INDOT contract R-43589-A bid tabulation
ROAD RECONSTRUCTION. Let by Indiana DOT on May 7, 2025, Lake, LaPorte. 2 bids received; low bid $4,413,300 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 07 MAY 2025
- Pay items
- 145
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $4,413,300 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $5,587,475 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $26,000 | $70,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $220,675 | $300,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $46,000 | $110,000 |
| 0012 | Pavement removal (202-02240) | SYS | 5,044 | $32.00 | $54.00 |
| 0013 | Curb and gutter, remove (202-02279) | LFT | 1,548 | $18.00 | $17.00 |
| 0014 | Pipe abandon and grout fill (202-02637) | LFT | 92 | $180.00 | $180.00 |
| 0015 | Pipe abandon and grout fill , water main, all sizes (202-02637) | LFT | 1,100 | $24.00 | $24.00 |
| 0016 | Concrete apron, remove (202-02771) | EACH | 2 | $1,500.00 | $1,600.00 |
| 0017 | Sidewalk concrete, remove (202-52710) | SYS | 1,534 | $32.00 | $33.00 |
| 0018 | Inlet, remove (202-91385) | EACH | 9 | $259.00 | $259.00 |
| 0019 | Manhole, remove (202-93047) | EACH | 2 | $458.00 | $458.00 |
| 0020 | Light standard and foundation, remove (202-93763) | EACH | 13 | $746.77 | $746.77 |
| 0021 | Pipe, remove (202-96133) | LFT | 484 | $16.00 | $16.00 |
| 0022 | Fire hydrant assembly, remove (202-97009) | EACH | 1 | $921.00 | $921.00 |
| 0023 | Excavation, common (203-02000) | CYS | 1,290 | $54.00 | $100.00 |
| 0024 | Stormwater management budget (205-12108) | DOL | 8,000 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $6,000.00 | $20,000 |
| 0026 | SWQCP preparation (205-12618) | LS | 1 | $3,000.00 | $1,500.00 |
| 0027 | Excavation, foundation, unclassified (206-51230) | CYS | 25 | $134.62 | $200.00 |
| 0028 | Subgrade treatment, type II (207-08264) | SYS | 760 | $38.00 | $45.00 |
| 0029 | Subgrade treatment, type IC (207-09935) | SYS | 4,260 | $51.00 | $45.00 |
| 0030 | Structure backfill, type 2 (211-09265) | CYS | 236 | $65.00 | $65.00 |
| 0031 | Flowable backfill, non- removable (213-09269) | CYS | 27 | $215.00 | $550.00 |
| 0032 | Geogrid, type IB (214-11796) | SYS | 152 | $2.96 | $6.00 |
| 0033 | Dense graded subbase (302-07455) | CYS | 168 | $115.00 | $225.00 |
| 0034 | Compacted aggregate, no. 53 (303-01180) | TON | 513 | $63.00 | $130.00 |
| 0035 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 296 | $154.00 | $240.00 |
| 0036 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 494 | $137.00 | $170.00 |
| 0037 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 1,134 | $102.00 | $140.00 |
| 0038 | Joint adhesive, surface (401-10258) | LFT | 1,702 | $1.00 | $4.00 |
| 0039 | Joint adhesive, intermediate (401-10259) | LFT | 1,702 | $1.50 | $5.00 |
| 0040 | HMA for temporary pavement, type B (402-10084) | TON | 201 | $275.00 | $300.00 |
| 0041 | Asphalt for tack coat (406-05520) | TON | 4 | $1,500.00 | $2,600.00 |
| 0042 | PCCP, 10 in. (502-06327) | SYS | 743 | $358.00 | $210.00 |
| 0043 | D-1 contraction joint (503-05240) | LFT | 529 | $46.00 | $40.00 |
| 0044 | PCCP patching, full depth (506-06333) | SYS | 40 | $237.00 | $400.00 |
| 0045 | Sidewalk, concrete (604-06070) | SYS | 1,460 | $67.00 | $150.00 |
| 0046 | Stamped concrete sidewalk (604-07823) | SYS | 478 | $133.00 | $350.00 |
| 0047 | Curb ramp, concrete (604-08086) | SYS | 128 | $190.00 | $220.00 |
| 0048 | Permeable unit pavers (604-10013) | SFT | 5,890 | $44.00 | $60.00 |
| 0049 | Detectable warning surfaces (604-12083) | SYS | 30 | $250.00 | $225.00 |
| 0050 | Curb, integral concrete, modified (605-06105) | LFT | 266 | $50.00 | $75.00 |
| 0051 | Curb, concrete (605-06120) | LFT | 2,066 | $60.00 | $55.00 |
| 0052 | Curb and gutter, concrete (605-06140) | LFT | 701 | $52.00 | $60.00 |
| 0053 | Curb, precast (605-97170) | LFT | 451 | $175.00 | $275.00 |
| 0054 | PCCP for approaches, 9 in. (610-09108) | SYS | 152 | $145.00 | $200.00 |
