
| 0139 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 909 | $50.00 | $95.00 | $135.00 | $115.00 |
| 0140 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 800 | $80.00 | $105.00 | $140.00 | $185.00 |
| 0141 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 48 | $110.00 | $220.00 | $250.00 | $170.00 |
| 0142 | Pipe, sanitary sewer, diameter 8 in. (715-05408) | LFT | 10 | $130.00 | $550.00 | $300.00 | $175.00 |
| 0143 | Pipe extension, circular, diameter 18 in. , concrete (715-05596) | LFT | 10 | $160.00 | $170.00 | $490.00 | $190.00 |
| 0144 | Cap , existing water main (715-06050) | EACH | 2 | $400.00 | $450.00 | $1,500.00 | $950.00 |
| 0145 | HMA for structure installation, type B (715-08305) | TON | 527 | $118.00 | $127.00 | $200.00 | $135.00 |
| 0146 | Pipe, type 2, circular, diameter 4 in. (715-08627) | LFT | 5 | $160.00 | $130.00 | $80.00 | $165.00 |
| 0147 | Video inspection for pipe (715-09064) | LFT | 1,790 | $1.50 | $3.00 | $1.40 | $3.00 |
| 0148 | Pipe end section, diameter 15 in. (715-46005) | EACH | 4 | $1,200.00 | $1,200.00 | $750.00 | $1,600.00 |
| 0149 | Pipe end section, diameter 24 in. (715-46020) | EACH | 1 | $1,500.00 | $1,400.00 | $1,000.00 | $1,600.00 |
| 0150 | Tapping sleeve with valve , 6 in. X 6 in. (715-90853) | EACH | 2 | $7,000.00 | $2,500.00 | $10,000 | $9,600.00 |
| 0151 | Adjust water valve to grade (715-94530) | EACH | 1 | $800.00 | $960.00 | $700.00 | $4,600.00 |
| 0152 | Water main, ductile iron, 6 in. (715-94780) | LFT | 73 | $275.00 | $445.00 | $200.00 | $115.00 |
| 0153 | Pipe, plug existing (720-02442) | EACH | 2 | $350.00 | $300.00 | $1,500.00 | $875.00 |
| 0154 | Casting, manhole, adjust to grade (720-12798) | EACH | 7 | $800.00 | $970.00 | $1,000.00 | $1,300.00 |
| 0155 | Inlet, type J10 (720-45045) | EACH | 1 | $3,500.00 | $3,600.00 | $4,600.00 | $3,700.00 |
| 0156 | Pipe catch basin, 15 in. (720-45265) | EACH | 4 | $3,000.00 | $2,800.00 | $2,600.00 | $2,500.00 |
| 0157 | Manhole, type C4 (720-45410) | EACH | 6 | $5,500.00 | $4,100.00 | $7,000.00 | $11,500 |
| 0158 | Fire hydrant (720-91742) | EACH | 1 | $8,500.00 | $13,000 | $10,000 | $13,800 |
| 0159 | Casting, water valve, adjust to grade (720-94840) | EACH | 2 | $800.00 | $900.00 | $700.00 | $900.00 |
| 0160 | Inlet, type B15 (720-98174) | EACH | 4 | $4,000.00 | $3,800.00 | $4,100.00 | $4,000.00 |
| 0161 | Inlet, type C15 (720-98555) | EACH | 11 | $4,000.00 | $3,800.00 | $4,100.00 | $4,000.00 |
| 0162 | Longitudinal grooving (722-12732) | SYS | 470 | $15.00 | $14.00 | $15.00 | $15.00 |
| 0163 | Road closure sign assembly (801-04308) | EACH | 43 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0164 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 272 | $1.95 | $2.00 | $1.95 | $1.95 |
| 0165 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 4,621 | $2.95 | $3.00 | $2.95 | $2.95 |
| 0166 | Detour route marker assembly (801-06625) | EACH | 162 | $65.00 | $65.00 | $65.00 | $65.00 |
| 0167 | Construction sign, type A (801-06640) | EACH | 105 | $145.00 | $145.00 | $145.00 | $145.00 |
| 0168 | Construction sign, type B (801-06645) | EACH | 32 | $98.00 | $98.00 | $98.00 | $98.00 |
| 0169 | Maintaining traffic (801-06775) | LS | 1 | $374,711 | $118,000 | $110,000 | $480,700 |
| 0170 | Barricade, type III-A (801-07118) | LFT | 216 | $12.00 | $12.00 | $12.00 | $12.00 |
| 0171 | Barricade, type III-B (801-07119) | LFT | 960 | $12.00 | $12.00 | $12.00 | $12.00 |
| 0172 | Temporary curb ramp (801-11990) | EACH | 1 | $585.86 | $2,500.00 | $5,000.00 | $10,000 |
| 0173 | Temporary accessible pedestrian path (801-12641) | SYS | 27 | $36.99 | $150.00 | $200.00 | $300.00 |
| 0174 | Temporary pedestrian channelizer (801-12862) | LFT | 881 | $20.00 | $25.00 | $40.00 | $20.00 |
| 0175 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $895.00 | $900.00 | $895.00 | $895.00 |
| 0176 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 167 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0177 | Sign, sheet assembly, relocate (802-07058) | EACH | 3 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0178 | Sign, sheet, relocate (802-07060) | EACH | 13 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0179 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 5 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0180 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 12 | $33.00 | $33.00 | $33.00 | $33.00 |
| 0181 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 19.50 | $34.00 | $34.00 | $34.00 | $34.00 |
| 0182 | Sign, ground mounted, reset (802-91122) | EACH | 17 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0183 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 0184 | Signal pole foundation, 36 in. X 144 in. (805-01815) | EACH | 4 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0185 | Traffic signal head, no. 1 (805-07190) | EACH | 8 | $700.00 | $700.00 | $700.00 | $700.00 |
| 0186 | Controller and cabinet, flasher solid state (805-78010) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0187 | Span, catenary, and tether (805-78415) | EACH | 4 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0188 | Disconnect hanger (805-78420) | EACH | 4 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0189 | Signal service (805-78445) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0190 | Signal cable, control, copper, 3C/14 gauge (805-78480) | LFT | 258 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0191 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 426 | $6.00 | $6.00 | $6.00 | $6.00 |
| 0192 | Signal cable, control, copper, 11C/14 gauge (805-78500) | LFT | 18 | $6.50 | $7.00 | $6.50 | $6.50 |
| 0193 | Signal pole, steel strain, 36 FT (805-81060) | EACH | 4 | $11,000 | $11,000 | $11,000 | $11,000 |
| 0194 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 284 | $5.95 | $6.00 | $5.95 | $5.95 |
| 0195 | Transverse marking, paint, stop line, white, 24 in. (808-06726) | LFT | 70 | $5.95 | $6.00 | $5.95 | $5.95 |
| 0196 | Retro-reflectivity testing (808-09381) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0197 | Grooving for pavement markings (808-12032) | LFT | 15,297 | $0.45 | $0.50 | $0.45 | $0.45 |
| 0198 | Line, preformed plastic, broken, yellow, 6 in. , wet reflective (808-12845) | LFT | 52 | $9.95 | $9.90 | $9.95 | $9.95 |
| 0199 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 3,436 | $0.45 | $0.50 | $0.45 | $0.45 |
| 0200 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 4,522 | $1.25 | $1.30 | $1.25 | $1.25 |
| 0201 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 656 | $0.45 | $0.50 | $0.45 | $0.45 |
| 0202 | Line, preformed plastic, solid, yellow, 6 in. , wet reflective (808-75057) | LFT | 5,075 | $6.95 | $7.00 | $6.95 | $6.95 |
| 0203 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 4,621 | $1.25 | $1.30 | $1.25 | $1.25 |
| 0204 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 343 | $5.95 | $6.00 | $5.95 | $5.95 |
| 0205 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 951 | $1.95 | $2.00 | $1.95 | $1.95 |
| 0206 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 41 | $14.00 | $30.00 | $10.00 | $35.00 |
| 0207 | Snowplowable raised pavement marker (808-75998) | EACH | 5 | $88.00 | $375.00 | $375.00 | $375.00 |
| 0208 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 1,027 | $1.50 | $1.50 | $1.50 | $1.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.