| 0055 | Bench (618-03812) | EACH | 7 | $2,700.00 | $3,000.00 |
| 0056 | Trash receptacle (618-97672) | EACH | 5 | $5,700.00 | $5,200.00 |
| 0057 | Water (621-06567) | KGAL | 1 | $25.00 | $25.00 |
| 0058 | Topsoil (621-06570) | CYS | 338 | $90.00 | $185.00 |
| 0059 | Sodding, nursery (621-06575) | SYS | 174 | $39.75 | $39.75 |
| 0060 | Soil , CU-structural (621-09908) | CYS | 1,067 | $200.00 | $470.00 |
| 0061 | Mulch, hardwood shredded bark (621-98038) | CYS | 27 | $140.00 | $140.00 |
| 0062 | Planter (622-03948) | EACH | 33 | $3,125.00 | $2,000.00 |
| 0063 | Tree grate (622-04648) | EACH | 11 | $6,500.00 | $4,000.00 |
| 0064 | Plant, deciduous tree, single stem, over 2.5 in. to 3.5 in. (622-05651) | EACH | 18 | $895.00 | $895.00 |
| 0065 | Plant, ground cover (622-05653) | EACH | 763 | $20.00 | $20.00 |
| 0066 | Plant, perennial (622-05654) | EACH | 318 | $31.00 | $31.00 |
| 0067 | Irrigation system (622-07764) | LS | 1 | $25,000 | $28,000 |
| 0068 | Field office, type C (628-09403) | MOS | 15 | $3,500.00 | $3,500.00 |
| 0069 | Computer system equipment (628-11976) | EACH | 2 | $2,100.00 | $1,000.00 |
| 0070 | Water main , cut and cap (715-02388) | EACH | 5 | $981.00 | $981.00 |
| 0071 | Valve with box, restrained gate, ductile iron, 12 in. , ductile iron (715-02433) | EACH | 3 | $6,800.00 | $6,800.00 |
| 0072 | Valve with box, restrained gate, ductile iron, 6 in. , ductile iron (715-02531) | EACH | 4 | $3,200.00 | $3,200.00 |
| 0073 | Valve with box, restrained gate, ductile iron, 8 in. , ductile iron (715-02532) | EACH | 3 | $4,400.00 | $4,400.00 |
| 0074 | Corporation stop , 1 inch (715-04750) | EACH | 6 | $2,360.00 | $2,360.00 |
| 0075 | Line stop , 12 inch (715-04995) | EACH | 1 | $16,600 | $16,600 |
| 0076 | Line stop , 8 inch (715-04995) | EACH | 2 | $12,600 | $12,600 |
| 0077 | Water service line, 6 in. , ductile iron (715-05061) | LFT | 110 | $154.00 | $154.00 |
| 0078 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 502 | $157.00 | $157.00 |
| 0079 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 28 | $935.00 | $935.00 |
| 0080 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 60 | $599.00 | $599.00 |
| 0081 | Water main connections (715-07794) | EACH | 6 | $8,480.00 | $8,480.00 |
| 0082 | Video inspection for pipe (715-09064) | LFT | 590 | $6.00 | $6.00 |
| 0083 | Water main, ductile iron, 8 in. (715-11571) | LFT | 160 | $246.00 | $246.00 |
| 0084 | Sewer, sanitary lateral, connections (715-11879) | LFT | 312 | $134.00 | $134.00 |
| 0085 | Valve, with box, restrained gate, ductile iron, 4 in. , ductile iron (715-90573) | EACH | 1 | $1,900.00 | $1,900.00 |
| 0086 | Sewer sanitary lateral reconnect (715-92253) | EACH | 8 | $1,040.00 | $1,040.00 |
| 0087 | Water main, ductile iron, 12 in. (715-92544) | LFT | 780 | $229.00 | $229.00 |
| 0088 | Water service line, 1 in. , copper (715-96629) | LFT | 200 | $70.00 | $70.00 |
| 0089 | Water main, ductile iron, 4 in. (715-98265) | LFT | 50 | $144.00 | $144.00 |
| 0090 | Geotextile for underdrains, type 3 (718-12309) | SYS | 2,892 | $0.01 | $3.76 |
| 0091 | Casting, manhole, adjust to grade (720-12798) | EACH | 3 | $1,160.00 | $1,160.00 |
| 0092 | Catch basin, type J10 (720-45240) | EACH | 8 | $5,720.00 | $5,720.00 |
| 0093 | Catch basin, type K10 (720-45250) | EACH | 3 | $5,720.00 | $5,720.00 |
| 0094 | Manhole, type C4 (720-45410) | EACH | 6 | $10,200 | $10,200 |
| 0095 | Inlet, type R13, modified (720-94847) | EACH | 3 | $5,570.00 | $5,570.00 |
| 0096 | Fire hydrant assembly (720-96999) | EACH | 2 | $9,680.00 | $9,680.00 |
| 0097 | Construction sign, type C (801-03290) | EACH | 6 | $274.00 | $274.00 |
| 0098 | Road closure sign assembly (801-04308) | EACH | 7 | $294.00 | $294.00 |
| 0099 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 10,479 | $1.49 | $1.49 |
| 0100 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 72 | $11.64 | $11.64 |
| 0101 | Detour route marker assembly (801-06625) | EACH | 12 | $169.00 | $169.00 |
| 0102 | Construction sign, type A (801-06640) | EACH | 34 | $238.00 | $238.00 |
| 0103 | Construction sign, type B (801-06645) | EACH | 41 | $119.00 | $119.00 |
| 0104 | Flashing arrow sign (801-06710) | DAY | 450 | $15.00 | $15.00 |
| 0105 | Maintaining traffic (801-06775) | LS | 1 | $38,000 | $150,000 |
| 0106 | Barricade, type III-A (801-07118) | LFT | 216 | $15.87 | $15.87 |
| 0107 | Temporary curb ramp (801-11990) | EACH | 2 | $2,030.00 | $4,500.00 |
| 0108 | Temporary pedestrian channelizer (801-12862) | LFT | 60 | $49.25 | $49.25 |
| 0109 | Bollard (802-03896) | EACH | 43 | $5,358.36 | $5,358.36 |
| 0110 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 91 | $39.52 | $39.52 |
| 0111 | Sign, sheet, and supports, remove (802-07059) | EACH | 2 | $157.80 | $157.80 |
| 0112 | Sign, sheet, relocate (802-07060) | EACH | 3 | $157.80 | $157.80 |
| 0113 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 82 | $41.48 | $41.48 |
| 0114 | Sign, double-faced, sheet, with legend, 0.100 in. thickness (802-09839) | SFT | 10 | $48.26 | $48.26 |
| 0115 | Sign sheet, install (802-99058) | EACH | 7 | $180.34 | $180.34 |
| 0116 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $9,903.72 | $9,903.72 |
| 0117 | Conduit, PVC, 2 in. (805-06595) | LFT | 550 | $20.72 | $20.72 |
| 0118 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 144 | $17.82 | $17.82 |
| 0119 | Handhole, lighting (807-02191) | EACH | 2 | $2,664.34 | $2,664.34 |
| 0120 | Light structure, remove and reset (807-02370) | EACH | 6 | $1,699.06 | $1,699.06 |
| 0121 | Luminaire, ornamental (807-03950) | EACH | 15 | $3,057.39 | $3,057.39 |
| 0122 | Light pole, ornamental (807-03951) | EACH | 15 | $3,870.50 | $3,870.50 |
| 0123 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 2,650 | $18.52 | $18.52 |
| 0124 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 21 | $1,909.10 | $1,909.10 |
| 0125 | Service point, type II (807-86810) | EACH | 1 | $11,254 | $11,254 |
| 0126 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 1,150 | $3.34 | $3.34 |
| 0127 | Connector kit, unfused (807-86910) | EACH | 30 | $52.38 | $52.38 |
| 0128 | Connector kit, fused (807-86915) | EACH | 30 | $52.38 | $52.38 |
| 0129 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 74 | $34.97 | $34.97 |
| 0130 | Multiple compression fitting, waterproofed (807-86925) | EACH | 8 | $44.35 | $44.35 |
| 0131 | Insulation link, non- waterproofed (807-86930) | EACH | 66 | $32.05 | $32.05 |
| 0132 | Insulation link, waterproofed (807-86935) | EACH | 16 | $41.43 | $41.43 |
| 0133 | Sign, underpass, and roadway lighting, location identification (807-86950) | EACH | 15 | $84.54 | $84.54 |
| 0134 | Line, remove (808-06716) | LFT | 4,684 | $0.54 | $0.54 |
| 0135 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 3,127 | $1.22 | $1.22 |
| 0136 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 1,431 | $1.22 | $1.22 |
| 0137 | Line, multi-component, broken, yellow, 4 in. (808-10036) | LFT | 84 | $4.44 | $4.44 |
| 0138 | Transverse marking, multi-component, crosshatch line, white, 12 in. (808-10047) | LFT | 580 | $6.88 | $6.88 |
| 0139 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 138 | $13.61 | $13.61 |
| 0140 | Pavement message marking, multi- component, only (808-10052) | EACH | 1 | $267.00 | $267.00 |
| 0141 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 13 | $219.00 | $219.00 |
| 0142 | Transverse marking, multi-component, crosswalk line, white, 24 in. (808-10099) | LFT | 690 | $13.61 | $13.61 |
| 0143 | Pavement message marking, multi- component, bike symbol (808-10192) | EACH | 8 | $331.00 | $331.00 |
| 0144 | Line, multi-component, dotted, white, 4 in. (808-11481) | LFT | 325 | $4.22 | $4.22 |
| 0145 | Stamped asphalt (808-11723) | SFT | 3,798 | $24.00 | $24.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of May 7, 2025. Compiled by Mirage Metrics.